HomeMy WebLinkAbout2017-11-06 (Regular) Meeting Agenda Packet
Please note: If you have a disability and need auxiliary aids or services, please notify the City of Englewood (303-
762-2405) at least 48 hours in advance of when services are needed.
1000 Englewood Pkwy – Council Chambers
Englewood, CO 80110
AGENDA
City Council Regular Meeting
Monday, November 6, 2017 ♦ 7:00 PM
1. Call to Order
2. Invocation
3. Pledge of Allegiance
4. Roll Call
5. Consideration of Minutes of Previous Session
a. Minutes from the Regular City Council Meeting of October 16, 2017.
City Council Regular - 16 Oct 2017 - Minutes - Pdf
6. Recognition of Scheduled Public Comment The deadline to sign up to speak for Scheduled Public
Comment is Wednesday, prior to the meeting, through the City Manager’s Office. Only those who meet
the deadline can speak in this section. (This is an opportunity for the public to address City Council. There
is an expectation that the presentation will be conducted in a respectful manner. Council may ask
questions for clarification, but there will not be any dialogue. Please limit your presentation to five
minutes.)
a. Kathleen Bailey, an Englewood resident, will address Council regarding health and
safety.
b. Casey Adragna will address Council regarding the Planned Unit Development for 3333,
3323, 3317 South Pearl St.
7. Recognition of Unscheduled Public Comment Speakers must sign up for Unscheduled Public
Comment at the beginning of the meeting. (This is an opportunity for the public to address City Council.
There is an expectation that the presentation will be conducted in a respectful manner. Council may ask
questions for clarification, but there will not be any dialogue. Please limit your presentation to three
minutes. Time for unscheduled public comment may be limited to 45 minutes, and if limited, shall be
continued to General Discussion.)
Council Response to Public Comment.
8. Communications, Proclamations, and Appointments
9. Consent Agenda Items
a. Approval of Ordinances on First Reading
b. Approval of Ordinances on Second Reading.
i. Council Bill 65 - Romans Park Permanent Easement
CB 65 - Romans Park Permanent Easement to Public Service Company of
Colorado - Pdf
Page 1 of 216
Englewood City Council Regular Agenda
November 6, 2017
Please note: If you have a disability and need auxiliary aids or services, please notify the City of Englewood (303-
762-2405) at least 48 hours in advance of when services are needed.
The Parks, Recreation and Library Services Department recommends that
Council adopt an Ordinance approving a permanent easement at Romans Park
for the Public Service Company of Colorado's relocation of an electrical
enclosure. Staff: Open Space Manager Dave Lee
ii. Council Bill 67 - Amending the Code regarding the Local Licensing Authority for
liquor and marijuana
CB 67 - Amending the Code regarding the Local Licensing Authority for liquor
and marijuana - Pdf
Staff recommends that Council adopt an Ordinance amending the Englewood
Municipal Code 2000 to establish a Hearing Officer as the Englewood Local
Liquor and Marijuana Licensing Authority. Staff: Acting City Clerk Stephanie
Carlile
c. Resolutions and Motions
i. Document Management System Contract
Document Management System Contract - Pdf
Staff recommends Council approve, by motion, the Tyler Technologies sales
quotation/amendment for Tyler Content Manager software provided by Tyler
Technologies to be added to the existing agreement in force with Tyler
Technologies. Staff: Applications Manager Joe Isenbart
ii. Rotolo Park Improvement Project
Rotolo Park Improvement Project - Pdf
The Parks, Recreation and Library Services Department recommends that
Council approve, by motion, the construction contract with Colorado Total
Maintenance for the Rotolo Park Shelter Project. Staff: Open Space Manager
Dave Lee
iii. Belleview Park Maintenance Storage Building
Belleview Park Maintenance Storage Building - Pdf
The Parks, Recreation and Library Services Department recommends that
Council approve a contract with A-Shed USA, Inc. for construction of a
maintenance storage building at Belleview Park in the Chenango parking lot.
Staff: Open Space Manager Dave Lee
10. Public Hearing Items
11. Ordinances, Resolutions and Motions
a. Approval of Ordinances on First Reading
i. Council Bill 66 - 3333, 3323, 3317 South Pearl Street Planned Unit Development
Council Bill 66
On October 16, 2017, following a motion and 2nd to approve Council Bill 66 and
set a public hearing for November 20, 2017, Council tabled voting on the motion
until November 6, 2017. At this time Staff recommends Council withdraw that
motion, and set a public hearing date of November 20, 2017 in conformance with
E.M.C. 16-2-8(G)(5). Staff will present Council Bill 66 for approval following the
Page 2 of 216
Englewood City Council Regular Agenda
November 6, 2017
Please note: If you have a disability and need auxiliary aids or services, please notify the City of Englewood (303-
762-2405) at least 48 hours in advance of when services are needed.
mandatory public hearing. Staff: Planner II Audra Kirk
b. Approval of Ordinances on Second Reading
c. Resolutions and Motions
i. Award Police Headquarters Project Construction
Police Headquarters Construction Project - Pdf
Exterior Elevation
Presentation
Staff recommends that City Council award, by motion, the project to construct
"Englewood Police Headquarters". The total estimated cost is not to exceed
$27,000,000 and consists of a contract amendment for construction to Adolphson
& Peterson in the amount of $21,029,755, other incidental and related costs
associated with the project in the amount of $4,384,180, as detailed with
estimated costs in the attached project budget, and a project contingency in the
amount of $1,586,065. Staff: Public Works Director Dave Henderson
ii. Motion to Issue an RFP for golf course management lease
- Pdf
Staff recommends that Council approve, by motion, the issuance of a Request for
Proposals for a long-term management lease for Broken Tee Golf Course. Staff:
Parks, Recreation and Library Services Director Dorothy Hargrove
12. General Discussion
a. Mayor's Choice
b. Council Members' Choice
13. City Manager’s Report
14. City Attorney’s Report
15. Adjournment
Page 3 of 216
MINUTES
City Council Regular Meeting
Monday, October 16, 2017
1000 Englewood Pkwy – Council Chambers 7:00 PM
1 Call to Order
The regular meeting of the Englewood City Council was called to order by Mayor
Jefferson at 7:00 p.m.
2 Invocation
The invocation was given by Council Member Russell.
3 Pledge of Allegiance
The Pledge of Allegiance was led by Council Member Russell.
4 Roll Call
COUNCIL PRESENT: Mayor Joe Jefferson
Mayor Pro Tem Rick Gillit
Council Member Laurett Barrentine
Council Member Amy Martinez
Council Member Linda Olson
Council Member Rita Russell
Council Member Steve Yates
A quorum was present.
COUNCIL ABSENT: None
STAFF PRESENT: City Manager Keck
City Attorney McKenney Brown
Interim Assistant City Manager Woulf
Acting City Clerk Carlile
Acting Deputy City Clerk McKinnon
Director Rinkel, Finance and Administrative Services
Director Kuosman, Littleton/Englewood Wastewater Treatment Plant
Director Power, Community Development
Open Space Manager Lee, Parks and Recreation
Senior Planner Stitt, Community Development
Planner II Kirk, Community Development
Page 1 of 13
Draft
Page 4 of 216
City Council Regular
October 16, 2017
Deputy Director Business Administration/ Communications Manager Doane,
Littleton/Englewood Wastewater Treatment Plant
Government Relations Specialist Varner, Littleton/Englewood Wastewater
Treatment Plant
Deputy Director of 0&M Solutions Carson, Littleton/Englewood Wastewater
Treatment Plant
Budget and Revenue Manager Nolan, Finance and Administrative Services
Deputy Police Chief Watson, Police Department
Technology Support Specialist II Munnell, Information Technology
5 Consideration of Minutes of Previous Session
a) Minutes from the Regular City Council Meeting of October 2, 2017.
Moved by Council Member Rick Gillit
Seconded by Council Member Steve Yates
TO APPROVE THE MINUTES OF THE REGULAR CITY COUNCIL MEETING
OF OCTOBER 2, 2017.
For Against Abstained
Amy Martinez x
Joe Jefferson x
Linda Olson x
Laurett Barrentine x
Rita Russell x
Rick Gillit (Moved By) x
Steve Yates (Seconded By) x
7 0 0
Motion CARRIED.
6 Recognition of Scheduled Public Comment
a) Colin Waters from the Colorado Lottery presented the Starburst Award to the
City of Englewood.
b) Kathleen Bailey, an Englewood resident, addressed Council regarding health
and safety.
c) Patrick Fitzgerald addressed Council regarding Wastewater Treatment Plant
biogas.
d) Carolyn Moershel, an Englewood resident, was scheduled to address Council
regarding ADU's/short term rentals but was not present.
e) Elaine Hults, an Englewood resident, addressed Council regarding an Open
Record Request.
7 Recognition of Unscheduled Public Comment
Page 2 of 13
Draft
Page 5 of 216
City Council Regular
October 16, 2017
a) Scott Gilbert, an Englewood resident addressed Council regarding the Biogas
Engineering contract.
b) Doug Cohn, an Englewood resident, gave thanks to everyone involved in the
Englewood Block Party and it's success.
Council responded to Public Comment.
8 Communications, Proclamations, and Appointments
There were no Communications, Proclamations, or Appointments.
9 Consent Agenda Items
Moved by Council Member Rick Gillit, seconded by Council Member Linda Olson to
approve Consent Agenda Items 9 (a) (i) and 9 (c) (i).
Council Member Rita Russell removed Agenda Items 9 (c) (i) from Consent Agenda.
a) Approval of Ordinances on First Reading
i) Romans Park Permanent Easement
Moved by Council Member Rick Gillit
Seconded by Council Member Linda Olson
COUNCIL BILL NO. 65 INTRODUCED BY COUNCIL MEMBER GILLIT
A BILL FOR AN ORDINANCE AUTHORIZING A GRANT OF A SWITCH
BOX UTILITY EASEMENT BETWEEN THE CITY OF ENGLEWOOD,
COLORADO AND PUBLIC SERVICE COMPANY OF COLORADO,
LOCATED IN ROMANS PARK.
For Against Abstained
Amy Martinez x
Joe Jefferson x
Linda Olson (Seconded By) x
Laurett Barrentine x
Rita Russell x
Rick Gillit (Moved By) x
Steve Yates x
7 0 0
Motion CARRIED.
b) Approval of Ordinances on Second Reading.
Page 3 of 13
Draft
Page 6 of 216
City Council Regular
October 16, 2017
There were no additional Ordinances on Second Reading. (See Agenda Items
11 (b) (i - v).)
c) Resolutions and Motions
i) 2018 Community Development Block Grant (CDBG) Application
[Clerks note: This agenda item was removed from the Consent
Agenda Motion and considered independently.]
Moved by Council Member Rick Gillit
Seconded by Council Member Linda Olson
RESOLUTION NO. 81, SERIES OF 2017
A RESOLUTION AUTHORIZING THE CITY OF ENGLEWOOD,
COLORADO, TO FILE AN APPLICATION WITH ARAPAHOE COUNTY
FOR 2018 COMMUNITY DEVELOPMENT BLOCK GRANT (CDBG)
FUNDS.
For Against Abstained
Amy Martinez x
Joe Jefferson x
Linda Olson (Seconded By) x
Laurett Barrentine x
Rita Russell x
Rick Gillit (Moved By) x
Steve Yates x
5 2 0
Motion CARRIED.
10 Public Hearing Items
No public hearing was scheduled before Council.
11 Ordinances, Resolutions and Motions
a) Approval of Ordinances on First Reading
i) Planned Unit Development - 3333, 3323, 3317 South Pearl Street
Moved by Council Member Rick Gillit
Seconded by Council Member Linda Olson
MOTION TO APPROVE COUNCIL BILL NO. 66 AND SET A PUBLIC
HEARING DATE FOR NOVEMBER 6, 2017.
Page 4 of 13
Draft
Page 7 of 216
City Council Regular
October 16, 2017
Moved by Council Member Rick Gillit
Seconded by Council Member Linda Olson
MOTION TO AMEND MOTION - TO APPROVE COUNCIL BILL NO. 66
AND SET A PUBLIC HEARING DATE FOR NOVEMBER 20, 2017.
Moved by Council Member Laurett Barrentine
Seconded by Council Member Rita Russell
MOTION TO TABLE THIS AGENDA ITEM (COUNCIL BILL NO. 66)
UNTIL THE REGULAR COUNCIL MEETING ON NOVEMBER 6, 2017.
For Against Abstained
Amy Martinez x
Joe Jefferson x
Linda Olson x
Laurett Barrentine (Moved By) x
Rita Russell (Seconded By) x
Rick Gillit x
Steve Yates x
5 2 0
Motion CARRIED. TABLED UNTIL NOVEMBER 6, 2017
ii) Amending the Code regarding the Local Licensing Authority for liquor and
marijuana
Moved by Council Member Rick Gillit
Seconded by Council Member Linda Olson
COUNCIL BILL NO. 67 INTRODUCED BY COUNCIL MEMBER GILLIT
A BILL FOR AN ORDINANCE AMENDING TITLE 2, CHAPTER 6,
SECTION 1, AND TITLE 5, SECTIONS 5-3A-2, 5-3A-3, 5-3D-2, 5-3D-3,
AND 5-3E-2 OF THE ENGLEWOOD MUNICIPAL CODE 2000 ALL
PERTAINING TO THE ENGLEWOOD LOCAL LIQUOR AND
MARIJUANA LICENSING AUTHORITY.
For Against Abstained
Amy Martinez x
Joe Jefferson x
Linda Olson (Seconded By) x
Laurett Barrentine x
Rita Russell x
Rick Gillit (Moved By) x
Steve Yates x
Page 5 of 13
Draft
Page 8 of 216
City Council Regular
October 16, 2017
7 0 0
Motion CARRIED.
b) Approval of Ordinances on Second Reading
i) 2018 City of Englewood Budget Ordinances
Moved by Council Member Rick Gillit
Seconded by Council Member Linda Olson
COUNCIL BILL NO. 67 INTRODUCED BY COUNCIL MEMBER GILLIT
A BILL FOR AN ORDINANCE AMENDING TITLE 2, CHAPTER 6,
SECTION 1, AND TITLE 5, SECTIONS 5-3A-2, 5-3A-3, 5-3D-2, 5-3D-3,
AND 5-3E-2 OF THE ENGLEWOOD MUNICIPAL CODE 2000 ALL
PERTAINING TO THE ENGLEWOOD LOCAL LIQUOR AND
MARIJUANA LICENSING AUTHORITY.
For Against Abstained
Amy Martinez x
Joe Jefferson x
Linda Olson (Seconded By) x
Laurett Barrentine x
Rita Russell x
Rick Gillit (Moved By) x
Steve Yates x
7 0 0
Motion CARRIED.
Moved by Council Member Rick Gillit
Seconded by Council Member Amy Martinez
MOTION TO APPROVE COUNCIL BILL NO. 53, INTRODUCED BY
COUNCIL MEMBER GILLIT.
Moved by Council Member Rita Russell
Seconded by Council Member Laurett Barrentine
MOTION TO AMEND COUNCIL BILL NO. 53 - TO DEFER ALL BUT 3
MILLION DOLLARS OF 2017 CAPITAL OUTLAY RELATED TO THE
POLICE BUILDING INTO THE 2018 PROPOSED POLICE
HEADQUARTERS FUND.
For Against Abstained
Amy Martinez x
Page 6 of 13
Draft
Page 9 of 216
City Council Regular
October 16, 2017
Joe Jefferson x
Linda Olson x
Laurett Barrentine (Seconded
By)
x
Rita Russell (Moved By) x
Rick Gillit x
Steve Yates x
2 5 0
Motion DEFEATED.
Moved by Council Member Laurett Barrentine
Seconded by Council Member Rita Russell
MOTION TO AMEND COUNCIL BILL NO. 53, ELIMINATING ALL FUND
BALANCE TRANSFERS IN THE 2018 BUDGET, EXCEPT SEWER AND
POLICE HEADQUARTERS.
For Against Abstained
Amy Martinez x
Joe Jefferson x
Linda Olson x
Laurett Barrentine (Moved By) x
Rita Russell (Seconded By) x
Rick Gillit x
Steve Yates x
2 5 0
Motion DEFEATED.
Moved by Council Member Laurett Barrentine
Seconded by Council Member Rita Russell
MOTION TO AMEND COUNCIL BILL NO. 53, REMOVING 4.7 MILLION
OUT OF THE LITTLETON/ENGLEWOOD WASTEWATER TREATMENT
PLANT 2018 PROPOSED CAPITAL BUDGET FOR THE PROPOSED
BIOGAS RECAPTURE PROJECT.
For Against Abstained
Amy Martinez x
Joe Jefferson x
Linda Olson x
Laurett Barrentine (Moved By) x
Rita Russell (Seconded By) x
Rick Gillit x
Steve Yates x
Page 7 of 13
Draft
Page 10 of 216
City Council Regular
October 16, 2017
2 5 0
Motion DEFEATED.
Moved by Council Member Rick Gillit
Seconded by Council Member Amy Martinez
ORDINANCE NO. 59 (COUNCIL BILL NO. 53 INTRODUCED BY
COUNCIL MEMBER GILLIT)
AN ORDINANCE ADOPTING THE BUDGET OF THE CITY OF
ENGLEWOOD, COLORADO, FOR FISCAL YEAR 2018.
For Against Abstained
Amy Martinez (Seconded By) x
Joe Jefferson x
Linda Olson x
Laurett Barrentine x
Rita Russell x
Rick Gillit (Moved By) x
Steve Yates x
5 2 0
Motion CARRIED.
ii) 2018 City of Englewood Budget Appropriations
Moved by Council Member Rick Gillit
Seconded by Council Member Steve Yates
ORDINANCE NO. 60 (COUNCIL BILL NO. 52 INTRODUCED BY
COUNCIL MEMBER GILLIT)
AN ORDINANCE APPROPRIATING MONIES FOR ALL MUNICIPAL
PURPOSES IN THE CITY OF ENGLEWOOD, COLORADO, FOR
FISCAL YEAR BEGINNING JANUARY 1, 2018, AND ENDING
DECEMBER 31, 2018, CONSTITUTING WHAT IS TERMED THE
ANNUAL APPROPRIATION BILL FOR FISCAL YEAR 2018.
For Against Abstained
Amy Martinez x
Joe Jefferson x
Linda Olson x
Laurett Barrentine x
Rita Russell x
Rick Gillit (Moved By) x
Page 8 of 13
Draft
Page 11 of 216
City Council Regular
October 16, 2017
Steve Yates (Seconded By) x
5 2 0
Motion CARRIED.
iii) 2018 LEWWTP Budget Ordinances
Moved by Council Member Linda Olson
Seconded by Council Member Rick Gillit
ORDINANCE NO. 61 (COUNCIL BILL NO. 56 INTRODUCED BY
COUNCIL MEMBER GILLIT)
AN ORDINANCE ADOPTING THE BUDGET FOR THE
LITTLETON/ENGLEWOOD WASTEWATER TREATMENT PLANT FOR
FISCAL YEAR 2018.
For Against Abstained
Amy Martinez x
Joe Jefferson x
Linda Olson (Moved By) x
Laurett Barrentine x
Rita Russell x
Rick Gillit (Seconded By) x
Steve Yates x
5 2 0
Motion CARRIED.
iv) 2018 LEWWTP Budget Appropriation
Moved by Council Member Linda Olson
Seconded by Council Member Rick Gillit
ORDINANCE NO. 62 (COUNCIL BILL NO. 54 INTRODUCED BY
COUNCIL MEMBER GILLIT)
AN ORDINANCE APPROPRIATING MONIES FOR THE
LITTLETON/ENGLEWOOD WASTEWATER TREATMENT PLANT
PURPOSES IN THE FISCAL YEAR BEGINNING JANUARY 1, 2018,
AND ENDING DECEMBER 31, 2018, CONSTITUTING WHAT IS
TERMED THE ANNUAL APPROPRIATION BILL FOR FISCAL YEAR
2018.
For Against Abstained
Amy Martinez x
Joe Jefferson x
Page 9 of 13
Draft
Page 12 of 216
City Council Regular
October 16, 2017
Linda Olson (Moved By) x
Laurett Barrentine x
Rita Russell x
Rick Gillit (Seconded By) x
Steve Yates x
5 2 0
Motion CARRIED.
v) Establish 2017 Mill Levy (Collected in 2018)
Moved by Council Member Rick Gillit
Seconded by Council Member Steve Yates
ORDINANCE NO. 63 (COUNCIL BILL NO. 55 INTRODUCED BY
COUNCIL MEMBER GILLIT)
AN ORDINANCE FIXING THE TAX LEVY IN MILLS UPON EACH
DOLLAR OF THE ASSESSED VALUATION OF ALL TAXABLE
PROPERTY WITHIN THE CITY OF ENGLEWOOD, COLORADO.
For Against Abstained
Amy Martinez x
Joe Jefferson x
Linda Olson x
Laurett Barrentine x
Rita Russell x
Rick Gillit (Moved By) x
Steve Yates (Seconded By) x
5 2 0
Motion CARRIED.
c) Resolutions and Motions
i) Belleview Park Improvement Project
Moved by Council Member Rick Gillit
Seconded by Council Member Amy Martinez
MOTION APPROVING A CONTRACT WITH CONSTRUCTION
CONCEPTS, INC., FOR THE BELLEVIEW PARK IMPROVEMENT
PROJECT, IN THE AMOUNT OF $244,021.
For Against Abstained
Amy Martinez (Seconded By) x
Joe Jefferson x
Page 10 of 13
Draft
Page 13 of 216
City Council Regular
October 16, 2017
Linda Olson x
Laurett Barrentine x
Rita Russell x
Rick Gillit (Moved By) x
Steve Yates x
7 0 0
Motion CARRIED.
ii) L/E WWTP Strategic Operating Plan (SOP)
Moved by Council Member Rick Gillit
Seconded by Council Member Steve Yates
MOTION APPROVING A CONTRACT WITH CAROLLO ENGINEERS,
INC.,TO CONDUCT THE LITTLETON/ENGLEWOOD STRATEGIC
OPERATIONS PLAN, IN THE AMOUNT OF $500,000.
For Against Abstained
Amy Martinez x
Joe Jefferson x
Linda Olson x
Laurett Barrentine x
Rita Russell x
Rick Gillit (Moved By) x
Steve Yates (Seconded By) x
5 2 0
Motion CARRIED.
iii) L/E WWTP Biogas to Renewalable Natural Gas (RNG) Project
Moved by Council Member Rick Gillit
Seconded by Council Member Steve Yates
MOTION APPROVING A CONTRACT WITH CAROLLO ENGINEERS,
INC., TO CONDUCT THE DESIGN ENGINEERING AND CONTRACTOR
PROCUREMENT SERVICES FOR THE LITTLETON/ENGLEWOOD
WASTEWATER TREATMENT PLANT BIOGAS TO RENEWABLE
NATURAL GAS PROJECT, IN THE AMOUNT OF $380,400.
For Against Abstained
Amy Martinez x
Joe Jefferson x
Linda Olson x
Laurett Barrentine x
Rita Russell x
Page 11 of 13
Draft
Page 14 of 216
City Council Regular
October 16, 2017
Rick Gillit (Moved By) x
Steve Yates (Seconded By) x
5 2 0
Motion CARRIED.
12 General Discussion
a) Mayor's Choice
b) Council Members' Choice
13 City Manager’s Report
a) Agenda setting and other business.
Moved by Council Member Joe Jefferson
Seconded by Council Member Steve Yates
MOTION TO ALLOW CITY MANAGER KECK TO USE HIS SIGNATURE ON
THE ARAPAHOE COUNTY BICYCLE PLAN.
For Against Abstained
Amy Martinez x
Joe Jefferson (Moved By) x
Linda Olson x
Laurett Barrentine x
Rita Russell x
Rick Gillit x
Steve Yates (Seconded By) x
5 2 0
Motion CARRIED.
Moved by Council Member Steve Yates
Seconded by Council Member Linda Olson
MOTION TO HAVE MAYOR/MANAGER MEETING AFTER THE REGULAR
COUNCIL MEETING AND RECORDED SEPARATE.
Discussion ensued and a vote was not taken. Consensus was that agenda
setting will be conducted with the Mayor, Mayor Pro Tem and City Manager on
Tuesdays and will be recorded. No public noticing will be required.
14 City Attorney’s Report
Page 12 of 13
Draft
Page 15 of 216
City Council Regular
October 16, 2017
15 Adjournment
MAYOR JEFFERSON MOVED TO ADJOURN. The meeting adjourned at 10:21 p.m.
Acting City Clerk
Page 13 of 13
Draft
Page 16 of 216
COUNCIL
COMMUNICATION
TO: Mayor and Council
FROM: Dave Lee
DEPARTMENT: Parks, Recreation & Library
DATE: November 6, 2017
SUBJECT: Council Bill 65 - Romans Park Permanent Easement
DESCRIPTION:
Council Bill 65 - Romans Park Permanent Easement
RECOMMENDATION:
The Parks, Recreation and Library Services Department recommends that Council adopt an
Ordinance approving a permanent easement at Romans Park for the Public Service Company
of Colorado's relocation of an electrical enclosure.
PREVIOUS COUNCIL ACTION:
Council previously approved Ordinance No. 25, Series of 1999, to Public Service Company of
Colorado authorizing a grant of easement for underground electrical lines at Romans Park.
SUMMARY:
Public Service Company seeks to relocate one existing electrical enclosure located in Romans
Park outside the current easement in order to safely access and maintain the utility. This will
not have a negative impact on pedestrian access of users of the park.
ANALYSIS:
Public Service wishes to provide better safety to their staff and improve their responsiveness for
repairs to their infrastructure.
FINANCIAL IMPLICATIONS:
There are no financial implications with this easement.
ALTERNATIVES:
There are no alternatives identified.
ATTACHMENTS:
Council Bill 65
Public Service Company of Colorado Easement
Exhibit A
Romans Park Area Map
Page 17 of 216
-1-
BY AUTHORITY
ORDINANCE NO. COUNCIL BILL NO. 65
SERIES OF 2017 INTRODUCED BY COUNCIL
MEMBER GILLIT
AN ORDINANCE AUTHORIZING A GRANT OF A SWITCH BOX UTILITY
EASEMENT BETWEEN THE CITY OF ENGLEWOOD, COLORADO AND
PUBLIC SERVICE COMPANY OF COLORADO, LOCATED IN ROMANS
PARK.
WHEREAS, in 1999, the Public Service Company installed electrical
lines and switching boxes in Romans Park located at 1700 East Floyd
Avenue to service upgraded electrical lines; and
WHEREAS, the current utility switch boxes are being upgraded and one
will be moved to accommodate access to both boxes; and
WHEREAS, with the passage of this Ordinance a utility easement that is
15 feet by 17 feet is hereby granted to Public Service Company, for the
relocation of an existing switch box in Romans Park;
NOW, THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE
CITY OF ENGLEWOOD, COLORADO, AS FOLLOWS:
Section 1. The Grant this utility easement to Public Service Company of
Colorado, by the City of Englewood, Colorado, attached hereto as Exhibit A,
is hereby accepted and approved by the Englewood City Council.
Section 2. The Mayor is authorized to execute and the City Clerk to
attest and seal the “Public Service Company of Colorado Switch Box Utility
Easement” for and on behalf of the City of Englewood, Colorado.
Introduced, read in full, and passed on first reading on the 16th day of
October, 2017.
Published by Title as a Bill for an Ordinance in the City’s official
newspaper on the 19th day of October, 2017.
Published as a Bill for an Ordinance on the City’s official website
beginning on the 18th day of October 2017.
Page 18 of 216
-2-
Read by Title and passed on final reading on the 6th day of November, 2017.
Published by Title in the City’s official newspaper as Ordinance No.___,
Series of 2017, on the 9th day of November, 2017.
Published by title on the City’s official website beginning on the 8th day
of November, 2017 for thirty (30) days.
This Ordinance shall take effect thirty (30) days after publication
following final passage.
Joe Jefferson, Mayor
ATTEST:
Stephanie Carlile, City Clerk
I, Stephanie Carlile, Acting City Clerk of the City of Englewood,
Colorado, hereby certify that the above and foregoing is a true copy of the
Ordinance passed on final reading and published by Title as Ordinance
No. ___, Series of 2017.
Stephanie Carlile
Page 19 of 216
Page 20 of 216
mamaA9.M
mx:_m_4 >I mo_<_>zw _u>_~_A
_.mm2_>zmz4 m>mm_smzq -_.>xom_.>
>um_.om_2_m:a_<_:n53mmoczamm.ozmbcmnmq amte S mango:8.._.o<<:m::uAmoE_._.mmzmmmm<<mmr23m
9:_u...:o_um__<_m~§m:.02522>Sum:om.maa2.oo_oaao._<_:mS moamzm_um%$333 mm_"o__o<<m”
wmmiaamo::6moi:__:m23m.m89Sam_umoommmmamaammozcmqS mmnmuzo:zcaumq >888?>_.mum:om
0952xmooam:63<<_.=O_..Emaonzim?ooamq oq Em mocz.o:m-:m:2 2:...moc5mwm~o_._m-ncm:m_1Ami»mmiv o«
33mmomo:8Emmaz8.8.8_<<.w8.8Ems
Smzomm$.$.?=m‘mar98$3.m_o_..mSm mocz._.:m 9.$3 a moo.2.8 vmoommmmamzr8=6
mo?smmm?0039.Emqmon
Smaowm$.$_S_.m.m.8?mmn
=._m:ommoo.oo.om..<<.3.8«max
25:8zmo.mm.m._..<<.3.8$3
Emsomz8.8.8_.m.3.8«mm...8=5_uo_:~2 mmmiazm.
_um_.om_>noamiwmmmmncmqm«mm»:53o_._mmm.
>mmrossmagammoacmao:mxzz,>.mzmm.N2Mmzmozma388 man3%mcm:zmamon
.26mc?oq2in%..§__aa=_m2.03»
_..
9&8.»Pm mmmom.Emum?mn.on am_..m_..2 mm...__..o..395 <<mm.089.
0:5.9:61.rmxwsooa.00momma.on>:m:m.mm.83.552 Low zo.2o~3.§.o_8.._ucc__owm_.<8m oo3um:<
3oo_oaao.mana:28cmnonmacmammau?wmmazzmm302.2538 _m:a m:2m<.
_<_o:$
_..mcqcwox.nrmmmmom
33,Eumooo:.8235omoamam3:3m:2m<6u-aooSm-_2ouomma-ammn=um8m_>.xoamsm3...aonx
Sag<<mm»o......,:U_._<m.was_n.rmxmsooa.00 momma
mm:_mm:mn:m_ouuo_.E==<man35..ESEmm_.::n.no3
_
mou.mmm.u8o
_
wow26 33 Ex
Page 21 of 216
Page 22 of 216
Page 23 of 216
COUNCIL
COMMUNICATION
TO: Mayor and Council
FROM: Stephanie Carlile
DEPARTMENT: City Clerk's Office
DATE: November 6, 2017
SUBJECT:
Council Bill 67 - Amending the Code regarding the Local
Licensing Authority for liquor and marijuana
DESCRIPTION:
Council Bill 67 - Amending the Code regarding the Local Licensing Authority for liquor and
marijuana
RECOMMENDATION:
Staff recommends Council approve an Ordinance amending the Englewood Municipal Code
2000 to establish a Hearing Officer as the Englewood Local Liquor and Marijuana Licensing
Authority.
PREVIOUS COUNCIL ACTION:
Staff presented an overview of the Hearing Officer concept including best practices from other
front range cities at the December 12, 2016 Study Session. Council directed Staff to glean
more information on the process, procedures and duties of a Hearing Officer to serve as the
local licensing authority.
Staff presented additional information and received consensus direction from Council at the
February 13, 2017 Study Session to draft and bring forth an Ordinance establishing a Hearing
Officer as the Englewood Local Liquor and Marijuana Licensing Authority.
SUMMARY:
Due to changes in State law and increased demand, the Liquor and Marijuana Licensing
Authority requires a certain level of expertise regarding administrative law procedure. The use
of a Hearing Officer instead of an Authority would ensure a level of expertise with law
procedure, promote consistency during the hearing process and keep a level of impartiality for
new licenses and violations.
A Hearing Officer with experience in interpreting and applying complex laws, would result in less
frustration for our citizens and ensure sound decisions.
A Hearing Officer is more efficient, streamlines the licensing process and provides better
customer service.
Many municipalities in Colorado have transitioned to a Hearing Officer including Aurora, Denver,
Golden, Greeley, Lakewood, Telluride, Centennial, Commerce City, and Castle Rock.
Page 24 of 216
ANALYSIS:
Staff recommends a qualification based selection process to chose a hearing officer. Staff
would solicit qualifications from attorneys to serve as the Hearing Officer. Staff will provide
Council with the recommended candidate for selection and appointment by Resolution at the
January 2, 2018 Regular City Council meeting. The Resolution will also establish compensation
and, at the discretion of Council, appoint an alternate Hearing Officer who may serve when the
appointed Hearing Officer is unavailable.
Staff recommends that the licensing approval process proceed as follows:
The following would be approved by a Hearing Officer:
•New Liquor and Marijuana License Applications
•Transfer of Ownership Applications (upon Staff referral)
•Special Event Permits (if protested)
•Show Cause Hearings
•Change of Location
For efficiency, Staff recommends approving several liquor and marijuana items administratively:
•Renewals
•Manager Registrations
•Change in Corporate Structure/Name Change
•Temporary Permits
•Modification of Premises
•Transfer of Ownership Applications
•Special Event Permits (not protested) [Note: We are no longer required to seek State
approval on Special Event Permits, we just keep the State apprised of any that we issue.]
FINANCIAL IMPLICATIONS:
We are estimating a average monthly expenditure of $400.00 for the services of the Hearing
Officer. Council will formally establish the compensation of the Hearing Officer.
ATTACHMENTS:
Council Bill 67
Page 25 of 216
1
BY AUTHORITY
ORDINANCE NO. ____ COUNCIL BILL NO. 67
SERIES OF 2017 INTRODUCED BY COUNCIL
MEMBER GILLIT
AN ORDINANCE AMENDING TITLE 2, CHAPTER 6, SECTION 1, AND
TITLE 5, SECTIONS 5-3A-2, 5-3A-3, 5-3D-2, 5-3D-3, AND 5-3E-2 OF THE
ENGLEWOOD MUNICIPAL CODE 2000 ALL PERTAINING TO THE
ENGLEWOOD LOCAL LIQUOR AND MARIJUANA LICENSING
AUTHORITY.
WHEREAS, Amendment to the Colorado Constitution and subsequent legislation resulted in
the City of Englewood approving a method for licensure of Medical Marijuana under the City’s
previously established local licensing authority;
WHEREAS, Approval by the electors of the City of Englewood of the licensure of Retail
Marijuana resulted in the City of Englewood approving a method for licensure of Retail
Marijuana under the City’s previously established local licensing authority;
WHEREAS, Licensure of all types of Alcoholic Beverage, Medical Marijuana, and Retail
Marijuana has, over time, become vested in the City’s local licensing authority;
WHEREAS, It has become necessary to establish consistency in terminology across all
sections of the Englewood Municipal Code utilizing the local licensing authority, and to
designate such authority as the Englewood Liquor and Marijuana Licensing Authority; and
WHEREAS, The complexity of application of State rules and regulations associated with
alcoholic beverage licensing and marijuana licensing necessitates changing the Local Liquor
and Marijuana Licensing Authority to a position held by a Hearing Officer.
NOW, THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF
ENGLEWOOD, COLORADO, AS FOLLOWS:
Section 1. The City Council of the City of Englewood, Colorado hereby authorizes amending
Title 2 of the Englewood Municipal Code 2000 as follows:
Page 26 of 216
2
Amending Title 2, Section 2-6-1 of the Englewood Municipal Code
Chapter 6 – ENGLEWOOD LOCAL LIQUOR, MEDICAL MARIJUANA, AND RETAIL
MARIJUANA LICENSING AUTHORITY
2-6-1: Licensing Authority Established.
A. There is hereby established a Local Licensing Authority, which shall have and is vested with
the authority to grant or refuse licenses for the sale at retail of malt, vinous or spirituous liquors
and fermented malt beverages, as provided by law, to suspend or revoke such licenses for
cause in the manner provided by law. Such authority shall have all the powers of the Local
Licensing Authority as set forth in Articles 46, 47 and 48 of Title 12, C.R.S. 1973.
See Title 5, Chapter 3, Article A of this Municipal Code for the organization, powers, functions
and duties of the Local Licensing Authority.
A. Englewood Local Liquor and Marijuana Licensing Authority.
1. Establishment. There is hereby established an Englewood Local Liquor and Marijuana
Licensing Authority (“Local Licensing Authority” or “Authority”), which is vested with
the authority to grant or refuse permits and licenses, to conduct investigations as are
required by law, and to suspend or revoke such licenses for cause in the manner provided
by law. Such Authority shall have all the powers of the Local Licensing Authority, as set
forth in Articles 43.3, 43.4, 46, 47 and 48 of Title 12, C.R.S., and as otherwise granted to
it in this Title 5.
2. Hearing Officer. The Local Licensing Authority shall consist of a sole Hearing Officer
who shall be selected following a standard rfq process, and in conformance with the
Purchasing Policies & Procedures of the City, and shall serve at the pleasure of the City
Council. The Hearing Officer shall be annually appointed/reappointed by the City Council
by resolution and may be removed with or without cause by a majority vote of the City
Council. The City Council shall establish compensation for the Hearing Officer. The City
Council may, in its discretion, appoint an alternate Hearing Officer who may serve when
the appointed Hearing Officer is unavailable or has a conflict with a pending matter. The
term "Hearing Officer" shall be synonymous with "Local Licensing Authority" as used
throughout this section
3. Qualifications of Hearing Officer. The Hearing Officer shall be an individual licensed to
practice law in the State of Colorado, with sufficient knowledge and expertise to apply and
enforce the Colorado Beer Code (C.R.S. 12-46-101, et seq.), Colorado Liquor Code (C.R.S.
12-47-101, et seq.), Special Events Code (C.R.S. 12-48-101, et seq.), Medical Marijuana
Code (C.R.S. 12-43.3-101, et seq.), Retail Marijuana Code (C.R.S. 12-43.4-101, et seq.),
and the equivalent sections of the Englewood Municipal Code regulating the licensing of
liquor or marijuana establishments in the City of Englewood, Colorado. The Hearing
Officer shall not hold any other City of Englewood office, appointment or position. The
Hearing Officer shall not have any financial interest in the operation of any business
located or operating in the City of Englewood holding a license pursuant to any of the
Codes listed within this paragraph.
Page 27 of 216
3
4. Rules of procedure; conduct of hearings. In conformance with applicable statutes and the
Englewood Municipal Code, the Hearing Officer serving as the Local Licensing Authority
shall have the power to decide matters brought before it following a public hearing. Public
hearings shall be held in in accordance with the procedural rules and regulations for
hearings as set forth in Title 1, Chapter 10, and/or as adopted by the Local Licensing
Authority. The Authority may also adopt rules of procedure and regulations concerning
the application and renewal processes. All hearings before the Local Licensing Authority
shall be public.
5. Meetings. The Local Licensing Authority shall hold a regular meeting once each calendar
month, unless there is no business to conduct. The Local Licensing Authority may call
special meetings after consultation with the City Clerk or the City Clerk's designee.
Notification of the public of such special meetings shall be completed in the same manner
as the regular meetings of the Authority. The purpose of meetings shall be to conduct public
hearings regarding licensure in conformance with applicable provisions of the Englewood
Municipal Code.
6. Subpoena power and violations. The Local Licensing Authority shall have the power to
administer oaths and issue subpoenas to require the presence of persons and the production
of documents, data compilations and other evidence at any hearing before the authority. A
subpoena shall be served in the same manner as a subpoena issued by the municipal court
of the City, in accordance with 1-10-3 of the EMC. It shall be unlawful for any person to
fail to comply with any subpoena or order to produce documents, data compilations or
other evidence issued by the authority. The municipal court shall enforce the subpoenas of
the Authority and, upon good cause shown, shall enter orders compelling witnesses to
attend and testify or produce documents, data compilations or other evidence, and shall
impose penalties or punishment for contempt in case of failure to comply with such orders.
7. Investigators. Such person or persons as the City Manager shall designate shall serve as
investigators or perform investigative duties on behalf of the Local Licensing Authority.
B. There is hereby established a Local Licensing Authority to issue only the following Medical
Marijuana Licenses upon payment of a fee and compliance with all Local Licensing
requirements to be determined by the Local Licensing Authority as set forth in Article 43.3 of
Title 12 C.R.S.:
1. A Medical Marijuana Center License;
2. A Medical Marijuana Optional Premises Cultivation Operation License;
3. A Medical Marijuana-Infused Products Manufacturer License.
B. The Local Licensing Authority is vested with the authority to grant or refuse licenses for the
sale at retail of malt, vinous or spirituous liquors and fermented malt beverages, as provided
by law, and to suspend or revoke such licenses for cause in the manner provided by law.
Such authority shall have all the powers of the Local Licensing Authority as set forth in
Articles 46, 47 and 48 of Title 12, C.R.S.
