HomeMy WebLinkAbout2021 Ordinance No. 002
Page 1 of 3
BY AUTHORITY
ORDINANCE NO. 2 COUNCIL BILL NO. 61
SERIES OF 2020/2021 INTRODUCED BY COUNCIL
MEMBER ANDERSON
AN ORDINANCE AUTHORIZING THE VACATION OF
APPROXIMATELY 4,000 SQUARE FEET OF EAST JEFFERSON DRIVE
RIGHT-OF-WAY IN THE NORTHEAST QUARTER OF SECTION 3,
TOWNSHIP 5 SOUTH, RANGE 68 WEST OF THE 6TH PRINCIPAL
MERIDIAN, IN THE CITY OF ENGLEWOOD, COUNTY OF ARAPAHOE,
STATE OF COLORADO, TO KEVIN FASING AND CALEY DOW.
WHEREAS, Kevin Fasing and Caley Dow, property owners of 3649 South Grant
Street, Englewood, Colorado have requested the City vacate its legal interest in
approximately 4,000 square feet of right-of-way for East Jefferson Drive, such right-of-way
located in the Northeast Quarter of Section 3, Township 5 South, Range 68 West of the 6th
Principal Meridian to allow for construction of additional housing;
WHEREAS, the legal description of the right-of-way for which vacation of legal
interest is requested is as follows:
24.22 feet NE from and parallel to the NE boundary of Lot 4, Block 3 of AW Hiner's
Subdivision and that portion of Lot 4, Block 3 of Higgins Broadway Addition
described as follows:
Beginning at the Northwest corner of Lot 4, Block 3 of AW Hiner's
Subdivision, thence North 26.59 feet to the Southwesterly line of Jefferson
Drive; thence Southeasterly along the Southwesterly line of Jefferson Drive
50.37 feet to the North line of Lot 4, Block 3 of AW Hiner's Subdivision;
thence along the North line of Lot 4, Block 3 of AW Hiner's Subdivision
42.78 feet to the point of beginning, then South to the NE and NW corners
of said property. As shown on Exhibit A, Attached hereto.
WHEREAS, Xcel Energy has acknowledged that it has/maintains utility facilities
within the right-of-way proposed for vacation, and such comments are set forth on Exhibit B
attached hereto;
WHEREAS, Century Link has confirmed it has/maintains aerial copper cable in the
alley running North from East Kenyon Avenue to East Jefferson Drive, such alley located on
the NW corner of the area proposed for vacation, and requesting such utility infrastructure
continue to be protected from any future development within the vacation area, as shown
on Exhibit C attached hereto;
WHEREAS, the City of Englewood has not received any further notification from
private utilities regarding existing facilities located within the proposed vacation area;
WHEREAS, the City of Englewood currently maintains an eight-inch (8") sewer line
within the alley which runs along the eastern portion of the proposed vacation, and for which
DocuSign Envelope ID: 5AB3B3AD-D1EF-4EBD-81C9-E66A29AA6AD8
Page 2 of 3
the applicant shall provide a utility easement/reservation consisting of seven and one-half
feet (7.5') on either side of the sewer line as measured from the center line of said sewer
pipe for a total width of fifteen feet (15'), as set forth in the City of Englewood 2020 Design
and Construction Standards and Specifications, Section 1.3.8.4, and as shown on Exhibit D
attached hereto;
WHEREAS, no other property owners abut the roadway right-of-way requested to
be vacated;
WHEREAS, on October 20, 2020 the Englewood Planning and Zoning Commission
heard testimony regarding the vacation and voted to move the application to the Englewood
City Council for further action, as shown on Exhibit E attached hereto; and
WHEREAS, the notice of a Public Hearing was published on November 5, 2020, and
a public hearing was held by the Englewood City Council on November 16, 2020.
NOW, THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY
OF ENGLEWOOD, COLORADO, AS FOLLOWS:
Section 1. The City Council, after being duly and fully informed so as to understand
the true nature of this application for vacation of right-of-way and the propriety of granting
the same at a public hearing held on November 16, 2020 makes the following findings:
1. That due and legal notice has been given by publication in the City's official
newspaper and by posting on the City's website on November 5, 2020.