Page 28 of 216
4
C. The Local Licensing Authority is vested with the authority to issue only the following
Medical and Retail Marijuana Licenses upon payment of a fee and compliance with all Local
Licensing requirements to be determined by the Local Licensing Authority as set forth in
Article 43.3 and 43.4 of Title 12 C.R.S.:
1. A Medical Marijuana Center License;
2. A Medical Marijuana Optional Premises Cultivation Operation License;
3. A Medical Marijuana-Infused Products Manufacturer License;
4. A Retail Marijuana Store License.
Section 2. The City Council of the City of Englewood, Colorado hereby authorizes amending
Title 5 of the Englewood Municipal Code 2000 as follows:
Amending Title 5, Section 5-3A-2 of the Englewood Municipal Code
5-3A-2: Definitions.
Certain terms and expressions used herein shall have the following meanings. All other words and
phrases used in this article shall have the meanings attached by the Colorado Statutes regulating
the sale of liquor and fermented malt beverages, or if not otherwise defined by law, are used in
their common, ordinary and accepted sense and meaning.
Applicant:
A. If aAn individual, that person making an application for a license under this Code;
B. If a partnership, All partners of a partnership which is making application for a license
under this Code; or
C. If a corporation, Any officer, director, manager or any stockholder therein of a
corporation making application for a license under this Code.
Authority or Local Licensing Authority: The local licensing authority of the City Englewood
Local Liquor and Marijuana Licensing Authority.
Investigator: The licensing investigator as set forth in Section 5-3A-3G of this article Section
2-6-1(A)(7) of the Englewood Municipal Code.
Manager: That person or those persons who manage, direct, supervise, oversee and administer
the acts, transactions and acts of servants or the establishments governed by this Article.
Amending Title 5, Section 5-3A-3 of the Englewood Municipal Code
5-3A-3: Englewood Local Liquor and Marijuana Licensing Authority Established.
A. Establishment. Vesting of Authority. There is hereby established an Englewood Local Liquor
and Marijuana Licensing Authority (“Local Licensing Authority” or “Authority”), which is
vested with the authority to grant or refuse permits and licenses for the sale at retail of malt,
Page 29 of 216
5
vinous or spirituous liquors and fermented malt beverages, to conduct investigations as are
required by law, and to suspend or revoke such licenses for cause in the manner provided by
law. Such Authority shall have all the powers of the Local Licensing Authority, as set forth
in Articles 46, 47 and 48 of Title 12, C.R.S. 1973.
B. Said authority shall consist of five (5) qualified electors of the City who shall be appointed
by the City Council. Of those initially appointed, two (2) shall be for a term of three (3) years,
two (2) for a term of two (2) years, and one (1) for a one year term. Thereafter, appointments
hall be for a three-year term. No person shall serve as a member of the Local Licensing
Authority who shall have any interest in the operation of a liquor establishment or in one
serving fermented malt beverages or who has a member of his or her immediate family who
has such an interest.
C. Any member of the Licensing Authority may be removed with or without cause by five (5)
concurring votes of the City Council. Any vacancy occurring on the Licensing Authority
shall be filled for the unexpired term by the City Council.
D. The authority shall annually elect a chairman from its number who shall preside over all
hearings and proceedings of the authority. The chairman may designate a member of the
authority to assume his duties in his absence. A quorum shall consist of three (3) members,
and a decision of a majority of the members of the authority shall control. Any absent
member may join in a decision of the authority after he has considered the evidence adduced
in any hearings conducted during his absence. All decisions are final, subject only to appeal
to a court of competent jurisdiction.
E. Members of the authority shall serve without compensation, but shall be reimbursed for any
necessary expenditures incurred in the performance of their duties.
F. The City Clerk shall receive all applications for licenses, and shall issue all licenses granted
by the authority, upon receipt of such license fees and taxes as are required by law and this
Code. The City Clerk shall serve as the official secretary of the authority and shall designate
a person or persons to provide the necessary secretarial and report services for the authority.
The City Clerk or designee shall attend the meetings of the authority. All public notice shall
be made by publication on the City’s official website, or in a newspaper designated by City
Council as the City’s official newspaper and by the posting of signs, as required by the
Colorado Liquor Code, shall be made by the City Clerk.
G. Such person or persons as the City Manager shall designate shall serve as investigators or
perform investigative duties on behalf of the Local Licensing Authority.
B. Delegation of authority to City Clerk. The City Clerk is authorized to act as the Local
Licensing Authority for the following Colorado Liquor Code and Colorado Beer Code
licensing functions:
1. Processing and issuance of special events permits pursuant to Article 48 of Title
12, C.R.S., provided that there are no parties filing a written objection to said
permit.
Page 30 of 216
6
2. Annual Colorado Liquor Code and Colorado Beer Code license renewals,
provided that the licensee has not violated any provisions of the Colorado
Liquor or Beer Codes and associated regulations during the preceding year.
3. Changes in shareholders, officers, directors or trade names of a licensee, or
registration and/or changes in on-site manager, provided that any investigation
conducted by the City does not reveal information that may reasonably form
the basis of a determination that the applicant is not qualified to hold the
respective license.
4. The issuance of temporary permits pursuant to and in compliance with the
provisions of C.R.S. 12-47-302, and C.R.S. 12-47-303. A temporary permit fee
shall be charged in conjunction with the issuance of each temporary permit.
5. Request to Change, Alter or Modify the Premises as set forth in E.M.C. 5-3A-
8.
6. Tasting permits issued in accordance with C.R.S. 12-47-301(10) and applicable
provisions of the Englewood Municipal Code.
7. Transfer of ownership.
The City Clerk may refer any licensing decision authorized under this section to the Local
Licensing Authority if, in the Clerk's discretion, the matter should be presented to the Local
Licensing Authority.
C. Duties of the City Clerk. The City Clerk shall receive all applications for licenses, and shall
issue all licenses granted by the Authority, upon receipt of such license fees and taxes as are
required by law and this Code. The City Clerk shall serve as the official secretary of the
Local Licensing Authority and shall designate a person or persons to provide the necessary
secretarial and reporting services for the Local Licensing Authority. The City Clerk or
designee shall attend the meetings of the Local Licensing Authority. All public notice shall
be made by publication on the City's official website, or in a newspaper designated by City
Council as the City's official newspaper. All signs required to be posted by the Colorado
Liquor Code, shall be made by the City Clerk.
Amending Title 5, Section 5-3D-2 of the Englewood Municipal Code
5-3D-2: - Powers and Duties of the Local Licensing Authority.
A. Vesting of Authority. The Local Licensing Authority, as established in E.M.C. 2-6-1, shall
grant or refuse local licenses for the cultivation, manufacture, distribution, and sale of Medical
Marijuana as provided by law; suspend, fine, restrict, or revoke such licenses upon a violation
of this Title, or a rule promulgated pursuant to this Title; and may impose any penalty
authorized by this Title or any rule promulgated pursuant to this Title. The Local Licensing
Authority may take action with respect to a registration or a license pursuant to this Title, and
in accordance with the procedures established pursuant to this Title.
B. Rules and Determinations. The Local Licensing Authority shall promulgate such rules and
make such special rulings and findings as necessary for the proper regulation and control of
Page 31 of 216
7
the cultivation, manufacture, distribution, and sale of Medical Marijuana and for the
enforcement of this Chapter.
C. Compliance with C.R.S. 12-43.3. The Local Licensing Authority hereby adopts shall comply
with and conform to the minimum licensing requirements of Article 43.3 of Title 12 C.R.S.
when issuing a License.
D. Additional licensing standards. In addition to all other standards applicable to the issuance of
licenses under this Code, the Local Licensing Authority hereby adopts shall comply with and
conform to the following additional standards for the issuance of Medical Marijuana Center,
Medical Marijuana Optional Premises Cultivation Operation, or Medical Marijuana-Infused
Products Manufacturer Licenses consistent with the intent of Article 43.3 of Title 12 C.R.S.
and this Code, including as follows:
1. Distance restrictions between premises in or out of City limits for which Local Licenses
are issued; shall be as follows:
(a) If the building in which Medical Marijuana is to be cultivated, manufactured or sold
is located within two thousand feet (2,000') of a school, an alcohol or drug treatment
facility, or the principal campus of a college, university, seminary, or a residential
child care facility or within two thousand five hundred feet (2,500') of an existing
licensed Medical Marijuana Center, Medical Marijuana-Infused Products
Manufacturer or Medical Marijuana Optional Premises Cultivation Operation. The
provisions of this Section shall not affect the renewal or re-issuance of a license once
granted or apply to licensed premises located or to be located on land owned by a
municipality; nor shall the provisions of the Section apply to existing licensed
premises on land owned by the State, or apply to a license in effect and actively doing
business before said principal campus was constructed.
(b) The distances referred to in this Title are to be computed by direct measurement from
the nearest property line of the land used for a school or campus to the nearest portion
of the building in which Medical Marijuana is to be sold, cultivated or infused, using
a route of direct pedestrian access.
(c) After April 20, 2015, Medical Marijuana Licensed Premises shall be limited to the
following locations but shall otherwise be exempt from the distance limitations of
this Chapter:
• 4695 South Windermere Street, Units A & B
• 4332 South Broadway
• 11 West Hampden Avenue, Suite 102
• 5005 South Federal Boulevard
2. Reasonable restrictions on the size of an applicant's Licensed Premises shall be as
follows:
(a) All Medical Marijuana Optional Premises Cultivation Operations shall not exceed
five thousand (5,000) square feet.
Page 32 of 216
8
(b) Restrictions on the size of licensed Medical Marijuana premises shall be reasonable
based upon the specific location, site, and premises.
3. Any other requirements necessary to ensure the control of the premises and the ease of
enforcement of the terms and conditions of the License, including the following:
(a) Any cultivation or manufacture of Medical Marijuana within a Multi-Tenant building
shall have a heating, ventilation and air conditioning system separate from the rest
of the building.
Amending Title 5, Section 5-3D-3 of the Englewood Municipal Code
5-3D-3: Definitions.
Any word or term used that is defined in Article XVIII, Section 14 (1)(f) of the Colorado
Constitution; in § 25-1.5-101 et seq. C.R.S. or in the Colorado Medical Marijuana Code, § 12-
43.3-101 et seq. C.R.S. shall have the same meaning that is ascribed to such word or term in those
Constitutional provisions or C.R.S. sections unless the definition is amended by this section.
Direct Measurement: means a straight line from the nearest property line of the school or
campus to the nearest portion of the building used for medical marijuana.
Good Cause: for purposes of refusing or denying a license renewal, reinstatement, or initial
license issuance means:
1. The licensee or applicant has violated, does not meet, or has failed to comply with any of
the terms, conditions, or provisions of Article 43.3 of Title 12 C.R.S., and rules
promulgated pursuant to this Title, or any supplemental local law, rules, or regulations;
2. The licensee or applicant has failed to comply with any special terms or conditions that
were placed on its license pursuant to an order of the State or Local Licensing Authority;
3. The licensed premises have been operated in a manner that adversely affects the public
health, welfare or the safety of the immediate neighborhood in which the establishment
is located. Evidence to support such a finding may include:
a. A continuing pattern of offenses against the public peace, as defined in Title 7 of this
Code.
b. A continuing pattern of drug-related criminal conduct within the premises or in the
immediate area.
c. A continuing pattern of criminal conduct directly related to or arising from the
facility.
4. The licensed premises will impair the use or development of adjacent conforming
properties or alter the essential character of the neighborhood.
Hearing Officer: means the individual who has been identified as the Englewood Local
Liquor and Marijuana Licensing Authority and given the authority to grant, deny or revoke a liquor
or marijuana license. Hearing Officer carries the same definition as that in 2-6-1(A)(2) of the
Englewood Municipal Code.
License: means to grant a license or registration pursuant to this Title.
Page 33 of 216
9
Licensed Premises: means the premises specified in an application for a license under this
Title, which are owned or in possession of the licensee and within which the licensee is authorized
to cultivate, manufacture, distribute, or sell Medical Marijuana in accordance with the provisions
of Article 43.3 of Title 12 C.R.S.
Licensee: means a person licensed or registered pursuant to Article 43.3 of Title 12 C.R.S.
and this Title.
Local Licensing Authority: means the Englewood Local Liquor and Medical Marijuana
Licensing Authority as established in E.M.C. 2-6-1.
Local Licensing Official: means the Director of Finance and Administrative Services or
designee, official designated to issue a license following approval by the Local Licensing
Authority.
Location: means a particular parcel of land that may be identified by an address or other
descriptive means.
Medical Marijuana: means Marijuana that is grown and/or sold pursuant to the provisions of
§ 106 of Article 1.5 of Title 12 C.R.S.; Article 43.3 of Title 12 C.R.S. and for a purpose authorized
by Section 14 of Article XVIII of the State Constitution.
Medical Marijuana Center: means a person licensed pursuant to Article 43.3 of Title 12
C.R.S. to operate a business as described in Article 43.3 of Title 12 C.R.S. that sells Medical
Marijuana to registered patients or Primary Care-Givers as defined in Section 14 of Article XVIII
of the State Constitution, but is not a Primary Care-Giver.
Medical Marijuana-Infused Product: means a product infused with Medical Marijuana that is
intended for use or consumption other than by smoking, including, but not limited to, edible
products, ointments, and tinctures. These products, when manufactured or sold by a licensed
Medical Marijuana Center or a Medical Marijuana-Infused Product Manufacturer, shall not be
considered a food or drug for the purposes of the "Colorado Food and Drug Act", Part 4 of Article
5 of Title 25, C.R.S.
Medical Marijuana-Infused Product Manufacturer: A person licensed pursuant to Article
43.3 of Title 12 C.R.S. to operate a business as described in Article 43.3 of Title 12 C.R.S.
Medical Marijuana Optional Premises Cultivation Operation: means the premises specified
in an application for a Medical Marijuana Center License with related growing facilities in
Colorado for which the Licensee is authorized to grow and cultivate Marijuana for a purpose
authorized by Section 14 of Article XVIII of the State Constitution.
Multi-Tenant Building: A building that is or can be occupied by more than one tenant.
Patient: a person who meets the definition of patient under Article XVIII, Section 14 (1)(d)
of the Colorado Constitution and applicable law or regulation.
Person: means a natural person, partnership, association, company, corporation, limited
liability company, or organization, or a manager, agent, owner, director, servant, officer, or
employee thereof.
Premises: means a distinct and definite location, which may include a building, a part of a
building, a room, or any other definite contiguous area.
Page 34 of 216
10
Primary Care-Giver: In addition to the definitions set forth in Section 14(1) (f) of Article
XVIII of the State Constitution, as used in Article 43.3 of Title 12 C.R.S., unless the context
otherwise requires, "Primary Care-Giver" means a natural person, or as may be more fully defined
in any applicable Federal or State law or regulation.
School: means a public or private preschool or a public or private elementary, middle, junior
high, or high school, college or campus of a college.
Smoking: means the burning of a lighted cigarette, cigar, pipe, or any other matter or substance
that contains tobacco or Medical Marijuana as defined by Article 43.3 of Title 12 C.R.S.
State Licensing Authority: means the Authority created for the purpose of regulating and
controlling the Licensing of the cultivation, manufacture, distribution, and sale of Medical
Marijuana in this State, pursuant to Article 43.3 of Title 12 C.R.S.
Amending Title 5, Section 5-3E-2 of the Englewood Municipal Code
5-3E-2: Powers and Duties of the Local Licensing Authority.
A. The Local Licensing Authority as established in E.M.C. 2-6-1 shall grant or refuse local
Licenses for the distribution and sale of Retail Marijuana as provided by law; suspend, fine,
restrict, or revoke such Licenses upon a violation of this Chapter or a rule promulgated pursuant
to this Chapter; and may impose any penalty authorized by this Chapter or any rule promulgated
pursuant to this Chapter, the Local Licensing Authority may take action with respect to a License
pursuant to this Title, and all in accordance with the authority and procedures established pursuant
to this Chapter and in Title E.M.C. 2-6-1.
B. The Local Licensing Authority shall promulgate such rules and make such special rulings
and findings as necessary for the proper regulation and control of the distribution and sale of Retail
Marijuana and for the enforcement of this Chapter.
C. The Local Licensing Authority hereby adopts shall comply with the minimum licensing
requirements of Article 43.4 of Title 12 C.R.S. to apply to in association with the issuance of a
Retail Marijuana Store License.
D. On and after January 1, 2017, the Local Licensing Authority shall begin receiving and
processing applications under this Chapter. The Local Licensing Authority is authorized to
administratively approve any License application under this Chapter so long as the conditions set
forth in the Chapter are met and the applicant has paid the operating fee and any other fees required
by this Chapter.
E. Prior to January 1, 2019, the Local Licensing authority may receive and process
applications for a Retail Marijuana Store pursuant to Section 5-3E-4 of this Chapter only if the
applicant is a Medical Marijuana Center duly licensed as of June 1, 2016 under 5-3D-1 et. seq. of
the Englewood Municipal Code 2000.
Section 3. Effective Date. This ordinance shall be published in conformance with the Englewood
City Charter and shall take effect and be in force on and after January 1, 2018. All ordinances or
Page 35 of 216
11
provisions of the Englewood Municipal Code modified by this ordinance shall remain in effect
until superseded on the effective date of this Ordinance on January 1, 2018.
Section 4. The following general provisions shall apply to interpretation and application of this
Ordinance:
A. Severability. If any clause, sentence, paragraph, or part of this Ordinance or the application
thereof to any person or circumstances shall for any reason be adjudged by a court of competent
jurisdiction invalid, such judgment shall not affect, impair or invalidate the remainder of this
Ordinance or it application to other persons or circumstances.
B. Inconsistent Ordinances. All other Ordinances or portions thereof inconsistent or
conflicting with this Ordinance or any portion hereof are hereby repealed to the extent of such
inconsistency or conflict.
C. Effect of repeal or modification. The repeal or modification of any provision of the Code
of the City of Englewood by this Ordinance shall not release, extinguish, alter, modify, or
change in whole or in part any penalty, forfeiture, or liability, either civil or criminal, which
shall have been incurred under such provision, and each provision shall be treated and held as
still remaining in force for the purposes of sustaining any and all proper actions, suits,
proceedings, and prosecutions for the enforcement of the penalty, forfeiture, or liability, as well
as for the purpose of sustaining any judgment, decree, or order which can or may be rendered,
entered, or made in such actions, suits, proceedings, or prosecutions.
D. Safety Clauses. The City Council hereby finds, determines, and declares that this Ordinance
is promulgated under the general police power of the City of Englewood, that it is promulgated
for the health, safety, and welfare of the public, and that this Ordinance is necessary for the
preservation of health and safety and for the protection of public convenience and welfare. The
City Council further determines that the Ordinance bears a rational relation to the proper
legislative object sought to be obtained.
Introduced, read in full, and passed on first reading on the 16th day of October, 2017.
Published by Title as a Bill for an Ordinance in the City’s official newspaper on the 19th day of
October, 2017.
Published as a Bill for an Ordinance on the City’s official website beginning on the 18th day
of October, 2017 for thirty (30) days.
Read by Title and passed on final reading on the 6th day of November, 2017.
Published by Title in the City’s official newspaper as Ordinance No. ___, Series of 2017, on
the 9th day of November, 2017.
Published by title on the City’s official website beginning on the 8th day of November, 2017
for thirty (30) days.
Page 36 of 216
12
This Ordinance shall take effect thirty (30) days after publication following final passage.
Joe Jefferson, Mayor
ATTEST:
Stephanie Carlile, City Clerk
I, Stephanie Carlile, Acting City Clerk of the City of Englewood, Colorado, hereby certify that
the above and foregoing is a true copy of the Ordinance passed on final reading and published by
Title as Ordinance No. ___, Series of 2017.
Stephanie Carlile
Page 37 of 216
COUNCIL
COMMUNICATION
TO: Mayor and Council
FROM: Joe Isenbart
DEPARTMENT: IT
DATE: November 6, 2017
SUBJECT: Document Management System Contract
DESCRIPTION:
Document Management System Contract
RECOMMENDATION:
Staff recommends Council approve, by motion, the Tyler Technologies sales quotation/amendment for
Tyler Content Manager software provided by Tyler Technologies to be added to the existing agreement
in force with Tyler Technologies.
PREVIOUS COUNCIL ACTION:
On July 17, 2017, Council approved resolution #79 to allocate $80,000 from the Capital Fund reserve to
fund the Document Management project. This is the contract associated with the allocation.
SUMMARY:
Following Council’s approval of the supplemental appropriation staff has been working with Tyler
Technologies and the City Attorney’s office to finalize the contract details. The contract as attached
includes all document management tools to manage the complete lifecycle of content, information and
documentation as presented on July 17, 2017.
ANALYSIS:
Tyler Content Manager offers the City of Englewood the best value through functionality that
saves users’ time, not only when documents are imported, but also where redaction and purging
are required.
FINANCIAL IMPLICATIONS:
The initial project implementation cost is approximately $80,000, including implementation
services, licensing, hardware, travel expenses and configuration. The annual recurring
maintenance is $9,450 beginning in the second year with standard increases each year
thereafter as long as the City continues to use the software. Funding for this project is allocated
in 31 0701-015, Capital Projects Fund - IT, Tyler Content Manager.
CONCLUSION:
Staff asks for Council approval of the Contract with Tyler Content Manager.
Page 38 of 216
ATTACHMENTS:
Contract and Sales Quotation - for Approval
Page 39 of 216
1
LICENSE AND SERVICES AGREEMENT
This License and Services Agreement is made between Tyler Technologies, Inc. and Client.
WHEREAS, Client selected Tyler to license the software products and perform the services set forth in the
Investment Summary and Tyler desires to perform such actions under the terms of this Agreement;
NOW THEREFORE, in consideration of the foregoing and of the mutual covenants and promises set forth in this
Agreement, Tyler and Client agree as follows:
SECTION A – DEFINITIONS
• “Agreement” means this License and Services Agreement.
• “Business Travel Policy” means our business travel policy. A copy of our current Business Travel Policy
is attached as Schedule 1 to Exhibit B.
• “Client” means City of Englewood.
• “Defect” means a failure of the Tyler Software to substantially conform to the functional descriptions
set forth in our written proposal to you, or their functional equivalent. Future functionality may be
updated, modified, or otherwise enhanced through our maintenance and support services, and the
governing functional descriptions for such future functionality will be set forth in our then-current
Documentation.
• “Developer” means a third party who owns the intellectual property rights to Third Party Software.
• “Documentation” means any online or written documentation related to the use or functionality of the
Tyler Software that we provide or otherwise make available to you, including instructions, user guides,
manuals and other training or self-help documentation.
• “Effective Date” means the date on which your authorized representative signs the Agreement.
• “Force Majeure” means an event beyond the reasonable control of you or us, including, without
limitation, governmental action, war, riot or civil commotion, fire, natural disaster, or any other cause
that could not with reasonable diligence be foreseen or prevented by you or us.
• “Investment Summary” means the agreed upon cost proposal for the software, products, and services
attached as Exhibit A.
• “Invoicing and Payment Policy” means the invoicing and payment policy. A copy of our current
Invoicing and Payment Policy is attached as Exhibit B.
• “Maintenance and Support Agreement” means the terms and conditions governing the provision of
maintenance and support services to all of our customers. A copy of our current Maintenance and
Support Agreement is attached as Exhibit C.
• “Support Call Process” means the support call process applicable to all of our customers who have
licensed the Tyler Software. A copy of our current Support Call Process is attached as Schedule 1 to
Exhibit C.
• “Third Party Terms” means, if any, the end user license agreement(s) or similar terms for the Third Party
Software, as applicable and attached as Exhibit D.
• “Third Party Hardware” means the third party hardware, if any, identified in the Investment Summary.
• “Third Party Products” means the Third Party Software and Third Party Hardware.
Page 40 of 216
2
• “Third Party Software” means the third party software, if any, identified in the Investment Summary.
• “Tyler” means Tyler Technologies, Inc., a Delaware corporation.
• “Tyler Software” means our proprietary software, including any integrations, custom modifications,
and/or other related interfaces identified in the Investment Summary and licensed by us to you through
this Agreement.
• “we”, “us”, “our” and similar terms mean Tyler.
• “you” and similar terms mean Client.
SECTION B – SOFTWARE LICENSE
1. License Grant and Restrictions.
1.1 We grant to you a license to use the Tyler Software for your internal business purposes only, in the
scope of the internal business purposes disclosed to us as of the Effective Date. You may make copies of
the Tyler Software for backup and testing purposes, so long as such copies are not used in production
and the testing is for internal use only. Notwithstanding any termination under Section G(2) of this
Agreement, your rights to use the Tyler Software are perpetual but may be revoked if you do not comply
with the terms of this Agreement.
1.2 The Documentation is licensed to you and may be used and copied by your employees for internal, non -
commercial reference purposes only.
1.3 You may not: (a) transfer or assign the Tyler Software to a third party; (b) reverse engineer, decompile,
or disassemble the Tyler Software; (c) rent, lease, lend, or provide commercial hosting services with the
Tyler Software; or (d) publish or otherwise disclose the Tyler Software or Documentation to third
parties.
1.4 The license terms in this Agreement apply to updates and enhancements we may provide to you or
make available to you through your Maintenance and Support Agreement.
1.5 The right to transfer the Tyler Software to a replacement hardware system is included in your license.
You will give us advance written notice of any such transfer and will pay us for any required or
requested technical assistance from us associated with such transfer.
1.6 We reserve all rights not expressly granted to you in this Agreement. The Tyler Software and
Documentation are protected by copyright and other intellectual property laws and treaties. We own
the title, copyright, and other intellectual property rights i n the Tyler Software and the Documentation.
The Tyler Software is licensed, not sold.
2. License Fees. You agree to pay us the license fees in the amounts set forth in the Investment Summary.
Those amounts are payable in accordance with our Invoicing and Payment Policy.
3. Escrow. We maintain an escrow agreement with a third party under which we place the source code for
each major release of the Tyler Software. You may be added as a beneficiary to the escrow agreement by
completing a standard beneficiary enrollment form and paying the annual beneficiary fee set forth in the
Investment Summary. You will be responsible for maintaining your ongoing status as a beneficiary, including
payment of the then-current annual beneficiary fees. Release of source code for the Tyler Software is
strictly governed by the terms of the escrow agreement.
4. Limited Warranty. We warrant that the Tyler Software will be without Defect(s) as long as you have a
Page 41 of 216
3
Maintenance and Support Agreement in effect. If the Tyler Software does not perform as warranted, we will
use all reasonable efforts, consistent with industry standards, to cure the Defect as set forth in the
Maintenance and Support Agreement.
SECTION C – PROFESSIONAL SERVICES
1. Services. We will provide you the various implementation-related services itemized in the Investment
Summary and described in our industry standard implementation plan. We will finalize that documentation
with you upon execution of this Agreement.
2. Professional Services Fees. You agree to pay us the professional services fees in the amounts set forth in the
Investment Summary. Those amounts are payable in accordance with our Invoicing and Payment Policy.
You acknowledge that the fees stated in the Investment Summary are good-faith estimates of the amount of
time and materials required for your implementation. We will bill you the actual fees incurred based on the
in-scope services provided to you. Any discrepancies in the total values set forth in the Investment
Summary will be resolved by multiplying the applicable hourly rate by the quoted hours.
3. Additional Services. The Investment Summary contains the scope of services and related costs (including
programming and/or interface estimates) required for the project based on our understanding of the
specifications you supplied. If additional work is required, or if you use or request additional services, we
will provide you with an addendum or change order, as applicable, outlining the costs for the additional
work. The price quotes in the addendum or change order will be valid for thirty (30) days from the date of
the quote.
4. Cancellation. We make all reasonable efforts to schedule our personnel for travel, including arranging travel
reservations, at least two (2) weeks in advance of commitments. Therefore, if you cancel services less than
two (2) weeks in advance (other than for Force Majeure or breach by us), you will be liable for all (a) non-
refundable expenses incurred by us on your behalf, and (b) daily fees associated with cancelled professional
services if we are unable to reassign our personnel. We will make all reasonable efforts to reassign
personnel in the event you cancel within two (2) weeks of scheduled commitments.
5. Services Warranty. We will perform the services in a professional, workmanlike manner, consistent with
industry standards. In the event we provide services that do not conform to this warranty, we will re -
perform such services at no additional cost to you.
6. Site Access and Requirements. At no cost to us, you agree to provide us with full and free access to your
personnel, facilities, and equipment as may be reasonably necessary for us to provide implementation
services, subject to any reasonable security protocols or other written policies provided to us as of the
Effective Date, and thereafter as mutually agreed to by you and us. You further agree to provide a
reasonably suitable environment, location, and space for the installation of the Tyler Software and any Third
Party Products, including, without limitation, sufficient electrical circuits, cables, and other reasonably
necessary items required for the installation and operation of the Tyler Software and any Third Party
Products.
7. Client Assistance. You acknowledge that the implementation of the Tyler Software is a cooperative process
requiring the time and resources of your personnel. You agree to use all reasonable efforts to cooperate
with and assist us as may be reasonably required to meet the agreed upon project deadlines and other
milestones for implementation. This cooperation includes at least working with us to schedule the
implementation-related services outlined in this Agreement. We will not be liable for failure to meet any
Page 42 of 216
4
deadlines and milestones when such failure is due to Force Majeure or to the failure by your personnel to
provide such cooperation and assistance (either through action or omission).
SECTION D – MAINTENANCE AND SUPPORT
This Agreement includes the period of free maintenance and support services identified in the Invoicing and
Payment Policy. If you have purchased ongoing maintenance and support services, and continue to make
timely payments for them according to our Invoicing and Payment Policy, we will provide you with
maintenance and support services for the Tyler Software under the terms of our standard Maintenance and
Support Agreement.
If you have opted not to purchase ongoing maintenance and support services for the Tyler Software, the
Maintenance and Support Agreement does not apply to you. Instead, you will only receive ongoing
maintenance and support on the Tyler Software on a time and materials basis. In addition, you will:
(i) receive the lowest priority under our Support Call Process;
(ii) be required to purchase new releases of the Tyler Software, including fixes, enhancements and
patches;
(iii) be charged our then-current rates for support services, or such other rates that we may
consider necessary to account for your lack of ongoing training on the Tyler Software;
(iv) be charged for a minimum of two (2) hours of support services for every support call; and
(v) not be granted access to the support website for the Tyler Software or the Tyler Community
Forum.
SECTION E – THIRD PARTY PRODUCTS
To the extent there are any Third Party Products set forth in the Investment Summary, the following terms and
conditions will apply:
1. Third Party Hardware. We will sell, deliver, and install onsite the Third Party Hardware, if you have
purchased any, for the price set forth in the Investment Summary. Those amounts are payable in
accordance with our Invoicing and Payment Policy.
2. Third Party Software. Upon payment in full of the Third Party Software license fees, you will receive a non-
transferable license to use the Third Party Software and related documentation for your internal business
purposes only. Your license rights to the Third Party Software will be governed by the Third Party Terms.
2.1 We will install onsite the Third Party Software. The installation cost is included in the installation fee in
the Investment Summary.
2.2 If the Developer charges a fee for future updates, releases, or other enhancements to the Third Party
Software, you will be required to pay such additional future fee.
2.3 The right to transfer the Third Party Software to a replacement hardware system is governed by the
Developer. You will give us advance written notice of any such transfer and will pay us for any required
or requested technical assistance from us associated with such transfer.
3. Third Party Products Warranties.
Page 43 of 216
5
3.1 We are authorized by each Developer to grant or transfer the licenses to the Third Party Software.
3.2 The Third Party Hardware will be new and unused, and upon payment in full, you will receive free and
clear title to the Third Party Hardware.
3.3 You acknowledge that we are not the manufacturer of the Third Party Products. We do not warrant or
guarantee the performance of the Third Party Products. However, we grant and pass through to you
any warranty that we may receive from the Developer or supplier of the Third Party Products.
4. Maintenance. If you have a Maintenance and Support Agreement in effect, you may report defects and
other issues related to the Third Party Software directly to us, and we will (a) directly address the defect or
issue, to the extent it relates to our interface with the Third Party Software; and/or (b) facilitate resolution
with the Developer, unless that Developer requires that you have a separate, direct maintenance agreement
in effect with that Developer. In all events, if you do not have a Maintenance and Support Agreement in
effect with us, you will be responsible for resolving defects and other issues related to the Third Party
Software directly with the Developer.
5. DocOrigin Software. Notwithstanding any provision to the contrary in the DocOrigin EULA, Tyler is
authorized by OF Software, Ltd. to agree to the following: The DocOrigin EULA shall be governed by the laws
of the State of Texas, and venue shall be in a federal or state court in or serving Dallas County, Texas.
SECTION F – INVOICING AND PAYMENT; INVOICE DISPUTES
1. Invoicing and Payment. We will invoice you for all fees set forth in the Investment Summary per our
Invoicing and Payment Policy, subject to Section F(2).
2. Invoice Disputes. If you believe any delivered software or service does not conform to the warranties in this
Agreement, you will provide us with written notice within thirty (30) days of your receipt of the applicable
invoice. The written notice must contain reasonable detail of the issues you contend are in dispute so that
we can confirm the issue and respond to your notice with either a justification of the invoice, an adjustment
to the invoice, or a proposal addressing the issues presented in your notice. We will work with you as may
be necessary to develop an action plan that outlines reasonable steps to be taken by each of us to resolve
any issues presented in your notice. You may withhold payment of the amount(s) actually in dispute , and
only those amounts, until we complete the action items outlined in the plan. If we are unable to complete
the action items outlined in the action plan because of your failure to complete the items agreed to be done
by you, then you will remit full payment of the invoice. We reserve the right to suspend delivery of all
services, including maintenance and support services, if you fail to pay an invoice not disputed as described
above within fifteen (15) days of notice of our intent to do so.
SECTION G – TERMINATION
1. For Cause. If you believe we have materially breached this Agreement, you will invoke the Dispute
Resolution clause set forth in Section I(3). You may terminate this Agreement for cause in the event we do
not cure, or create a mutually agreeable action plan to address, a material breach of this Agreement within
the thirty (30) day window set forth in Section I(3). In the event of termination for cause, you will pay us for
all undisputed fees and expenses related to the software, products, and/or services you have received, or
we have incurred or delivered, prior to the effective date of termination.
Page 44 of 216
6
2. Lack of Appropriations. Notwithstanding any language to the contrary in this Agreement including, without
limitation, Maintenance fee language in Exhibit A (Investment Summary) or Maintenance term auto-renewal
in Exhibit C (Maintenance and Support Agreement), if you should not appropriate or otherwise receive funds
sufficient to purchase, lease, operate, or maintain the software or services set forth in this Agreement, you
may unilaterally terminate this Agreement effective on the final day of the fiscal year through which you
have funding. You will make every effort to give us at least thirty (30) days written notice prior to a
termination for lack of appropriations. In the event of termination due to a lack of appropriations, you will
pay us for all undisputed fees and expenses related to the software and/or services you have received, or we
have incurred or delivered, prior to the effective date of termination. Any disputed fees and expenses must
have been submitted to the Invoice Dispute process set forth in Section F(2) at the time of termination in
order to be withheld at termination. You will not be entitled to a refund or offset of previously paid license
and other fees. The parties understand and acknowledge that each party is subject to Article X, § 20 of the
Colorado Constitution (“TABOR”). The parties do not intend to violate the terms and requirements of
TABOR by the execution of this Agreement. It is understood and agreed that this Agreement does not
create multi-fiscal year direct or indirect debt or obligation within the meaning of TABOR and,
notwithstanding anything in this Agreement to the contrary, all payment obligations of the Client are
expressly dependent and conditioned upon the continued availability of funds beyond the term of the City’s
current fiscal period ending the next succeeding December 31. Financial obligations of the City payable after
the current fiscal year are contingent upon funds for that purpose being appropriated, budgeted and
otherwise made available in accordance with the rules, regulations, and resolutions of the Client and
applicable law. Upon the failure to appropriate such funds, the Agreement shall be terminated as forth in
this section.
3. Force Majeure. Neither party will be liable, you or we may terminate this Agreement if a Force Majeure
event suspends performance of scheduled tasks for a period of forty-five (45) days or more. In the event of
termination due to Force Majeure, you will pay us for all undisputed fees and expenses related to the
software and/or services you have received, or we have incurred or delivered, prior to the effective date of
termination. Any disputed fees and expenses must have been submitted to the Invoice Dispute process set
forth in Section F(2) at the time of termination in order to be withheld at termination. You will not be
entitled to a refund or offset of previously paid license and other fees.
4. For Convenience. You may terminate this Agreement for convenience with thirty (30) days advance written
notice. In the event of termination for convenience, you will pay us for all fees and expenses related to the
software, products, and/or services you have received, or we have incurred or delivered, prior to the
effective date of termination.
SECTION H – INDEMNIFICATION, LIMITATION OF LIABILITY AND INSURANCE
1. Intellectual Property Infringement Indemnification.
1.1 We will defend you against any third party claim(s) that the Tyler Software or Documentation infringes
that third party’s patent, copyright, or trademark, or misappropriates its trade secrets, and will pay the
amount of any resulting adverse final judgment (or settlement to which we consent). You must notify us
promptly in writing of the claim and give us sole control over its defense or settlement. You agree to
provide us with reasonable assistance, cooperation, and information in defending the claim at our
expense.
1.2 Our obligations under this Section H(1) will not apply to the extent the claim or adverse final judgment is
Page 45 of 216
7
based on your: (a) use of a previous version of the Tyler Software and the claim would have been
avoided had you installed and used the current version of the Tyler Software, and we provided notice of
that requirement to you; (b) combining the Tyler Software with any product or device not provided,
contemplated, or approved by us; (c) altering or modifying the Tyler Software, including any
modification by third parties at your direction or otherwise permitted by you; (d) use of the Tyler
Software in contradiction of this Agreement, including with non-licensed third parties; or (e) willful
infringement, including use of the Tyler Software after we notify you to discontinue use due to such a
claim.
1.3 If we receive information concerning an infringement or misa ppropriation claim related to the Tyler
Software, we may, at our expense and without obligation to do so, either: (a) procure for you the right
to continue its use; (b) modify it to make it non-infringing; or (c) replace it with a functional equivalent,
in which case you will stop running the allegedly infringing Tyler Software immediately. Alternatively,
we may decide to litigate the claim to judgment, in which case you may continue to use the Tyler
Software consistent with the terms of this Agreement.
1.4 If an infringement or misappropriation claim is fully litigated and your use of the Tyler Software is
enjoined by a court of competent jurisdiction, in addition to paying any adverse final judgment (or
settlement to which we consent), we will, at our option, either: (a) procure the right to continue its use;
(b) modify it to make it non-infringing; (c) replace it with a functional equivalent; or (d) terminate your
license and refund the license fees paid for the infringing Tyler Software, as depreciated on a straight-
line basis measured over seven (7) years from the Effective Date. We will pursue those options in the
order listed herein. This section provides your exclusive remedy for third party copyright, patent, or
trademark infringement and trade secret misappropriation claims.
2. General Indemnification.
2.1 We will indemnify and hold harmless you and your agents, officials, and employees from and against any
and all third-party claims, losses, liabilities, damages, costs, and expenses (including reasonable
attorney's fees and costs) for (a) personal injury or property damage to the extent caused by our
negligence or willful misconduct; or (b) our violation of a law applicable to our performance under this
Agreement. You must notify us promptly in writing of the claim and give us sole control over its defense
or settlement. You agree to provide us with reasonable assistance, cooperation, and information in
defending the claim at our expense.
3. DISCLAIMER. EXCEPT FOR THE EXPRESS WARRANTIES PROVIDED IN THIS AGREEMENT AND TO THE
MAXIMUM EXTENT PERMITTED BY APPLICABLE LAW, WE HEREBY DISCLAIM ALL OTHER WARRANTIES
AND CONDITIONS, WHETHER EXPRESS, IMPLIED, OR STATUTORY, INCLUDING, BUT NOT LIMITED TO, ANY
IMPLIED WARRANTIES, DUTIES, OR CONDITIONS OF MERCHANTABILITY OR FITNESS FOR A PARTICULAR
PURPOSE.
4. LIMITATION OF LIABILITY. EXCEPT AS OTHERWISE EXPRESSLY SET FORTH IN THIS AGREEMENT, OUR
LIABILITY FOR DAMAGES ARISING OUT OF THIS AGREEMENT, WHETHER BASED ON A THEORY OF
CONTRACT OR TORT, INCLUDING NEGLIGENCE AND STRICT LIABILITY, SHALL BE LIMITED TO YOUR ACTUAL
DIRECT DAMAGES, NOT TO EXCEED (A) PRIOR TO FORMAL TRANSITION TO MAINTENANCE AND SUPPORT,
THE TOTAL ONE-TIME FEES SET FORTH IN THE INVESTMENT SUMMARY; OR (B) AFTER FORMAL
TRANSITION TO MAINTENANCE AND SUPPORT, THE THEN-CURRENT ANNUAL MAINTENANCE AND
SUPPORT FEE. THE PRICES SET FORTH IN THIS AGREEMENT ARE SET IN RELIANCE UPON THIS LIMITATION
Page 46 of 216
8
OF LIABILITY. THE FOREGOING LIMITATION OF LIABILITY SHALL NOT APPLY TO CLAIMS THAT ARE SUBJECT
TO SECTIONS H(1) AND H(2).
5. EXCLUSION OF CERTAIN DAMAGES. TO THE MAXIMUM EXTENT PERMITTED BY APPLICABLE LAW, IN NO
EVENT SHALL WE BE LIABLE FOR ANY SPECIAL, INCIDENTAL, PUNITIVE, INDIRECT, OR CONSEQUENTIAL
DAMAGES WHATSOEVER, EVEN IF WE HAVE BEEN ADVISED OF THE POSSIBILITY OF SUCH DAMAGES.
6. Insurance. During the course of performing services under this Agreement, we agree to maintain the
following levels of insurance: (a) Commercial General Liability of at least $1,000,000; (b) Automobile Liability
of at least $1,000,000; (c) Professional Liability of at least $1,000,000; (d) Workers Compensation complying
with applicable statutory requirements; and (e) Excess/Umbrella Liability of at least $5,000,000. We will add
you as an additional insured to our Commercial General Liability and Automobile Liability policies , which will
automatically add you as an additional insured to our Excess/Umbrella Liability policy as well. We will
provide you with copies of certificates of insurance upon your written request.
SECTION I – GENERAL TERMS AND CONDITIONS
1. Additional Products and Services. You may purchase additional products and services at the rates set forth
in the Investment Summary for twelve (12) months from the Effective Date, and thereafter at our then-
current list price, by executing a mutually agreed addendum. If no rate is provided in the Investment
Summary, or those twelve (12) months have expired, you may purchase additional products and services at
our then-current list price, also by executing a mutually agreed addendum. The terms of this Agreement will
control any such additional purchase(s), unless otherwise specifically provided in the addendum.
2. Optional Items. Pricing for any listed optional products and services in the Investment Summary will be valid
for twelve (12) months from the Effective Date.
3. Dispute Resolution. You agree to provide us with written notice within thirty (30) days of becoming aware
of a dispute. You agree to cooperate with us in trying to reasonably resolve all disputes, including, if
requested by either party, appointing a senior representative to meet and engage in good faith negotiations
with our appointed senior representative. Senior representatives will convene within thirty (30) days of the
written dispute notice, unless otherwise agreed. All meetings and discussions between senior
representatives will be deemed confidential settlement discussions not subject to disclosure under Federal
Rule of Evidence 408 or any similar applicable state rule. If we fail to resolve the dispute, either of us may
assert our respective rights and remedies in a court of competent jurisdiction. Nothing in this section shall
prevent you or us from seeking necessary injunctive relief during the dispute resolution procedures.
4. Taxes. The fees in the Investment Summary do not include any taxes, including, without limitation, sales,
use, or excise tax. If you are a tax-exempt entity, you agree to provide us with a tax-exempt certificate.
Otherwise, we will pay all applicable taxes to the proper authorities and you will reimburse us for such taxes.
If you have a valid direct-pay permit, you agree to provide us with a copy. For clarity, we are responsible for
paying our income taxes, both federal and state, as applicable, arising from our performance of this
Agreement.
5. Nondiscrimination. We will not discriminate against any person employed or applying for employment
concerning the performance of our responsibilities under this Agreement. This discrimination prohibition
will apply to all matters of initial employment, tenure, and terms of employment, or otherwise with respect
to any matter directly or indirectly relating to employment concerning race, color, religion, national origin,
Page 47 of 216
9
age, sex, sexual orientation, ancestry, disability that is unrelated to the individual's ability to perform the
duties of a particular job or position, height, weight, marital status, or political affiliation. We will post,
where appropriate, all notices related to nondiscrimination as may be required by applicable law.
6. E-Verify. We have complied, and will comply, with the E-Verify procedures administered by the U.S.
Citizenship and Immigration Services Verification Division for all of our employees assigned to your project.
7. Subcontractors. We will not subcontract any services under this Agreement without your prior written
consent, not to be unreasonably withheld.
8. Binding Effect; No Assignment. This Agreement shall be binding on, and shall be for the benefit of, either
your or our successor(s) or permitted assign(s). Neither party may assign this Agreement without the prior
written consent of the other party; provided, however, your consent is not required for an assignment by us
as a result of a corporate reorganization, merger, acquisition, or purchase of substantially all of our assets.
In the event we assign this Agreement as a result of a corporate reorganization, merger, acquisition, or
purchase of substantially all of our assets, we will provide you timely notice of such assignment after the
assignment is made.
9. Force Majeure. Except for your payment obligations, neither party will be liable for delays in performing its
obligations under this Agreement to the extent that the delay is caused by Force Majeure; provided,
however, that within ten (10) business days of the Force Majeure event, the party whose performance is
delayed provides the other party with written notice explaining the cause and extent thereof, as well as a
request for a reasonable time extension equal to the estimated duration of the Force Majeure event.
10. No Intended Third Party Beneficiaries. This Agreement is entered into solely for the benefit of you and us.
No third party will be deemed a beneficiary of this Agreement, and no third party will have the right to make
any claim or assert any right under this Agreement. This provision does not affect the rights of third parties
under any Third Party Terms.
11. Entire Agreement; Amendment. This Agreement represents the entire agreement between you and us with
respect to the subject matter hereof, and supersedes any prior agreements, understandings, and
representations, whether written, oral, expressed, implied, or statutory. Purchase orders submitted by you,
if any, are for your internal administrative purposes only, and the terms and conditions contained in those
purchase orders will have no force or effect. This Agreement may only be modified by a written amendment
signed by an authorized representative of each party.
12. Severability. If any term or provision of this Agreement is held invalid or unenforceable, the remainder of
this Agreement will be considered valid and enforceable to the fullest extent permitted by law.
13. No Waiver. In the event that the terms and conditions of this Agreement are not strictly enforced by either
party, such non-enforcement will not act as or be deemed to act as a waiver or modification of this
Agreement, nor will such non-enforcement prevent such party from enforcing each and every term of this
Agreement thereafter.
14. Independent Contractor. We are an independent contractor for all purposes under this Agreement.
15. Notices. All notices or communications required or permitted as a part of this Agreement, such as notice of
an alleged material breach for a termination for cause or a dispute that must be submitted to dispute
resolution, must be in writing and will be deemed delivered upon the earlier of the following: (a) actual
receipt by the receiving party; (b) upon receipt by sender of a certified mail, return receipt signed by an
Page 48 of 216
10
employee or agent of the receiving party; (c) upon receipt by sender of proof of email delivery; or (d) if not
actually received, five (5) days after deposit with the United States Postal Service authorized mail center
with proper postage (certified mail, return receipt requested) affixed and addressed to the other party at
the address set forth on the signature page hereto or such other address as the party may have designated
by proper notice. The consequences for the failure to receive a notice due to improper notification by the
intended receiving party of a change in address will be borne by the intended receiving party.
16. Client Lists. You agree that we may identify you by name in client lists, marketing presentations, and
promotional materials.
17. Confidentiality. Both parties recognize that their respective employees and agents, in the course of
performance of this Agreement, may be exposed to confidential information and that disclosure of such
information could violate rights to private individuals and entities, including the parties. Confidential
information is nonpublic information that a reasonable person would believe to be confidential and
includes, without limitation, personal identifying information (e.g., social security numbers) and trade
secrets, each as defined by applicable state law. Each party agrees that it will not disclose any confidential
information of the other party and further agrees to take all reasonable and appropriate action to prevent
such disclosure by its employees or agents. The confidentiality covenants contained herein will survive the
termination or cancellation of this Agreement. This obligation of confidentiality will not apply to
information that:
(a) is in the public domain, either at the time of disclosure or afterwards, except by breach of this
Agreement by a party or its employees or agents;
(b) a party can establish by reasonable proof was in that party's possession at the time of initial
disclosure;
(c) a party receives from a third party who has a right to disclose it to the receiving party; or
(d) is the subject of a legitimate disclosure request under the open records laws or similar applicable
public disclosure laws governing this Agreement; provided, however, that in the event you receive
an open records or other similar applicable request, you will give us prompt notice and otherwise
perform the functions required by applicable law.
18. Business License. In the event a local business license is required for us to perform services hereunder, you
will promptly notify us and provide us with the necessary paperwork and/or contact information so that we
may timely obtain such license.
19. Governing Law. This Agreement will be governed by and construed in accordance with the laws of your
state of domicile, without regard to its rules on conflicts of law.
20. Multiple Originals and Authorized Signatures. This Agreement may be executed in multiple originals, any of
which will be independently treated as an original document. Any electronic, faxed, scanned, photocopied ,
or similarly reproduced signature on this Agreement or any amendment hereto will be deemed an original
signature and will be fully enforceable as if an original signature. Each party represents to the other that the
signatory set forth below is duly authorized to bind that party to this Agreement.
21. Cooperative Procurement. To the maximum extent permitted by applicable law, we agree that this
Agreement may be used as a cooperative procurement vehicle by eligible jurisdictions. We reserve the right
to negotiate and customize the terms and conditions set forth herein, including but not limited to pricing, to
the scope and circumstances of that cooperative procurement.
Page 49 of 216
11
22. Contract Documents. This Agreement includes the following exhibits:
Exhibit A Investment Summary
Exhibit B Invoicing and Payment Policy
Schedule 1: Business Travel Policy
Exhibit C Maintenance and Support Agreement
Schedule 1: Support Call Process
Exhibit D DocOrigin End User License Agreement
IN WITNESS WHEREOF, a duly authorized representative of each party has executed this Agreement as of the
date(s) set forth below.
Tyler Technologies, Inc. City of Englewood
By: By:
Name: Name:
Title: Title:
Date: Date:
Address for Notices: Address for Notices:
Tyler Technologies, Inc. City of Englewood
One Tyler Drive 1000 Englewood Parkway
Yarmouth, ME 04096 Englewood, CO 80110-2373
Attention: Chief Legal Officer Attention:
Page 50 of 216
12
Exhibit A
Investment Summary
The following Investment Summary details the software, products, and services to be delivered by us to you
under the Agreement. This Investment Summary is effective as of the Effective Date. Capitalized terms not
otherwise defined will have the meaning assigned to such terms in the Agreement.
Sales Quote# QUO-20479-C5Q3Z8 to be inserted on following page
REMAINDER OF PAGE INTENTIONALLY LEFT BLANK
Page 51 of 216
Sales Quotation for:
Englewood, CO Tyler price quotations are valid for 120 days
Software and Related Services
Description License
Year 1
Maintenance # of Days Cost Module Total
$38,000 $6,840 10 $12,750 $57,590
$9,500 $1,710 0 $0 $2,000 $11,210
$5,000 $900 3 $3,660 $9,560
$52,500 $9,450 13 $16,410 $2,000 $78,360
$52,500 $9,450 13 $16,410 $2,000 $80,360
$2,875 $9,450 $12,325
$49,625 $0 13 $16,410 $2,000 $68,035
Service Qty Fee
TCM Forms - Financial Library 2 $1,800
TCM Forms - General Billing Library 1 $2,000
TCM Forms - Payroll Library 1 $1,500
TOTAL:$5,300
TOTAL INITIAL COST:
Discount Amount:
Includes 1 AP Check, 1 EFT, 1 PO, 1 Requisiton, 1 Inventory Issue, 1 Request for Payment, 1099-MISC,
1099-R, 1009-G, 1099-INT, 1099-S
Description
Includes 1 MB Statement, 1 Receipt, 1 Refund Check
Tyler Content Manager & Tyler Forms Subtotal:
Tyler Content Manager & Tyler Forms:
TCM Enterprise Edition (TCM EE)
Tyler Forms Processing
Includes 1 Payroll Check, 1 EFT, 1 1099R, 1 W2, and 1 1095C
Installation /
Configuration
Quote Expiration:
Quote Description:
Quote Number:
Client Name:
Quoted By:
Date:
Christopher Vargo
6/8/2017
10/6/2017
Englewood, CO
QUO-20479-C5Q3Z8
Englewood, CO TCM EE
1000 Englewood Parkway
Englewood, CO 80110-2373
(303) 762-2587
Implementation
TCM EE Web Services Interface
Overall Subtotal:
Tyler New World ERP
Private and Confidential Page 1Page 52 of 216
Sales Quotation for:
Englewood, CO Tyler price quotations are valid for 120 days
Opportunty Number - Version
Englewood, CO
10/6/2017
6/8/2017
Quote Expiration:
Christopher Vargo
Quote Description:
Quote Number:
Client Name:
Quoted By:
Date:
Englewood, CO TCM EE
1000 Englewood Parkway
Englewood, CO 80110-2373
(303) 762-2587
New World ERP Summary
One Time
Fees
Recurring
Fees
Total Licensed Software $49,625 $9,450
Total Hosted / SaaS Software $0
Total Services $23,710
Summary Total $73,335 $9,450
$82,785
3 Trips $6,000
Contract Total (Excluding Estimated Travel Expenses)
Estimated Travel Expenses
Trips @ $2,000/each -Includes airfare, car rental, hotel
accommodations and per diem
Tyler New World ERP
Private and Confidential Page 2Page 53 of 216
Sales Quotation for:
Englewood, CO Tyler price quotations are valid for 120 days
Opportunty Number - Version
Englewood, CO
10/6/2017
6/8/2017
Quote Expiration:
Christopher Vargo
Quote Description:
Quote Number:
Client Name:
Quoted By:
Date:
Englewood, CO TCM EE
1000 Englewood Parkway
Englewood, CO 80110-2373
(303) 762-2587
Footnotes
Authorized Client Signatory:
The software, services, and hardware, as applicable, that are itemized above, are hereby added to your existing Agreement with
Tyler's prices do not include applicable local, city or federal sales, use excise, personal property or other similar taxes or duties, which you are responsible for determining and
remitting.
Conversion prices are based on a single occurrence of the database. If additional databases need to be converted, these will need to be quoted.
The costs provided in this proposal are based on all of the proposed products and services being obtained from Tyler Technologies. Should significant portions of the products
or services be deleted, Tyler reserves the right to adjust its prices accordingly.
Travel and expenses are not included under Total Services as they are billed at actual cost. A separate line item above "Estimated Travel Expenses", shows Tyler's estimate
for travel and living expenses for the scope of this project. That estimate is based upon $2,000 per trip, which may include airfare, hotel, per diem, car rental, and gas). All
travel and living expenses will be billed on a weekly basis, but only as incurred.
Tyler New World ERP
Private and Confidential Page 3Page 54 of 216
Sales Quotation for:
Englewood, CO Tyler price quotations are valid for 120 days
Opportunty Number - Version
Englewood, CO
10/6/2017
6/8/2017
Quote Expiration:
Christopher Vargo
Quote Description:
Quote Number:
Client Name:
Quoted By:
Date:
Englewood, CO TCM EE
1000 Englewood Parkway
Englewood, CO 80110-2373
(303) 762-2587
Unless otherwise noted, prices submitted in the quote do not include travel expenses incurred in accordance with Tyler's then-current Business Travel Policy.
In the event Client cancels services less than two (2) weeks in advance, Client is liable to Tyler for (i) all non-refundable expenses incurred by Tyler on Client's behalf; and (ii)
daily fees associated with the cancelled services if Tyler is unable to re-assign its personnel.
In the event Client acquires from Tyler any edition of Tyler Content Manager software other than Enterprise Edition, the license for Content Manager is restricted to use with
Tyler applications only. If Client wishes to use Tyler Content Manager software with non-Tyler applications, Client must purchase or upgrade to Tyler Content Manager
Enterprise Edition.
Prices assumes that all software proposed is licensed.
Annual maintenance will be a recurring software cost that will begin at Year 2 and will include a price increase each subsequent year.
In the event a self-hosted customer opts to enroll as a beneficiary under Tyler's source code escrow agreement, Tyler will provide the paperwork required for enrollment. That
self-hosted customer will be billed, on an annual basis, directly by Tyler's escrow agent, and all such fees must be paid directly to that escrow agent. Rates for subsequent
years are subject to change at the discretion of Tyler's escrow agent.
The Tyler Software Product Tyler Forms Processing must be used in conjunction with a Hewlett Packard printer supported by Tyler for printing checks.
Tyler's form library prices are based on the actual form quantities listed, and assume the forms will be provided according to the standard New World ERP form template. Any
forms in addition to the quoted amounts and types, including custom forms or forms that otherwise require custom programming, are subject to an additional fee. Please also
note that use of the Tyler Forms functionality requires the use of approved printers as well. You may contact Tyler's support team for the most current list of approved
printers.
Financials Library includes 1 AP Check, 1 EFT, 1 Purchase Order, 1 Requisition, 1 Inventory Issue, 1 Request for Payment, 1099-MISC, 1099-R, 1099-G, 1099-INT, 1099-S
General Billing Library includes 1 MB Statement, 1 Receipt, 1 Refund Check
Programming for check reconciliation import and positive pay export assumes one bank format each. Multiple bank formats are extra. Includes digitizing two signatures,
additional charges will apply for additional signatures.
Payroll Library includes: 1 Payroll Check, 1 EFT, 1 1099R, 1 W2, and 1 1095C
Tyler's quote contains estimates of the amount of services needed, based on our preliminary understanding of the size and scope of your project. The actual amount of
services depends on such factors as your level of involvement in the project and the speed of knowledge transfer.
Tyler New World ERP
Private and Confidential Page 4Page 55 of 216
13
Exhibit B
Invoicing and Payment Policy
We will provide you with the software and services set forth in the Investment Summary. Capitalized terms not
otherwise defined will have the meaning assigned to such terms in the Agreement.
Invoicing: We will invoice you for the applicable license and services fees in the Investment Summary as set
forth below. Your rights to dispute any invoice are set forth in the Agreement.
1. Tyler Software.
1.1 License Fees: License fees are invoiced as follows: (a) 25% on the Effective Date; (b) 60% on the date
when we make the applicable Tyler Software available to you for downloading (the “Available
Download Date”); and (c) 15% on the earlier of use of the Tyler Software in live production or 180
days after the Available Download Date.
1.2 Maintenance and Support Fees: Year 1 maintenance and support fees are waived through the earlier
of (a) availability of the Tyler Software for use in a live production environment; or (b) one (1) year
from the Effective Date. Year 2 maintenance and support fees, at our then-current rates, are
payable on that earlier-of date, and subsequent maintenance and support fees are invoiced annually
in advance of each anniversary thereof. Tyler agrees that the increase in the annual maintenance
shall not exceed more than 3% per year, over the prior year, for the first three (3) annual
maintenance renewals. Your fees for each subsequent year will be set at our then-current rates.
2. Professional Services.
2.1 Implementation and Other Professional Services (including training): Implementation and other
professional services (including training) are billed and invoiced as delivered, at the rates set forth in
the Investment Summary.
2.2 Consulting Services: If you have purchased any Business Process Consulting services, if they have
been quoted as fixed-fee services, they will be invoiced 50% upon delivery of the Best Practice
Recommendations, by module, and 50% upon delivery of custom desktop procedures, by module. If
you have purchased any Business Process Consulting services and they are quoted as an estimate,
then we will bill you the actual services delivered on a time and materials basis.
2.3 Conversions: Fixed-fee conversions are invoiced 50% upon initial delivery of the converted data, by
conversion option, and 50% upon Client acceptance to load the converted data into Live/Production
environment, by conversion option. Where conversions are quoted as estimated, we will bill you
the actual services delivered on a time and materials basis.
2.4 Requested Modifications to the Tyler Software: Requested modifications to the Tyler Software are
invoiced 50% upon delivery of specifications and 50% upon delivery of the applicable modification.
Page 56 of 216
14
You must report any failure of the modification to conform to the specifications within thirty (30)
days of delivery; otherwise, the modification will be deemed to be in compliance with the
specifications after the 30-day window has passed. You may still report Defects to us as set forth in
the Maintenance and Support Agreement.
2.5 Other Fixed Price Services: Except as otherwise provided, other fixed price services are invoiced
upon complete delivery of the service. For the avoidance of doubt, where “Project Planning
Services” are provided, payment will be due upon delivery of the Implementation Planning
document. Dedicated Project Management services, if any, will be billed monthly in arrears,
beginning on the first day of the month immediately following the project kick-off meeting.
2.6 Change Management Services: If you have purchased any change management services, those
services will be invoiced in the following amounts and upon the following milestones:
Acceptance of Change Management Discovery Analysis 15%
Delivery of Change Management Plan and Strategy Presentation 10%
Acceptance of Executive Playbook 15%
Acceptance of Resistance Management Plan 15%
Acceptance of Procedural Change Communications Plan 10%
Change Management Coach Training 20%
Change Management After-Action Review 15%
3. Third Party Products.
3.1 Third Party Software License Fees: License fees for Third Party Software, if any, are invoiced when
we make it available to you for downloading.
3.2 Third Party Software Maintenance: The first year maintenance fees for the Third Party Software, if
any, is invoiced when we make that Third Party Software available to you for downloading.
3.3 Third Party Hardware: Third Party Hardware costs, if any, are invoiced upon delivery.
4. Expenses. The service rates in the Investment Summary do not include travel expenses. Expenses will
be billed as incurred and only in accordance with our then-current Business Travel Policy, plus a 10%
travel agency processing fee. Our current Business Travel Policy is attached to this Exhibit B at Schedule
1. Copies of receipts will be provided upon request; we reserve the right to charge you an
administrative fee depending on the extent of your requests. Receipts for miscellaneous items less than
twenty-five dollars and mileage logs are not available.
Payment. Payment for undisputed invoices is due within forty-five (45) days of the invoice date. We prefer to
receive payments electronically. Our electronic payment information is:
Bank: Wells Fargo Bank, N.A.
420 Montgomery
San Francisco, CA 94104
ABA: 121000248
Account: 4124302472
Beneficiary: Tyler Technologies, Inc. – Operating
Page 57 of 216
15
Exhibit B
Schedule 1
Business Travel Policy
1. Air Travel
A. Reservations & Tickets
Tyler’s Travel Management Company (TMC) will provide an employee with a direct flight within two
hours before or after the requested departure time, assuming that flight does not add more than
three hours to the employee’s total trip duration and the fare is within $100 (each way) of the
lowest logical fare. If a net savings of $200 or more (each way) is possible through a connecting
flight that is within two hours before or after the requested departure time and that does not add
more than three hours to the employee’s total trip duration, the connecting flight should be
accepted.
Employees are encouraged to make advanced reservations to take full advantage of discount
opportunities. Employees should use all reasonable efforts to make travel arrangements at least
two (2) weeks in advance of commitments. A seven (7) day advance booking requirement is
mandatory. When booking less than seven (7) days in advance, management approval will be
required.
Except in the case of international travel where a segment of continuous air travel is six (6) or more
consecutive hours in length, only economy or coach class seating is reimbursable. Employees shall
not be reimbursed for “Basic Economy Fares” because these fares are non-refundable and have
many restrictions that outweigh the cost-savings.
B. Baggage Fees
Reimbursement of personal baggage charges are based on trip duration as follows:
• Up to five (5) days = one (1) checked bag
• Six (6) or more days = two (2) checked bags
Baggage fees for sports equipment are not reimbursable.
Page 58 of 216
16
2. Ground Transportation
A. Private Automobile
Mileage Allowance – Business use of an employee’s private automobile will be reimbursed at the
current IRS allowable rate, plus out of pocket costs for tolls and parking. Mileage will be calculated
by using the employee's office as the starting and ending point, in compliance with IRS regulations.
Employees who have been designated a home office should calculate miles from their home.
B. Rental Car
Employees are authorized to rent cars only in conjunction with air travel when cost, convenience,
and the specific situation reasonably require their use. When renting a car for Tyler business,
employees should select a “mid-size” or “intermediate” car. “Full” size cars may be rented when
three or more employees are traveling together. Tyler carries leased vehicle coverage for business
car rentals; except for employees traveling to Alaska and internationally (excluding Canada),
additional insurance on the rental agreement should be declined.
C. Public Transportation
Taxi or airport limousine services may be considered when traveling in and around cities or to and
from airports when less expensive means of transportation are unavailable or impractical. The
actual fare plus a reasonable tip (15-18%) are reimbursable. In the case of a free hotel shuttle to the
airport, tips are included in the per diem rates and will not be reimbursed separately.
D. Parking & Tolls
When parking at the airport, employees must use longer term parking areas that are measured in
days as opposed to hours. Park and fly options located near some airports may also be used. For
extended trips that would result in excessive parking charges, public transportation to/from the
airport should be considered. Tolls will be reimbursed when receipts are presented.
3. Lodging
Tyler’s TMC will select hotel chains that are well established, reasonable in price, and conveniently
located in relation to the traveler's work assignment. Typical hotel chains include Courtyard,
Fairfield Inn, Hampton Inn, and Holiday Inn Express. If the employee has a discount rate with a local
hotel, the hotel reservation should note that discount and the employee should confirm the lower
rate with the hotel upon arrival. Employee memberships in travel clubs such as AAA should be
noted in their travel profiles so that the employee can take advantage of any lower club rates.
“No shows” or cancellation fees are not reimbursable if the employee does not comply with the
hotel’s cancellation policy.
Tips for maids and other hotel staff are included in the per diem rate and are not reimbursed
separately.
Page 59 of 216
17
Employees are not authorized to reserve non-traditional short-term lodging, such as Airbnb, VRBO,
and HomeAway. Employees who elect to make such reservations shall not be reimbursed.
4. Meals and Incidental Expenses
Employee meals and incidental expenses while on travel status within the continental U.S. are in
accordance with the federal per diem rates published by the General Services Administration.
Incidental expenses include tips to maids, hotel staff, and shuttle drivers and other minor travel
expenses. Per diem rates are available at www.gsa.gov/perdiem.
Per diem for Alaska, Hawaii, U.S. protectorates and international destinations are provided
separately by the Department of Defense and will be determined as required.
A. Overnight Travel
For each full day of travel, all three meals are reimbursable. Per diems on the first and last day of a
trip are governed as set forth below.
Departure Day
Depart before 12:00 noon Lunch and dinner
Depart after 12:00 noon
Return Day
Dinner
Return before 12:00 noon Breakfast
Return between 12:00 noon & 7:00 p.m. Breakfast and lunch
Return after 7:00 p.m.* Breakfast, lunch and dinner
*7:00 p.m. is defined as direct travel time and does not include time taken to stop for dinner.
The reimbursement rates for individual meals are calculated as a percentage of the full day per diem
as follows:
Breakfast 15%
Lunch 25%
Dinner 60%
B. Same Day Travel
Employees traveling at least 100 miles to a site and returning in the same day are eligible to claim
lunch on an expense report. Employees on same day travel status are eligible to claim dinner in the
event they return home after 7:00 p.m.*
*7:00 p.m. is defined as direct travel time and does not include time taken to stop for dinner.
Page 60 of 216
18
5. Internet Access – Hotels and Airports
Employees who travel may need to access their e-mail at night. Many hotels provide free high
speed internet access and Tyler employees are encouraged to use such hotels whenever possible. If
an employee’s hotel charges for internet access it is reimbursable up to $10.00 per day. Charges for
internet access at airports are not reimbursable.
6. International Travel
All international flights with the exception of flights between the U.S. and Canada should be
reserved through TMC using the “lowest practical coach fare” with the exception of flights that are
six (6) or more consecutive hours in length. In such event, the next available seating class above
coach shall be reimbursed.
When required to travel internationally for business, employees shall be reimbursed for photo fees,
application fees, and execution fees when obtaining a new passport book, but fees related to
passport renewals are not reimbursable. Visa application and legal fees, entry taxes and departure
taxes are reimbursable.
The cost of vaccinations that are either required for travel to specific countries or suggested by the
U.S. Department of Health & Human Services for travel to specific countries, is reimbursable.
Section 4, Meals & Incidental Expenses, and Section 2.b., Rental Car, shall apply to this section.
Page 61 of 216
19
Exhibit C
Maintenance and Support Agreement
We will provide you with the following maintenance and support services for the Tyler Software. Capitalized
terms not otherwise defined will have the meaning assigned to such terms in the Agreement.
1. Term. We provide maintenance and support services on an annual basis. The initial term commences on
the Effective Date, and remains in effect for one (1) year. The term will renew automatically for additional
one (1) year terms unless terminated in writing by either party at least thirty (30) days prior to the end of
the then-current term. We will adjust the term to match your first use of the Tyler Software in live
production if that event precedes the one (1) year anniversary of the Effective Date.
2. Maintenance and Support Fees. Your year 1 maintenance and support fees for the Tyler Software are listed
in the Investment Summary, and your payment obligations are set forth in the Invoicing and Payment Policy.
We reserve the right to suspend maintenance and support services if you fail to pay undisputed
maintenance and support fees within thirty (30) days of our written notice. We will reinstate maintenance
and support services only if you pay all past due maintenance and support fees, including all fees for the
periods during which services were suspended.
3. Maintenance and Support Services. As long as you are not using the Help Desk as a substitute for our
training services on the Tyler Software, and you timely pay your maintenance and support fees, we will,
consistent with our then-current Support Call Process:
3.1 perform our maintenance and support obligations in a professional, good, and workmanlike manner,
consistent with industry standards, to resolve Defects in the Tyler Software (limited to the then-current
version and the immediately prior version); provided, however, that if you modify the Tyler Software
without our consent, our obligation to provide maintenance and support services on and warrant the
Tyler Software will be void;
3.2 provide telephone support during our established support hours;
3.3 maintain personnel that are sufficiently trained to be familiar with the Tyler Software and Third Party
Software, if any, in order to provide maintenance and support services;
3.4 provide you with a copy of all major and minor releases to the Tyler Software (including updates and
enhancements) that we make generally available without additional charge to customers who have a
maintenance and support agreement in effect; and
3.5 provide non-Defect resolution support of prior releases of the Tyler Software in accordance with our
then-current release life cycle policy.
4. Client Responsibilities. We will use all reasonable efforts to perform any maintenance and support services
Page 62 of 216
20
remotely. Currently, we use a third-party secure unattended connectivity tool called Bomg ar, as well as
GotoAssist by Citrix. Therefore, you agree to maintain a high-speed internet connection capable of
connecting us to your PCs and server(s). You agree to provide us with a login account and local
administrative privileges as we may reasonably require to perform remote services. We will, at our option,
use the secure connection to assist with proper diagnosis and resolution, subject to any reasonably
applicable security protocols. If we cannot resolve a support issue remotely, we may be req uired to provide
onsite services. In such event, we will be responsible for our travel expenses, unless it is determined that
the reason onsite support was required was a reason outside our control. Either way, you agree to provide
us with full and free access to the Tyler Software, working space, adequate facilities within a reasonable
distance from the equipment, and use of machines, attachments, features, or other equipment reasonably
necessary for us to provide the maintenance and support services, al l at no charge to us. We strongly
recommend that you also maintain a VPN for backup connectivity purposes.
5. Hardware and Other Systems. If you are a self-hosted customer and, in the process of diagnosing a software
support issue, it is discovered that one of your peripheral systems or other software is the cause of the
issue, we will notify you so that you may contact the support agency for that peripheral system. We cannot
support or maintain Third Party Products except as expressly set forth in the Agreement.
In order for us to provide the highest level of software support, you bear the following responsibility related
to hardware and software:
(a) All infrastructure executing Tyler Software shall be managed by you;
(b) You will maintain support contracts for all non-Tyler software associated with Tyler Software (including
operating systems and database management systems, but excluding Third-Party Software, if any); and
(c) You will perform daily database backups and verify that those backups are successful.
6. Other Excluded Services. Maintenance and support fees do not include fees for the following services: (a)
initial installation or implementation of the Tyler Software; (b) onsite maintenance and support (unless Tyler
cannot remotely correct a Defect in the Tyler Software, as set forth above); (c) application design; (d) other
consulting services; (e) maintenance and support of an operating system or hardware, unless you are a
hosted customer; (f) support outside our normal business hours as listed in our then-current Support Call
Process; or (g) installation, training services, or third party product costs related to a new release.
Requested maintenance and support services such as those outlined in this section will be billed to you on a
time and materials basis at our then current rates. You must request those services with at least one (1)
weeks’ advance notice.
7. Current Support Call Process. Our current Support Call Process for the Tyler Software is attached to this
Exhibit C at Schedule 1.
Page 63 of 216
21
Exhibit C
Schedule 1
Support Call Process
Support Channels
Tyler Technologies, Inc. provides the following channels of software support:
(1) Tyler Community – an on-line resource, Tyler Community provides a venue for all Tyler clients with
current maintenance agreements to collaborate with one another, share best practices and resources,
and access documentation.
(2) On-line submission (portal) – for less urgent and functionality-based questions, users may create
unlimited support incidents through the customer relationship management portal available at the Tyler
Technologies website.
(3) Email – for less urgent situations, users may submit unlimited emails directly to the software support
group.
(4) Telephone – for urgent or complex questions, users receive toll-free, unlimited telephone software
support.
Support Resources
A number of additional resources are available to provide a comprehensive and complete support experience:
(1) Tyler Website – www.tylertech.com – for accessing client tools and other information including support
contact information.
(2) Tyler Community – available through login, Tyler Community provides a venue for clients to support one
another and share best practices and resources.
(3) Knowledgebase – A fully searchable depository of thousands of documents related to procedures, best
practices, release information, and job aides.
(4) Program Updates – where development activity is made available for client consumption
Support Availability
Tyler Technologies support is available during the local business hours of 8 AM to 5 PM (Monday – Friday) across
four US time zones (Pacific, Mountain, Central and Eastern). Clients may receive coverage across these time
zones. Tyler’s holiday schedule is outlined below. There will be no support coverage on these days.
New Year’s Day Thanksgiving Day
Memorial Day Day after Thanksgiving
Independence Day Christmas Day
Labor Day
Page 64 of 216
22
Issue Handling
Incident Tracking
Every support incident is logged into Tyler’s Customer Relationship Management System and given a unique
incident number. This system tracks the history of each incident. The incident tracking number is used to track
and reference open issues when clients contact support. Clients may track incidents, using the incident number,
through the portal at Tyler’s website or by calling software support directly.
Incident Priority
Each incident is assigned a priority number, which corresponds to the client’s needs and deadlines. The client is
responsible for reasonably setting the priority of the incident per the chart below. This chart is not intended to
address every type of support incident, and certain “characteristics” may or may not apply depending on
whether the Tyler software has been deployed on customer infrastructure or the Tyler cloud. The goal is to help
guide the client towards clearly understanding and communicating the importance of the issue and to describe
generally expected responses and resolutions.
Priority
Level Characteristics of Support Incident Resolution Targets
1
Critical
Support incident that causes (a)
complete application failure or
application unavailability; (b)
application failure or unavailability in
one or more of the client’s remote
location; or (c) systemic loss of multiple
essential system functions.
Tyler shall provide an initial response to Priority Level 1
incidents within one (1) business hour of receipt of the
support incident. Tyler shall use commercially
reasonable efforts to resolve such support incidents or
provide a circumvention procedure within one (1)
business day. For non-hosted customers, Tyler’s
responsibility for lost or corrupted data is limited to
assisting the client in restoring its last available
database.
2
High
Support incident that causes (a)
repeated, consistent failure of essential
functionality affecting more than one
user or (b) loss or corruption of data.
Tyler shall provide an initial response to Priority Level 2
incidents within four (4) business hours of receipt of
the support incident. Tyler shall use commercially
reasonable efforts to resolve such support incidents or
provide a circumvention procedure within ten (10)
business days. For non-hosted customers, Tyler’s
responsibility for loss or corrupted data is limited to
assisting the client in restoring its last available
database.
3
Medium
Priority Level 1 incident with an existing
circumvention procedure, or a Priority
Level 2 incident that affects only one
user or for which there is an existing
circumvention procedure.
Tyler shall provide an initial response to Priority Level 3
incidents within one (1) business day of receipt of the
support incident. Tyler shall use commercially
reasonable efforts to resolve such support incidents
without the need for a circumvention procedure with
the next published maintenance update or service
pack. For non-hosted customers, Tyler’s responsibility
for lost or corrupted data is limited to assisting the
client in restoring its last available database.
Page 65 of 216
23
Priority
Level Characteristics of Support Incident Resolution Targets
4
Non-
critical
Support incident that causes failure of
non-essential functionality or a
cosmetic or other issue that does not
qualify as any other Priority Level.
Tyler shall provide an initial response to Priority Level 4
incidents within two (2) business days. Tyler shall use
commercially reasonable efforts to resolve such
support incidents, as well as cosmetic issues, with a
future version release.
Incident Escalation
Tyler Technology’s software support consists of four levels of personnel:
(1) Level 1: front-line representatives
(2) Level 2: more senior in their support role, they assist front-line representatives and take on escalated
issues
(3) Level 3: assist in incident escalations and specialized client issues
(4) Level 4: responsible for the management of support teams for either a single product or a product group
If a client feels they are not receiving the service needed, they may contact the appropriate Softwar e Support
Manager. After receiving the incident tracking number, the manager will follow up on the open issue and
determine the necessary action to meet the client’s needs.
On occasion, the priority or immediacy of a software support incident may change after initiation. Tyler
encourages clients to communicate the level of urgency or priority of software support issues so that we can
respond appropriately. A software support incident can be escalated by any of the following methods:
(1) Telephone – for immediate response, call toll-free to either escalate an incident’s priority or to escalate
an issue through management channels as described above.
(2) Email – clients can send an email to software support in order to escalate the priority of an issue
(3) On-line Support Incident Portal – clients can also escalate the priority of an issue by logging into the
client incident portal and referencing the appropriate incident tracking number.
Remote Support Tool
Some support calls require further analysis of the client’s database, process or setup to diagnose a problem or to
assist with a question. Tyler will, at its discretion, use an industry-standard remote support tool. Support is able
to quickly connect to the client’s desktop and view the site’s setup, diagnose problem s, or assist with screen
navigation. More information about the remote support tool Tyler uses is available upon request.
Page 66 of 216
24
Exhibit D
DocOrigin End User License Agreement
REMAINDER OF PAGE INTENTIONALLY LEFT BLANK
Page 67 of 216
25
Page 68 of 216
26
Page 69 of 216
27
Page 70 of 216
28
Page 71 of 216
29
Page 72 of 216
Page 73 of 216
COUNCIL
COMMUNICATION
TO: Mayor and Council
FROM: Dave Lee
DEPARTMENT: Parks, Recreation & Library
DATE: November 6, 2017
SUBJECT: Rotolo Park Improvement Project
DESCRIPTION:
Rotolo Park Improvement Project
RECOMMENDATION:
The Parks, Recreation and Library Services Department recommends that Council approve, by
motion, the construction contract with Colorado Total Maintenance for the Rotolo Park Shelter
Project.
PREVIOUS COUNCIL ACTION:
Council approved Ordinance No. 47, Series of 2017, authorizing an IGA with Arapahoe County
Open Space for the use of funds pertaining to Rotolo Park Shelter Project.
Council approved Resolution No. 7, Series of 2017, authorizing an Open Space grant
application for Rotolo Park Shelter Project.
SUMMARY:
Arapahoe County Open Space notified the City of Englewood that the grant was approved by
the County Commissioners in June 2017. The grant funding will allow for the construction of a
shelter, ADA compliant sidewalk, picnic benches and a grill to enhance the newly completed
playground at Rotolo Park.
ANALYSIS:
The Picnic shelter will allow parents to watch their children on the playground in the comfort of
the shade and to provide shelter during inclement weather. Families will be able to use the
shelter facility to picnic and play at Rotolo Park.
FINANCIAL IMPLICATIONS:
Six bids were received for the project and the lowest bidder is Colorado Total Maintenance with
a bid of $84,783.00. Funds for this project are budgeted in the 2017 Open Space Fund in the
amount of $63,200, with a grant of $50,000 and matching funds of $13,200. Because the
lowest bid received exceeded the grant and matching funds allocated, the remaining
expenditure of $21,583 will come from the Open Space contingency fund. After these
expenditures, the remaining fund balance will be $1,449,651.91 as shown in the budget recap
below:
Page 74 of 216
12/31/2016 Beginning Fund Balance $1,675,962.00
2017 Estimated Sources of Funds $ 806,427.00
YTD Expenditures and Encumbrances ($ 997,954.09) (YTD as of 8/31/17)
Rotolo Park Matching Fund and Contingency Expense ($ 34,783.00)
YTD Remaining Fund Balance $1,449,651.91
CONCLUSION:
Rotolo Park will gain increased usage with the addition of the new playground and shelter
amenities.
ATTACHMENTS:
Contract CFC 17-31
Bid Tabulation Sheet
Bid Proposal Form
Rotolo Park Improvement Project Design
Open Space Budget
Page 75 of 216
M
City of Englewood Bid Tabulation Sheet
Bid Opening Date:August 29,2017 2:00 PM MDT Apparent Low Bidder
ITEM BID:ITB-17-017 Rotolo Park Improvement Project
:|I :on 0—soow~
—
_2——
__—
—2——
————
‘———
O3Q.0H
Colorado Total Maintenance Y Y $84,783.00
P0#Box118 j
Englewood.co 80151 T
—_——
—
_:——
—_——
—_——
__——
—
_K——
-2—‘
_————
—2——
—-
—K——
—2——
303-721-9003 _-
—
__——-
—2__
———_Page 76 of 216
Page 77 of 216
Page 78 of 216
o.._.:vVLE-kEm.ru__eKnmmmzo.
Ho39$3
IH|W.D.PEF>|NE.E:
,,no
Fpw?WEEE»?