2. No private rights will be injured or endangered by the vacation of a portion
of East Jefferson Drive, no land will be left without access to a public
roadway, and the public will suffer no loss or inconvenience thereby, and
the land to be vacated is no longer necessary for the public use and
convenience.
3. In justice to the applicant, the request of the applicant ought to be granted.
4. No written objection to said vacation has been filed with the City by an
owner or adjoining owner who would be a proper party to the action
requested by the applicant.
5. That all existing rights-of-way and/or easements, whether owned by the
City or private companies for public utilities or public service facilities
currently in existence shall be reserved, maintained and not disturbed by
any future development of the property.
6. That the applicant shall provide to the City a 15-foot (15') utility/sewer
easement for the existing sewer line in accordance with the City of
Englewood 2020 Design and Construction Standards and Specifications,
Section 1.3.8.4, and such easement shall be on file prior to the issuance of
any building permit upon the property.
Section 2. The City Council of the City of Englewood, Colorado, hereby
incorporates the recitals as set forth above within this ordinance, and approves the
DocuSign Envelope ID: 5AB3B3AD-D1EF-4EBD-81C9-E66A29AA6AD8
Page 3 of 3
vacation of the City’s legal interest in the roadway right-of-way as shown on Exhibit A,
attached hereto, subject to those reservations set forth in Section 3, below.
Section 3. This order approving this requested vacation reserves to the City and
the owners of any lesser property rights for public utilities, rights-of-ways and easements
for public service facilities originally held in such plat, street, alley, easement or
established within the public reservation that are in existence and use as of the day upon
which this Ordinance is approved.
Section 4. This Ordinance shall take effect and be in force from and after
publication in accordance with § 40 of the Home Rule Charter of the City of Englewood,
Colorado.
Introduced, read in full, and passed on first reading on the 7th day of December, 2020.
Published by Title as a Bill for an Ordinance in the City’s official newspaper on the 10th
day of December, 2020.
Published as a Bill for an Ordinance on the City’s official website beginning on the 9th
day of December, 2020 for thirty (30) days.
Read by Title and passed on final reading on the 4th day of January, 2021.
Published by Title in the City’s official newspaper as Ordinance No. 2, Series of
2020/2021, on the 7th day of January, 2021.
Published by title on the City’s official website beginning on the 6th day of January,
2021 for thirty (30) days.
This Ordinance shall take effect thirty (30) days after publication following final
passage.
Linda Olson, Mayor
ATTEST:
Stephanie Carlile, City Clerk
I, Stephanie Carlile, City Clerk of the City of Englewood, Colorado, hereby certify that
the above and foregoing is a true copy of the Ordinance passed on final reading and
published by Title as Ordinance No. 2, Series of 2020/2021.
Stephanie Carlile
DocuSign Envelope ID: 5AB3B3AD-D1EF-4EBD-81C9-E66A29AA6AD8
xhibit AProposed vacation24.22 feet NE of NE boundary28.4 feet N of NE and NW corners152.5 feet longDocuSign Envelope ID: 5AB3B3AD-D1EF-4EBD-81C9-E66A29AA6AD8
EXTERNAL - STOP & THINK before opening links and attachments.
From:Martinez, Robyn M
To:Wade Burkholder; James.Elkins@CenturyLink.com
Subject:RE: SUB2020-017 3649 S GRANT ST Englewood Right of Way Vacation Request
Date:Wednesday, October 7, 2020 4:14:29 PM
Attachments:image001.jpg
image003.jpg
USE CAUTION: This email originated from outside of the organization. DO NOT CLICK LINKS or OPEN
ATTACHMENTS unless you have verified the sender and know that the content is legitimate.
Hi Wade,
Xcel Energy has no objection to this row vacation as long as utility rights are maintained for existing
facilities within the vacation area.