.35 ommnm:m__umoum:8 moomu?msommag_m _:m<onmc_m*2 :_:m2 69 n Em ca o_om_:oam?m
4:mcsamqmasma5.8.2 :m~mu<mo?mmm8 cm«mma<man8 munmmam.Em oao Umumnamaoq tmqxm
mmoammzo:m_.=u$2_8 mxmoc?mEm mnmojma 83.owoosqmo?E oo:8:::<o."ag m_mo8 _..m<mamma<man33%.:Em §_§8 .83 E Em 2.3 2 Em E:m3o::.n 9.E_m Eouomm 3 m mEm€oo3um:<moomEmc_m8 Em 0.2 2 m_._m_m<<ooa.m?m:<:_.:m <sE_:Hm::9 35 :2:Em am?mo_“msinms socom.403 Em
U:mn8q 2 _um:6.mmonmmzosw_.Ea=<8 nomo.3m__mq 8 Em maa?mmmEmamimnmam.<m:.
.36v8uomm__mBmqm <<_Eoc..m:<oo_..:mo:o:<<_E m:<oEmq nmqmosm.339 2 oo?oqmaonmSmximm:<oEmaca81:5 mm3m So}mag _mE m__ammumoa8:man<<_EoS oo__cm8:2 ..a__a.
.:._mc_amaa:8 9&2 mo_So<<_mqcmmEm 32 3 Em Q2 8 ?m_.mQm_..<2 m__camm_._c3_:mq man8 <<m_<m
_:8::m_§mm Em1m__...
028 m.E_m n_m<9._No:
waamaqm2 wage
:maEa.<acm_H no.8 ccmimmmmm
I 5 --....iI4aI
nl‘»?»I>.l.E.a.vN?.
(«III
._.:m:23man.0030:33mEm»so}9.3mEng:99:oo_.:m3u_m.8acuo:<<_.._o:waam.Emm msmmmm_mmm
..o__o<<
_uo~_:3_.3m:o:$_m:<m368Emmmmqm?m?8”
38m:m_m<<ooq_um:2<m<m:m_m<<ooqoo_oBao we 3.86
808V8800<<<<<<m:m_m<<ooano2mumnsmar?.
ms 3m3_uQ o?33l||
:moo6oB._o:.
m
ms
wcmimmmmnaqmmm._..m3m m_.a_u:o:m_.E3cm~Q
ID
5.
ooaoaao
Page 79 of 216
38m:o_m<<ooa_um_.x<<m<m:m_m<<ooaOo_o«mqoms8.86
808ammmoo<<<<<<m:o_m<<oonooo6
>..uD D vs»
u
zmam
>aa$mm
Page 80 of 216
WOZU Z0.ma
xzo<<>:.zmzm<Emmmummmmzam.
._._..m~Smo._._<_.En.
mm.u1:o_um_.man om<m_omm_.mm:_.m£man_:am3:=Kooaumsx moo?oqmaoa
m:Eo2~mn8qmzmm?mmm:m_.m_mc_.m.<ucwimmmE Em mam2 om_=o3.m mmmcamé.mamEma man232
cocaa:280:am:_m<<ooa-Boo ms _m<<ooa_um_.x<<mms _mEooa 00 83c
Emamimnmaom__maEm O_u__mmmv
EEm3:manEm”9.3R_u_<m_um8m2 G03o:oB_ma>383
Uo__mG.Am3%;2._.o.m_ma:o_.Em vm<3m3Esmqmoq E _m<<E_3o:m<o aq m?m?mm.55 E3 o:«mm_<mm.ocn
3.3.ma3E_w:m8B.mxmoc8am_mcoommmoammanmmm6:m__.oE=<manmm<m 3 Emmmu_.mmm3m.
<<:mmm>m_Em$5_um_zo__u>_.EmmM5338 Em mooo3um:<
X906mm;_3u6<m3m3_u_.o_.mo..:6 2o.”zmgvoa
mIE6:m<<mmao_3><m.
m:m_m<<ooa_O0
zO<<_:._mmm_nomm_2EmOc=ommmEm__moomu?Em ca 2 Em _u _manEm _u_.Eo.um_mEm__mama58 m
Oo::mR<<.EEm026mm.3moooamaom<<.EEm "m_.3m 2 man:ca.9;:Em mEm am__Em2 Em _u1:o_cm_8 mamaman:oo:Emor2Em_u_._:n_um_m:m__um<8 Em Oc__ommEm aimwmzom:2 8 mmaEm um:m=<Emamo?am2<mm:Em
m3oc2mumoamqEmmacaman.man:_m..mmnm3oE:«on San:Em Oc_6mm3 oon..m_E ooiqmo?<sE m:oEm«um:<
8um_+o_.3Em<<o«xoo<m~ma3mmaca.Em:aw oa_a2_o=m:m__cm2....m oEm2<_wm 8 ..m3mE 3 E:3_.om man.
?g-??
Ac a.V8‘Al
3:8manm$_8SE85
>:o_._..m<-3-.umo.
_ULamAmimoans.mm<2.:
>:2.:.m»m:_.o»<
33.oosa:was so ._2_:m_om_=o:._ammmx.8%:N388
E<..<...>34=..m~wEm€.noa
F
>34_.cm.H mcwmé
>5 >::.Em._u_:m:omm_oo3cm:<Page 81 of 216
Page 82 of 216
%m:u_o<<oo;
ELL“,
|L?tL
Mu_mnr.F..nLPM..
IctxkE.wp?w
3:...
9::
mE19‘
.
NU$_nEM.OK Um?m.&3:§_H
>:acmmzozm35"an2.25%ea :6 SS mm<m=35"an29:Ba oo3_:m:m:mm<o.:znnmmmmasncmmsosm33cm3228o:moumamnamnmnrma4.8;.16 E33 33 2:35:Bi mnEEo:m_
Emozsmaos.Him 33325..<3:cmEng 3 En a<w_:m:o:omV55 ca._.Zmam om2&2
N._uo:=m:m_:Z3:O38
>nE8mm
m.U?momEHm::m2::moonmpmqwomwas
m:o2SEQ«mm::m<oV5:cam:osmmmmaS2:J?m owoo:m:.:n:o:..V :32 2:3 33 on San
:E.:maea:02_o:m:33«mos...Ioi _o:mF.nun:noz?mzw$2.Uozmim201$
9Zaoncoins.o:ESQ2::umS:m_:8cacaoanEam?Amormac?Emmam:o§:m mqommM555:
omown:oo_:B2ea:6muuqouam?amnmmomoo:.6_o:o3
ma>am2m2._.on OC>:::O>.:O2m
_aw-:..:m
_~c8_c ?u...»_=::.c<n=.2:$8.8.
38m:m_m<<ooa_um:c2m<.m:c_m<<ooqOo_oSqo m9 8-83
.83Evmmoo<<<<<<.m:c_m<<ooaoo.o6
A >E mno€oB:o:.was E
Q_.«.<OW
unonczmzm2...u_<_m_oz
:m.ZSmwo~o_o.um1._3u3<m5m3 Pawn"
w.€30:o~mm:_~Page 83 of 216
Page 84 of 216
Page 85 of 216
Page 86 of 216
.V .......,..
....;,'lA.'."';‘¥\
...7.
.
A .«‘‘_».-.1 ;.
—
A7 '
x
’
’1
__,,___,,,H _7 A
n s‘
‘K
7 _
1
..”
*7
._;
———I
,___1
i..
_
‘
_
_-_
H
1 V'_|)v;n.V-3_'
_>
-.4‘,.1
V
7 1
zwL-om ;
,oncmlo
Arvndn Parka -Brldgnnldo.Homuntand.Club
(_2g_:_:_s_t,Ludxbug,Law Wnluh.Vnnkno Doodle
concrete.ptaygrounds,landscape,st.-ed:ng
IOID TVICGS
nver Water
‘Iun Lipan
City of Lnkawood
Jnhn Palcga
Ci 0!Arvadn
Harry Johnson
970-669-5291
303-628-6329
303-987-75115
720~B98~'l-100
Projects in as
D Studio
0 Sludvo
Stream
Wenu Associates
V8 ear 52
720-328-1986
720-321+1986
100 615!&?me,Denver
100 Evans 8.Plano Flwer
100 61518.Ri?e.Denvm
100%Donvnr
101)‘?-2.Denver
100%Dcnvc-1
92.Vnnous Arvada Colorado 5
Penn Stalion Parking Lot
Landsca I lion
Gram Fmnllnr Schedule D Platte River
Landscape.irngatmu.curshm fines
Penn Station Plazn
Landscape.I hon
Wnnh -ton Pntk -Downing Street lmga?on
Land -u,in lion
River Vlnlon JHP
landscape.I non,nauva mainlanmncu
Pan ucnara Landing
landscape u lion,nulsve mnimonance
64th Ave Pump Slallon
landscape Imgauon.tocyciad nsphan c
roadwa
Groen Gables City oi Lakewood
Playground Damn and mplacn
City 0 Denver
ECI Conslmcl
De
Se
Job Name
Job Descri lion
Denver City on Call Landscape &Irrigation 2014
vanous
stenger Park Inlgntion
lnigallon
Denver City on Call Landscape 5 lulgnllon 2016
Owne1lGC
Donvor Ciiy and County
Parka and Rec
Nina Pisano
City ol Arvndn
Mike Lee
Denver City and Counly
Parka nnd Rec
T6330
720-898-7390 Ken
RTD
EC!Construc on emces
Denver
EC!COHSHUCHOUServrces
RTD
ECI Cousltuchuu Setvlces
City ol Donvov
Bnan Welh on
City cl Denver
ECI Construction Services
970-689-6291
970 669-6291
720-918-0634
970-669-6291
203.65000
396.198 74
215 70190
771,477.72
‘
545.-$50.52
85
234,1 53.20
$41,161.20
201161292
816367.03
566.55G.30
Apr-IG
NOV-16
M116
lat!2015
Jun-15
fall
Page 87 of 216
,
1
'.'."'.'un\J V,!.L.5-|‘lN/‘NC.
I_nu III
rv;_W_,--»—~»-~——-9-
‘..,
."'1
--:>»1.-xw ‘_zn‘..\..A s mi m.,,?,.,.,
"
':u--_‘rm“-1 >7/rm:
I
......
A _
7
-.__x »wmur.
‘..«.....»»u.:....-....‘...mm -
-4.;.4.L .,o m
3rmf.w»...‘.».‘...,......‘.‘.um .,
‘
_,_
H:m.».....L!‘.4'3na!'4»n ..
r Y 4‘.M.-,.»1 -...v...,..r-...-4;.’
landscape
Weir Gulch
Landscap:8.I liun.Nullve Mulnleuzmce
State Home -Hnnmru Gulch
In non.eras:.n conlrol.:;,sued-n
Dunnen Holler
uncrela dutch suuclures,lensing.seed
Sonny Lawson
anc .ball liatd
Mnyiulr Park
anemia pla vnunrtlvnqauon landscape
Ono ighlina Trail
I I
May at C enter Rec Ccnlor
I I n plant:Jandscape
City ul Arvndn
MilmI at:
US Alrfovco
Mum!Inc
Urban Drainage 1!.Flaod
Control District
Mme Suunanlo
Donvm City
[mu Pmikh
Denver WDIM
Hm pan
Denver City
1|’Pk
Denver City
Jeru Parikh
Denvur Chy
ECI Slla construction
I ‘Ihorlon
720898-7400
307-634-8305
303-455-62 77
720-013-0622
303-5 28-6329
720 913-0622
720-913-0519
Bnlma Des n
DHM De<ign
App.e«I I):agn
"hzrvbces
Danvr.-r Wznm
Ar Iterra Group 3039
r‘?I '\ll-.1
‘hi I rl-/.1111!
S 301 795 IO 5 289.831 70 9130/2014 1U.’il‘lIZ’
0M
S I 058 37500 S l 083,221 18 -1/30/2D1~1 9/80/1014
5 129.25000 S 162 421 05
Original crnu?nnl or cm ncluni cm l
lconuoctconlrncldaledale
S 367.239 65 S g/30/2014
Job Name
Job Desert non
Laydon Park
I hon &la um!tuuovalinn
.
Wmrnn Air Force Bane WAFB
nl Slruel
303-892-5565
100 Ill"8 L n
303-841 7077
100 112m 3 8 manFiona
103-SP8-63?‘)
100 l4Ih&Wazoo
City Pnvk -Monlvlew Tra?ic Circle
100%7310 5 Uman U
r
303456-2887
590.9440!)5 1,429,404.00
236 531 20 S 235 531
-100 5
335 7 65
__H)CvA.lrkn
:1 z_m'
u'
.nigh no .'r
\r_:
On ‘1(t
190‘la‘:uvnwDenverCty
S 193!
‘K:ol
Page 88 of 216
Page 89 of 216
?$..._.....=\..S..4.F.a.:.§.=.
Dim7E...3:29:and;mine can __:%_a._E $5.In 253 :_E.£:.oacnmam_.3nn:<r.as r.<cJ.Ecunzv.Ea %::=_=:.m 3...3...:_..En:ncm2:no:6_r.F.eanow.c3F._:..a _=onE._=Em.Qim :.&.:Ea o<..._.mr.cm u:m=?.._.$moa:.355
=§:mmr._:E:S ummcqn .n_:?.....c~mna<_nn5 can n:r.=3.E...:5 m:nnr.mm?:.<ca.
mEF.:.._m..A_ea :5 o<cq 3 32:3 3::E _.E.amn..6...\_3_mu__c=§mE:u:o=m
92.43...E5.8 «cu?5n_E:=m _.::::._nu_.E.nn2_.o_.022...:3%ea
_~...n.E_:o=9min.u:<$.m2255 :5.En <51,wasno3Ec.F..._Sans‘ea WE
SE.EE:J..Qim rumEra:5105.__._.._mE_c=.rimuaca53...2a .392?aa?mz..._...mm%.__:.5_.:3 cF_:...r.:«mu?3.F;van:3<o_<E.__::6 _.:amn£:=m
E55,.0:1...I 05.n.c::._2_3 _m=amn£#.Ea :3.§§_3.:5 >rnn ea 5
05>nr.::._aa $.52.m_:..n=._nm:5..8 ram:5 r=os._2_mr.ea mr_:m8 Ea:
mimic:.$aF.=:..3..a.=9._§..2...sumr:€rir..=nr,5 ..<s:,._=m3:..:B..P.:
Guamo:::3..ww?namEa E.E B:_u<n Ea Dania :2.322:?2::
mm...E..._.:rdmzimm.9:7 :<_..J..=<c_<r..._SE.522 nc=m?<.=.c=a:.c:m
m=<o_<_=mnn:_:.:~nn_:1...B:o:2:23.mzmzusm.O3;7 .,.Enomainm$5.?3:
£2a._3.=m§.:im=:o3.Dim ::E.,..2 O:.____._...amcunnamoq_F6:mc :2:So
w::c0..nc_o:.ac 3._x..m:nEr.m2.:nu:o:3 3:.31.2a :m_:E 5.5 zen;
3u=uw...3c=_.03.?.5 wasa 9.258 >395.8:.:.Owl.»5 :05.nn::._?_2:n::m:cn:o:mu=..:..Ea 33:3.
O 8 ._.Q._.E.om
%me so
m.====:.=._.=..uHMO
m_===§.:3 9.3 .55 04?.1:8 33.as wu_
$oss?.2...__oEm :6 nmo.
mnnzuuiEa ._._..Em==:.uommzoam39.::5 ma:00:53:03.mar._:=:.__amm:nnnocszamm_.=::.nE_>nx .mm=r.m.032.=::EmaaE=.no=_:.n_ea .37
=::=_.mn=_c=_.2:.ummwmm.=zcmczusamea:.<:.2__.mnm:::=r.m.2%Ea
no=:..._n_m.m:E:._o=22.5 .52.2..:25 2::9:z3..nnS._cEm=_.m_.<mmo3
BmczawE922 mu:..Q—=2ono_mea =.u:__=mE:5 me...am:6:pm aE.=G.no:=o_
ea ucunzoqm?ino 8 9:n:r._=m.as._a_%9 wnn=c_c..m.Dumas.=m5.;§
>._:;=_m_3:o:=2::5 c_:<2m_€2 Eanax.m_:==_o=_=:=.=cmno=_Bn_m.
:_=_§Ex._..£=:r.._uuunn?oaw8ummcaaooairzcea unncnznno:=:E__na:o=
SE.9:.n:c:Z
Page 90 of 216
mu .l3J')1]/\LIaIUOO
O 8.mc_=__:m_9.
.\=.2..~E==S..n.e=u=.=u=.e=m§3..§
gown=5 22?...3:0.2:min.”63 In :3 3 znew.E€E.=..:nn Pa 9
_.§.%_mcv?im?:.=8 _§%n£..=m :acm_J.2::cx_..2:u.cE
_==n7n£.x.>:..mn:o=.=m=.__u:o=.noanzuc.5...q .E=:=.n.Euzm.._ounrum
=_m:.__&:53...:...nE=..=_==n€n_boom3..03::was m..._~n9.8:o=.I .
:5 u _=o<c=mcnnnmw2.602.5 no=__.._n:=m:_m..o_umo::3.”ea 2.Eam?
£__:n sczaam==o:m_.n_E:...=m_=mno.:=:a:...m_.nnE__i=mS no===EnE_
rimuzoaea 2§__3_9.=.mE__E_o=..021...5 .55 82>n£._:»F.._..oq
mE....Q2..._.cu_:.ea _:u
_u::=mcr::._n.=n _.oq..._.c=n_.msclsmea
$3.».hes»D:§:§...=_m§3..==
4.o3.mrz?a 5...:0.25 5 ~95 ea rum3 _._.:=m.cx?.._..n:a_.._=_.§%8?.2...
:%2a..:En:=:o=m an:5 :...:<2r ea =.._a§_§4.2%$010 n_c.£.€2::
ocsca Ea _:£._..E assume:5 :GE....58.me.u _.3._...n_am:5 n:=_:.<aa :2
m?.n:._?_:c:u..In _.,...Dr.....o~_§%n=cr.ea .3_m.u:o:£23 $.:c_.no:__.F.;ea _..
_5Em u _.:.£Ea a...::..nE_c=.4133F:u _.=5<c=Enr «anon._..3£..::m n.:..n_.::=a
m:_.r._;..Ec:9.3?c<o.Bc_.a:m__:_._2_:.%.18 n_E:c:mcm.I...:8 ox_::E.a 55
.£__.E,£.1:m CE.nc:nP.F n:<Ec=.:n_..=:=m3:2?£:.__..E:__E_..=._._¢c:7 ea 5..2m:cn::r.u.,mm5:9...0mm.»nr.:5a 2:.ea 33::
DERhale...m.E;.3R.=.E_w§...:.$n=nwn.w
DEEc:Em.=:5Numama._....€ri...:nr.E a Forum.?_E:_.a§us;_:.mu:c:UcmmmacaE
0.23_:3.:.n:o3.o_.\.DEEm:3..o:.wCE.Oc=m::_..:o=n_nwu:_:c:_$5.:::::m_.
§c:2_..,...2.2.:E:m:.w.nu3_.nm.£o_E_aE:...u=E Ea .._mam.Fame 2.2:39..Oman
E€n:_.<..:_..2<_ucmEancc2_._=u...;.9:n:..s.maa 3.mzcm.E_:_r._.::.§=..~
2::_.=:Eu#_u.E=nn.332....canzzm.E:::=...25EEmo:=..=_Ea u.E.nG
...o=6_E:n...DEE5.?..%_r.L96LE....:.a m...::nr,o1r.:Fé...rm_.:a.<.,mo?:8
E22.3?Eno::._...E_:c_n_.780.37 Em:m_..=EE....m=2.:5 n:r.E.w 5...:
m._:.w?2_o:
»a...=%Qcimu n.a=2::..:.==m=hE.E.€x
233%:5 can:E2:3:1:2 88 In :3 3 «E2.néczcaoc S
_:_ma§.\r=a_§?...=m:.:E_5.F.E::=m Eu:no:m:.:n:..5.noznaer.anasumn.:23 E::a=x::oncE:.c:ea ma?am.In 2:?2:04.3 _=..m<..<
...n_::::...=_ea ..u...cE__~cwSm_.E::mea ._r.:_c::c=3 2:...:_2 E.can
_3E__=:c=nae??..§%7 _c :05 o,.,.:>nn:__.=..:2:.?:.r.€ea :n=_:.
ea :5 u .E::=mo...::._£:r._.E.._.:..=n:mrolsmea nxnmézoz
Page 91 of 216
n _u 7o-“J5.”
56:9.1:.>?...:2.n=2.m.s3..§
.35:_.o.=r.._his an_._w.8.a 2...:5 3.2 3 «E5.3 :5 _E:_wn=nn3E=_..._:5Q..ea
no=m:.:n:o=:=_=m_Q..2.m:_..E<_mnmC5.C35:U_.u_.Emr._onE.o=m 5 En:um=.m==m.=m
Un:<n_.m.un_::cm_=.onc:_cm==o=m_5_.=En Un:<nq 32.6 >::_In 3%_.scare.o..
Q..:=._8:o=m .=o_E==mn...=_=&5:38?_3m..=_o=>E=.o..9....ea 9=._._2_
r2.%2E _#oP.$_o=n_ea mm..OE._:._n._P.....§%.m%...i8.£5.:6 U2...2.
>m:n=_:=....Q._=;n Ems.C355 2:.om:>5 :2...nn::._..é.55:r.xnr._mE 2.2.
_..c=:::=_nu:o=ea _._nE 26...ago:E?smE.o£=r._.m_.€sE=o..=..__8 naunzv.
=:=EmnS2=
.1
5::$32...:E..:.E.n=nm QhawE_.E:m§3._..§
4.9:E:Fd 01$_:~03 2a 7,;i «an:c?r:€n:n=n...5 5 _.:Emn.._.c.:E_=:..==:nr.
ea ...o3.:E..:c::=.E....J..I...:5.%%._,__.NE5 EE=E:::..u.5..._E&m...£.&o?==E.
:::5=9.2.:r....:._r.m._:c2n__E_.5;_.=.....anE::F.F.E_E%2_§5 mcE_E..GF.:.
..<._mnc=.¢.3.Asa 3;23:.:8 35 5 «ca...Esspmwsm_==%nE.E:=:=:x:5nr.
2....E:o:.,.2...5:a .252 ..2.?.n.m=:.u.5...ans?c;.;nzcawm:ur.3..wo_.m...o:..:::...
nnci _cE_2.._ea _m¢o:.4m.I...Q :3 r.=n:«F.__n.r:2.<Fdmr.uEcEa 3c:£=_.=m $23.
ea :5 Em9...:2:98 :5.mcam E.EmE___cmcn_¢....>E=%S_.c mm:82..3:a _.:5n:
a _:1..u_u:_m2...mos:.:.mu _:.._=m>:E§_3....§mu:.£_1_§nE...am aczczzm...
Gad.~..3=2.>~E.=R_=n:...m ,m=_uo<.;.3..
GOG.mE:...q 5 NS »E 0.23 22.2.".E.m::._r.E=:::=F.:u=nn —:oun_.:....nea
n::.._z._<u3<»d yr.:5 2::m_.r.nE_awn3.5.5:5 ::_.5_.:::S 2:.n_:.._.:m.in F;.N_
maul.nxvrinanc3 :E3F=u=n .ea o<2mnn¢Er.550:2:9.._.:_m
_
aamcqn 3:.“
_:c_z..:_cmEd 3 52.:2.
OH.No 98 ::m_Oc
Page 92 of 216
2:3,?n,e==m_02:.
~.a=:=.1 ~..::.::ns.§§.§.3»a 3.3::
._...:=3.Bar.5 04.3 S _.=E.._=_.2.~03 am2 _:o:..mm5:_._3,32...>E=::m:.Eo_.
5...:3 «cm:_.:§E cx_..¢:n:c.:2as.u.._8%aa céaam 5:.32.3.2.€9,152
2...3.5 o _.S..c::.un_,.:..nc_..._:?_c__:..:=w vn£-_:-n_=mm ncnoa?.?_.inc .:=._3
.¢.___&2 3.=Em_=m ea o:m.S_~_:m3%.ea Rmccqnnm 8 9..:<r.n mcunzon=§.r.n.m on
32.ea 2.ccama..F::=..<F::8 u§__:..E £c_.w 2::.:<r.-mr.::=<E_E_u ea
macaw.nzuiam3:.<=:<cSE::3 5 :5E:\n?=_._a._am...=$3==F.:$Ea I
no=::_:E_5 En mcnonmm2.29.:Eo._r.n.._.2=:¢.naozm<,.o~E=mmmu 85:2::
:E::._c 3.51:8 Ea .8:..c_.s=2_E can:ans....:u=c=me.5 us oE52==5 «E_nu:..=mea m_.c§:wanna.2.3...::=.4 DO...>E=_3.£E:o:.OmI>use
noE_.:m=_..r..:a 90::«<.=4 ?_.=Emn:F.=_.~.E_=_:mnc=_.=3 _=.4 noE=::=r.=_3 :3
CS:_§.:.§6.33 §u=nm§._..7..:«.3
_=255...N9
_
E==J.o_=2_0.25 2::H.«ER.ox_x=._...=...cs2_,§..S :6 manna
:Ecm_J.5 c_...._.E_c=m\c:._nn::=Emn_._.cqE.rimuzoano_=Sn.oq 3 =6 Ur.=<n_.ZE3
ES.55::5 _.E==n._s=_o=m noB=....3E_E.o_.nn.m:2:ca 5 E__Sm.:2
nE=c:=:.m?sn...m_,.:_mass?9.:SE.:8 cxnc=n=nr.=.m?snn ea gauze.an
vain o:_.mc_<rA 9:.55:3.5.2 r:_:.mea Siozm o::.4 unnazazam“.23 2.2::
3:2:.E018 o_omc€5::co...En no=m==n:o:Ea =:.:=EE=nr.E<:_o=n
m:cu§==:.m.Eonnwwcy .§a=__m .53._.£._..2.o:,Ea ma..._x..Go==c_
balk 5=:.m~.~eE~.£:€Kazan?
USE _.o:.&0.2:3 $35 Mei :5:u:nx_...:mTc .:_2£:.=...__::9...::::...=.=F.ceaou...E:o:m.65 2::<r.=_n_nuea nc:m:.=n:o=...n:::_....:_.2;32 B «$5..3.
r=:s_nam.Ea o£=E.m_::_Em u=a:m:.n=E_0.235 n?.<n:E:<c:E::r..E=nr.2.333
.52 .92 2:.._nn_5 51 :_=a_...u.82:30:.DEE =5_.F.m _.:..E nuzmE cP.<n.=nos:
Eur.on 3.:E:nc=m_En:o:ea :E:=r.:EF.r.u3_.an_m.£<_:m <u_:uE.....a.:_2§.
:5...ea rc?szmu.:?..q<:..c;.:3 yr...I...5.25 n_cmc€,1...ma...32:3:Ea
£__.E££:..E...=__€_:mea nozaamE.2::.535".£__c:oam 5 n<nJE5.n=_._:n:m.u..5
EE£E.__._nE cc:n::o=w.Page 93 of 216
ROTOLOPARKIMPR VEMENTPR
Englewood,CO
(1%
l6'x26'HIPsusuzn
on couc no
aasnuc aeucmo as
PICN|CTAB|-ES (2)nauseamo R£LOCATED
J
E
5
HorizontalScale‘1"=16'
———
48
8,2016 '0‘!II
mpsheher.W126’
nncydtdsnclhuvuznandltgulnrudwlvunlasdlatla
Cale:-can-eunnsvoot?adundhrvteloyeuuarrusoy
6'-0'PROPOSEDCONCRE
TESIDEWALKEXPANSION;
HCIIICTDHCKI)
AInhmImI2wmah.Irnme:aapmLdIvkw’:1I'
Kolurgnyahlllnunzloyauwuvlarny
Page 94 of 216
32.,
mouiiauI31ma?a?
wocwnouas35%
wo<E.:o
5.m..uo<u33m3m_
00.52miau?x
08:203:.
was08.:
room.03:.
._.oB__:$aq<m3:.oam_
Z25<wa5.o3Sooaoman092.
?ea:m2.5§
O59._u__..m:n_:nmocaou
?ogmo=:...ouonmcauu
tmwm2m§&
m§.2i==3u
o:_E_.m_manx$_.8.§.
Non:m.ie:&E:ra
O52...._=m:n_:ucumm
?ea:tunao:n§%
23mccwnoa«tuna»o2..§&
maniaISAmm?aoo
_..§._wm?aaovmamamnmOrmzoo
m?iuue?nanneahos.
_u3_o?oo3u_m=o:
955..mvu..o<m_
canntzizunon35%
.
_H_moE6mm
2:»
>39:
..u3.~uuM
85:
BS!
Sauna
3.2:
Spas
Spas
Nahum
.393“
«meE
.%.=t
._.u3.§u
:3:
A.96.»:
Spawnm
3....
>3».
53.8:a
air
a98o
SEE
.33
898»
39.3»
£98m
5.8m
tuham
89%»
._.a.3.8.0
Nuhm?
..a$.m8
8n.u.Bu
c lmsa wm_m:om
Me:3:83
>33.>023‘>35
$3.2:.
£3.89
.
33.3»g u 23.3 H
mmsomo «aqua .§...§..233
898°mS.o8 .3930 um25
..umu.8o ..u=.~&..3m.m~u Si»:
93..ummm mum...8.8..
._.u8.muo ..u3.8._..§...§
._.u8.u8 ..u~o.8._._.§...a._3955 89...»:398..
e?pma 23.3»..ma.m:22.8 2.u..8o
..§..u=.939.3»..u.a.m.:Spas n.398_.?mboo
‘.30En ._
.:._..=»..u&.m.:Q.So So 8..Eu 8..
2%:.=.§3.3..IEIE .8.§
...§.§«2 £3
.23%:?ag «§.§
Lm.an.\..3 {So .98.:awe»:cubes
4.$m..8 ..t~..am §.n....~....
5.8..«momma»u 838 «SSE Q m 838
9.3133..353 man_.».mo«mm:o:
_u::..._Cum:mumom3:5
Sources and Uses
m.m8.o8
..mmo.o8
..u8.o8
88.8
»S u
>oEm_
m.m.o=.o:.om«Ea mocnoom.cmommannznamam.:_uEE mm_m:no
33
>35.
oumzm_u>om mczo
no:
>oEm_
no.u
>nEm_
no.m
>oEm_
no:
mm=:._m8
no._u
95%.
n.8o.o8
..u8.o8
..o8.o8
898°
0.22 m:m_m<<ooa.oo_o_.mao
_u§.83 mcuoma23
Page 95 of 216
Page 96 of 216
Page 97 of 216
Page 98 of 216
Page 99 of 216
Hog
UB9
:m._.__.m.
M.uzE)?v7\COa//;/2AQNU
:u:.3swamman._a_=£
mo.._moc_.m>
_z <<_._.zmwms=._mmmom_=3 umamm=m_.m8 =m<mmxmoimn =._mno:._.m2 Em n_m<..=a<02.mam.<<_._:m:
mUo<m.
O_._.<ommzm_.m<<ooo
w<“Um”?
AU__.mn.o:
9:
ll
Dm?u
Boom:m_m<<oon_um_.x<<m<_m=a_mSooq.Oo_oBn_oma8.8:
Go“:qmvmuoo
=<_~<2.
U29
>.3._mm._._
05.0_m.x
Page 100 of 216
Page 101 of 216
Page 102 of 216
Page 103 of 216
Contract Approval Summary
V10/25/2017
Page | 1
Contact Identification Information (to be completed by the City Clerk)
ID number:Authorizing Resolution/Ordinance:
Recording Information:
City Contact Information
Staff Contact Person: Dave Lee Phone: 303.762.2687
Title: Open Space Manager Email: dlee@englewoodco.gov
Vendor Contact Information
Vendor Name: Colorado Total Maintenance Vendor Contact: Shannon Willis
Vendor Address: PO Box 118 Vendor Phone: 303.975.9399
City: Englewood Vendor Email:
State: CO Zip Code: 80151
Contract Type
Contract Type:Construction Agreement
Description of ‘Other’ Contract Type:
Description of Contract Work/Services:
Attachments:
☒Contract -- ☐Original ☐Copy
☐Addendum(s)
☐Exhibit(s)
☐Certificate of Insurance
Summary of Terms:
Start Date: 11/15/17 End Date: 3/30/18
Total Amount of Contract for term above (or
estimated amount if based on item pricing):$84,783.00
If Amended: Original Amount
$
Amendment Amount
$
Total as Amended:
$
Renewal options available:
Payment terms (please
describe terms or attach
schedule if based on
deliverables):
Attachments:
☐Original Contract if this is an amendment
☐Related Contracts/Conveyances
Construction of a picnic shelter, side walk, tables and grill at Rotolo Park.
Page 104 of 216
Contract Approval Summary
V10/25/2017
Page | 2
Source of funds:
Budgeted Funds: $63,200
Line Item Description:Line Item Total Funding:
$
Portion of Line Item spent to
date: $
Funding Source:Fund: 10-OSF Division Code: 1305
Note (if needed):
Attachments:
☐Copy of budget page from current budget book if contract value $25,000 or over or
requires Council approval.
Process for Choosing Vendor:
☒Bid: ☐ Bid Evaluation Summary attached
☐ Bid Response of proposed awardee
☐RFP: ☐ RFP Evaluation Summary attached
☐ RFP Response of proposed awardee
☐Quotes: Copy of Quotes attached
☐Sole Source: Explain Need below
☐Other: Please describe
Page 105 of 216
COUNCIL
COMMUNICATION
TO: Mayor and Council
FROM: Dave Lee
DEPARTMENT: Parks, Recreation & Library
DATE: November 6, 2017
SUBJECT: Belleview Park Maintenance Storage Building
DESCRIPTION:
Belleview Park Maintenance Storage Building
RECOMMENDATION:
The Parks, Recreation and Library Services Department recommends that Council approve a
contract with A-Shed USA, Inc. for construction of a maintenance storage building at Belleview
Park in the Chenango parking lot.
PREVIOUS COUNCIL ACTION:
There has been no previous Council action on this item.
SUMMARY:
The Parks Department currently utilizes a small storage area that is attached to the Belleview
Children's Farm. The storage area is inadequate in size and space utilization for Parks' needs.
There is also a safety concern because families with small children are often in the immediate
area.when staff are operating vehicles to access the equipment and supplies
A new site at the edge of the Chenango parking lot was determined to be the best location to
relocate Parks maintenance activities and storage for the building. The project includes
construction of a 24'x24' wood-framed garage building, foundation, floor slab construction and
electrical service. This location will not impede access to the park or reduce the available
parking.
ANALYSIS:
Request for bids for the maintenance storage facility were sent out in July 2017. No bids were
received back from the request. Staff then solicited quotes for the project, receiving just one
from A-Shed USA, Inc. A-Shed does not provide electrical service for their buildings and a quote
for electrical service was received from Electric Blue, Inc.
FINANCIAL IMPLICATIONS:
A-Shed, Inc. provided a quote of $33,200 for construction of the building and Electric Blue, Inc.
provided a quote of $3,060 for electrical service to the building for a total expense of $36,260.
Funds for this project are budgeted in the 2017 Open Space Fund (Project 1301-0008, Task 51)
Page 106 of 216
in the amount of $40,000. After this expenditure, the remaining fund balance will be
$1,448,174.91, as shown in the budget recap below:
12/31/2016 Beginning Fund Balance $1,675,962.00
2017 Estimated Sources of Funds $ 806,427.00
YTD Expenditures and Encumbrances ($ 997,954.09) (YTD as of 8/31/17)
Maintenance Shed Expense ($ 36,260.00)
YTD Remaining Fund Balance $1,448,174.91
ALTERNATIVES:
No other alternatives have been identified.
ATTACHMENTS:
Open Space Fund budget page
A-Shed Contract #CFC/17-23
Schedule A
Electric Blue Estimate
Invitation to Bid #ITB-17-009
Page 107 of 216
32.,
mouiiauI31ma?a?
wocwnouas35%
wo<E.:o
5.m..uo<u33m3m_
00.52miau?x
08:203:.
was08.:
room.03:.
._.oB__:$aq<m3:.oam_
Z25<wa5.o3Sooaoman092.
?ea:m2.5§
O59._u__..m:n_:nmocaou
?ogmo=:...ouonmcauu
tmwm2m§&
m§.2i==3u
o:_E_.m_manx$_.8.§.
Non:m.ie:&E:ra
O52...._=m:n_:ucumm
?ea:tunao:n§%
23mccwnoa«tuna»o2..§&
maniaISAmm?aoo
_..§._wm?aaovmamamnmOrmzoo
m?iuue?nanneahos.
_u3_o?oo3u_m=o:
955..mvu..o<m_
canntzizunon35%
.
_H_moE6mm
2:»
>39:
..u3.~uuM
85:
BS!
Sauna
3.2:
Spas
Spas
Nahum
.393“
«meE
.%.=t
._.u3.§u
:3:
A.96.»:
Spawnm
3....
>3».
53.8:a
air
a98o
SEE
.33
898»
39.3»
£98m
5.8m
tuham
89%»
._.a.3.8.0
Nuhm?
..a$.m8
8n.u.Bu
c lmsa wm_m:om
Me:3:83
>33.>023‘>35
$3.2:.
£3.89
.
33.3»g u 23.3 H
mmsomo «aqua .§...§..233
898°mS.o8 .3930 um25
..umu.8o ..u=.~&..3m.m~u Si»:
93..ummm mum...8.8..
._.u8.muo ..u3.8._..§...§
._.u8.u8 ..u~o.8._._.§...a._3955 89...»:398..
e?pma 23.3»..ma.m:22.8 2.u..8o
..§..u=.939.3»..u.a.m.:Spas n.398_.?mboo
‘.30En ._
.:._..=»..u&.m.:Q.So So 8..Eu 8..
2%:.=.§3.3..IEIE .8.§
...§.§«2 £3
.23%:?ag «§.§
Lm.an.\..3 {So .98.:awe»:cubes
4.$m..8 ..t~..am §.n....~....
5.8..«momma»u 838 «SSE Q m 838
9.3133..353 man_.».mo«mm:o:
_u::..._Cum:mumom3:5
Sources and Uses
m.m8.o8
..mmo.o8
..u8.o8
88.8
»S u
>oEm_
m.m.o=.o:.om«Ea mocnoom.cmommannznamam.:_uEE mm_m:no
33
>35.
oumzm_u>om mczo
no:
>oEm_
no.u
>nEm_
no.m
>oEm_
no:
mm=:._m8
no._u
95%.
n.8o.o8
..u8.o8
..o8.o8
898°
0.22 m:m_m<<ooa.oo_o_.mao
_u§.83 mcuoma23Page 108 of 216
Contract Approval Summary
V10/25/2017
Page | 1
Contact Identification Information (to be completed by the City Clerk)
ID number:Authorizing Resolution/Ordinance:
Recording Information:
City Contact Information
Staff Contact Person: Dave Lee Phone: 303.762.2687
Title: Open Space Manager Email: dlee@englewoodco.gov
Vendor Contact Information
Vendor Name: A-Shed USA, Inc.Vendor Contact: Yo Berlin
Vendor Address:6521 Washington St. #A Vendor Phone: 303.520.4634
City: Denver Vendor Email:yo@a-shed.com
State: CO Zip Code: 80229
Contract Type
Contract Type:Contractural Services
Description of ‘Other’ Contract Type:
Description of Contract Work/Services:
Attachments:
☐Contract -- ☐Original ☐Copy
☐Addendum(s)
☐Exhibit(s)
☐Certificate of Insurance
Summary of Terms:
Start Date: 11/15/17 End Date: 1/30/18
Total Amount of Contract for term above (or
estimated amount if based on item pricing):$33,200
If Amended: Original Amount
$
Amendment Amount
$
Total as Amended:
$
Renewal options available:
Payment terms (please
describe terms or attach
schedule if based on
deliverables):
Attachments:
☒Original Contract if this is an amendment
☐Related Contracts/Conveyances
Construction of a maintenance storage shed to be located in the Chenango parking lot of
Belleview Park. A-Shed will construct the building and Electric Blue will provide the electrical
power connection to the building at a cost of $3,060.00.
Page 109 of 216
Contract Approval Summary
V10/25/2017
Page | 2
Source of funds:
Budgeted Funds: $40,000
Line Item Description:Line Item Total Funding:
$
Portion of Line Item spent to
date: $
Funding Source:Fund:10-OSF Division Code:1305
Note (if needed):A-Shed costs $33,200, Electric Blue costs $3,060.
Attachments:
☐Copy of budget page from current budget book if contract value $25,000 or over or
requires Council approval.
Process for Choosing Vendor:
☐Bid: ☐ Bid Evaluation Summary attached
☐ Bid Response of proposed awardee
☐RFP: ☐ RFP Evaluation Summary attached
☐ RFP Response of proposed awardee
☒Quotes: Copy of Quotes attached
☐Sole Source: Explain Need below
☐Other: Please describe
Page 110 of 216
Page 111 of 216
Page 112 of 216
Page 113 of 216
Page 114 of 216
Page 115 of 216
Page 116 of 216
Page 117 of 216
Page 118 of 216
Page 119 of 216
BM‘*1:
E
h!I M Ii -m
B "G u ¥
Walsh”UCFQIDB D n>2>nua
mum.<<uw_.__:u8:m.5.;
022»...00 Sumo
u8.~$.83 mm!8u.n$.88
._.E 05.onmam?soon
>nE3aE
92"m=m_msBon
2:8"00
NE02.2
2.052 uou.3~.~mcu
m.3m=<
n»x E x 3
12:3 .38 2 snug :2.
O :2
3.29.am noon:m.uu.nm_noo_.
Sam .oo=._.=o:um_mnn==<use..13 noon3..25
Emama «B30
52 <._.:xu_.
_
3
._.:..=m<o:.m
8 <2 >n..==aQ:a__u.3a:u_o=w_1....E Os.m_._u093.:
Cu mam:ma».as...H ..5_ox=mmu
.3 m.ommmac.3%..
_.:m_._.=8:3 :m_.__n._o=N...am mam1=«3.35
mm..m_.1 9...
oxnn<n=o:w=__
Eu...3......SS.on=n3.m8 2._:o_:8
M»x m 3:
m?ama :..a=a__5_n §._am.§_
Sunni Rcmmmm55.>3»
DCO
._.o....n<.aU22 Sumo.N
wu_oa=.u_:<0 mo_.=:
u8.So..§.«
212:...U u
u 3._$.8 3 3..8.8
u rjéao M .
«$.90
«58.8 M _...§..8
M A898 m _
898
9 Hobo «Hobo
_:n_:nma _=n.a&
.:n_:nmn 50.52.
_=..._.a3 __._n._.Emn
_=n_:._on _:o__..amn
«N3 M 5 898
u «.8 M ._Saba
M N.oo M A:u~.8
m 898 u 898
u 98 m 898
_=a_.a.a __..nEama
_:n__.Ema _:o_cnmn
m -
ms.403.u 3 .398
$2....»023 ._.m_u
_u_.ao¢aa_:man u 898
u.__§»n...o.8
._.o8_9 u_.m$.oo
Us on:
m._.._2 U5
0.53<u__...38.5.
Zxmu.20._m:04xmmwozm.w..m102mam_.m<m_._zaOxw:muxmv>a>dozczrmuazaasqmuoz«X5wzhuozumx.Vmzmu.20.5 =9 EEVDZQE 10$>oo:_azn >24
zmnmwmziwC=b.2Gumagnuon8..oo:._.:>:om<54:._.2mNDz_20a.6_z>zom.monxmmux?aamno<mz>5m.Hrm<m:zouxmoc_xnu>.mzmum 2.2.351 I>._.m 5 9.3.5.
OCMAOKMI:>w._.:m5524anpznmizazz3zozauO1M5283.n>:nm:.>.=ozuF8<1):qU><m1:0!mnzmoshu.20!»SFP umOEDE >.9.z?qanazn _umm.>F
029:.£0u><=m5.u>._mm:Emn._..3>MIn>znm._.>.:ozmun
u=nCV023:15.32>20{CW4mmooFm9.mu15.03303>....=:mDuum:<mm<.1304.20021.35-3F >mmasnnnxaaam01 .431.um:202...:
.25.3:<3.-rmmn_.s:nmuoz)9...SmiznzaEiznmm..1«tno5m._.>zu_zoEiznmu.Ezzmn2940>::._dazm<Ba uP..mn._._oz.._..:uumm?a §F um
m?aozmw?MD!zm>woz>u..m>ddnzn<nm?>20Ema>mmoQ><mu$2.:InnochnaozonAIM?2.>2?mUCM
.338uanwupaac?aosu
«anFn32.0:2:13 83 333 «an on 6 En noan?osu _un_u§
Uwunauo2:.Banana».uoam.=_:o3Swan uaowuE5 m:<Raina».636 o.wuinana.
mus.-__:a.:.nzo:!
ma
Page 120 of 216
COUNCIL
COMMUNICATION
TO: Mayor and Council
FROM: Audra Kirk
DEPARTMENT: Community Development
DATE: November 6, 2017
SUBJECT:
Council Bill 66 - 3333, 3323, 3317 South Pearl Street
Planned Unit Development
DESCRIPTION:
Council Bill 66 - 3333, 3323, 3317 South Pearl Street Planned Unit Development
RECOMMENDATION:
On October 16, 2017, following a motion and 2nd to approve Council Bill 66 and set a public
hearing for November 20, 2017, Council tabled voting on the motion until November 6, 2017. At
this time Staff recommends Council withdraw that motion, and set a public hearing date of
November 20, 2017 in conformance with E.M.C. 16-2-8(G)(5). Staff will present Council Bill 66
for approval following the mandatory public hearing.
PREVIOUS COUNCIL ACTION:
On October 16, 2017, Council considered the proposed 3333, 3323, 3317 South Pearl Street
Planned Unit Development (PUD) on First Reading. The item was tabled until November 6,
2017.
SUMMARY:
ANALYSIS:
Title 16-2-8(G)(5) sets forth the procedure for Council consideration of a PUD:
The Council shall review the proposed PUD, the recommendation of the City staff, and the
recommendation of the Commission, and shall hold a public hearing on the proposed PUD.
Following such hearing, the Council may approve, deny, or refer a proposed PUD back to the
Commission for modifications based on the requirements of this Title. Per E.M.C. 16 -2-8(F) the
decision making body shall only approve a proposed PUD rezoning if it finds that the proposed
rezoning meets the specific criteria provided within Council Bill 66.
The Planned Unit Development (PUD) is a rezoning process that establishes specific zoning
and site planning criteria to meet the needs of a specific development proposal that may not be
accommodated within existing zoning development regulations. A PUD rezoning provides the
opportunity for unified development control for multiple properties or multiple uses.
The property at 3317 South Pearl Street contains a single-family home built in 1987, and a
detached garage. The lot at 3317 South Pearl Street is 6,250 s.f. in area. The property at 3323
Page 121 of 216
South Pearl Street contains a single-family home built in 1950, and a detached garage. The lot
at 3323 South Pearl Street is 6,250 s.f. in area. The property at 3333 South Pearl Street
contains a single family home built in 1943 and has a lot area of 9,375 s.f.
The minimum threshold requirement to re-zone any property to a PUD is one-half acre of total
land area. Mr. Adragna, owner of 3333 South Pearl Street, acquired this minimum threshold by
including two of his neighbors to the north into the PUD rezoning. While the three property
owners will be included in the PUD, if approved, the development may not happen at the same
time.
PUD OVERVIEW
The proposed 3333, 3323, 3317 South Pearl Street PUD will allow a maximum of one (1) three
unit dwelling, two (2) two-unit dwellings, and three (3) detached garages. Each unit will be
required to have 2 off-street parking spaces. All of the designated parking is accessed from the
alley, and meets the City’s parking regulations.
The proposed new homes are set back approximately 25 feet from South Pearl Street to be
compatible with the existing structures to the north and south. The PUD District Development
Standards require that landscaping and screening comply with the City of Englewood Unified
Development Code Section 16-6-7.
All new utilities are to be placed underground between the garages and the residences. A Minor
Subdivision application to reconfigure the lots will be submitted, and will be approved
administratively if the PUD application is approved.
Architectural Character: The proposed PUD will be urban in character and respect the
pedestrian scale of the neighborhood. The PUD contains architectural character standards that
require a mix of pattern and color changes, a minimum masonry requirement, and a
requirement that building entries be clearly defined with architectural elements. It should be
noted that the conceptual building footprints shown on the proposed Site Plan and the proposed
building elevations are subject to change; however, any changes would have to meet the design
standards and guidelines of the PUD.
Permitted Uses: The subject property currently lies within the R-1-C Single Unit Residential
District. The existing R-1-C Zone District allows primarily residential and public/institutional
uses.The proposed PUD District Plan includes a table of allowed uses that lists the primary
permitted residential and public/institutional uses.
Dimensional Standards: The following table provides a comparison of dimensional
requirements for principal structures between the property’s existing R-1-C zone classification
and the proposed PUD. The proposed PUD is very similar to the R-2-B zone district; however,
there are important differences. First, in the R-2-B zone district, the minimum lot area for a
single family home is 6,000 s.f., with a minimum of 50 feet of street frontage. The proposed
PUD would allow a single family home to be built on a 4,500 s.f. lot with 37.5 feet of street
frontage. Other zone districts do allow for homes to be built on a 4,500 s.f. lot; however, they
must be lots of record on or before February 23, 2004. Secondly, the R-2-B zone district has a
maximum lot coverage of 60% for multi-unit dwellings. The proposed PUD has a maximum lot
coverage of 50% for multi-unit dwellings. The dimensional requirements set forth in the
proposed PUD would allow multi-unit dwellings (based on lot area and lot width), and single
family dwellings on a 37.5 ft. lot.
Page 122 of 216
COMPARISON OF DIMENSIONAL REQUIREMENTS FOR PRINCIPAL STRUCTURES
Min
Lot
Area
(sq ft)
Max
FAR
Max Lot
Coverage
(%)
Min
Lot
Width
(ft)
Max
Height
(ft)
Minimum Setbacks
(ft)
Front Each
Side
Rear
R-1-C District (Existing Zoning)
One-Unit
Dwelling
6,000 None 40 50 32
25
5 20
One-Unit
Dwelling on
a
Small Lot
(must be an
existing lot)
4,500 None 35 37 32
25
3 20
All Other
Allowed
Uses
24,000 None 40 200 32
25
25 25
3333, 3323, 3317 South Pearl Street PUD (New Zoning)
One-Unit
Dwelling
4,500 None 40 37.5 32 25 5 20
Multi-Unit
Dwelling
(Maximum
units based
on lot area
and lot
width)
3,000
Per unit
None 50 25
per
unit
32 25 5 25
All Other
Allowed
Uses
24,000 None 40 200 32 25 25 25
Residential Density: The proposed 3333, 3323, 3317 South Pearl Street PUD would permit a
maximum of 7 dwelling units on the 0.5 acre property. This represents a maximum density of
14 dwelling units per acre (d.u./ac.). For comparison purposes, some properties to the east of
the subject property contain multi-unit apartment buildings with densities of 60 d.u./ac and
higher. Properties to the west in the R-1-C zone district could have a maximum density of 7
d.u./ac. Allowing for a slight increase in density between the R-1-C zone district and the MU-R-
3-C zone district complies with the 2016 Comprehensive Plan to create a transition zone
between the medical zone districts and the residential. The 2016 Comprehensive Plan defines
Areas of Transition as: “Location of diversified land use including medium to high density
housing and medical office.”
Page 123 of 216
Setbacks: A setback is the minimum distance a structure must be located from a property line.
The proposed PUD setbacks for principal structures are shown in the table of Dimensional
Requirements above. The proposed setbacks, maximum area and height regulations for
detached accessory structures are as follows:
Use Maximum
Number
Maximum
Height
Front
Setback
Side
Setback
Rear
Setback
Maximum
Floor Area
Detached
Garage
1 per
dwelling unit
16’ 25’ 3’ 6’ 1000 s.f.
Storage
Shed
1 10’ 25’ 3’ 3’ 150 s.f.
Other
Accessory
Structure
1 12’ 25’ 3’ 3’ 200 s.f.
Building Height: The maximum building heights in the PUD are based on the average
elevation of the finished grade at the corners of the building to the highest point of the building
or structure. The maximum allowed PUD building height for all uses is 32 feet; the maximum
allowed height for a detached garages is 16 feet.
Parking: The Unified Development Code (UDC) requires 2 parking spaces for each single -unit
dwelling and 1.5 parking spaces for each multi-unit dwelling. The proposed PUD requires 2
parking spaces for each multi-unit dwelling.
Traffic: The Public Works Department reviewed the proposed PUD request for potential
impacts. Public Works concluded that a traffic impact study was not required due to the slight
increase in traffic over the existing permitted density.
Signage: The proposed PUD will follow the standard signage regulations of the UDC for the R-
1-C Zone District.
Landscaping: The UDC requires that a minimum of 40% of a property be landscaped in the R-
1-C Zone District. The proposed PUD also requires that 40% of the PUD property be
landscaped, as well as meeting all other landscape requirements for the R-1-C Zone District.
Sheet 07 of the PUD provides more detail on the landscape plan.
Screening and Fencing: The proposed PUD will follow the standard screening and fencing
regulations of the UDC for the R-1-C Zone District.
Grading and Drainage: The proposed Grading and Drainage Plan was acceptable to the
City’s Public Works Department.
Utilities: The proposed Utilities Plan was reviewed and approved by the City’s Utilities
Department.
Park Dedication: The subdivision regulations of the UDC require the dedication of park land or
payment of a fee in lieu of dedication for all residential developments. The proposed Pearl
Page 124 of 216
Street development will be required to pay a fee in lieu of dedication for the 4 to 7 new
residences. This translates to a fee in lieu of dedication amount of between $1,690 and $3,070.
PLANNED UNIT DEVELOPMENT CONSIDERATIONS
Section 16-2-8.F Approval Criteria states: PUD rezonings shall be made in the interest of
promoting the health, safety, and general welfare of the community, and shall be consistent with
the Comprehensive Plan. In addition the review or decision making body shall only recommend
approval of, or shall only approve, a proposed PUD rezoning if it finds that the proposed
rezoning meets the criteria listed below:
1. The proposed development shall comply with all applicable use, development, and design
standards set forth in this Title that are not otherwise modified or waived according to the
rezoning approval. In addition, the proposed rezoning shall meet at least one of the following
criteria:
a. The proposed development will exceed the development quality standards; levels of
public amenities; or levels of design innovation otherwise applicable under this Title, and
the proposed development would not be allowed or practicable under a standard zone
district with conditional uses or with a reasonable number of Zoning Variances or
Administrative Adjustments; or
b. The property cannot be developed, or no reasonable economic use of the property can
be achieved, under the existing zoning, even though the use of the conditional uses or a
reasonable number of Zoning Variances or Administrative Adjustments.
The proposed PUD meets the criteria of 1a. The proposed PUD will exceed the current UDC
quality standards by specifying a variety of materials on facades of the building; by calling for a
minimum masonry percentage or defined porch on the front façade; and by requiring rear
loaded garages.
The PUD contains architectural character standards that require a mix of pattern and color
changes, and a requirement that building entries be clearly defined with architectural elements.
Provisions for roof pitches and flat roofs are also included in the PUD.
The proposed PUD further meets the requirement of 1a due to the fact that there are not any
conditional uses allowed by the UDC that would allow for multi-family dwellings in an R-1-C
zone district or allow a single family dwelling on a 37.5 ft. wide lot. In addition, the Board of
Adjustments and Appeals cannot grant a variance, nor can staff grant an Administrative
Adjustment, for an increase in density or a reduction in lot area that would increase density.
2. All PUD rezonings shall meet the following criterion:
a. The resulting rezoned property will not have a significant negative impact on those
properties surrounding the rezoned area and the general public health, safety and welfare
of the community will be protected.
The Public Works Department reviewed the proposed PUD request and concluded that there
were no significant traffic impacts with this minor increase in permitted density.
Page 125 of 216
The rezoned property will not have a significant negative impact on those properties
surrounding the rezoned area and the general public health, safety and welfare of the
community are protected.
Section 16-2-8.H.4(a): In its review of the PUD application, in addition to any other criteria and
findings applicable to the decision, the Commission’s recommendations shall include its written
findings on each of the following points:
1. The application is or is not in conformance with the Comprehensive Plan and this Title.
The 3333, 3323, 3317 South Pearl Street PUD conforms to the Englewood Forward:
2016 Comprehensive Plan strategy of redevelopment. Part 3, Envisioning the Plan, lists
this area as a Residential Transition Area. Specifically, this area is to, “Explore
residential redevelopment plans that promote infill townhome development between the
hospitals and single family neighborhoods to the north to provide a transitional zone that
will diversify land use mix, provide opportunities for new housing and home ownership.”
2. The application is or is not consistent with adopted and generally accepted standards of
development in the City.
The 3333, 3323, 3317 South Pearl Street PUD is consistent with adopted and generally
accepted development standards established by the City of Englewood. The application
was reviewed by the City’s Development Review Team (DRT) and all comments were
addressed by the applicant.
3. The application is or is not substantially consistent with the goals, objectives, design
guidelines, policies and any other ordinance, law, or requirement of the City.
The 3333, 3323, 3317 South Pearl Street PUD is substantially consistent with the goals,
objectives, design guidelines, policies, and other ordinances, laws and requirements of
the City.
FINANCIAL IMPLICATIONS:
The proposed 3333, 3323, 3317 South Pearl Street PUD will generate building use tax, based
on the total cost of the project and park fee-in-lieu, of between $1,690 and $3,070 depending on
the final number of units built.
ATTACHMENTS:
Bill for an Ordinance
3333, 3323, 3317 South Pearl Street Planned Unit Development
Planning and Zoning Commission Staff Report - September 6, 2017
Neighborhood Meeting Summary - June 9, 2017
Letter of Support - June 7, 2017
Survey Conducted by Applicant - June 22, 2017
Planning and Zoning Commission Minutes - September 6, 2017
Planning and Zoning Commission Findings of Fact - September 6, 2017
Emails
Page 126 of 216
1
BY AUTHORITY
ORDINANCE NO. ____ COUNCIL BILL NO. 66
SERIES OF 2017 INTRODUCED BY COUNCIL
MEMBER ________________
A BILL FOR
AN ORDINANCE APPROVING THE 3333, 3323, 3317 S. PEARL STREET PLANNED UNIT
DEVELOPMENT (PUD), LOCATED AT 3333, 3323, AND 3317 SOUTH PEARL STREET, IN
THE CITY OF ENGLEWOOD, COLORADO.
WHEREAS, Casey and Amy Adragna are the owners of 3333 South Pearl Street, Scott and
Elizabeth Brann are the owners of 3323 South Pearl Street; and Kelley Rhodes is the owner of
3317 South Pearl Street; and
WHEREAS, the proposed site consists of three parcels totaling one-half acre, the minimum
threshold for a Planned Unit Development (PUD); and
WHEREAS, the properties currently lie in a R-1-C Zone District which allows for residential
and public/institutional uses; and
WHEREAS, a PUD is a rezoning process that establishes specific zoning and site planning
criteria to meet the needs of a specific development proposal that may not be accommodated within
the existing zoning development regulations. The PUD rezoning provides the opportunity for
unified development control for multiple properties or multiple uses; and
WHEREAS, currently the property at 3333 South Pearl Street contains a single-family home that
was built in 1943, the property at 3323 South Pearl Street contains a single-family with a detached
garage that was built in 1950, and the property at 3317 South Pearl Street contains an existing
single-family residence with a detached garage that was built in 1987; and
WHEREAS, the proposed PUD will allow a maximum of one (1) three unit dwelling, two (2)
two-unit dwellings, and three (3) detached garages. Each unit will be required to have two (2) off
street parking spaces. The proposed new homes are setback approximately twenty-five (25) feet
from South Pearl Street to be compatible with the existing structures to the North and South. All
new utilities will be placed underground, and the PUD Development Standards require that
landscaping and screening comply with the City of Englewood Unified Development Code Section
16-6-7; and
WHEREAS, the proposed PUD will be urban in character and respect the pedestrian scale of the
neighborhood. The PUD contains architectural standards that require a mix of pattern and color
changes, a minimum masonry requirement, and a requirement that building entries be clearly
defined with architectural elements; and
Page 127 of 216
2
WHEREAS, 3333, 3323, 3317 S. Pearl Street Planned Unit Development submitted an
application to rezone the property to a PUD because the existing zoning designation would not
accommodate the proposed development; and
WHEREAS, the proposed 3333, 3323, 3317 S. Pearl Street Planned Unit Development will
exceed the development quality standards required by the Englewood Unified Development Code
for residential development; and
WHEREAS, the property cannot be developed, or no reasonable economic use of the property
can be achieved, under the existing zoning, even through the use of conditional uses or a
reasonable number of Zoning Variances or Administrative Adjustments; and
WHEREAS, the Planning and Zoning Commission held Public Hearing on September 6, 2017;
and
WHEREAS, the Planning and Zoning Commission made the following findings:
1. That the proposed development would be possible or practicable under a standard
R-2-B zone district.
2. That the property can be developed, or that reasonable economic use of the
property can be achieved, under the existing zoning, even through the use of
conditional uses or Administrative Adjustment.
WHEREAS, the Planning and Zoning Commission recommended that the 3333, 3323, 3317 S.
Pearl Street Planned Unit Development not be approved; and
WHEREAS, the proposed use of the property cannot meet the requirements of Englewood
Unified Development Code Section 16-6-8(F), without a PUD, in that there are not any conditional
uses allowed by the UDC that would allow for multi-family dwellings in the R-1-C zone district or
allow a single family dwelling on 37 ½’ wide lot; and
WHEREAS, the Board of Adjustment and Appeals cannot grant a variance, nor can staff grant
Administrative Adjustments for an increase in density or reduction in lot area that would increase
density; and
WHEREAS, the proposed PUD complies with the 2016 Comprehensive Plan to create transition
zones between the medical zone districts and residential districts, and the 2016 Comprehensive
Plan defines Areas of Transition as “Location of diversified land use including medium to high
density housing and medical office”; and
WHEREAS, the proposed PUD conforms to the Englewood Forward: 2016 Comprehensive
Plan strategy of redevelopment, that it is consistent with adopted and generally accepted
development standards adopted by the City of Englewood, and it is substantially consistent with
the goals, objectives, design guidelines, policies, and other ordinances, laws and requirements of
the City.
Page 128 of 216
3
NOW, THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF
ENGLEWOOD, COLORADO, AS FOLLOWS:
Section 1. The 3333, 3323, 3317 S. Pearl Street Planned Unit Development (PUD), for property
located at 3333, 3323 and 3317 South Pearl Street, in the City of Englewood, Colorado, attached
hereto as Exhibit A, is hereby approved.
Introduced, read in full, and passed on first reading on the 6th day of November, 2017.
Published by Title as a Bill for an Ordinance in the City’s official newspaper on the 9th day of
November, 2017.
Published as a Bill for an Ordinance on the City’s official website beginning on the 8th day of
November, 2017 for thirty (30) days.
Joe Jefferson, Mayor
ATTEST:
Stephanie Carlile, Acting City Clerk
I, Stephanie Carlile Acting, City Clerk of the City of Englewood, Colorado, hereby certify that the
above and foregoing is a true copy of the Bill for Ordinance introduced, read in full, and passed on
first reading on the 6th day of November, 2017.
Stephanie Carlile
Page 129 of 216
TO:Planning and Zoning Commission
THRU:Brad Power, Community Development Director
Harold Stitt, Senior Planner
FROM:Audra L. Kirk, Planner II
DATE:September 6, 2017
SUBJECT: Case ZON2017-002 - Public Hearing
3333, 3323, 3317 South Pearl Street Planned Unit Development
APPLICANT:
Casey Adragna
2192 West Caley Avenue
Littleton, CO 80120
PROPERTY OWNER(S):
Casey and Amy Adragna
2192 West Caley Avenue
Littleton, CO 80120
Scott and Elizabeth Brann
8474 South Brentwood Street
Littleton, CO 80128
Kelley Rhodes
3317 South Pearl Street
Englewood, CO 80113
PROPERTY ADDRESSES:
3317, 3323 and 3333 South Pearl Street, Englewood, CO 80113
REQUEST:
The applicant has submitted an application to rezone the properties above from R-1-C
Single Unit Residential District (Small Lot Size) to the 3333, 3323, 3317 South Pearl
Street Planned Unit Development (PUD). The proposed PUD would allow for a
maximum of one (1) single-family attached dwellings with three (3) units, and two (2)
single-family attached dwellings with two (2) units.
Page 130 of 216
2
RECOMMENDATION:
Case ZON2017-002: The Department of Community Development recommends that
the Planning and Zoning Commission review the 3333, 3323, 3317 South Pearl Street
PUD request and forward a favorable recommendation for approval to City Council.
LEGAL DESCRIPTIONS:
3333 South Pearl Street: Lots 40-42 Block 3 West View
3323 South Pearl Street: Lots 43-44 Block 3 West View
3317 South Pearl Street: Lots 45-46 Block 3 West View
EXISTING ZONE DISTRICT:
R-1-C Single Unit Residential District (Small Lot Size)
PROPERTY LOCATION AND SURROUNDING LAND USE:
The subject properties of this PUD are located on South Pearl Street between East
Floyd Avenue and East Girard Avenue. Land to the north, south, and west of the subject
property is zoned R-1-C Single Unit Residential District. Land directly to the east of the
subject property is zoned MU-R-3-C High Density Residential and Limited Office
District.
PUD PROCEDURE:
Rezoning to a PUD requires the applicant to have a pre-application meeting with staff,
and a neighborhood meeting with owners and neighbors located within 1,000 feet of the
proposed PUD. After the neighborhood meeting a formal application is submitted to the
City and reviewed by City departments and other affected outside agencies. A public
hearing is held before the Planning and Zoning Commission and City Council. If the
PUD is approved there is a 30 day referendum time period before becoming effective.
BACKGROUND:
The Planned Unit Development is a rezoning process that establishes specific zoning
and site planning criteria to meet the needs of a specific development proposal that may
not be accommodated within existing zoning development regulations. A PUD rezoning
provides the opportunity for unified development control for multiple properties or
multiple uses.
The property at 3317 South Pearl Street contains an existing single-family home that
was built in 1987, and a detached garage. The lot at 3317 South Pearl Street is 6,250
s.f. in area. The property at 3323 South Pearl Street contains a single-family home built
in 1950, and a detached garage. The lot at 3323 is 6,250 s.f. in area. The property at
3333 South Pearl Street contains a single family home built in 1943, and has a lot area
of 9,375 s.f.
The minimum threshold requirement to re-zone any property to a PUD is ½ acre of total
land area. Mr. Adragna of 3333 South Pearl Street was able to acquire this minimum
threshold by including two of his neighbors to the north into the PUD rezoning. While
the three property owners will be included in the PUD, if approved, the development
may not happen at the same time.
Page 131 of 216
3
NEIGHBORHOOD MEETING SUMMARY:
Pursuant to the PUD procedure, the applicant conducted a neighborhood meeting on
June 6, 2017, prior to submitting the application for a PUD rezoning on July 28, 2017.
Notice of the pre-application meeting was mailed to property owners and occupants of
property within 1000 feet of the site. Neighborhood meeting notes are attached to this
report (See Exhibit B). In addition to the neighborhood meeting, the applicant also
conducted a survey of residence on the 3300 block of South Pearl Street. The survey
asked if neighbors would rather see a PUD with zoning to match the MU-R-3-C that is
currently on the east side of South Pearl Street of if they would like to see a lower
density with duplexes and townhomes. (See Exhibit D).
CITY DEPARTMENT AND DIVISION REVIEW:
The 3333, 3323 and 3317 South Pearl Street PUD was reviewed by the City’s
Development Review Team (DRT) on August 8, 2017. Identified issues were
addressed by the applicant and the final 3333, 3323, 3317 South Pearl Street PUD was
submitted on August 23, 2017.
PUD OVERVIEW:
The proposed 3333, 3323, 3317 South Pearl Street PUD will allow a maximum of one
(1) three unit dwelling, two (2) two-unit dwellings, and three (3) detached garages. Each
unit will be required to have 2 off-street parking spaces. All of the designated parking is
accessed from the alley, and meets the City’s parking regulations.
The proposed new homes are setback approximately 25 feet from South Pearl Street to
be compatible with the existing structures to the north and south. The PUD District
Development Standards require that landscaping and screening comply with the City of
Englewood Unified Development Code Section 16-6-7.
All new utilities are to be placed underground between the garages and the residences.
A Minor Subdivision application to reconfigure the lots will be submitted, and will be
approved administratively if the PUD application is approved.
Architectural Character: The proposed PUD will be urban in character and respect
the pedestrian scale of the neighborhood. The PUD contains architectural character
standards that require a mix of pattern and color changes, a minimum masonry
requirement, and a requirement that building entries be clearly defined with architectural
elements. It should be noted that the conceptual building footprints shown on the
Proposed Site Plan and the proposed building elevations are subject to change;
however, any changes would have to meet the design standards and guidelines of the
PUD.
Permitted Uses: The subject property currently lies within the R-1-C Single Unit
Residential District. The existing R-1-C Zone District allows primarily residential and
public/institutional uses. The proposed PUD District Plan includes a table of allowed
uses that lists the primary permitted residential and public/institutional uses.
Page 132 of 216
4
Dimensional Standards: The following table provides a comparison of dimensional
requirements for principal structures between the property’s existing R-1-C zone
classification and the proposed PUD.
COMPARISON OF DIMENSIONAL REQUIREMENTS FOR PRINCIPAL STRUCTURES
Minimum Setbacks (ft)Min
Lot
Area
(sq ft)
Max FAR
Max Lot
Coverage
(%)
Min
Lot
Width
(ft)
Max
Height
(ft)Front
Each
Side Rear
R-1-C District (Existing Zoning)
One-Unit Dwelling 6,000 None 40 50 32 25 5 20
One-Unit
Dwelling on a
Small Lot
4,500 None 35 37 32 25 3 20
All Other
Allowed Uses
24,000 None 40 200 32 25 25 25
3333, 3323, 3317 South Pearl Street PUD (New Zoning)
One-Unit Dwelling 4,500 None 40 37.5 32 25 5 20
Multi-Unit Dwelling
(Maximum units
based on lot area and
lot width)
3,000
Per unit
None 50 25
per
unit
32 25 5 25
All Other
Allowed Uses
24,000 None 40 200 32 25 25 25
Residential Density: The proposed 3333, 3323, 3317 South Pearl Street PUD would
permit a maximum of 7 dwelling units on the 0.5 acre property. This represents a
maximum density of 14 dwelling units per acre (d.u./ac.). For comparison purposes,
some properties to the east of subject property contain multi-unit apartment buildings
with densities of 60 d.u./ac and higher. Properties to the west in the R-1-C zone district
could have a maximum density of 7 d.u./ac.
Setbacks: A setback is the minimum distance a structure must be located from a
property line. The proposed PUD setbacks for principal structures are shown in the
table of Dimensional Requirements above. The proposed setbacks, maximum area and
height regulations for detached accessory structures are as follows:
Use Maximum
Number
Maximum
Height
Front
Setback
Side
Setback
Rear
Setback
Maximum
Floor
Area
Detached
Garage
1 per
dwelling
unit
16’25’3’6’1000 s.f.
Page 133 of 216
5
Storage
Shed
1 10’25’3’3’150 s.f.
Other
Accessory
Structure
1 12’25’3’3’200 s.f.
Building Height: The maximum building heights in the PUD are based on the average
elevation of the finished grade at the corners of the building to the highest point of the
building or structure. The maximum allowed PUD building height for all uses is 32 feet;
the maximum allowed height for garages without a detached accessory structure is 16
feet.
Parking: The UDC requires 2 parking spaces for each single-unit dwelling and 1.5
parking spaces for each multi-unit dwelling. The proposed PUD requires 2 parking
spaces for each multi-unit dwelling.
Traffic: The Public Works Department reviewed the proposed PUD request for
potential impacts. Public Works concluded that a traffic impact study was not required
due to the slight increase in traffic over the existing permitted density.
Signage: The proposed PUD will follow the standard signage regulations of the UDC
for the R-1-C Zone District.
Landscaping: The UDC requires that a minimum of 40% of a property be landscaped
in the R-1-C Zone District. The proposed PUD also requires that 40% of the PUD
property be landscaped, as well as meeting all other landscape requirements for the R-
1-C Zone District. Sheet 07 of the PUD provides more detail on the landscape plan.
Screening and Fencing: The proposed PUD will follow the standard screening and
fencing regulations of the UDC for the R-1-C Zone District.
Grading and Drainage: The proposed Grading and Drainage Plan was acceptable to
the City’s Public Works Department.
Utilities: The proposed Utilities Plan was reviewed and approved by the City’s Utilities
Department.
Park Dedication: The subdivision regulations of the UDC require the dedication of
park land or payment of a fee in lieu of dedication for all residential developments. The
proposed Pearl Street development will be required to pay a fee in lieu of dedication for
the 4 to 7 new residences. This translates to a fee in lieu of dedication amount of
between $1,690 and $3,070.
PUD SUMMARY:
The proposed 3333, 3323, 3317 South Pearl Street PUD has been reviewed by the
City’s Development Review Team (DRT) and issues identified by the DRT were
Page 134 of 216
6
addressed by the applicant. The PUD documents are complete and no additional
conditions of approval are recommended at this time. Therefore, the Community
Development Department recommends that the Planning and Zoning Commission
review the 3333, 3323, 3317 South Pearl Street PUD request and forward a favorable
recommendation for approval to City Council.
PLANNED UNIT DEVELOPMENT CONSIDERATIONS:
The Planning and Zoning Commission is to review 3333, 3323, 3317 South Pearl Street
PUD request, and following the public hearing, may recommend that the Council
approve, deny, or approve the rezoning with conditions. In its review of the application,
the Commission’s recommendations should include findings on each of the following
points:
1. The application is or is not in conformance with the Comprehensive Plan and this
Title (UDC).
The 3333, 3323, 3317 South Pearl Street PUD conforms to the Englewood
Forward: 2016 Comprehensive Plan strategy of redevelopment. Part 3,
Envisioning the Plan, lists this area as a Residential Transition Area.
Specifically, this area is to, “Explore residential redevelopment plans that
promote infill townhome development between the hospitals and single family
neighborhoods to the north to provide a transitional zone that will diversify land
use mix, provide opportunities for new housing and home ownership.”
2. The application is or is not consistent with adopted and generally accepted
standards of development in the City.
The 3333, 3323, 3317 South Pearl Street PUD is consistent with adopted and
generally accepted development standards established by the City of
Englewood. The application was reviewed by the City’s Development Review
Team (DRT) and all comments were addressed by the applicant.
3. The application is or is not substantially consistent with the goals, objectives, design
guidelines, policies and any other ordinance, law, or requirement of the City.
The 3333, 3323, 3317 South Pearl Street PUD is substantially consistent with the
goals, objectives, design guidelines, policies, and other ordinances, laws and
requirements of the City.
4. The UDC requires that the review or decision making body shall only approve a
proposed PUD if it finds that the proposed development complies with all applicable
use, development, and design standards set forth in the UDC that are not otherwise
modified or waived according to the rezoning approval; and the proposed rezoning
meets one of the following criteria:
a. That the proposed development will exceed the development quality standards,
levels of public amenities, or levels of design innovation otherwise applicable under
Page 135 of 216
7
this Title, and would not be possible or practicable under a standard zone district
with conditional uses or with a reasonable number of Zoning Variances or
Administrative Adjustments; or
The proposed PUD will exceed the development quality standards required by the
UDC for residential development as follows:
The proposed PUD will exceed the current UDC quality standards by
specifying a variety of materials on facades of the building; by calling for a
minimum masonry percentage or defined porch on the front façade; and by
requiring rear loaded garages.
The PUD contains architectural character standards that require a mix of
pattern and color changes, and a requirement that building entries be clearly
defined with architectural elements. Provisions for roof pitches and flat roofs
are also included in the PUD.
b. That the property cannot be developed, or that no reasonable economic use of the
property can be achieved, under the existing zoning, even through the use of
conditional uses or a reasonable number of Zoning Variances or Administrative
Adjustments.
These properties are in an R-1-C zone district and would be able to be redeveloped
into single-family homes.
In addition to the two Planned Unit Development considerations above, the UDC
requires that a property rezoned to PUD must not have a significant negative impact on
those properties surrounding the rezoned area and that the general public health, safety
and welfare of the community are protected. Staff has reviewed the PUD request and
found the following:
The PUD application is in conformance with the Englewood Forward: 2016
Comprehensive Plan and the Unified Development Code.
The application is consistent with adopted and generally accepted standards of
development in the City.
The Public Works Department reviewed the proposed PUD request and
concluded that there were not significant traffic impacts with this minor increase
in permitted density.
The rezoned property will not have a significant negative impact on those
properties surrounding the rezoned area and the general public health, safety
and welfare of the community are protected.
ATTACHMENTS:
Exhibit A: 3333, 3323, 3317 South Pearl Street PUD
Exhibit B: Neighborhood Meeting Summary – June 9, 2017
Exhibit C: Letter of support from Shawn Koons – June 7, 2017
Page 136 of 216
8
Exhibit D: Survey done by applicant dated June 22, 2017
Page 137 of 216
4.143
88.8333moon:_umm_._£32aca
zmE_auo.._..oo.___smm:am
_<_m=m<932
...:am9B3
>:maammmH>oo3x_3m.m_<no
>_ama~_uSmmma.m:oa
Ommm<>a.muammm<mmEa%w2._2_o=2=5u8_.mo..Im mamaam.am6
mmmaanmacoSE.woo:w_<__oam__mwamaaQ88mos»:_umm_._mamamanSaa
_Am__m<maoamm3mm:mos»:_umm_._mama._<__..>a_.mmamoSam m"88 mos":
_umm_._mamammm«mam.o3um:<.
_<__..>a_.mmam«E8am"ammo8om:<oSamamSoca56 8 am<mEm mo2 8
Eama:o_mxoa.SooqSmmo.Sam88manm33.9oa :5 E.Sam _o».=m__
cazmSmqm8cmUS:Hamomam:<3"ammqmmSocaaaoqmmmm3 oa_<A :38.Im
mxU_m_amaEm."amamSacoSocaam<mm_3=m.a_3mam8am_m?maamammm"am
m-~-mNoam23.0..2.3=:mmmxomuzoamu
a.Oamca:aSmaomoma:m<mm3.33:3_o.mamm238 ma.
N._.am333:3.2Saza3..moamca:aSm___amSocaummam.
m._<_c_=.ca=aSm___ammSocaam<mm3mx.3:3_o.oo<m.mmmo?woe...
_<_a>a«mmammxa_m_amaEm"NoamEmao?m:m:m__<_._m<moocaamamm.3 3m m__m<.
maaaoSm3aa_mo?Smmqmmn.Imsamcocaamamm_a3m m__m<Em<ma~mmacmmoa
mcoammmeg:_umm_._m._.mm._Emmmm.mam_m3c=3m3__<NoaammaaEm Smmnmam
m_am_m33.2Noaaam.
_<_a>a.mmamum<mmm<m.m_mxm3u_mm2Sam»a?mmo?a:.o_mxmmmaaa_o_mxmm
nocacm3...:53.
ImEmaoomama31.02cu8ancmmzoam\oo33ma~m\ooaom_.am.
Ocmmzoam\oo33ma8\ooanm3m
a._._m<m<o:ammmmaoamaSam.Em<<=_no8oc_.ao3m<m_:mm..v.<mm.Emao3m<m_:mS:aoqmmwm.
__<m__<ma3mau_mSoon_8..3<mm_.m_u6_.mo~m__xmEm<<=_ax Em .34mm=:oE_.m.
m._f-oNoaam<5:cmnouamaco.<0:nmammmEm.amuumaaom__.mmn_<..OE.u8a3:<836:amam=<<<=_ma:cm3:_mmmEma Samwmmo_.ommSm
m=mmw
L.._.amoSam_.2$8mac":vmmam=mm.mama.Emaoamaommmaacomnmamm8amqm
aocmmnmanow.M-m23mm32mEma=maoca.dammzmm:9.ma onuo:ca:<8
ooazacm8__<mEmqm.
>3mn:3m:.n m
Page 138 of 216
Page 139 of 216
Page 140 of 216
Page 141 of 216
Page 142 of 216
Page 143 of 216
_u_m::_:cmanNoaau0o_.:3_mm.o:
mmEm_.:uma9 no‘.N
HOowomm?lmwcmtoIma?zmmomDam~o282.8~
_uo_.>mm._._m.>um.~=_2.
Om?._.o$:_m<
Um_.<__A__._8:
_sm_.o_u.=_:om
.__o_.=.mzox=so<mams
2_=8_uBm::3Ammnoanmaas
vain:2.3.3
No:Em...
§_o_._w_m>52:
$53..Oo_m3m:
lDX><>(><><)<><>(><
oo
.5020:o>xm_mo.
oo33_mm_o:m..mEmocmmmqEmnmmmmanSmo_.=m.._m.Oo_.:3_mm_o:m~w Sm:
<o.mnmanm.m8aSm...2:939.
_<_o<ma_u<_so3um_.mo:Em:
wmnoanmn3.32:62.3:8m_.mm3._.m
\:uwmo<moxmmNOZMS38.93N88.>2D88WOCWInms?.
msmmma3.>22mDC22.om<m53:m2§2oEOZSSIDHO 0:.<
OOCZOFS\:.Ibm><om>m..mm.mOO?=SmZDb102.
m2.>mu.:m»>cu.m_:an
_<_=$1_.mm:.__.m.m8o.a3asx
we:Em:=<_o<m...._msx
02m.wosS_m<x
Um2_x__._8:x
.<_m_.oEaaomx
3::mi,x
_um:_ox_<_3.ax
.<=n:m_m>52:x
33%..oo_m3m:x
amo
_<_o:o:_um_um>4mo.
_u_.__u=n1235
ommm83.3>onmmmo_.<U<<m___:ucam
_so<2_U<_<_m=.Um_.No:Em:
mmnoznmn3._<_m3_um_.23%..no_m=_m:Page 144 of 216
Page 145 of 216
Page 146 of 216
Page 147 of 216
Page 148 of 216
Page 149 of 216
Page 150 of 216
Page 151 of 216
Page 152 of 216
Page 153 of 216
Page 154 of 216
Page 155 of 216
COUNCIL
COMMUNICATION
TO: Mayor and Council
FROM: Dave Henderson
DEPARTMENT: Public Works
DATE: November 6, 2017
SUBJECT: Award Police Headquarters Project Construction
DESCRIPTION:
Award Police Headquarters Project Construction
RECOMMENDATION:
Staff recommends that City Council award, by motion, the project to construct "Englewood
Police Headquarters". The total estimated cost is not to exceed $27,000,000 and consists of a
contract amendment for construction to Adolphson & Peterson in the amount of $21,029,755,
other incidental and related costs associated with the project in the amount of $4,384,180, as
detailed with estimated costs in the attached project budget, and a project contingency in the
amount of $1,586,065.