Should you have any questions please do not hesitate to contact me
Thank you,
Robyn Martinez
Xcel Energy
Contract Right-Of-Way Agent
O: 303.716.2043
E: robyn.m.martinez@xcelenergy.com
XCELENERGY.COM
Please consider the environment before printing this email.
From: Wade Burkholder <wburkholder@englewoodco.gov>
Sent: Monday, September 28, 2020 9:32 AM
To: James.Elkins@CenturyLink.com; Martinez, Robyn M <Robyn.M.Martinez@xcelenergy.com>
Cc: Wade Burkholder <wburkholder@englewoodco.gov>
Subject: SUB2020-017 3649 S GRANT ST Englewood Right of Way Vacation Request
Good Morning:
The City of Englewood has received the attached right of way vacation request for a portion of
E. Jefferson Avenue adjacent to the residential property at 3649 S. Grant Street.
Please forward me your findings of acceptance or non-acceptance of this right of way request
from your respective utilities operations by close of business October 9th, 2020. If you have
any questions please do not hesitate to contact me.
Best Regards,
Wade Burkholder|Planning Manager
City of Englewood | Community Development Department
1000 Englewood Parkway Englewood, CO 80110
Exhibit BDocuSign Envelope ID: 5AB3B3AD-D1EF-4EBD-81C9-E66A29AA6AD8
From:Elkins, James
To:Wade Burkholder
Subject:RE: SUB2020-017 3649 S GRANT ST Englewood Right of Way Vacation Request
Date:Thursday, November 5, 2020 7:51:23 AM
USE CAUTION: This email originated from outside of the organization. DO NOT CLICK LINKS or OPEN
ATTACHMENTS unless you have verified the sender and know that the content is legitimate.
There is an aerial copper cable take runs down the alley from E Keyon Ave north to E Jefferson Drive.
Any questions please call.
Thank you
James Elkins |OSP Field Engineer
MOUNTAIN, LTD.
Cell: 720-545-6037
801 W Mineral Ave. Suite 100
Littleton, CO 80120
james.elkins@lumen.com
From: Wade Burkholder <wburkholder@englewoodco.gov>
Sent: Wednesday, November 4, 2020 1:08 PM
To: Elkins, James <James.Elkins@CenturyLink.com>
Subject: FW: SUB2020-017 3649 S GRANT ST Englewood Right of Way Vacation Request
Importance: High
Hello, I am following up on the request sent on September 28th regarding a request for vacation of
right of way, see below, I was hoping to have an answer as to whether there are Century Link utilities
in this location that need to be accounted for in this request. This is going to be going to City
Council for recommendation and I will need an answer no later than Thursday at 5pm.
Thank you.
Wade Burkholder|Planning Manager
City of Englewood | Community Development Department
1000 Englewood Parkway Englewood, CO 80110
wburkholder@englewoodco.gov | o: 303.762.2341
From: Wade Burkholder
Sent: Monday, September 28, 2020 9:32 AM
To: James.Elkins@CenturyLink.com; robyn.m.martinez@xcelenergy.com
Exhibit CDocuSign Envelope ID: 5AB3B3AD-D1EF-4EBD-81C9-E66A29AA6AD8
Cc: Wade Burkholder <wburkholder@englewoodco.gov>
Subject: SUB2020-017 3649 S GRANT ST Englewood Right of Way Vacation Request
Good Morning:
The City of Englewood has received the attached right of way vacation request for a portion of
E. Jefferson Avenue adjacent to the residential property at 3649 S. Grant Street.
Please forward me your findings of acceptance or non-acceptance of this right of way request
from your respective utilities operations by close of business October 9th, 2020. If you have
any questions please do not hesitate to contact me.
Best Regards,
Wade Burkholder|Planning Manager
City of Englewood | Community Development Department
1000 Englewood Parkway Englewood, CO 80110
wburkholder@englewoodco.gov | o: 303.762.2341
This communication is the property of Lumen Technologies and may contain confidential or
privileged information. Unauthorized use of this communication is strictly prohibited and may
be unlawful. If you have received this communication in error, please immediately notify the
sender by reply e-mail and destroy all copies of the communication and any attachments.