PREVIOUS COUNCIL ACTION:
Council approved an ordinance setting forth the ballot language and submitting to a vote of the
registered electors a General Obligation Bond (GOB) for the construction of a new Englewood
Police Department Headquarters.
Ballot issue 2C was passed by the voters on November 8, 2016.
Council approved a professional services contract with Stifel, Nicolaus & Company for
underwriting services associated with the sale of General Obligation Bonds for the Englewood
Police Headquarters building on December 19, 2016.
Council approved a resolution declaring its intent to reimburse City funds spent on the
Englewood Police Department Headquarters from the proceeds of the issuance of Municipal
Bonds on January 3, 2017.
Council approved, by motion, a professional services contract with CBRE for project
management and workplace strategy services on January 17, 2017.
Council approved, by motion, a professional services contract with DLR Group for architectural
and engineering services for the Englewood Police Headquarters on April 17, 2017.
Page 156 of 216
Council approved Ordinance No. 30, Series 2017 approving the issuance of General Obligation
Bonds on May 4, 2017.
Council approved, by motion, a contract with Adolfson & Peterson Construction for Construction
Management and Pre-Construction services on June 19, 2017.
Council approved, by motion, a professional services contract with NORESCO for
Commissioning Services on October 2, 2017.
Council approved, by motion, a professional services contract with Acuity for Technology
Consulting on October 2, 2017.
Staff provided project updates at several study sessions in 2017.
SUMMARY:
The project delivery method selected for the Police Headquarters building is the Construction
Manager-General Contractor (CM-GC). In June, 2017, Council approved the selection of
Adolphson & Peterson as the CM-GC. This selection was based on a formal competitive RFP
process and included the provision to award the contract in two phases. The first phase was for
pre-construction services which is now complete. Adolphson and Peterson worked closely with
the architect during the design phase by providing estimates, constructibility input, and offering
cost saving alternatives where appropriate. This collaborative approach to project delivery will
result in a functional facility that will be constructed within budget.
Design Documents are complete and Adolphson and Peterson has provided their Guaranteed
Maximum Price (GMP) as required by the contract. Staff, along with our design team and
project manager, reviewed the GMP for conformance with the Design Development drawings.
Staff recommends awarding the second and final phase of the contract to Adolphson and
Peterson.
ANALYSIS:
Staff is requesting Council approval of the "Project" in the amount not to exceed the project
budget of $27 million. The project will include estimated costs (both previously expended and
anticipated) associated with the design and construction of the project as detailed in the Design
Development (DD) drawings and specifications. As required by City purchasing policy, staff will
present to City Council any new contracts that exceed $25,000. Future Council
Communications will clearly enunciate that they are included in the $27 million dollar budget
when Council award is recommended.
Included in the project budget is an owners contingency in the amount of $1,586,065. This
represents 5.9 % of the project budget. A construction contingency in the amount of $943,330
is included in the contractor's GMP. This contingency is for unknown and unforeseen conditions
that may be encountered during the course of construction that are not scope increase costs.
Per our contract with Adolphson and Peterson, any funds not expended from the GMP
construction contingency will transfer to the owner's contingency at the end of the project.
Approval of the "Project" as a whole is recommended to clearly state that costs will not exceed
the project budget without City Council approval. Staff will provide Council with periodic project
budget updates.
Page 157 of 216
FINANCIAL IMPLICATIONS:
Adolphson and Peterson's contract will be amended to the total GMP amount of $21,029,755.
The pre-construction services previously approved are included in the GMP. Other estimated
costs associated with the project are detailed in the attached project budget summary. All
subcontractor bidding (buy out) by Adolphson and Peterson is open book and will be reviewed
by our project manager.
ATTACHMENTS:
Budget Summary
Elevations
Guaranteed Maximum Price Amendment
Exhibit A CMB 100% DD Schedule
Page 158 of 216
Englewood Police Headquarters
Budget Summary
October 31, 2017
Description Current Budget Committed Costs
GMP Amount 21,029,755.00$ 21,029,755.00$
Additional Project Costs 4,384,180.00$ 2,291,839.75$
Planning and Permitting Fees 78,666.00 ‐
Tap & Utility Fees 50,000.00 28,216.29
City Use Tax 394,767.00 ‐
Owner/Relocation Costs 49,710.00 ‐
Design Team 1,616,039.00 1,590,970.00
Surveying ‐ ‐
Geotechnical 10,000.00 9,600.00
Environmental Consulting/Testing ‐ ‐
Commissioning 45,325.00 45,325.00
Project Management 564,375.00 564,375.00
IT/AV Design 27,150.00 27,150.00
Misc Consulting Fees 32,850.00 26,203.46
Material Testing/Inspections 155,218.00 ‐
Furniture 845,070.00 ‐
IT/AV Systems & Equipment 269,275.00 ‐
Security Systems 215,735.00 ‐
Interior Signage 30,000.00 ‐
Project Contingency 1,586,065.00$ ‐$
Total 27,000,000.00$ 23,321,594.75$
Page 159 of 216
Page 160 of 216
Page 161 of 216
Page 162 of 216
Page 163 of 216
Project: Englewood Police HQ Revised: 10/27/17
Owner: City of Englewood Estimator: Chris Cooper
Architect: DLR Group Project SF: 49,725
Duration in Months: 18.00
Police Park Estimate #: DD GMP
Phase 1 - Police
HQ Building &
Site
Phase 2 - Surface
Parking & Site Subtotal
Division #0 Procurement and Contracting Requirements $677,797 $0 677,797 $13.63 /SF 3.6% of Direct Costs
Division #1 General Requirements $272,600 $30,000 302,600 $6.09 /SF 1.6% of Direct Costs
Division #2 Existing Conditions $54,995 $274,068 329,063 $6.62 /SF 1.7% of Direct Costs
Division #3 Concrete $1,671,975 $11,805 1,683,780 $33.86 /SF 8.9% of Direct Costs
Division #4 Masonry $1,395,661 $48,281 1,443,941 $29.04 /SF 7.7% of Direct Costs
Division #5 Metals $1,367,627 $0 1,367,627 $27.50 /SF 7.2% of Direct Costs
Division #6 Wood, Plastics, and Composites $314,778 $0 314,778 $6.33 /SF 1.7% of Direct Costs
Division #7 Thermal and Moisture Protection $700,415 $0 700,415 $14.09 /SF 3.7% of Direct Costs
Division #8 Openings $1,137,939 $0 1,137,939 $22.88 /SF 6.0% of Direct Costs
Division #9 Finishes $2,022,360 $0 2,022,360 $40.67 /SF 10.7% of Direct Costs
Division #10 Specialties $976,963 $1,500 978,463 $19.68 /SF 5.2% of Direct Costs
Division #11 Equipment $6,118 $0 6,118 $0.12 /SF 0.0% of Direct Costs
Division #12 Furnishings $103,784 $0 103,784 $2.09 /SF 0.6% of Direct Costs
Division #13 Special Construction $0 $1,125,000 1,125,000 $22.62 /SF 6.0% of Direct Costs
Division #14 Conveying Equipment $151,866 $0 151,866 $3.05 /SF 0.8% of Direct Costs
Division #21 Fire Suppression $171,416 $7,500 178,916 $3.60 /SF 0.9% of Direct Costs
Division #22 Plumbing $554,201 $0 554,201 $11.15 /SF 2.9% of Direct Costs
Division #23 Heating, Ventilating and Air Conditioning $1,585,945 $148,566 1,734,511 $34.88 /SF 9.2% of Direct Costs
Division #25 Integrated Automation $0 $0 0 $0.00 /SF 0.0% of Direct Costs
Division #26 Electrical $1,508,250 $152,400 1,660,650 $33.40 /SF 8.8% of Direct Costs
Division #27 Communications $134,350 $0 134,350 $2.70 /SF 0.7% of Direct Costs
Division #28 Electronic Safety and Security $0 $0 0 $0.00 /SF 0.0% of Direct Costs
Division #31 Earthwork $334,555 $214,891 549,446 $11.05 /SF 2.9% of Direct Costs
Division #32 Exterior Improvements $337,798 $661,509 999,307 $20.10 /SF 5.3% of Direct Costs
Division #33 Utilities $184,293 $525,401 709,694 $14.27 /SF 3.8% of Direct Costs
Subtotal $15,665,687 $3,200,921 $18,866,607 $379.42 /SF 100.0% of Project
83%17%
Utility Tap & Development Fees By Owner By Owner By Owner $0.00 /SF
Permit Allowance Exempt Exempt Exempt $0.00 /SF 0.00% of Project
Use Tax W/ CBRE Budget W/ CBRE Budget W/ CBRE Budget $0.00 /SF 0.00% of Project
Estimate and Bidding Contingency $391,642 $80,023 471,665 $9.49 /SF 2.50% of Subtotal
Construction Contingency $783,284 $160,046 943,330 $18.97 /SF 5.00% of Subtotal
Builders Risk Insurance $39,164 $8,002 47,167 $0.95 /SF 0.25% of Project
Comprehensive General Liability Insurance $205,182 $41,924 247,106 $4.97 /SF 1.15% of Costs
Sub Bonding / Subguard $176,583 $38,051 214,635 $4.32 /SF 1.20% of Costs
Performance, Labor & Material Bond $98,521 $20,142 118,663 $2.39 /SF 0.55% of Project
Escalation Allowance $0 $0 0 $0.00 /SF 0.00% of Project
General Contractors Fee $512,122 $104,699 616,821 $12.40 /SF 2.95% of Costs
Preconstruction Services $45,698 $9,337 55,035 $1.11 /SF Per RFP Response
$17,917,885 $3,663,145 $21,581,029
Accepted Price Options:($551,274)
DD GMP Construction Cost w/ Accepted Price Options $21,029,755
Construction Budget $21,054,250
Cost Delta ($24,495)Under Budget
Design Development GMP Construction Cost
Project Summary Sheet - Estimated Cost of the Work
Exhibit A-1
Page 164 of 216
Detailed Cost Estimate Englewood Police HQ
DD GMP
Item #bl
a
Description blank Quantity Unit Total Unit Total $b Notes / Comments / Clarifications
00 - Procurement and Contracting Requirements
00 72 00 - AIA General Conditions
001 General conditions of the contract 1.00 ls $489,520.35 $489,520 Based on 13 months
002 General conditions of surface parking and sitework 1.00 ls $188,277.06 $188,277 Based on 5 months
003 Public services and development fees Not Included - See Summary
Total 00 72 00 - AIA General Conditions $677,797
Total - 00 - Procurement and Contracting Requirements $677,797
01 - General Requirements
01 14 00 - Work Restrictions
001 Off-hours work Not Included
002 Site access requirements - offsite staging Not Included
Total 01 14 00 - Work Restrictions $0
01 33 00 - Submittals
001 Delivery costs / messenger services W/ GC's
002 Reproduction costs 20.00 ea $200.00 $4,000
Total 01 33 00 - Submittals $4,000
01 45 00 - Quality Control
001 Independent testing By Owner
002 Soil compaction tests By Owner
003 Concrete tests By Owner
004 Steel weld test / inspections By Owner
Total 01 45 00 - Quality Control $0
01 51 00 - Temporary Facilities
001 Hoists By Trade / Division
002 Const. aids and misc. services N/A
003 Temp. encloures for dust protection & entry 1.00 allow $20,000.00 $20,000
004 Barricades and warning lights 1.00 allow $20,000.00 $20,000
005 Street Closure / ROW Allowance 1.00 allow $60,000.00 $60,000
006 Temp Parking Fees @ Garage Not Included
007 Temporary electricity w/ Div 26
008 Temporary lighting w/ Div 26
009 Temporary water w/ trades
010 Weather Protection - Phase 1 4.00 mth/allow $30,000.00 $120,000
011 Weather Protection - Phase 2 1.00 mth/allow $30,000.00 $30,000
012 Dumpsters for project 1.00 ls $48,600.00 $48,600
Total 01 51 00 - Temporary Facilities $298,600
01 54 00 - Construction Aids
001 Temporary elevators N/A
002 Temporary hoists N/A
003 Temporary cranes By Division
004 Temporary scaffolding and platforms By Division
Total 01 54 00 - Construction Aids $0
01 74 00 - Cleaning
001 Final clean site 90,090.00 sf Included With GCs
002 Final clean building 49,725.00 sf Included With GC's
Total 01 74 00 - Cleaning $0
Total - 01 - General Requirements $302,600
02 - Existing Conditions
02 21 00 - Surveys
001 Phase 1 - Police Building 1.00 sub $26,650.00 $26,650
002 Building corners, vert/horiz control 1.00 ls Included
003 Grid lines 1.00 ls Included
004 Reestablish grid lines on slab 1.00 ls Included
005 Verify overlot grading 1.00 ls Included
006 Overlot grading 1.00 ls Included
007 Utilities 1.00 ls Included
008 Sidewalks & Site Paving 1.00 ls Included
009 Sawcut lines 1.00 ls Included
010 Curb & gutter 1.00 ls Included
011 Drilled piers 92.00 ea Included
012 Light pole bases 22.00 ea Included
013 LED Bollards 36.00 ea Included
014 Tree grates/bike racks/benches, all other site ammenities 15.00 ea $55.00 $825
015 Transformer/Generator Pads 1.00 ls Included
016 Retaining walls Not Included
017 Re-stake original layout 20%1.00 ls $8,860.80 $8,861
018 Total Station Rental 6.00 mo $2,693.25 $16,160
019 Certified improvement survey 1.00 ls $2,500.00 $2,500
020 Phase 2 - Surface Parking 1.00 sub $9,300.00 $9,300
021 Additional Mobilization 1.00 ea $1,500.00 $1,500
022 Overlot grading 1.00 ls Included
023 Bluetop - asphalt parking 1.00 ls Included
024 Carport Columns 87.00 ea Included
025 Fencing 770.00 lf Included
026 Landscape rain garden intervals 1.00 ls Included
Date printed: 10/27/2017 20171016 Englewood PHQ DD GMP Estimate.xlsb Page 1/19
Exhibit A-2
Page 165 of 216
027 Re-stake original layout 20%1.00 ls $8,088.64 $8,089
028 Total Station Rental 4.00 mo $2,693.25 $10,773
029 Certified improvement survey 1.00 ea $2,000.00 $2,000
Total 02 21 00 - Surveys $86,657
02 41 00 - Demolition
001 Phase 1 site demolition w/ Div 31 Earthwork
002 Phase 2 - Surface Parking 1.00 sub $210,414.50 $210,415
003 Demo Permit 1.00 ea Included
004 ROW permit for sidewalk / street closure 1.00 ls w/ Div 01 General Requirements above
005 Entire building - 2 story Police Building 28,115.00 sf Included
006 Entire concrete slab on crawlspace & concrete tees 1.00 ls Included
007 Grade beams with backhoe to 3' deep 1.00 ls Included
008 Haul off debris, recycle of metal/concrete 1.00 ls Included
009 Caisson Removal Not Included
010 Selective Demolition along Fire Station shared walls 60.00 lf Included
011 - Twin Tee floor construction separation 60.00 lf Included
012 - Temp Shoring of concrete twin tees 60.00 lf Included
013 - Sawcut twin tees, selective demo to separate from Fire Station foundation wall 60.00 lf Included
014 - Roof membrane/decking removed 5' back from separation line to cut joists 300.00 sf Included
015 - Temp shoring of bar joists at separation 60.00 lf Included
016 Store owner items @ unknown location on-site 1.00 ls $3,654.75 $3,655
017 Traffic Control 20.00 days $765.68 $15,314
018 Dust Protection 150.00 lf $39.94 $5,991
019 Temporary Plywood protection against new building South Elevation 3,400.00 sf $2.07 $7,032
020 Asbestos Abatement By Owner
Total 02 41 00 - Demolition $242,406
Total - 02 - Existing Conditions $329,063
03 - Concrete
03 11 00 - Concrete Forming
001 Police Building 1.00 sub $927,182.00 $927,182
002 FORMWORK/PLACEMENT - FOUNDATIONS Included
003 Drilled Piers w/ Div 31 Piers
004 Caissons - 24" x 65'deep, pour concrete 800.40 cy Included
005 Concrete pump per day (one truck -65 cy)25.00 day Included
006 Pier Cap - 36"x36"x3'-0"depth, on 6" void form 1,249.50 cf Included
007 Drop Panels - 48"x48"x1'-6" depth, 6" cont void form 888.00 cf Included
008 Footings Not Included
009 Column pads Not Included
010 Grade beams - 16"w x 3'-0" depth, 6" void form 560.00 lf Included
011 Grade beams - 24"w x 3'-0" depth, 6" void form 35.00 lf Included
012 Grade beams - 36"w x 3'-0" depth, 6" void form 80.00 lf Included
013 Grade beams over 3'-0" high Not Anticipated
014 Elevator Pit Walls, 8"w x 36"d 85.00 lf Included
015 Shear Wall GB - 12"w x 36"h 109.00 lf Included
016 Stoop Grade Beams, 3'-0 High, 6" void form, 12"w 110.00 lf Included
017 Pier caps, footings, column pads, grade beams, columns - labor to pour 226.55 cy Included
018 Install embeds furnished by others 4,212.00 sf/frmwk $0.15 $632
019 MISC. FORMWORK ITEMS Below
020 Patch tie holes for waterproofing/dampproofing 4,212.00 sf $0.40 $1,677
021 Concrete Foreman for layout/pour coordination/QAQC 4.00 mth $11,805.31 $47,221
022 Hand Excavation 15.00 day $300.00 $4,500
023 Hoisting for formwork 1.00 mth $4,294.82 $4,295
024 Shore fnd walls prior to backfill per lf of wall Shoring not anticipated to be required
025 Water stop - labor & material Not Included
026 Surface Parking
027 Drilled Piers w/ Div 13
028 Caissons - 18" x 65'deep, pour concrete 1.00 ls w/ Div 13
029 Concrete pump per day 25.00 day w/ Div 13
030 Pier caps at Carport Caissons N/A Not Shown/Anticipated
031 Concrete Foreman for layout/pour coordination/QAQC 1.00 mth $11,805.31 $11,805
Total 03 11 00 - Concrete Forming $997,312
03 35 00 - Concrete Finishing
001 Police Building 1.00 sub $622,231.00 $622,231
002 12" SOG, 2-way slab system, on 6" void form 25,944.00 sf Included
003 SOG column diamonds - (2' x 2' x 8")47.00 ea Included
004 Thickened slabs for non bearing masonry (6" x 2'-6)Not Anticipated w/ 12" Structural SOG
005 Install 15mil STEGO vapor barrier (prices include 15% waste) 25,944.00 sf Included
006 CIP Steps N/A
007 Concrete holding cell benches 50.00 lf $125.00 $6,250
008 Slab on Metal Deck - Type 1, 3" on 3" metal deck, WWF reinf 20,005.00 sf Included
009 Slab on Metal Deck - Type 2, 5" on 3" metal deck, #5 @ 12" o.c. 2,200.00 sf Included
010 Equipment Pads - (6")250.00 sf $5.00 $1,250
011 MISC. FLATWORK ITEMS Below
012 Misc. concrete accessories (cure, bulkheads, etc.) 48,399.00 sf Included
013 Expansion Joint Material 610.00 lf $2.25 $1,373
014 Cold weather protection (blankets..)$0.45 w/ Div 01
Total 03 35 00 - Concrete Finishing $631,104
03 30 05 - Concrete Materials
001 Sitework - Gray concrete w/ Div 32
002 Police Building 1.00 sub Included w/ Forming & Finishing Above
003 Caissons - material 800.40 cy Included
Date printed: 10/27/2017 20171016 Englewood PHQ DD GMP Estimate.xlsb Page 2/19
Page 166 of 216
004 Sonotube @ top of caisson 24" - mat'l 276.00 lf Included
005 Pier caps, footings, column pads, grade beams, columns - material 226.55 cy Included
006 SOG - material 1,008.93 cy Included
007 SOD - material 17.35 cy Included
008 SOD - light weight material Not Anticipated
009 Void Form under Grade Beams - 6"979.00 lf Included
010 Void Form under SOG - 6"25,944.00 sf Included
011 Vapor Barrier under SOG 25,944.00 sf Included
012 Short load/off hour deliveries 1,252.83 cy $4.00 $5,011
013 Fibermesh Not Anticipated
014 Additives for concrete flatwork 1,252.83 cy $8.00 $10,023
015 CONCRETE PUMP, fnd & slabs 1,252.83 cy Included
016 Line pump setup 1,252.83 cy $2.24 $2,802
017 Surface Parking
018 Caisson Material 360.15 cy w/ Div 13
019 Concrete walls for Security Fencing w/ Div 32 Fencing
Total 03 30 05 - Concrete Materials $17,836
03 20 00 - Concrete Reinforcing
001 Police Building 1.00 sub Included w/ Forming & Finishing Above
002 Rebar material - Caissons 1.00 ls Included
003 Install rebar - Caissons 1.00 ls Included
004 Stock rebar lengths 1.00 ls $5,367.60 $5,368
005 Rebar Material - Foundation Walls & Pilasters 1.00 ls Included
006 Rebar Material - Structural two-way slab on grade 1.00 ls Included
007 Install concrete rebar 1.00 ls Included
008 Accessories material (chairs,spacers, safety caps, etc) 45,949.00 sf $0.06 $2,757
009 Accessories - labor 45,949.00 sf $0.03 $1,378
010 Rebar Hoisting 1.50 mth $17,289.66 $25,934
011 Wire mesh - labor 20,005.00 sf Included
012 - 4.0 mesh material 20,005.00 sf Included
013 Surface Parking Lot
014 Rebar material - Caissons 22.51 tons w/ Div 13 Included
015 Install rebar - Caissons 22.51 tons w/ Div 13 Included
Total 03 20 00 - Concrete Reinforcing $35,437
03 60 00 - Grouting
001 Columns, embeds plates, hoist sills - Police Bldg 49,725.00 sf $0.15 $7,459
Total 03 60 00 - Grouting $7,459
Total - 03 - Concrete $1,689,148
04 - Masonry
04 20 00 - Unit Masonry
001 Police Building Below
002 Masonry scope of work 1.00 ls $1,149,000.00 $1,149,000
003 8" std CMU Foundations - fully grouted @ Foundations 1,643.00 sf Included
004 8" std CMU - Exterior Wall Backup, grouted & reinforced, To 2nd Floor & Parapet 8,104.00 sf Included
005 8" std CMU - Interior to 10" High, grouted & reinforced 12,228.00 sf Included
006 8" std CMU - Interior Backup @ Stone Work, grouted & reinforced, To 10' High 2,702.00 sf Included
007 Add For 8" Bond Beams 1,140.00 lf Included
008 Concrete Fill - 3000 psi 170.00 cy Included
009 Reinforcing Steel 40.00 ton $900.00 $36,000
010 Rebar Positioners 4,000.00 pcs Included
011 Cut & Seal Top Walls to Deck 160.00 lf Included
012 Thru Wall Flashing 980.00 lf Included
013 Control Joints 320.00 lf Included
014 Bituminous Coating on HM Frames Included With Div. 8 - Hollow Metal
015 Bond Beam Lintels 310.00 lf Included
016 Steel Beam Lintels 100.00 lf $45.00 $4,500
017 Embeded Beam Plates 20.00 ea $50.00 $1,000
018 Embeded Anchor Bolts @ Beam Plates 40.00 ea $50.00 $2,000
019 Embeded Joist Plates 10.00 ea $500.00 $5,000
020 Embeded Deck Plates - Continous 220.00 lf $8.00 $1,760
021 Bolted Deck Plates - Continous 120.00 lf $17.30 $2,076
022 Tool & Clean masonry 31,897.00 sf Included
023 Shoring for door & window openings 220.00 lf $39.50 $8,690
024 Temp bracing for wall panels and masonry 25.00 ea $46.10 $1,153
025 Deadmen for bracing of masonry 25.00 ea $75.00 $1,875
026 Masonry corner plywood protection 24.00 ea $426.50 $10,236
027 Remove debris from job site 31,897.00 sf $0.45 $14,354
028 Brick Below
029 4" std CMU Starter Block 440.00 sf Included
030 Face Brick 15,103.00 sf Included
031 2" Rigid Insulation 15,505.00 sf $5.35 $82,998
032 Screw on Brick Anchors 2,400.00 pcs Included
033 Grout Cavities @ Foundations 6.00 cy Included
034 Thru Wall Flashing at Gyp Sheathing 1,030.00 lf Included
035 Brick Control Joints 310.00 lf Included
036 Fluid-Applied Membrane Air Barrier 15,505.00 sf W/ Div. 7
037 Clean Brick Veneer 15,505.00 sf Included
038 Steel Angle Brick Lintels 20.00 lf $70.00 $1,400
039 Lay Brick to Ledger Angle 610.00 lf Included
040 Lay Brick Off Beam Lintels 80.00 lf Included
041 Masonry corner plywood protection 18.00 ea $426.50 $7,677
042 Remove debris from job site 15,505.00 sf $0.45 $6,977
Date printed: 10/27/2017 20171016 Englewood PHQ DD GMP Estimate.xlsb Page 3/19
Page 167 of 216
043 Stone Cladding Below
044 Mfg Stone - Thinclad Tile, Smooth Ext Soffits 800.00 sf Included
045 Mfg Stone - Fullbed Tile, Smooth Interior Walls, FullBed - Interior Lobby 2,870.00 sf $19.51 $55,999
046 Mfg Stone - Fullbed Tile, Rocked, Exterior Walls, FullBed 2,920.00 sf Included
047 Add For Corner Returns 424.00 lf Included
048 Add For Stretcher"s 172.00 lf Included
049 Watertable/Sill/Int Wall Cap 150.00 lf Included
050 Mortar & Adhesives 6,590.00 sf Included
051 Tool & Clean Exposed 6,590.00 sf Included
052 Remove debris from job site 6,590.00 sf $0.45 $2,966
053 Site Below
054 Masonry trash enclosure - 8" CMU at Dumpster Enclosure 384.00 sf $15.50 $5,952
055 Masonry trash enclosure - Brick Veneer at Dumpster Enclosure 448.00 sf $10.00 $4,480
056 Concrete Fill - 3000 psi 5.00 cy $350.00 $1,750
057 Reinforcing Steel w/ Rebar Postioners 200.00 lbs $1.00 $200
058 Tool & Clean masonry 384.00 sf $0.45 $173
059 Clean Brick Veneer 448.00 sf $0.45 $202
060 Misc. Masonry Accessories 1.00 ls $150.00 $150
061 Dumpster Gates w/ Hardware - 4' x 8'2.00 ea w/ steel
062 Remove Debris From Job Site 832.00 sf $0.45 $374
063 Patch at fire station 1.00 allow $35,000.00 $35,000
Total 04 20 00 - Unit Masonry $1,443,941
Total - 04 - Masonry $1,443,941
05 - Steel
05 12 00 - Structural Steel
001 Police Building 1.00 sub $1,270,761.60 $1,270,762
002 Floor structure, - joist, beams, columns 1.00 ls Included
003 Roof structure - joist, beams, columns 1.00 ls Included
004 Entry Canopy 1.00 ls Included
005 Hip Beam Framing (dtl 42/S5.2)Not Included
006 AESS (architectural exposed steel) - interior @ Lobby 1.00 ls Not Included
007 AESS (architectural exposed steel) - exterior @ Screen Wall only 1.00 ls Not Included
008 AESS @ Sally Port or other exposed areas Not Included
009 Structural steel erection 320.00 tons Included
010 Professional engineering for all structural and misc. steel Design and engineering not included
011 Surface Parking
012 Carport Canopies w/ Div 13 Pre Engineered Structures
Total 05 12 00 - Structural Steel $1,270,762
05 21 00 - Steel Joist Framing
001 Police Building Included w/ 05 12 00
Total 05 21 00 - Steel Joist Framing $0
05 30 00 - Metal Deck
001 Police Building
002 Floor Deck material - 20 gauge, 3" - Standard 20,005.00 sf Included
003 Floor Deck material - 20 gauge, 3" - Composite (Tactical Training) 2,200.00 sf Included
004 Roof Deck material - 20 gauge 1.5", Type A Standard 23,345.00 sf Included w/ 05 12 00
005 Roof Deck material - 20 gauge 1.5", Type B Composite Not Included
006 Metal Roof Deck - 1-1/2" galv composite deck w/ NWC topping @ RTUs 545.00 sf Included
007 Canopy Deck - 20 gauge 1.5", Type A Standard 4,535.00 sf Included
008 Vulcraft acoustical deck - 3", 20 gage painted - S2.2 note 6 5,255.00 sf $2.25 $11,824 Additional cost from 20 ga - NRC of .65
009 Sound insulation installation in flutes 5,255.00 sf $0.40 $2,102
Total 05 30 00 - Metal Deck $13,926
05 50 00 - Metal Fabrications
001 Police Building Included w/ Structural Steel above
002 Stairs and landings Included w/ Structural Steel above
003 Steel stairs, metal pan, bent steel treads/risers 81.00 riser Included w/ Structural Steel above
004 Stair landing; floor and/or intermediate 185.00 sf Included w/ Structural Steel above
005 Roof ladders, mechanical ladders 34.00 lf Included w/ Structural Steel above
006 Elevator pit ladder 12.00 lf Included w/ Structural Steel above
007 Guard Rails - Interior Below
008 Tensioned Cable Guardrail for Monumental Staircase & Landing 87.00 lf Included w/ Structural Steel above
009 Glass Guardrail for 2nd Level Lobby overlook 50.00 lf Included w/ Structural Steel above
010 Tensioned Cable Guardrail at Back of House Stair Landing 46.00 lf Included w/ Structural Steel above
011 Glass Guardrail at Back of House Stair @ Lvl 2 Break Room 32.00 lf Included w/ Structural Steel above
012 Wall Mounted Handrails 220.00 lf Included w/ Structural Steel above
013 Guard Rails - Exterior Below
014 Stainless Steel Railing @ Ramp - top rail/post only 40.00 lf Included w/ Structural Steel above
015 Bondo railings 36.00 hrs $44.73 $1,610
016 Coredrilling for ext. handrails 10.00 ea $86.18 $862
017 Site Fabrications Below
018 Pipe bollards - 4" dia 30.00 ea $200.00 $6,000 Not Shown, Assumed may be required
019 Install pipe bollards - 4" dia 30.00 ea $75.00 $2,250
020 Sidewalk chases - angles & galvanized diamondplate cover 60.00 sf $120.00 $7,200 Not Shown, Assumed may be required
021 Install sidewalk chases 50.00 lf $15.00 $750
022 Trash gates - angle frame & deck - galvanized - installed 1.00 pair $3,500.00 $3,500
023 Hoisting for site FOB items 1.00 ls $6,356.65 $6,357
024 Misc. Metals Below
025 Roof mechanical screen framing - 8'h HSS Steel Framing 310.00 lf Included w/ Structural Steel above
026 - Mini Mesh infill - 1/2" woven wire mesh, stainless steel due to diameter size 2,480.00 sf Included above, Cannont galvanize wire size
027 Exterior Rec Area Screen Framing - 44/A5.1, Woven wire mesh, galv. 555.00 sf Included w/ Structural Steel above
028 Stainless Steel countertops w/ Dip Trays 16.00 lf $315.00 $5,040
Date printed: 10/27/2017 20171016 Englewood PHQ DD GMP Estimate.xlsb Page 4/19
Page 168 of 216
029 Counter support angles 30.00 ea $100.00 $3,000
030 Locker Bench Supports 50.25 ea $37.33 $1,876
031 Angles at overhead doors 88.00 lf Included w/ Structural Steel above
032 Pour Stop, bent plate 1,350.00 lf Included w/ Structural Steel above
033 Ledger Angle at entire bldg perimeter - curtain wall/brick supports (54 and 46/A9.4) 1,350.00 lf Included w/ Structural Steel above