DocuSign Envelope ID: 5AB3B3AD-D1EF-4EBD-81C9-E66A29AA6AD8
U /vaouwmrv rots:2 Am/Mu:
‘
VNE 561104 mm,Propos
,9.W.2...;24.22 I.
5“28.4 fea
caucus:VA
ansmzm Em
Exhibit DDocuSign Envelope ID: 5AB3B3AD-D1EF-4EBD-81C9-E66A29AA6AD8
MINUTES
Planning and Zoning Commission Meeting
Tuesday, October 20, 2020
COMMISSIONERS PRESENT:Daryl Kinton
Mike Freemire
Michele Austin
Kate Fuller
Carl Adams
Noel Atkins
Diane Lipovsky
Colin Haggerty
COMMISSIONERS ABSENT:Cate Townley
Judy Browne
STAFF PRESENT:John Voboril, Senior Planner
Guy Norris, Traffic Engineer
Konad Krori, Engineer IV
Tim Hoos, Capitals Projects and Engineering Manager
Wade Burkholder, Planning Manager
Dan Poremba, Chief Redevelopment Officer
Dugan Comer, Deputy City Assistant
1.Call to Order
The virtual meeting was called to order by Chair Freemire at 7:00 pm.
2.Approval of Minutes
Draft October 6, 2020 Mintues
Moved by Member Diane Lipovsky
Seconded by Member Kate Fuller
MOTION TO APPROVE THE OCTOBER 6, 2020 MINUTES AS APPROVED.
For Against Abstained
Daryl Kinton x
Mike Freemire x
Michele Austin x
Kate Fuller (Seconded By)x
Carl Adams x
Noel Atkins x
Diane Lipovsky (Moved By)x
Exhibit EDocuSign Envelope ID: 5AB3B3AD-D1EF-4EBD-81C9-E66A29AA6AD8
Planning and Zoning Commission
October 20, 2020
Colin Haggerty x
7 0 1
Motion CARRIED.
3.Public Forum
Kevin Fasing, 3649 South Grant Street, addressed the Commission regarding
his application.
4.Case SUB2020-017 Vacation of Right of Way
3649 South Grant Street
Staff: Wade Burkholder, Planning Manager
Moved by Member Colin Haggerty
Seconded by Member Michele Austin
MOTION TO RECOMMEND CITY COUNCIL APPROVE CASE SUB2020-017 TO
VACATE APPROXIMATELY 4,000 SQUARE FEET OF EAST JEFFERSON DRIVE
RIGHT-OF-WAY.
For Against Abstained
Daryl Kinton x
Mike Freemire x
Michele Austin (Seconded By)x
Kate Fuller x
Carl Adams x
Noel Atkins x
Diane Lipovsky x
Colin Haggerty (Moved By)x
1 7 0
Motion DEFEATED.
Commissioner's based their denial on the following:
1.Viable use of the property per the Unified Development Code remains
without vacation of the right-of-way.
2.Potential interference with existing city water and sewer transmission
mains within the area of request.
3. The Congestion Mitigation and Alternatives Analysis study in this
corridor may recommend alternative right-of-way lines in this area to
accommodate multi-modal transportation improvements.
DocuSign Envelope ID: 5AB3B3AD-D1EF-4EBD-81C9-E66A29AA6AD8
Planning and Zoning Commission
October 20, 2020
4. The US 285/Broadway Interchange reconstruction project may
establish alternative right-of-way lines within this area as the project
design is finalized.
5.CityCenter Redevelopment
Staff: John Voboril, Senior Planner
6.Staff's Choice
7.Attorney's Choice
8.Commissioner's Choice
9.Adjourn
The meeting adjourned at 9 p.m.
Nancy Fenton, Staff Liaison
Nancy G
Fenton
Digitally signed by Nancy G
Fenton
Date: 2020.11.09 17:40:06
-07'00'
DocuSign Envelope ID: 5AB3B3AD-D1EF-4EBD-81C9-E66A29AA6AD8