034 Elevator hoist beam 2.00 ea $500.00 $1,000
035 Elevator sill angle 2.00 ea $100.00 $200
036 Elevator sump pit grate and frame 2.00 ea Included Included w/ Structural Steel above
037 Operable partition support beams 49.00 lf $150.00 $7,350
038 Prepunch beams for op. partitions 5.00 ea $250.00 $1,250
039 Above ceiling angles for toilet partition support 19.00 ea $125.00 $2,375
040 Roof opening frames 9.00 ea $375.00 $3,375
041 Clean mud off steel 90.00 hrs $44.73 $4,026
042 Erection of metal fabrications Included above
Total 05 50 00 - Metal Fabrications $58,020
05 90 00 - Steel Erection & Coordination
001 Police Building Below Below
002 Safety cabling 2,700.00 lf $6.15 $16,605
003 Site improvements for crane access 1.00 ls $1,500.00 $1,500
004 Spark protection for other trades 1.00 ls $4,328.40 $4,328
005 Touch up paint for steel, joist, deck 49,725.00 sf $0.05 $2,486
Total 05 90 00 - Steel Erection & Coordination $24,920
Total - 05 - Steel $1,367,627
06 - Carpentry
06 10 53 - Rough Carpentry
001 Police Building Below
002 Rough Carpentry per sf of Building 49,725.00 sf $1.70 $84,533
Total 06 10 53 - Rough Carpentry $84,533
06 22 13 - Finish Carpentry
001 Police Building Below
002 Millwork scope of work 1.00 ls $208,895.00 $208,895
003 Lobby 101 - Lobby counter base cabinets and ss countertop 1.00 ls Included
004 Record 111 - SS + Base Cabinets 1.00 ls Included
005 Lobby bullet resistant speaker port, glass, transaction drawer, and stone tops 1.00 ls $5,500.00 $5,500
006 Lobby Painted Wood Base Not Included Removed from scope per DLR direction
007 Mens 104A and Womens 105A - quartz tops with supports & plam plumbing panels 1.00 ls Included
008 Fingerprint 107 - Plam casework with SS countertops 1.00 ls Included
009 Mail 109 - Melamine cubbies with SS countertop and supports 1.00 ls Included Verify with DLR is Mailboxes are NIC
010 Breakroom 113 - Plam casework with SS countertops 1.00 ls Included
011 Ammo 122 - Plam casework with stainless steel tops 1.00 ls Included
012 Rifle Storage 126 - Melamine open storage cabinets (41nos) 1.00 ls Included
013 Corridor 129 - Plam casework with SS countertops 1.00 ls Included
014 Community 143 - Plam casework with SS countertops 1.00 ls Included
015 Mens 147 and Womens 149 - quartz tops with supports and plam plumbing panels 1.00 ls Included
016 Evidence return 151 - Transaction countertop with dip tray 1.00 ls w/ Div 5
017 Lab 155 - SS countertops with supports and base cabinet 1.00 ls Included
018 Evidence Processing 160 - SS countertops with supports and sink base 1.00 ls Included
019 Report / Viewing 172 - SS countertop with supports 1.00 ls Included
020 Booking 173 - Plam casework with SS countertops 1.00 ls Included
021 Fingerprint 176 - Plam casework with SS countertops 1.00 ls Included
022 Intox 177 - Plam casework with SS countertops 1.00 ls Included
023 Juvenille Booking 179 - Plam casework with SS countertops 1.00 ls Included
024 Mens 204A and Womens 205A - quartz tops with supports & plam plumbing panels 1.00 ls Included
025 Victim Waiting 210 - Plam casework with SS countertops 1.00 ls Included
026 Investigation 220 - SS countertops with supports 1.00 ls Included
027 Fire Inspector 224 - Melamine drawing storage unit 1.00 ls Included
028 Break room 238 - Plam casework with SS countertops 1.00 ls Included
029 Admin 255 - Plam casework with SS countertops 1.00 ls Included
030 Admin 255 - Executive Desk 1.00 allow $7,500.00 $7,500
031 Training 250 - Plam casework with SS countertops 1.00 ls Included
032 Dispatch 270 - Plam casework with SS countertops 1.00 ls Included
033 Breakroom 269 - Plam casework with SS countertops 1.00 ls Included
034 Mens 229 and 330 - Quartz tops with supports and plumbing panels 1.00 ls Included
035 Womens 235 and 236 - Quartz tops with supports and plumbing panels 1.00 ls Included
036 Solid surface wall caps 1.00 ls Included
037 Solid surface window sills 1.00 ls Included
038 Gun Cleaning - Chemical resistant countertop Not Included
039 Lab - Chemical resistant countertop Not Included
040 Evidence Processing - Epoxy countertop Not Included
041 Locker Rooms - integral wood benches 201.00 lf w/ Div 10 With division 10 lockers
042 Protect casework after installation 1,480.00 lf $1.64 $2,431
043 Caulk casework/countertops 1,480.00 lf $4.00 $5,920
044 Records Room casework Not Included Not Included - w/ FF&E
Total 06 22 13 - Finish Carpentry $230,246
Total - 06 - Carpentry $314,778
07 - Thermal and Moisture Protection
07 13 26 - Waterproofing
001 Not Anticipated - no occupied space below grade Excluded
Total 07 13 26 - Waterproofing $0
07 11 13 - Bituminous Damproofing
001 Police Building Below
Date printed: 10/27/2017 20171016 Englewood PHQ DD GMP Estimate.xlsb Page 5/19
Page 169 of 216
002 Cold applied damproofing - foundation walls (1 coat Hydrocide 600) 1.00 ls $11,400.00 $11,400
003 Drainage/protection board 1.00 sf W / Abv.
004 Fill voids prior to damproofing 3,066.00 sf $0.23 $710
005 Waterproofing @ Elev. Pit Walls - 78 lf x 8' High 1.00 ls $2,900.00 $2,900
006 Fluid-Applied Membrane Air Barriers to Gypsum 7,401.00 sf $7.50 $55,508
007 Fluid-Applied Membrane Air Barriers to Masonry 8,104.00 sf $7.50 $60,780
008 2" Rigid Insulation to Gypsum 7,401.00 sf W / Div 4 - Masonry
009 2" Rigid Insulation to Masonry 8,104.00 sf W / Div 4 - Masonry
010 Fill voids prior to application - Gypsum 7,401.00 sf $0.23 $1,714
011 Fill voids prior to application - Masonry 8,104.00 sf $0.23 $1,877
012 Fasteners & Adhesives at Rigid Insulation W / Div 4 - Masonry
Total 07 11 13 - Bituminous Damproofing $134,888
07 19 16 - Water Repellent Coating
001 Water Repellants at Brick Veneer 15,103.00 sf W/ Paint
Total 07 19 16 - Water Repellent Coating $0
07 76 16 - Deck Pavers & Waterproofing
001 Architectural pavers on pedestals Not Included Excluded - not anticipated
Total 07 76 16 - Deck Pavers & Waterproofing $0
07 92 13 - Caulking & Sealants
001 Police Building Below
002 Caulking & sealants per s.f. of Building 1.00 ls $16,000.00 $16,000
003 Steel Ledger Angle @ Veneer 602.00 lf Included
004 Building Expansion joints @ Concrete Paving & Walks 606.00 lf Included
005 Control joints at Drywall 264.00 lf W/ Drywall
006 Control joints at Brick Veneer 320.00 lf Included
007 Control joints at CMU Walls & Joints CMU to Gyp.320.00 lf Included
008 Door frames (Exterior)8.00 ea Included
009 Window frames (Exterior)4.00 ea Included
010 Window frames (Interior) 6.00 ea Included
011 Door frames (Interior) Single 110.00 ea Included
012 Door frames (Interior) Double 12.00 ea Included
013 Security caulking at detention areas 1.00 ls $15,790.00 $15,790
014 Security Caulking - Detention Door frames (Interior) Single 19.00 ea Included
015 Detention Window frames (Exterior)2.00 ea Included
016 Detention Window frames (Interior) 2.00 ea Included
017 Building Expansion joints - 1" Int, & Ext. Not Included
Total 07 92 13 - Caulking & Sealants $31,790
07 84 13 - Fire Stopping - Insulation & Sealants
001 Police Building Below
002 Firestopping Alum. To Slab on Deck 1.00 ls $18,000.00 $18,000
Total 07 84 13 - Fire Stopping - Insulation & Sealants $18,000
07 81 16 - Spray Fireproofing
001 Not Required per Type II-B fully sprinklered building Not Included Excluded
Total 07 81 16 - Spray Fireproofing $0
07 21 13 - Building Insulation
001 Police Building Below
002 Exterior foundation wall insulation 2"W/ 071000 w/ Div 07 Damproofing
003 Under slab insulation 2.5" thick Not Req'd Not Anticipated
004 Exterior wall insulation - R19 w/vb, Mineral Wool 7,401.00 sf W/ 092000 w/ Div 09 Gypsum Board
005 Air Barrier - self-adhered fluid applied 7,401.00 sf W/ 071000 w/ Div 07 Damproofing
006 Spray Foam Insulation Not Included Excluded
007 Air infiltration foam at openings 24,750.00 gsf W/ 071000 w/ Div 07 Damproofing
008 Building Envelope testing per ICC NIC Excluded - By Owner if required
Total 07 21 13 - Building Insulation $0
07 24 00 - Exterior Insulation & Finish System (EIFS)
001 Not Anticipated Excluded
Total 07 24 00 - Exterior Insulation & Finish System (EIFS)$0
07 53 23 - Roofing & Roof Insulation
001 Police Building Below
002 60 mil TPO, fully adhered 1.00 ls $350,000.00 $350,000
003 - Add for tapered insulation 5,189.00 sf Included Assumes sloped structure, crickets only
004 - Add for Acoustical Batt insulation 27,602.00 sf Not Included
005 Roof Coping - 14"w 1.00 ls Included
006 Roof Coping - 6"w 251.00 lf Included
007 Roofing on top of Entrance Canopy Included
008 Roof Hatch - 3' x 4'1.00 ea W/ Below
009 Roof pavers 24" x 24" x 2"Not Included
010 Rubber roof walk pads 3'w Continous 372.00 lf Included
011 Fall Protection Eyebolt on 4" Pipe to 8" High 6.00 ea $550.00 $3,300
012 Safety measures for roof work 1.00 ls $3,389.20 $3,389
013 Parking Lot - Phase 2 Below
014 Roofing on top of Car Port Canopies w/ Div 13
Total 07 53 23 - Roofing & Roof Insulation $356,689
07 71 00 - Roof Specialties & Accessories
001 Police Building Below
002 Roof scuttle, 3-0 x 4-0, galv. Steel w/ Ladder & Safety Post Extension 1.00 ea $2,225.00 $2,225
Total 07 71 00 - Roof Specialties & Accessories $2,225
07 60 00 - Flashing & Sheet Metal
001 Police Building Below
002 Roof metal fabrications for complete assembly 49,725.00 sf w/ Roofing
Date printed: 10/27/2017 20171016 Englewood PHQ DD GMP Estimate.xlsb Page 6/19
Page 170 of 216
003 Parapet cap - prefinished, 16" wide 645.00 lf w/ Roofing
004 Parapet cap - prefinished, 6" wide 251.00 lf w/ Roofing
005 Counter flashing - 1 pc.w/ Roofing
006 Complete reglet system w/ Roofing
007 RTU curb flashing 230.00 lf $25.00 $5,750
008 Misc. flashings and terminations 49,725.00 sf $0.25 $12,431
009 Snow fence Not Included
Total 07 60 00 - Flashing & Sheet Metal $18,181
07 42 13 - Metal Wall Panels
001 Police Building Below
002 Wall panels @ Doors & Windows - ACM 466.00 sf $35.00 $16,310 1" Sandwich Panel, Alum Finish
003 Wood Composition Siding - Fiberon, non-insulated, vertical 1,567.00 sf $24.20 $37,921
004 Wood Composition Siding - Fiberon, non-insulated, horizontal 3,488.00 sf $24.20 $84,410
005 Framing & Sheathing w/ Div 09 Drywall w/ Div 9
006 Flashing associated with metal wall panels 1.00 ls Included
007 Custom Colors Not Included
Total 07 42 13 - Metal Wall Panels $138,641
07 95 00 - Expansion Control
001 Police Building Below
002 Not Anticipated Not Included
Total 07 95 00 - Expansion Control $0
Total - 07 - Thermal and Moisture Protection $700,415
08 - Doors and Windows
08 12 13 - Hollow Metal Doors and Frames
001 Police Building Below
002 HM Frame - single 3'-0" x 7'-0", 118 pcs 1.00 ls $48,330.00 $48,330
003 HM Frame - dbl 6'-0" x 7'-0"12.00 ea Included
004 Add For HM Sidelite frames 32.00 ea Included
005 3'-0" x 7'-0" HM door - standard 17.00 ea Included
006 HM Window frames - 10pcs 244.00 sf Included
007 Detention Frames @ Holding Area/Booking entrances Singles 19.00 ea w/ Div 10 W/ Div 10 Detention Equipment
008 Detention HM Doors @ Holding Area/Booking entrances 16.00 ea w/ Div 10 W/ Div 10 Detention Equipment
009 Detention Wood Doors @ Holding Area/Booking entrances 3.00 ea w/ Div 10 W/ Div 10 Detention Equipment
010 Detention Sliding Doors @ Cells 9.00 ea w/ Div 10 W/ Div 10 Detention Equipment
011 Level 4 Detention @ Sally Ports & Hard Interview w/ Div 10 W/ Div 10 Detention Equipment
012 Detention HM Window frames - 4pcs 168.00 sf w/ Div 10 W/ Div 10 Detention Equipment
013 Bituminous Coating on HM Frames 3,400.00 lf $3.30 $11,220
014 Misc welding, grinding, bondo 147.00 ea $20.35 $2,991
015 Installation of HM Frames, 162 pcs 1.00 ls $16,475.00 $16,475
016 Installation of HM Doors, 17 pcs 1.00 ls $45,764.00 $45,764
017 Repair minor damage to installed doors 147.00 ea $15.00 $2,205
018 Unload/handle/distribute, 147 pcs 147.00 ea $27.37 $4,023
Total 08 12 13 - Hollow Metal Doors and Frames $131,008
08 14 00 - Wood Doors
001 Police Building Below
002 Premachined - red oak or birch - solid core 3'-0" x 7'-0", 131 pcs 1.00 ls $52,300.00 $52,300
003 Installation of wood doors 131.00 ea Included
004 Repair minor damage to installed doors 131.00 ea $15.00 $1,965
005 Unload/handle/distribute 131.00 ea $27.37 $3,585
Total 08 14 00 - Wood Doors $57,850
08 71 00 - Hardware
001 Police Building Below
002 Office function hardware set, 130 pcs 1.00 ls $61,232.00 $61,232
003 Egress function hardware set 1.00 ls $8,594.00 $8,594
004 Specialty Security function hardware set 19.00 ea w/ Div 10 Included with Detention Equipement
005 Automatic Operators - Install 2.00 ea $1,500.00 $3,000
006 Knox Box 1.00 ea $602.50 $603 New Building Only
007 Misc. missing hardware 1.00 ls $1,756.75 $1,757
008 Installation of hardware 130.00 ea Included W/ Above
009 Unload/handle/distribute 130.00 ea $27.37 $3,557 W/ Above
Total 08 71 00 - Hardware $78,743
08 31 00 - Access Doors
001 Security Rated @ Police 2.00 ea Div. 10 W/ Detention Equipment
002 Security Rated Sally Port 2.00 ea Div. 10
003 Access doors at remaining areas 1.00 allow $5,500.00 $5,500
Total 08 31 00 - Access Doors $5,500
08 33 43 - Smoke Containment System
001 Not Anticipated
Total 08 33 43 - Smoke Containment System $0
08 33 23 - Sectional Overhead Door
001 Overhead door scope of work 1.00 ls $50,270.00 $50,270
002 Powder Coated - 20' x 12' - Drive-Thru 2.00 ea Included
003 Powder Coated - 20' x 10' - Drive-Thru 1.00 ea Included
004 Powder Coated - 18"-8" x 12' - Drive-Thru 1.00 ea Included
005 Add for high cycle door 4.00 ea $1,200.00 $4,800
006 Add automatic operators 4.00 ea Included
007 Add low voltage wiring for operators 4.00 ea $150.00 $600
Total 08 33 23 - Sectional Overhead Door $55,670
08 41 00 - Aluminum Entrances
001 Police Building 1.00 sub $702,170.00 $702,170
Date printed: 10/27/2017 20171016 Englewood PHQ DD GMP Estimate.xlsb Page 7/19
Page 171 of 216
002 Interior Storefront Framing 1.00 ls Included
003 Glass Inserts 1.00 ls Included
004 Exterior Curtainwall Framing 8,407.00 sf Included
005 2nd Bead of Caulking - Interior Included
006 Ballistic Glazing @ Interior Storefronts 132.00 sf Included
007 Sun control Not Included Not Included
008 Support steel for curtainwall system Not Included Not Antcipated
009 Aluminum doors, frames, hardware 7.00 ea Included Includes hardware
010 Auto Operators 4.00 ea Included
011 Automatic sliding doors - 6'w x 7' h, single panel, Horton manu. 124A & B 2.00 ea Included
Total 08 41 00 - Aluminum Entrances $702,170
08 80 00 - Glass & Glazing
001 Police Building Below
002 Ballistic Security glazing in Storefronts 222.00 sf Included One-Way in Viewing/Hard Interview
003 Security glazing in Detention Doors 9.00 ea Included
004 1/4" clear tempered glass set in HM frame 96.00 sf Included
005 Exterior glazing in Curtain Walls, Insulated Type GL1A 1,594.00 sf Included
006 Exterior glazing in Curtain Walls, Insulated Type GL1B 25.00 sf Included
007 Exterior glazing in Curtain Walls, Insulated Type GL1C 2,501.00 sf Included
008 Exterior glazing in Curtain Walls, Insulated Type GL2A 792.00 sf Included
009 Exterior glazing in Curtain Walls, Insulated Type GL3A 3,464.00 sf Included
010 Exterior glazing in Curtain Walls, Insulated Type GL4 124.00 sf Included
011 Frameless mirrors - restrooms, Gym, Defensive Tactics 0.00 sf Included
012 Door vision kits 67.00 ea Included
013 Labor for vision kits 67.00 ea Included
Total 08 80 00 - Glass & Glazing $0
08 62 00 - Skylights
001 Police Building Below
002 Singular Fixed Skylight - metal framed 4' x 6', 18pcs 1.00 ls $23,490.00 $23,490
003 Fixed Linear Atrium Skylight - metal framed 8' x 34', 2pcs 1.00 ls $34,030.00 $34,030
004 Skylight curb -4' x 6' Prefab 18.00 ea $375.00 $6,750
005 Skylight Curb 8' x 34' Field Fab Wood Blocking to steel Purlin 2.00 ea $7,800.00 $15,600
006 Hoisting 16.00 hrs $250.00 $4,000
007 Temp safety enclosure @ opening 976.00 sf $4.00 $3,904
008 Final clean of skylight 976.00 sf $2.16 $2,108
Total 08 62 00 - Skylights $89,882
08 95 00 - Insulated Translucent Fiberglass Panel Wall System
001 Not Included Excluded - not anticipated
Total 08 95 00 - Insulated Translucent Fiberglass Panel Wall System $0
Total - 08 - Doors and Windows $1,120,823
09 - Finishes
09 21 16 - Gypsum Board Assemblies
001 Framing and Drywall scope of work 1.00 ls $1,100,000.00 $1,100,000
002 Exterior Canopy Veritical Framing - 30'H, 6" ms, sheathing/vap bar both sides 95.00 lf Included
003 Exterior Soffit Framing - 3'h, 6" ms, sheathing/vap bar both sides 276.00 lf Included
004 Exterior Wall Assembly 15'4" , 6" MS, ext sheathing, int. gyp bd 618.00 lf Included
005 Exterior Wall Assembly (Stair Clerestory) - 11'3", sheathing 95.00 lf Included
006 Exterior parapet framing - sheathing one side 710.00 lf Included
007 Vapor Barrier / Weather Barrier Included
008 Interior Framing & Drywall Below
009 3-5/8" stud, 16" o.c., x 14'H, batts, gyp both sides 3,585.00 lf Included
010 3-5/8" stud, 16" o.c., x 14'H, batts, to deck, gyp one side 321.00 lf Included
011 Furred Interior Walls x 10' H 279.00 lf Included
012 Furred Interior Walls x 12' H 281.00 lf Included
013 Partition Wall - Shaftwalls x 15' H 101.00 lf Included
014 Impact resistant gyp panels to 48" (cs acrovyn)5,792.00 sf $1.85 $10,715
015 Impact resistant gyp panels - full height in Gym & Def Tactics 3,478.00 sf $1.85 $6,434
016 Additional layer gyp at sound restrictive areas 15,840.00 sf $1.85 $29,304
017 Ballistic Level Assemblies 630.00 sf $22.00 $13,860
018 Mold resistant gyp at wet walls 9,960.00 sf Included
019 3-sided soffit @ Stairwell Clerestory, 6'h x 2'w 1,360.00 sf Included
020 L shaped soffits - 24" x 24"107.00 lf Included
021 L-shaped soffits - 36" x 24" 104.00 lf Included
022 Gyp Bd Ceilings 6,569.00 sf Included
023 Secure gyp board ceilings at detention areas 3,353.00 sf Included
024 Gyp Bd ceiling '2' designation 2,717.00 sf Not Included
025 Acoustical sealants at top of wall conditions 1.00 ls Included
026 Scaffolding Included
027 Drywall layout of walls, ceilings, soffits 49,725.00 sf bldg $0.18 $8,951
028 Touch up and minor repair 1.00 ls $11,603.14 $11,603
029 Remove debris from job site 49,725.00 sf $0.10 $4,973
030 Shop drawings, reg. engr stamp Not Included
Total 09 21 16 - Gypsum Board Assemblies $1,185,840
09 30 00 - Tiling
001 Police Building Below
002 Wall tile at restrooms and locker rooms (4' h wainscott) 5,233.00 sf $15.00 $78,495 Installed price of $15/s.f. per DLR direction
003 Porcelain floor tile 7,990.00 sf $15.00 $119,850 Installed price of $15/s.f. per DLR direction
004 Stone at main stair and restroom groups 1.00 ls W/ Div4 With masonry scope
005 Stair Tile - see 42 & 52/A8.1 1.00 ls Included
006 Add for epoxy grout on 2x2 tile Included Cost be be inclusive of installed price above
007 Add for moisture membrane Included Cost be be inclusive of installed price above
Date printed: 10/27/2017 20171016 Englewood PHQ DD GMP Estimate.xlsb Page 8/19
Page 172 of 216
008 Add for crack protection membrane Included Cost be be inclusive of installed price above
009 Floor prep and joint grinding 7,990.00 sf $0.65 $5,187
010 Floor protection 7,990.00 sf $0.54 $4,321
Total 09 30 00 - Tiling $207,853
09 51 00 - Acoustical Ceilings
001 Police Building Below
002 Armstrong Cirrus 589 2x2 with Silhouette grid 23,202.00 sf $4.75 $110,210
003 Metal security ceilings - all detention areas 3,353.00 sf $25.00 $83,825
004 5% stock material 23,202.00 sf $0.05 $1,160
Total 09 51 00 - Acoustical Ceilings $195,195
09 80 00 - Acoustic Treatment
001 Police Building Below
002 Acoustic Wall Panels in Training Room - 15% of wall surface area 300.00 sf $19.00 $5,700 Not Shown on drawings but included at SD Estimate
003 Acoustic Wall Panels in Community Room - 10% of wall surface area 182.00 sf $19.00 $3,458 Not Shown on drawings but included at SD Estimate
Total 09 80 00 - Acoustic Treatment $9,158
09 65 00 - Resilient Flooring
001 Police Building Below
002 LVT - Johnsonite or similar planks 273.00 sf $7.45 $2,034 Material price of $4/ s.f. per DLR direction
003 4" base 6,840.00 lf $2.15 $14,706
004 Clean/seal/wax floors 273.00 sf $0.25 $68
005 5% stock material 273.00 sf $0.05 $14
006 Moisture tests (1/1000sf)1.00 ea $105.00 $105
007 Floor prep and joint grinding 273.00 sf $0.65 $177
008 Floor protection 273.00 sf $0.54 $148
009 Rubber lab flooring, chemical/slip resistant @ Evidence Lab Not Included Not Included, Finish schedule indicates sealed conc
Total 09 65 00 - Resilient Flooring $17,252
09 65 02 - Floor Moisture Mitigation
001 Vapor mitigation system Not Included
Total 09 65 02 - Floor Moisture Mitigation $0
09 66 00 - Polished Concrete
001 Police Building Below
002 Ground and polished with large aggregate exposure, level 3 high gloss 6,949.00 sf $7.85 $54,550 Corridor 267 assumed to be porcelain tile
003 Ground and polished stair treads and risers at Stair 200s 1.00 ls $14,950.00 $14,950
004 Sealed concrete at back of house areas 11,632.00 sf $1.05 $12,214
005 Floor prep and joint grinding 7,995.00 sf $1.45 $11,593
006 Floor protection 7,995.00 sf $2.09 $16,710
Total 09 66 00 - Polished Concrete $110,016
09 64 00 - Wood Flooring
001 None shown
Total 09 64 00 - Wood Flooring $0
09 68 00 - Carpet
001 Police Building Below
002 Shaw or equivalent, 2x2 tile 1,743.00 sy $32.00 $55,776 Unit price set at $32 /sy installed per DLR direction
003 Carpet tile at access flooring 180.00 sy $32.00 $5,760
004 Moisture tests (1/1000sf)16.00 ea $100.00 $1,600
005 Floor prep and joint grinding 15,687.00 sf $0.69 $10,861
006 Floor protection 15,687.00 sf $0.54 $8,484
Total 09 68 00 - Carpet $82,480
09 67 00 - Fluid-Applied Flooring
001 None Shown Not Included
Total 09 67 00 - Fluid-Applied Flooring $0
09 65 66 - Resilient Athletic Flooring
001 Police Building Below
002 Johnsonite or equivilent 2,259.60 sf $13.60 $30,731 Material price set at $11/s.f. per DLR direction
003 Moisture tests (1/1000sf)3.00 ea $100.00 $300
004 Floor prep and joint grinding 2,259.60 sf $0.65 $1,467
005 Floor protection 2,259.60 sf $0.54 $1,222
Total 09 65 66 - Resilient Athletic Flooring $33,719
09 69 00 - Access Flooring
001 Police Building Below
002 Haworth TecCrete, 7" pedestals 1,612.00 sf $11.00 $17,732
003 Approach Ramp 44.00 sf $30.00 $1,320
Total 09 69 00 - Access Flooring $19,052
09 72 00 - Wall Coverings
001 Wall Coverings at stairs (A8.1 & A8.2)Not Included Not Included
002 Wall Talkers Not Included Not Included
Total 09 72 00 - Wall Coverings $0
09 90 00 - Painting and Coating
001 Police Building Below
002 Paint scope of work 1.00 ls $158,665.00 $158,665
003 Painted drywall 92,956.00 sf Included
004 Painted Security CMU including Blockfill x 14' H 23,034.00 sf Included
005 Painted CMU w/ Epoxy Paint at Evidence 4,405.00 sf Included
006 Ceiling - exposed structure (bar joists & deck)2,337.00 sf Included
007 Gyp board ceilings & soffits 9,286.00 sf Included
008 Door frames 45.00 ea Included
009 Doors - HM Only, wood to be factory finished 42.00 ea Included
010 Water repellent at masonry 1.00 ls Included
011 Touch up doors 43.00 ea $15.00 $645
Date printed: 10/27/2017 20171016 Englewood PHQ DD GMP Estimate.xlsb Page 9/19
Page 173 of 216
012 Final touch up at completion of project 49,725.00 sf $0.05 $2,486
013 Police Site Below
014 Exterior painting (high performance exterior paint)Included
015 - Dumpster gates per pair 1.00 pr Included
016 - Bollards 42.00 ea Included
017 - Handrails - standard Included
018 Roof screen steel 1.00 ls Included
019 Surface Parking Below
020 Painting of primed carports 1.00 ls w/ Div 13
Total 09 90 00 - Painting and Coating $161,796
Total - 09 - Finishes $2,022,360
10 - Specialties
10 21 13 - Toilet Partitions
001 Police Building Below
002 Phenolic toilet partitions, FMOB 19.00 ea $975.00 $18,525
003 Install 19.00 ea $238.56 $4,533
004 Phenolic urinal screen, Wall mounted 2.00 ea $450.00 $900
005 Install 2.00 ea $119.28 $239
Total 10 21 13 - Toilet Partitions $24,196
10 28 00 - Toilet & Bath Accessories
001 Police Building Below
002 Toilet Accessories Scope of Work 1.00 ls $14,021.00 $14,021
003 Grab bars 36"12.00 ea Included
004 Grab bars 42"12.00 ea Included
005 Grabbars 48"2.00 ea Included
006 Grab bars 12"2.00 ea Included
007 Grab bars 18"12.00 ea Included
008 TP holders - multi roll 23.00 ea Included
009 Soap dispenser, plastic 33.00 ea Included
010 Paper towel dispeners/waste recptcle 11.00 ea Included
011 Napkin waste, surface mounted 14.00 ea Included
012 Seat cover dispenser Not Included
013 Mirrors 24" x 36"33.00 ea Included
014 Koala diaper mounted changing station 2.00 ea $325.00 $650
015 Hand dryer 14.00 ea $400.00 $5,600
016 Mop basin & broom holder 4.00 ea $185.00 $740
017 Robe hook 7.00 ea $10.00 $70
018 Unit Shower - Curtain & hooks 6.00 ea Included
019 ADA shower seat 2.00 ea Included
020 Install subcontractor supplied accessories 189.00 ea $18.70 $3,534
Total 10 28 00 - Toilet & Bath Accessories $24,615
10 30 00 - Fireplaces
001 Not Anticipated Excluded
Total 10 30 00 - Fireplaces $0
10 75 00 - Flagpole
001 SS - 33' overall ht, 30' exposed, 2-piece pole 3.00 ea $2,900.00 $8,700
002 Drill hole 3.00 ea $200.00 $600
003 Install pole - material 3.00 ea $235.00 $705
004 Install pole - labor 3.00 ea $250.00 $750
Total 10 75 00 - Flagpole $10,755
10 14 00 - Identifying Devices
001 Police Building Below
002 Interior Wayfinding signage Below
003 Room Signage 140.00 ea $185.00 $25,900
004 Cell Signage 8.00 ea $250.00 $2,000
005 RR Signage 14.00 ea $250.00 $3,500
006 Stairwell Signage 6.00 ea $350.00 $2,100
007 Exterior Building Sign Allowance Below
008 Letters 2'27.00 ea $450.00 $12,150
009 Building plaque - bronze 1.00 ea $1,350.00 $1,350
010 Install Backing 1.00 ls $2,385.60 $2,386
011 Surface Parking Below
012 Wayfinding signage allowance 1.00 allow $1,500.00 $1,500
Total 10 14 00 - Identifying Devices $50,886
10 14 53 - Traffic Signage
001 Exterior signage allowance 1.00 allow $5,000.00 $5,000
002 Monument sign Not Included Pinned letters on low wall included
Total 10 14 53 - Traffic Signage $5,000
10 12 00 - Display Cases
001 Police Building Below
002 Wall Mounted - Wood, sliding doors w/glass shelves 4'x6'x10-3/4" 1.00 ea $2,500.00 $2,500
003 Installation 1.00 ea $954.24 $954
Total 10 12 00 - Display Cases $3,454
10 51 00 - Lockers
001 Police Building Below
002 Locker scope of work 1.00 ls $299,505.00 $299,505
003 30"w x 34"d x 72"h 2 tier duty bag lockers 49.00 ea Included
004 24"w x 24" d x 66" h Tiffin powder coated Gear Lockers in Locker Rooms 101.00 ea Included
005 - Wardrobe base Included
006 - Infinity Shelf Included
Date printed: 10/27/2017 20171016 Englewood PHQ DD GMP Estimate.xlsb Page 10/19
Page 174 of 216
007 - Triple hook Included
008 - Locker drawer kit Included
009 - Drying rack Included
010 - Plug and play electrical system Included
011 - maple benches Included
012 12"w x 18"d x 72"h 4 tier Visitor lockers in Locker rooms and Patrol 136 27.00 ea Included
013 24"w x 6.5"d x 70"h 6 tier Tiffin pistol lockers 4.00 ea Included
014 12"w x 12"d x 36"h 3 tier wall mtd visitor locker in Break Rm 269 6.00 ea Included
015 12"w x 18"d x72"h visitor locker in Booking 173 5.00 ea Included
016 12"w x 18"d x 72"h visitor locker in Break rm 113 6.00 ea Included
017 36"w x 24"d x 78"h pass through evidence locker 3.00 ea Included
018 Installation of lockers, bases, slope cap 1.00 ls Included
019 - Rifle storage to be Open Millwork Cubbies Not Included Per DLR Comments 7/12/17
Total 10 51 00 - Lockers $299,505
10 44 00 - Fire Extinguishers, Cabinets, & Accessories
001 Police Building Below
002 Fire Extinguishers - 10# multipurpose 10.00 ea $180.00 $1,800
003 Cabinets - stainless steel 10.00 ea $320.00 $3,200
004 Blocking @ opening 10.00 ea $97.10 $971
005 Unload,handle and install 10.00 ea $101.46 $1,015
Total 10 44 00 - Fire Extinguishers, Cabinets, & Accessories $6,986
10 22 23 - Operable Wall Partitions
001 Police Building Below
002 Modernfold Encore Series 10'-0" high 1.00 ls $40,420.00 $40,420
003 21'6" wide paired panel with pocket doors at Major Crimes 222 1.00 ea Included
004 26'-10" wide single panel at Training 270 1.00 ea Included
Total 10 22 23 - Operable Wall Partitions $40,420
10 28 15 - Detention Accessories and Furnishings
001 Police Building Below
002 Detention HM Frames - Single, 19pcs 1.00 ls $337,400.00 $337,400
003 Detention HM Doors & Hardware 16.00 ea Included
004 Detention Sliding Doors, Frames & Hardware 9.00 ea Included
005 Detention Wood Doors & Hardware 3.00 ea Included
006 Detention HM Windows 4' x 6'-3pcs/16' x 6'-1pc 168.00 sf Included
007 Detention Access Doors 4.00 ea Included
008 Detention Security Glazing, 222 sf 1.00 ls $19,095.00 $19,095
009 Detention Mirror 12" x 16" (430 Stainless Steel)7.00 ea Included
010 Recessed Roll Toilet Tissue Holder 7.00 ea $150.00 $1,050
011 Wall Hung Book Shelves with Hooks Not Included
012 Security ADA Grab Bar 1.00 ea Included
013 Misc welding, grinding, bondo 19.00 ea $92.25 $1,753
014 Installation of HM frames 19.00 ea $169.20 $3,215
015 Bituminous Coating on HM Frames 342.00 lf $3.30 $1,129
016 Grout HM frames 342.00 lf W/ Div. 4 Included with Masonry
017 3/16" x 3" Embedded Plates at Sliding Door Sills 36.00 ea $62.00 $2,232
018 3/16" x 3" Embedded Plates at Sliding Door Jambs & Heads 90.00 ea $62.00 $5,580
019 Embedded Steel Plate at HM Door Heads - Continous 76.00 lf $18.00 $1,368
020 Unload/handle/distribute 16.00 hrs $115.00 $1,840
Total 10 28 15 - Detention Accessories and Furnishings $374,661
10 56 26 - Mobile Storage Shelving
001 Police Building
002 Datum MobileTrak5 System - manual operation 1.00 ls $104,491.00 $104,491
003 High Density Storage Shelving - Records - 8'-6" shelving x 8' height - 8 levels 119.00 lf Included Assume Legal size filing (15" deep)
004 High Density Storage Shelving - Evidence - 13' shelving x 8' height - 8 Levels 266.66 lf Included Assumed 18" deep filing
005 Recessed Track floor rails 2.00 rooms $7,500.00 $15,000
Total 10 56 26 - Mobile Storage Shelving $119,491
10 85 00 - Wall Protection
001 Police Building Below
002 CS Acrovyn wall paneling - 48" in main corridors 2,051.00 sf $15.00 $30,765
Total 10 85 00 - Wall Protection $30,765
10 80 00 - Misc Specialties
001 Police Building Below
002 Stainless steel corner guards - 3" x 3" x 4'57.00 ea $70.00 $3,990
003 Install corner guards 57.00 ea $15.00 $855
Total 10 80 00 - Misc Specialties $4,845
Total - 10 - Specialties $995,579
11 - Equipment
11 13 00 - Loading Dock Equipment
001 Not Anticipated Not Included
Total 11 13 00 - Loading Dock Equipment $0
11 23 00 - Commercial Laundry Equipment
001 Not Anticipated Excluded
Total 11 23 00 - Commercial Laundry Equipment $0
11 30 00 - Residential Equipment
001 Allowance to install Owner-furnished items 1.00 allow $6,117.60 $6,118
Total 11 30 00 - Residential Equipment $6,118
11 40 00 - Food Service Equipment
001 Not Anticipated Excluded
Date printed: 10/27/2017 20171016 Englewood PHQ DD GMP Estimate.xlsb Page 11/19
Page 175 of 216
Total 11 40 00 - Food Service Equipment $0
11 52 00 - Projection Screens
001 Police Building
002 Screens & Projectors By Owner, with FF&E See Div 28
Total 11 52 00 - Projection Screens $0
11 53 00 - Laboratory Equipment
001 By Owner Not Included
002 Fume Hood - mfg: Airmaster Not Included
Total 11 53 00 - Laboratory Equipment $0
Total - 11 - Equipment $6,118
12 - Furnishings
12 24 00 - Roller Shades
001 Motorized roller shades at vision glazing 1,135.00 sf $15.00 $17,025 No locations shown
Total 12 24 00 - Roller Shades $17,025
12 48 43 - Floor Mats
001 Walk-off mats in Vestibule, Recessed grate 440.00 sf $44.44 $19,554 Added 3rd vestibule at DDs
002 Rubber Floor Mats - By Owner Not Included
Total 12 48 43 - Floor Mats $19,554
12 93 00 - Site Furnishings
001 Site furnishing scope of work 1.00 ls $55,668.00 $55,668
002 Oblique vector bench 3.00 ea Included
003 Hub vector bench 12.00 ea Included
004 Tree grates 4' x 4' 4.00 ea $1,470.00 $5,880
005 Bicycle rack, 8 bikes 2.00 ea $950.00 $1,900
006 Unload, Handle & Install 21.00 ea $178.92 $3,757
Total 12 93 00 - Site Furnishings $67,205
Total - 12 - Furnishings $103,784
13 - Special Construction
13 34 00 - Pre Engineered Structures
001 Surface Parking Below
002 Carport Canopies Allowance 1.00 allow $1,125,000.00 $1,125,000 Based on 125 spaces with caisson foundations
003 Car Port Canopies - Pre-Engineered Structures - Single Bay 13,690.00 sf Included
004 Car Port Canopies - Pre-Engineered Structures - Double Bay 9,340.00 sf Included
005 Covered Walkways 455.00 sf Included
006 LF of drilled pier - 18" dia, 65' depth 5,005.00 lf Included
007 Crane for setting cages and pulling casings 1.00 ls Included
008 Caissons - 18" x 65'deep, pour concrete 1.00 ls Included
009 Concrete pump per day 25.00 day Included
010 Caisson Material 360.15 cy Included
011 Rebar material - Caissons 0.00 tons Included
012 Install rebar - Caissons 0.00 tons Included
013 Painting of primed carports 1.00 ls Included
014 Heat trace at canopies 1.00 ls Included
015 Provide conduit for future PV system install 1.00 ls Included
016 Zee purlin rafters 1.00 ls Included
017 Standing Seam Metal roofing - 24ga, standard Kynar color 13,690.00 sf Included
018 Polycarbonate Roofing Not Included Not Included - see alternates for pricing
019 Stainless steel gutters 885.00 lf Included
020 Stainless steel downspouts 924.00 lf Included
021 - Heat Trace Included
022 Snow Clips/Snow Guards/Ice Guards Not Included
023 Furnish/Set anchor bolts 1.00 ls Included
024 Grout Columns 77.00 ea Included
Total 13 34 00 - Pre Engineered Structures $1,125,000
Total - 13 - Special Construction $1,125,000
14 - Conveying Systems
14 20 00 - Elevators
001 Police Building Below
002 MRL Holeless Hydraulic, 3,500 lb 2 stop 2.00 stops $37,000.00 $74,000
003 7'11" high interior cab height 1.00 ls Included
004 MRL Holeless Hydraulic, 4,500 lb 2 stop 2.00 stops $37,000.00 $74,000
005 Layout 12.00 hrs $59.64 $716
006 Sill angle 4.00 ea $300.00 $1,200
007 Pit ladder 2.00 ea $450.00 $900
008 Extended warranty for early use N/A
009 Overhead hoisting beam 1.00 ls $1,050.00 $1,050
010 Standard Cab finishes from manufacturer line 1.00 ls Included
Total 14 20 00 - Elevators $151,866
Total - 14 - Conveying Systems $151,866
21 - Fire Suppression
21 00 00 - Fire Suppression
001 Police Building Below
002 Wet-type Fire Protection System for new building 49,725.00 sf $2.80 $139,230
003 Seismic bracing per Zone C requirement 1.00 ls $9,900.00 $9,900
004 Design, furnish and install per NFPA 13 1.00 ls Included
005 Double-check backflow preventer 1.00 ls Included
006 FDC - fire dept connection 1.00 ls Included
007 Schedule 10 black piping for 1-1/2" and larger 1.00 ls Included
008 Schedule 40 black piping for 1-1/4" and smaller 1.00 ls Included
Date printed: 10/27/2017 20171016 Englewood PHQ DD GMP Estimate.xlsb Page 12/19
Page 176 of 216
009 Institutional heads at secure areas 1.00 ls Included
010 Brass upright sprinklers with head guards at exposed ceilings 1.00 ls Included
011 Concealed heads, white finish in finished ceiling areas 1.00 ls Included
012 Underground to inside the bldg 1.00 ls $5,500.00 $5,500
013 Core drills, fire/sound caulking 49,725.00 sf $0.05 $2,486
014 Fire pump Not Included
015 Dry system at exterior canopy Not Included Non combustible construction
016 Preaction system at IDF rooms Not Included May be potential added depending on owner decision
017 BIM Coordination 1.00 ls $14,300.00 $14,300
018 Surface Parking Below
019 Dry system below canopies Not Included Not Anticipated
019 Cap and make safe for existing building separation from Fire Station 1.00 allow $7,500.00 $7,500
Total 21 00 00 - Fire Suppression $178,916
Total - 21 - Fire Suppression $178,916
22 - Plumbing
22 00 00 - Plumbing
001 Police Building 1.00 ls $402,353.00 $402,353
002 Relocate existing condensing units and water heater at existing facility 1.00 ls $33,000.00 $33,000
003 Cut, cap, and make safe HVAC and plumbing systems at existing facility 1.00 ls Included
004 Domestic water system 1.00 ls Included
005 Storm water system 1.00 ls Included
006 Waste and vent system 1.00 ls Included
007 Natural gas system 1.00 ls Included
008 Plumbing fixtures 1.00 ls Included
009 - Water closets with wall mounted battery flush valve 22.00 ea Included
010 - Urinals with battery sensor flush valve 6.00 ea Included
011 - Penal wear water closets 7.00 ea Included
012 - Counter mounted lavatories with battery sensor 29.00 ea Included
013 - Wall mounted lavatories with battery sensor 3.00 ea Included
014 - Counter mounted sinks 8.00 ea Included
015 Add costs to hang piping below grade 1.00 allow $90,000.00 $90,000
016 60 gal gas fired water heater 2.00 ea Included
017 Floor drains w/ trap primers 12.00 ea Included
018 Trench drains 3.00 ea Included
019 Floor sink 3.00 ea Included
020 Showers 6.00 ea Included
021 Mop sink 2.00 ea Included
022 Dual height water cooler 2.00 ea Included
023 Hose bibbs 4.00 ea Included
024 Wall hydrants 2.00 ea Included
025 Roof hydrants 2.00 ea $1,500.00 $3,000
026 Icemaker boxes 3.00 ea Included
027 Roof drains w/ overflows 9.00 ea Included
028 1500 gal Sand / oil interceptor 1.00 ea Included
029 Emergency eyewash 2.00 ea Included
030 Elevator sump pump 2.00 ea Included
031 Core drilling 50.00 ea $35.00 $1,750
032 Concrete pads for plumbing equipment 500.00 sf $7.00 $3,500
033 Shop drawings 1.00 ls $10,000.00 $10,000
034 Test & Balance 1.00 ls $10,598.00 $10,598
035 Commissioning support 1.00 ls Included
034 Mechanical permits and fees 1.00 ls Included
Total 22 00 00 - Plumbing $554,201
Total - 22 - Plumbing $554,201
23 -Heating, Ventilating and Air Conditioning
23 00 00 - Heating, Ventilating and Air Conditioning
001 Police Building 1.00 ls Below
002 Relocation of AHU and duct modification 1.00 allow $65,000.00 $65,000
003 Heating systems 1.00 ls $1,311,744.00 $1,311,744
004 - 750 MBH gas fired boilers 2.00 ea Included
005 - Hot water pumps 2.00 ea Included
006 - 140 gal expansion tank 1.00 ea Included
007 - 50 gal glycol feeder 1.00 ea Included
008 Relocate existing boiler and heating pumps 1.00 ls Included
009 Air handling equipment 1.00 ls Included
010 - RTU/ERV 1 20,000 CFM rooftop energy recovery unit 1.00 ea Included
011 - RTU 2 16,700 CFM DX Cooling with hot water coil 1.00 ea Included
012 - RTU/ERV 3 3,350 CFM rooftop energy recovery unit 1.00 ea Included
013 - RTU/ERV 4 2,100 CFM Rooftop energy recovery unit 1.00 ea Included
014 - RTU 5 1,600 CFM DX cooling with gas heat 1.00 ea Included
015 - RTU 6 2,400 CFM DX cooling with gas heat 1.00 ea Included
016 - CRAC unit 5 ton capacity 2.00 ea Included
017 - FCU split system with air cooled condensing unit 1.00 ea Included
018 FPBs 14.00 ea Included
019 VAV boxes hot water reheat 31.00 ea Included
020 CUH cabinet unit heaters 6.00 ea Included
021 EF1 - EF9 exhaust fans 8.00 ea Included
022 Sheetmetal, GRDs, accessories 1.00 ls Included
023 Temperature controls 1.00 ls $130,000.00 $130,000
024 Insulation 1.00 ls $77,454.00 $77,454
025 Security grilles and burglar bars Included
026 Fiberglass ductboard sound boots at conference, closed offices and training rooms 1.00 ls Included
Date printed: 10/27/2017 20171016 Englewood PHQ DD GMP Estimate.xlsb Page 13/19
Page 177 of 216
027 Core drilling 50.00 ea $25.00 $1,250
028 Snow Melt @ sidewalks Not Included
029 Seismic bracing per Zone C requirement $25,082.00 Included
030 Clean & replace filters @ Substantial Completion 49,725.00 sf $0.01 $497
031 Test & balance 1.00 ls Included
032 Commissioning assistance 1.00 ls Included
033 Mech permits and fees 1.00 ls Included
034 Phase 2 - Surface Parking 0.00 um Below
035 Fire station gas, domestic water, sewer 1.00 ls $148,566.00 $148,566
Total 23 00 00 - Heating, Ventilating and Air Conditioning $1,734,511
Total - 23 -Heating, Ventilating and Air Conditioning $1,734,511
25 -Integrated Automation
25 00 00 - Integrated Automation
001 Included w/ Div 23 W/ Div 23
Total 25 00 00 - Integrated Automation $0
Total - 25 -Integrated Automation $0
26 -Electrical Systems
26 00 00 - Electrical
001 Police Building Below
002 New 2000a service and distribution to building 1.00 ls $330,950.00 $330,950
003 Branch power, receptacles, and power to mechanical units 1.00 ls $187,800.00 $187,800
004 Lighting fixtures & controls - all fixtures to be LED 1.00 ls $404,600.00 $404,600
005 750kw diesel fuel powered generator for new facility 1.00 ls $296,200.00 $296,200
006 20kw diesel powered generator for existing fire station 1.00 ls Not Included
007 Lightning protection system 1.00 ls $30,300.00 $30,300
008 Fire Alarm system 1.00 ls $144,300.00 $144,300
009 Temp lighting and power 1.00 ls $38,450.00 $38,450
010 Fire sealants & caulking for pens 1.00 ls $3,500.00 $3,500
011 Seismic bracing per Zone C requirement Included
012 Surface Parking 1.00 ls $88,700.00 $88,700
013 Service and distribution 1.00 ls $46,800.00 $46,800
014 Parking lot pole lights and canopy fixtures 1.00 ls w/ Div 13
015 Heat trace at canopies 1.00 ls w/ Div 13
016 Provide conduit for future PV system install 1.00 ls w/ Div 13
017 Temp power 1.00 ls $16,900.00 $16,900
018 Police Site Lighting and Power 1.00 ls $70,900.00 $70,900
019 - Pedestrial Pole Lights, Type ZA 14.00 ea Included
020 - LED Bollards, supply & install, Type ZB 20.00 ea Included
021 Relocate existing site utilities 1.00 ls Not Included Cost of new primary and conduit by owner
022 Power to irrigation controller 1.00 ea $1,250.00 $1,250
023 Elec Permits 1.00 ls Included
024 Power to trailers 1.00 ls Included
025 MEP Coordination 1.00 ls Included
026 BIM Coordination 1.00 ls Included
023 Remove and relocate existing PV array to new facility 1.00 ls Not Included
Total 26 00 00 - Electrical $1,660,650
Total - 26 -Electrical Systems $1,660,650
27 - Communications
27 10 00 - Structured Cabling
001 Police Building Below
002 Structured Cabling Allowance Removed AP to provide rough-in only
003 Telecommunication racks By Owner
004 New Tele/Data Cabling System - Cat 6 w/ jacks and faceplates By Owner
005 New Tele/Data Cabling System - Cat 6- Rough-In 1.00 ls $84,000.00 $84,000
Total 27 10 00 - Structured Cabling $84,000
27 41 00 - Audio-Video System
001 Police Building Below
002 AV System allowance Removed AP to provide rough-in only
003 - Roll Call By Owner
004 70” LED TV w/ 3 HDMI, 1 VGA input, wall mount By Owner
005 Sound bar w/wireless subwoofer (analog & optical in)By Owner
006 - Community Room By Owner
007 80" Pro 1080p Display By Owner
008 2x210W commercial power amplifier, 4/8Ω or 70/100V By Owner
009 4” 2-way in-ceiling speakers By Owner
010 Rack hardware By Owner
011 Digital Media 8G+ Receiver & Room Controller w/scaler By Owner
012 3-Series Digital Media Presentation System 300 By Owner
013 7” Touch screen, black smooth By Owner
014 - Defense tactics and gym (each)By Owner
015 80" Pro 1080p Display By Owner
016 2x210W commercial power amplifier, 4/8Ω or 70/100V By Owner
017 4” 2-way in-ceiling speakers By Owner
018 Rack hardware By Owner
019 Digital Media 8G+ Receiver & Room Controller w/scaler By Owner
020 3-Series Digital Media Presentation System 300 By Owner
021 7” Touch screen, black smooth By Owner
022 - Breakrooms (3 spaces) and Meeting Rooms (4 spaces)By Owner
023 48” Pro Monitor w/IP Control By Owner
024 sound bar w/wireless subwoofer (analog & optical in)By Owner
Date printed: 10/27/2017 20171016 Englewood PHQ DD GMP Estimate.xlsb Page 14/19
Page 178 of 216
Total 27 41 00 - Audio-Video System $0
27 51 00 - Distributed AV systems
001 Police Building Below
002 Paging / PA System allowance 1.00 allow $24,600.00 $24,600
003 2 zone system with all page feaature Included
004 Software , hardware, cabling Included
Total 27 51 00 - Distributed AV systems $24,600
27 53 13 - Clock Systems
001 Wireless Clock System Not Included
Total 27 53 13 - Clock Systems $0
27 53 19 - Internal Cellular Systems
001 DAS system 1.00 ls $14,600.00 $14,600
002 Rescue assistance system at elevator 1.00 ls $11,150.00 $11,150
Total 27 53 19 - Internal Cellular Systems $25,750
Total - 27 - Communications $134,350
28 - Electronic Safety and Security
28 13 00 - Electronic Access Control
001 Police Building Below
002 Access Control System Allowance Removed AP to provide rough-in only and electrified hardware
003 Card reader access points By Owner
004 Gate reader access points By Owner
005 Key fobs By Owner
006 System software and hardware By Owner
Total 28 13 00 - Electronic Access Control $0
28 16 00 - Intrusion Detection
001 Police Building Below
002 - Intrusion detection system allowance By Owner
003 Alarm panel, enclosure and transformer By Owner
004 keypad By Owner
005 Wireless motion detectors By Owner
006 Door contacts By Owner
007 - Duress panic button system allowance By Owner
008 Alarm panel, enclosure and transformer By Owner
009 Keypad By Owner
010 Panic Buttons By Owner
Total 28 16 00 - Intrusion Detection $0
28 20 00 - Electronic Surveillance
001 Police Building Below
002 Electronic Surveillance system allowance By Owner
003 Interior and exterior IP Camera locations By Owner
004 Network video recorder By Owner
005 Software for playback and recording By Owner
Total 28 20 00 - Electronic Surveillance $0
28 30 00 - Electronic Detection and Alarm
001 Fire Detection and Alarm w/Division 26 - Electrical
Total 28 30 00 - Electronic Detection and Alarm $0
Total - 28 - Electronic Safety and Security $0
31 - Earthwork
31 00 00 - Earthwork
001 Police Building Below
002 Mobilization 1.00 ls $5,200.00 $5,200
003 Site Demolition 1.00 sub $45,422.47 $45,422
004 sawcut asphalt for demo 1.00 ls Included
005 Landscape 12,512.00 sf Included
006 Asphalt 24,731.00 sf Included
007 C & G 1,510.00 lf Included
008 Sidewalk/Concrete Pavement 3,432.00 sf Included
009 Traffic Control Signs 15.00 ea Included
010 Small/Medium/Large Trees 17.00 ea Included
011 Remove and dispose of light poles 2.00 ea Included
012 Emergency Comm Tower - remove and relocate p/ C010 1.00 ea By Owner
013 Pole w/ Camera - salvage p/ C010 1.00 ea $750.00 $750
014 Traffic Control 15.00 day $1,080.00 $16,200
015 Vermin Removal Not Included
016 Earthwork phase 1 1.00 sub $51,716.18 $51,716
017 Locate Exisiting Utilities Prior to Start 1.00 ls $4,000.00 $4,000
018 Strip site and export 430.00 cy Included
019 Excavate cut to fill 1.00 ls Included
020 Export excess material 1,510.00 cy Included
021 Rough grade building 2,880.00 sy Included
022 rough grade site 5,645.00 sy Included
023 Fine grade building 2,880.00 sy Included
024 Foundation excavation and backfill 1.00 sub $68,079.00 $68,079
025 Excavate foundation walls 1,215.00 cy Included
026 Backfill foundation walls 1,100.00 cy Included
027 Excavate and backfill pads 34.00 ea Included
028 excavate and backfill elevator pit 2.00 ea Included
029 Grade for stairways 3.00 ea Included
030 Export pier spoils 750.00 cy Included
031 Excavate and backfill exterior walls 2.00 ea Included
Date printed: 10/27/2017 20171016 Englewood PHQ DD GMP Estimate.xlsb Page 15/19
Page 179 of 216
032 Place 10 Mil Steggo Vapor Barrier Under SOG Sand (1" Sand, VP, 3" Sand) 26,106.00 sf Included w/ Div 03 Concrete Finishing
033 Misc Interior Grading, i.e. Slab Depressions, Footings, Steps 26,106.00 sf $0.35 $9,137
034 Hand Excavation 48.00 hr $44.73 $2,147
035 Protection of Layout and Replcm't as Needed 1.00 ls $2,726.40 $2,726
036 Unclassified Soils/Excavations Not Included
037 Hazardous Wastes Not Included
038 Phase 2 - Surface Parking Below
039 Mobilization 1.00 ls $5,200.00 $5,200
040 Demolition 1.00 ls $63,827.03 $63,827
041 Landscape 18,309.00 sf Included
042 Asphalt 20,690.00 sf Included
043 C & G 1,301.00 lf Included
044 Sidewalk/Concrete Pavement 9,130.00 sf Included
045 Concrete Steps 18.00 sf Included
046 Dry Wells along Elati 2.00 ea Included
047 Iron Fence 6'H 31.00 lf $5.75 $178
048 Traffic Control Signs 11.00 ea $50.00 $550
049 Small/Medium/Large Trees - Remove and preserve where possible 3.00 ea Included
050 Remove Debris per Truckload 7.00 ea Included
051 3'H Brick Planter 116.00 lf Included
052 8' x 8' Shed 1.00 ea $500.00 $500
053 Timber Tree Well 38.00 lf $7.00 $266
054 Traffic Control 10.00 day $900.00 $9,000
055 Bollards 6.00 ea $43.00 $258
056 Brick Monument Sign 1.00 ea $450.00 $450
057 Vermin Removal Not Included
058 Earthwork phase 2 1.00 ls $127,935.12 $127,935
059 Locate Exisiting Utilities Prior to Start 1.00 ls $4,000.00 $4,000
060 Excavate cut to fill 1.00 ls Included
061 Import for crawlspace infill 1.00 ls Included
062 Rough grade pavement 4,940.00 sy Included
063 Rough grade for permeable pavers 1.00 ls Included
064 Rough grade for ROW improvements 1.00 ls Included
065 Rough grade for sidewalks 1.00 ls Included
066 Rough grade for landscaping 1.00 ls Included
067 Rough grade for curb and gutter 1.00 ls Included
068 Backfill curb and gutter 1.00 ls Included
069 Scarify 12" & Recompact @ Concrete paving 11,565.00 sf Included
070 Fine Grade concrete & asphalt 55,602.00 sf Included
071 Import 3/4" rock for permeable pavers 130.00 cy Included
072 Import pea gravel for permeable pavers 130.00 cy Included
073 excavate and backfill retaining wall 1.00 ls Included
074 Protection of Layout and Replcm't as Needed 1.00 ls $2,726.40 $2,726
075 Unclassified Soils/Excavations Not Included
076 Hazardous Wastes Not Included
Total 31 00 00 - Earthwork $420,269
31 25 00 - Erosion and Sedimentation Controls
001 Site
002 Vehicle tracking gravel 8" - 20' x 50'2.00 ea $2,940.00 $5,880
003 Refresh Tracking Pad & Remove Prior to Asphalt 4.00 ea $2,333.00 $9,332
004 Silt fence around site 2,213.00 lf $2.30 $5,090
005 - Maintain silt fence 2,213.00 lf $1.00 $2,207
006 Erosion control blanket Not Anticpated at this time
007 Haybales Not Anticpated at this time
008 Inlet filters 7.00 ea $480.00 $3,360
009 Concrete truck washout install 1.00 ls $965.00 $965
010 Concrete truck washout, maintenance, clean-up 20.00 ea $500.74 $10,015
011 Remove sediment deposits after run-off 125.00 cy $28.84 $3,605
012 Street cleaning as needed 51.96 day $300.00 $15,588
013 Winter control/protection 1.00 ls $3,578.40 $3,578
014 Frost/mud/water removal 1.00 ls $5,367.60 $5,368
015 Traffic control for excavation 2.00 wk $2,000.00 $4,000
016 Maintain erosion control during proj 623.52 hrs $54.73 $34,125
017 Engineered stormwater management permit (Good for 1 year) 1.00 ls $750.00 $750
018 Engineered stormwater management plan 1.00 ls $2,500.00 $2,500
019 Engineered stormwater management engineering 1.00 ls $3,500.00 $3,500
Total 31 25 00 - Erosion and Sedimentation Controls $109,863
31 41 00 - Shoring
001 None anticipated
Total 31 41 00 - Shoring $0
31 63 29 - Drilled Concrete Piers and Shafts
001 Police Building Below
002 LF of drilled pier - 24" dia, 65' depth 5,980.00 lf Included
003 Move spoils to central stockpile 20.00 day Included
004 Crane for moving tall cages to piles 1.00 ls W/ Concrete
005 Casing as necessary 5,980.00 lf Included
006 Dewatering (Pump & fire hose)1.00 ls $10,446.00 $10,446
007 Additional mobilizations 1.00 ea $3,500.00 $3,500
008 Second Drill Rig for double production (2 per day per rig) 1.00 ea Included
009 Surface Parking Lot Below
010 Remobilization 1.00 ls w/ Div 13
011 LF of drilled pier - 18" dia, 65' depth 5,005.00 lf w/ Div 13
Date printed: 10/27/2017 20171016 Englewood PHQ DD GMP Estimate.xlsb Page 16/19
Page 180 of 216
012 Crane for setting cages and pulling casings 1.00 ls w/ Div 13
Total 31 63 29 - Drilled Concrete Piers and Shafts $13,946
31 68 16 - Helical Foundation Anchors
001 Not Anticipated Not Included
Total 31 68 16 - Helical Foundation Anchors $0
Total - 31 - Earthwork $544,078
32 - Exterior Improvments
32 12 16 - Asphalt Paving
001 Police Building - Phase 1 Below
002 2'W Asphalt Patch 133.00 sy $50.00 $6,650
003 Utility Patching - 9" Full Depth 50.00 sy w/ Div. 33
004 Gravel Under Pavement per SY 133.00 sy $12.00 $1,596
005 Scarify 12" & Recompact, Fine Grade 133.00 sy $3.50 $466
006 Minor subgrade corrections prior to paving 2%1.00 ls $348.46 $348
007 Clean Parking Lot Prior to Turn Over 1,640.00 sf $0.10 $164
008 Precast Wheel Stops Not Included
009 Install Wheel Stops Not Included
010 Re-Adjust Manholes 6.00 ea $120.00 $720
011 Traffic Control for Paving 2.00 wk $1,789.20 $3,578
012 Patch trailer compound parking lot after construction 275.00 sy $50.00 $13,750
013 Parking Lot Phase 2 1.00 sub $202,455.00 $202,455
014 Asphalt paving - general parking areas - 6" full depth 3,132.89 sy Included
015 Asphalt paving - heavy traffic areas - 7" full depth 1,872.33 sy Included
016 Asphalt paving - Elati Street - 6" full depth 455.00 sy Included
017 Ashpalt patch - 6" full depth 248.44 sy Included
018 Gravel Under Pavement Not Included
019 Scarify 12" & Recompact, Fine Grade to +/- 0.10ft 5,708.67 sy Included
020 Minor subgrade corrections prior to paving 2%1.00 ls $4,049.10 $4,049
021 Clean Parking Lot Prior to Turn Over 51,378.00 sf $0.10 $5,138
022 Additional Mobilizations 2.00 ea $2,000.00 $4,000
023 Precast Wheel Stops 12.00 ea $50.00 $600
024 Install Wheel Stops 12.00 ea $15.00 $180
025 Re-Adjust Manholes 7.00 ea $520.00 $3,640
026 Traffic Control for Paving 3.00 wk $3,911.40 $11,734
Total 32 12 16 - Asphalt Paving $259,068
32 13 13 - Concrete Paving
001 Police Building Site - Phase 1 1.00 sub $35,072.00 $35,072
002 Sidewalks (5")1,763.00 sf Included
003 Entrance Plaza Concrete - Integral Colored Concrete 3,790.00 sf Included
004 Concrete drive pans 932.00 sf Included
005 Concrete street pan - 4'w 620.00 sf Included
006 Concrete Ramp 213.00 sf $17.44 $3,715
007 Concrete ramp wall 111.00 sf $67.00 $7,437
008 Misc. (6") concrete pads 150.00 sf $6.00 $900
009 Plaza seat walls Not Included
010 Concrete steps Not Included
011 24"W Curb & gutter 625.00 lf Included
012 12" curbs @ Pavers perimeter 330.00 lf $13.00 $4,290
013 Clean backfill dirt off of the curb and gutter 955.00 lf $0.59 $563
014 Handicap Ramps w/ Truncated Domes 5.00 ea $325.00 $1,625
015 Sidewalk chase/drain channel/trench drain Not Included
016 Scarify 12" & Recompact, Fine Grade W/ Earthwork
017 Rebar for site flatwork - labor 3.00 tn $500.00 $1,500
018 Rebar for site flatwork - material 3.00 tn $1,025.00 $3,075
019 Trash enclosure foundation allowance 1.00 allow $5,000.00 $5,000
020 Fibermesh 135.52 cy $23.29 $3,156
021 Curing compound, exp. jts mtl., accessories 8,204.00 sf $0.07 $574
022 Traffic control 5.00 wks $1,700.00 $8,500
023 Sweep/clean sitework prior to turnover 8,204.00 sf $0.25 $2,035
024 Hoisting for formwork/FOB items 1.00 mo $2,932.65 $2,933
025 Protection/Blankets Labor 8,204.00 sf $0.29 $2,379
026 Concrete material - Colored 84.22 cy $200.00 $16,844
027 Concrete material - standard gray 168.36 cy $145.00 $24,412
028 Concrete additives & shortload deliveries 168.36 cy $12.00 $2,020
029 Concrete Foreman for pour coordination and material management 1.00 mo $11,805.31 $11,805
030 Surface Parking Site 1.00 sub $40,345.00 $40,345
031 Sidewalks (5")1,265.00 sf Included
032 Replace sidewalks damaged from construction 1,550.00 sf $2.30 $3,565
033 Entrance Plaza Concrete - Integral Colored Concrete 945.00 sf Included
034 4' concrete pan 1,972.00 lf Included
035 Curb & gutter 24"W 468.00 lf Included
036 12" curbs @ Pavers perimeter 485.00 lf $13.00 $6,305
037 6"h Vertical Curb 1,400.00 lf Included
038 Trickle Pan 60.00 sf Included
039 Clean backfill dirt off of the curb and gutter 2,353.00 lf $1.00 $2,353
040 Handicap Ramps w/ Truncated Domes 4.00 ea $325.00 $1,300
041 Dowel into existing concrete 100.00 ea $25.93 $2,593
042 Fibermesh 253.82 cy $8.29 $2,104
043 Curing compound, exp. jts mtl., accessories 6,200.00 sf $0.07 $434
044 Traffic control 5.00 wks $1,700.00 $8,500
045 Sweep/clean sitework prior to turnover 6,200.00 sf $0.25 $1,538
046 Protection/Blankets Labor 6,200.00 sf $0.29 $1,798
Date printed: 10/27/2017 20171016 Englewood PHQ DD GMP Estimate.xlsb Page 17/19
Page 181 of 216
047 Concrete material - Colored 22.75 cy $200.00 $4,550
048 Concrete material - standard gray 253.82 cy $145.00 $36,804
049 Concrete additives & shortload deliveries 253.82 cy $12.00 $3,046
050 Concrete Foreman for pour coordination and material management 1.50 mo $11,805.31 $17,708
Total 32 13 13 - Concrete Paving $270,780
32 14 00 - Permeable Unit Paving
001 Permeable pavers - Pavestone 4x4x16 - Police Plaza 2,930.00 sf $14.61 $42,803
002 Permeable pavers - Pavestone 4x4x16 - Parking 4,033.00 sf $14.61 $58,917 Shown on Civil drawings but not Landscape
Total 32 14 00 - Permeable Unit Paving $101,720
32 15 40 - Crushed Stone Surfacing
001 Not Anticipated Not Included
Total 32 15 40 - Crushed Stone Surfacing $0
32 17 23 - Pavement Markings
001 Parking Stalls 154.00 ea $4.50 $693
002 Handicap Symbols 6.00 ea $35.00 $210
003 Cross Walks (10' W x 35' L)700.00 sf $0.75 $525
004 Hatching 1,500.00 sf $0.45 $675
005 Misc. not shown 1.00 ls $500.00 $500
Total 32 17 23 - Pavement Markings $2,603
32 31 00 - Fences and Gates
001 Police Building Below
002 Chainlink fencing/cage in Sallyport Evidence Dropoff, 14'h to deck 15.00 lf $210.00 $3,150
003 Chainlink Sliding Gate - 2'-8" x 7'-0" in Sallyport Evidence Dropoff 1.00 ea $210.00 $210
004 Surface Parking Below
005 Security Fencing - Mini Mesh Screen, 8'h w/ HSS Posts @ 9' O.C. 770.00 lf $225.00 $173,250
006 - Concrete footings - 4'd 86.00 ea Included
007 Parking control gates at entrance gates - 12'w x 8'h 4.00 ea $8,750.00 $35,000
008 - Card Reader Pedestals 4.00 ea $2,250.00 $9,000
009 Vehical control loops (per spec)4.00 ea $4,500.00 $18,000
010 Continuous Footings Not Included
Total 32 31 00 - Fences and Gates $238,610
32 32 00 - Retaining Walls
001 Not Anticipated Not Included
Total 32 32 00 - Retaining Walls $0
32 90 00 - Planting
001 Site 1.00 ls $116,348.50 $116,349
002 Ammend with compost all areas 5 cy/1000 sf 1,104.00 sf Included
003 Raingarden growing media 1.00 ls Included
004 Deciduous trees 18.00 ea Included
005 Ornamental trees 13.00 ea Included
006 Deciduous shrubs 705.00 ea Included
007 Grasses 228.00 ea Included
008 Perennials - 1 gallon 2,126.00 ea Included
009 Irrigation system 1.00 ls Included
010 4" cobble 7,250.00 sf Included
011 Boulders 9.00 ea Included
012 Sod - complete w/ irrigation 1,091.00 sf Included
013 Sod - Maintain for 60 days from final acceptance of all landscape/Month 1.00 ls Included
014 Misc concrete pads for irrigation equipment 1.00 ls $500.00 $500
015 Street cleaning 1.00 ls $6,099.03 $6,099
016 Traffic control/Barricades 2.00 wk $1,789.20 $3,578
Total 32 90 00 - Planting $126,526
Total - 32 - Exterior Improvments $999,307
33 -Utilities
33 10 00 - Water Utilities
001 Locate existing utilities 1.00 ls $2,500.00 $2,500
002 Phase 1 1.00 ls $66,312.00 $66,312
003 2.5" Cold Water Service Line @ new police 1.00 ls Included
004 2-1/2" Cold Water Service Line @ redirect from existing police station to fire station 76.00 lf Included
005 6" Fire Service Line @ new police 57.00 lf Included
006 6" Fire Service Line @ Fire Station 76.00 lf $93.00 $7,068
007 Water Meter 2.00 ea $2,500.00 $5,000
008 Fire Hydrant assembly 1.00 ea $8,400.00 $8,400
009 Chlorine & Pressure Test Included
010 2.5" gate valve 1.00 ea $2,500.00 $2,500
011 6" gate valve 3.00 ea $1,130.00 $3,390
012 Extend into building 1.00 ls $4,500.00 $4,500
013 Sawcut asphalt & concrete Included
014 Traffic control/Barricades 5.00 days $1,320.00 $6,600
Total 33 10 00 - Water Utilities $106,270
33 30 00 - Sanitary Sewerage Utilities
001 Locate existing utilities 1.00 ls $2,500.00 $2,500
002 Phase 1 1.00 ls $41,556.00 $41,556
003 Join existing main with manhole 1.00 ea Included
004 Modify existing manhole at existing access 1.00 ea Included
005 6" SDR35 PVC Sanitary Sewer service 160.00 lf Included
006 Concrete encasement below building 160.00 lf Included
007 48" dia manhole 1.00 ea Included
008 Sawcut asphalt & concrete (9")Included
009 Remove and replace pavement 600.00 sf $9.00 $5,400
Date printed: 10/27/2017 20171016 Englewood PHQ DD GMP Estimate.xlsb Page 18/19
Page 182 of 216
010 Flow Fill 70.00 cy $135.00 $9,450
011 Haul off utility spoils 106.67 cy $10.00 $1,067
012 Remove asphalt & concrete from site Inclued
013 Barricades/traffic control 2.00 days $1,320.00 $2,640
014 Temp Manhole 1.00 ea $6,750.00 $6,750
015 10" sleeve around 6" PVC 154.00 lf $40.00 $6,160
016 Phase 2 1.00 ls $15,055.00 $15,055
017 Tie into existing sanitary system 1.00 ea Included
018 6" SDR35 PVC Sanitary Sewer service 154.00 lf Included
019 Fittings and cleanouts 1.00 ls Included
020 48" dia manhole 1.00 ea Included
Total 33 30 00 - Sanitary Sewerage Utilities $90,578
33 40 00 - Storm Drainage Utilities
001 Locate existing utilities 1.00 ls $2,500.00 $2,500
002 Phase 2 1.00 ls $479,941.00 $479,941
003 18" RCP 167.00 lf Included
004 12" PVC force main 57.00 lf Included
005 12" PVC storm sewer 120.00 lf Included
006 8" PVC storm sewer 160.00 lf Included
007 6" PVC storm sewer 935.00 lf Included
008 Fittings and cleanouts 1.00 ls Included
009 6" downspout riser 3.00 ea Included
010 24" nyloplast 9.00 ea Included
011 Type 16 inlet 2.00 ea Included
012 5' Type R inlet 2.00 ea Included
013 48" manhhole 1.00 ea Included
014 6' diameter stormceptor 2.00 ea Included
015 8' diameter CMP detention 1.00 ls Included
016 excavate and backfill vaults 3.00 ea Included
017 8'x18' concrete pump station vault w/ aluminum hatch 1.00 ea Included
018 8'x18' concrete vault with manhole 1.00 ea Included
019 Slotted concrete vault for force main discharge 1.00 ea $8,500.00 $8,500
020 Lift Station pumps 1.00 ls Included
021 Rain gardens with membranes & perforated PVC 1.00 ls Included
022 Inlet protection 13.00 ea $285.00 $3,705
023 Barricades/traffic control 10.00 days $1,820.00 $18,200
Total 33 40 00 - Storm Drainage Utilities $512,846
33 46 00 - Subdrainage
001 Building perimeter drainage Not Included Not Included
Total 33 46 00 - Subdrainage $0
Total - 33 -Utilities $709,694
TOTAL DIRECT COST OF WORK 18866607.23 $18,866,607
Date printed: 10/27/2017 20171016 Englewood PHQ DD GMP Estimate.xlsb Page 19/19
Page 183 of 216
8 910 11 12 13 16 17 1824 1/25/1900Price Options ListEnglewood Police HQCurrent Cost Estimate$21,581,029Target Budget$21,054,250Delta$526,779Total Accepted Costs-$551,274Revised Target-$24,495Total Pending Reductions Items (other than alt funding)-$201,008Price Options($201,008)$352,351-$551,274$0$0Item Number Date Description of ItemStatusPending Cost ReductionPending Cost AdditionAccepted CostRejected CostRecommended Accepted CostsComments Decision Date00 - Alternates / Program Discussions00 - 001 10/16/2017 50% Parking Lot Canopy Reduction with caisson foundation (62 spaces covered) Accepted(443,480)Remaining carports for 62 spaces to be a late bid alternate 10/24/201700 - 002 10/17/2017 Provide shallow foundations ILO caissons at reduced qty of carports (62 spaces) Pending(137,796)Cannot be accepted in addition to 00-00300 - 003 10/27/2017Add Alternate - Provide additional 63 space carports with shallow foundations for a total of 125 spaces coveredPending 229,703To be included as add alternate in 100% CD documents00 - 004 10/24/2017 Enclose main lobby staircase - add glass/doors, cove lighting, skylights, stone veneer Pending 122,64802 - Site Work (Divisions 31, 32, 33)02 - 001 10/16/2017 Remove site benches (15 total benches currently shown) Accepted(55,668)To be furnished from owner FFE budget 10/19/201702 - 002 10/16/2017 Entrance plaza lighting V.E. (36 light bollards currently shown)Pending PriceZA Bollards ($1,135/ea) and ZB ($370/ea)02 - 003 10/16/2017 Provide standard concrete ILO colored concrete at plazaPending(5,300)03 - Concrete04 - Masonry05 - Steel05 - 001 10/16/2017 Delete acoustical deckAccepted(13,926)Previously included at areas now shown to have acoustical ceilings10/19/201705 - 002 10/16/2017 Provide decking/metal panel ILO mini mesh at mechanical screen wall Pending(28,000)AP to look into a lighter guage mini mesh as alternate option06 - Carpentry07 -Thermal and Moisture Protection08 - Doors and Windows08 - 001 10/16/2017Provide standard HM doors and frames at (10) locations in detention area ILO security doors and framesPending(20,754)09 - Finishes09 - 002 10/17/2017 Remove acoustical panels from base and provide as potential late add alternate Pending(9,158)Could be a late Add Alternate10 - Specialties11 - Equipment12 - Furnishings13 - Special Construction13 - 001 10/20/2017 Canopy Gutters - Stainless Steel to standard paint gradeAccepted(13,800)10/19/201714 - Conveying Systems15 - Mechanical Systems (Divisions 22, 23, 24, & 25)16 - Electrical and Low Voltage Systems (Division 26, 27, 28)16 - 001 10/18/2017 Provide Aluminum feeders ILO copper at mains over 100 ampsAccepted(24,400)8/17/2017This decisions and scope changes documented on this price options list supersede all other contract documents and exhibits. To the extent Contractor provides value engineering suggestions, or comments with respect to the Drawings and Specifications, Client acknowledges that such services are preliminary and advisory only and not professional design services. Client shall refer all such suggestions and comments to the Architect or other design professionals designated by Client for review and evaluation and final determination regarding their adoption prior to Client’s acceptance thereof. Client further acknowledges that, unless or until the Construction Agreement (hereinafter defined) provides otherwise, that the Architect, Architect’s consultants, and all other consultants engaged by Client or the Architect shall be solely responsible for the adequacy of the design (as revised or modified by such suggestions or comments, or otherwise), and that Contractor is not responsible for the adequacy of the Drawings and Specifications, or for confirming the absence of errors or omissions that may exist therein. In addition, 20171016 Englewood PHQ DD GMP Estimate.xlsbPrice Options List, 10/27/2017Page 1/1Exhibit A-3Page 184 of 216
Englewood Police HQ
DD GMP
Clarifications and Assumptions
SUMMARY OF WORK
This estimate for the Englewood Police Headquarters will include a new two-Story Police
Headquarters facility that is approximately 49,725 square feet, the demolition of the existing police
building and construction of a new secured surface parking lot that is approximately 51,500 square
feet. It is anticipated construction will start in December of 2017, and work will be completed in
June of 2019.
CLARIFICATIONS AND ASSUMPTIONS
GENERAL CLARIFICATIONS
● (2) separate contingencies have been included in the estimate:
- Estimate & Bidding Contingency – 2.5% - This contingency is included to cover scope that has not
been anticipated at this time, but will be required for completion of design. It is intended to cover
estimating innaccuracies. It is anticipated that this contingency will be reduced to 0% after all
subcontracts are signed and returned to AP.
- Construction Contingency – 5% - Per contract, this contingency is included to protect the contractor
against the risks assumed in providing a GMP estimate. This contingency is included for the following
purposes: estimate inaccuracies, unfavorable bidding from trade contractors, contract default in
payment or performance by a subcontractor or supplier, cost of corrective work not provided for
elsewhere, other conditions which result in an increase to the cost of the work. This contingency
shall not be used for changes in the work or unforeseen conditions.
● The escalation allowance has been reduced to 0 as the majority of scopes have been confirmed with
subcontractor input in alignment with the schedule.
● This is an estimate for the cost of construction, no land fees, architectural fees, legal fees, land
development fees, tap fees, etc. have been included.
● The cost of the building permit is not included.
● Sales tax and Use tax has not been included.
● It is assumed all work will be completed during a standard 40-hour work week. No allowance for
overtime or off-hours work has been included.
SUBSTRUCTURE
● We are not including any interior grade beams except where noted on Foundation Plans as "Shear
Walls." Otherwise we are only including grade beams at perimeter of building.
● Police building to have a 12" thick structural slab on 6" void form. Subgrade to be compacted
common fill using onsite materials. Structural fills are not included.
● Foundation walls to have dampproofing on outside face. No waterproofing is included except for
elevator pit.
● Does not include shoring along the South edge of the new building where it will be constructed
adjacent to the existing Police Headquarters. Due to the height of the grade beams we do not
anticipate the need for shoring.
● Including costs for carport columns to be built on full-depth 18" caissons, at an estimated depth of
65 feet. See price options for shallow foundation option.
Clarifications Page 1/4
Exhibit A-4
Page 185 of 216
Englewood Police HQ
DD GMP
Clarifications and Assumptions
SUPERSTRUCTURE
● The estimated structural steel tonnage is 320 TONS, including joists, beams, and columns.
● Does not include snow fence/snow guards/ice guards.
● Acoustical Decking is not included.
● Does not include reinforcment or structural repairs to existing Fire Station.
● Assuming a portion of Ithaca to be closed for crane path.
● Does not include spray fireproofing or intumescent steel coatings.
SHELL
● Roof to be structurally sloped decking with crickets at corners only. Does not include a fully tapered
roof insulation system.
● Does not include mullion extensions at exterior glazing.
● Exterior insulation to be rigid insulation with self-adhered, fluid applied air and weather barrier.
● Does not include spray foam insulation, or below-slab insulation.
● Ballistic glazing is not included at exterior elevations.
● Ballistic glazing is only included at PDO Office and lobby transaction windows.
● Does not include graffiti coating at CMU or stone veneers.
● Carport steel to be field painted.
● Carport roofing to be metal standing seam (24 gauge).
INTERIORS
● Does not include floor moisture mitigation prior to installing flooring finishes.
● Does not include chemical resistant or epoxy countertops.
● Includes metal security ceilings in detention areas.
● High-Density storage to consist of 8 foot high shelving (8 levels), assuming 18" deep shelving in
Evidence and 15" deep legal-size shelving in Records.
SERVICES
● Does not include fire sprinklers, dry or wet type, at the police building's exterior canopy.
● Wet type sprinkler system included at Sally Port. Due to conditioned space, we do not anticipate a
dry set being required.
● Does not include a separate dry system, gas system, or pre-action system for IT rooms or
Evidence/Records rooms.
● AP to provide rough-in conduits only for the following Low Voltage systems:
- Structure Cabling Tele/Data
- Audio/Visual systems
- Access Control
- Intrusion Detection
- Security and electronic surveillance systems
● AP to provide full scope of Paging/PA system.
Clarifications Page 2/4
Page 186 of 216
Englewood Police HQ
DD GMP
Clarifications and Assumptions
SITE WORK
●Does not include overexcavation and recompaction underneath building slab on grade because a
deep foundation system is included.
● Does not include overexcavation and recompaction underneath site asphalt or concrete paving.
● Does not include a monument and/or marquee sign. GMP does include the Pinned letters on the
plaza low wall.
● Gravel is not included under paving.
● Parking stalls do not include wheel stops.
●Including underground stormwater detention with (2)stormceptors,8'diameter CMP detention,
with (2) concrete vaults. Detention vaults to be fed by rain garden drainage, peremeable pavement
drainage, and standard roof drains and site inlets.
ITEMS BY OTHERS
● All independent testing and inspections, including commissioning
● All fees associated with utilities will be paid for by the owner (water, electric, gas)
● Any expenses associated with dry utilities and getting them to the site (cable, fiber, power and gas)
● Removal or working with hazardous materials, including asbestos and lead abatement as defined by
OSHA.
● All moving costs
● All artwork - purchasing, moving, and installation
● Technology - Computers, Servers, phones, etc. – purchasing, moving and installation
● Furniture, Desks, chairs, tables, moveable casework – purchasing, moving and installation
Clarifications Page 3/4
Page 187 of 216
Englewood Police HQ
DD GMP
Clarifications and Assumptions
● Audio / Visual Projectors
● Projection Screens, Smart Boards
● Televisions
● Residential Equipment
● Land Costs
● Legal Fees
● Architectural and Engineering Fees
● Technology – Servers, computers, phones, etc.
● Owner contingency
DOCUMENTS
This estimate is based on the following documents:
● Design Development Drawings dated September 15, 2017.
● Design Development Specifications dated September 15, 2017.
● No addenda were received.
Clarifications Page 4/4
Page 188 of 216
Exhibit A-5 Englewood Police - Drawings
Sheet Title Consultant 100% DD's
0.0 COVER SHEET DLR Group 9/15/2017
0.0b COVER SHEET DLR Group 9/15/2017
C000 COVER SHEET MARTIN/MARTIN CONSULTING 9/15/2017
C010 EXISTING CONDITIONS AND DEMOLITION PLAN MARTIN/MARTIN CONSULTING 9/15/2017
C100 SITE PLAN MARTIN/MARTIN CONSULTING 9/15/2017
C200 OVERALL GRADING PLAN MARTIN/MARTIN CONSULTING 9/15/2017
C210 EROSION CONTROL PLAN MARTIN/MARTIN CONSULTING 9/15/2017
C300 OVERALL UTILITY PLAN MARTIN/MARTIN CONSULTING 9/15/2017
C400 SITE DETAILS MARTIN/MARTIN CONSULTING 9/15/2017
C410 PUMP DETAILS MARTIN/MARTIN CONSULTING 9/15/2017
L1.01 LAYOUT & MATERIALS PLAN LOGAN SIMPSON 9/15/2017
L3.01 LANDSCAPE PLAN LOGAN SIMPSON 9/15/2017
L3.02 PLANTING DETAILS LOGAN SIMPSON 9/15/2017
L4.01 IRRIGATION PLAN LOGAN SIMPSON 9/15/2017
L5.01 SITE DETAILS LOGAN SIMPSON 9/15/2017
CP1.0 CODE ANALYSIS & NOTES DLR Group 9/15/2017
CP1.1 CODE PLAN - FIRST FLOOR DLR Group 9/15/2017
CP1.2 CODE PLAN - SECOND FLOOR DLR Group 9/15/2017
A0.1 ARCHITECTURAL SITE PLAN DLR Group 9/15/2017
A0.10 ARCHITECTURAL SITE DETAILS DLR Group 9/15/2017
A1.1 FIRST FLOOR PLAN DLR Group 9/15/2017
A1.2 SECOND FLOOR PLAN DLR Group 9/15/2017
A2.1 LARGE SCALE PLANS DLR Group 9/15/2017
A3.1 RCP - FIRST FLOOR DLR Group 9/15/2017
A3.2 RCP - SECOND FLOOR DLR Group 9/15/2017
A3.3 ENLARGED RCP - ENTRY WRAP DLR Group 9/15/2017
A4.1 ROOF PLAN DLR Group 9/15/2017
A5.1 EXTERIOR ELEVATIONS DLR Group 9/15/2017
A5.2 EXTERIOR ELEVATIONS DLR Group 9/15/2017
A7.1 WALL SECTIONS DLR Group 9/15/2017
A7.2 WALL SECTIONS DLR Group 9/15/2017
A7.3 WALL SECTIONS DLR Group 9/15/2017
A8.1 STAIR PLANS AND SECTIONS DLR Group 9/15/2017
A8.2 STAIR PLANS AND SECTIONS DLR Group 9/15/2017
A8.5 ELEVATOR PLANS AND SECTIONS DLR Group 9/15/2017
A9.1 DOOR AND FRAME SCHEDULES DLR Group 9/15/2017
A9.2 FRAME ELEVATIONS DLR Group 9/15/2017
A9.3 DOOR AND WINDOW DETAILS DLR Group 9/15/2017
A9.4 DOOR AND WINDOW DETAILS DLR Group 9/15/2017
A10.3 WALL TYPE & DETAILS DLR Group 9/15/2017
A11.1 CASEWORK ELEVATIONS DLR Group 9/15/2017
A11.2 CASEWORK ELEVATIONS DLR Group 9/15/2017
A13.0 FINISH SCHEDULE AND DETAILS DLR Group 9/15/2017
S0.1 STRUCTURAL NOTES DLR Group 9/15/2017
GENERAL
CIVIL
LANDSCAPE
ARCHITECTURAL
STRUCTURAL
Page 1 of 2
Page 189 of 216
Exhibit A-5 Englewood Police - Drawings
Sheet Title Consultant 100% DD's
S0.2 STRUCTURAL NOTES & SPECIAL INSPECTIONS DLR Group 9/15/2017
S1.1 FOUNDATION PLAN DLR Group 9/15/2017
S2.1 FLOOR FRAMING PLAN DLR Group 9/15/2017
S2.2 ROOF FRAMING PLAN DLR Group 9/15/2017
S3.1 STRUCTURAL DETAILS DLR Group 9/15/2017
S3.2 STRUCTURAL DETAILS DLR Group 9/15/2017
S4.1 STRUCTURAL DETAILS DLR Group 9/15/2017
S5.1 STRUCTURAL DETAILS DLR Group 9/15/2017
S5.2 STRUCTURAL DETAILS DLR Group 9/15/2017
S5.3 STRUCTURAL DETAILS DLR Group 9/15/2017
S5.4 STRUCTURAL DETAILS DLR Group 9/15/2017
FP1.1 FIRE PROECTION PLAN DLR Group 9/15/2017
M0.0 MECHANICAL SYMBOLS AND ABBREVIATIONS DLR Group 9/15/2017
M1.1 HVAC PLAN - FIRST LEVEL DLR Group 9/15/2017
M1.2 HVAC PLAN - SECOND LEVEL DLR Group 9/15/2017
M1.3 HVAC ROOF PLAN DLR Group 9/15/2017
M2.1 PIPING PLAN - FIRST LEVEL DLR Group 9/15/2017
M2.2 PIPING PLAN - SECOND LEVEL DLR Group 9/15/2017
M3.1 MECHANICAL LARGE SCALE PLANS DLR Group 9/15/2017
M4.1 MECHANICAL DETAILS DLR Group 9/15/2017
M4.2 MECHANICAL DETAILS DLR Group 9/15/2017
M5.1 MECHANICAL SCHEDULES DLR Group 9/15/2017
M5.2 MECHANICAL SCHEDULES DLR Group 9/15/2017
M6.1 MECHANICAL CONTROL DIAGRAM DLR Group 9/15/2017
M6.2 MECHANICAL CONTROL DIAGRAM DLR Group 9/15/2017
P0.1 PLUMBING PLAN - UNDERGROUND LEVEL DLR Group 9/15/2017
P1.1 PLUMBING PLAN - FIRST LEVEL DLR Group 9/15/2017
P1.2 PLUMBING PLAN - SECOND LEVEL DLR Group 9/15/2017
P2.1 PLUMBING LARGE SCALE PLANS DLR Group 9/15/2017
P3.1 PLUMBING DETAILS DLR Group 9/15/2017
P4.1 PLUMBING WASTE AND VENT RISERS DLR Group 9/15/2017
P5.1 PLUMBING SCHEDULES DLR Group 9/15/2017
E0.0 ELECTRICAL SYMBOLS AND GENERAL NOTES DLR Group 9/15/2017
E0.1 ELECTRICAL SITE POWER PLAN DLR Group 9/15/2017
E0.2 ELECTRICAL SITE LIGHTING PLAN DLR Group 9/15/2017
E1.1 LIGHTING PLAN - FIRST LEVEL DLR Group 9/15/2017
E1.2 LIGHTING PLAN - SECOND LEVEL DLR Group 9/15/2017
E2.1 POWER PLAN - FIRST LEVEL DLR Group 9/15/2017
E2.2 POWER PLAN - SECOND LEVEL DLR Group 9/15/2017
E2.3 POWER PLAN - ROOF DLR Group 9/15/2017
E4.1 ENLARGED ELECTRICAL PLANS DLR Group 9/15/2017
E5.1 ELECTRICAL ONE-LINE DIAGRAMS DLR Group 9/15/2017
E7.1 ELECTRICAL SCHEDULES DLR Group 9/15/2017
PLUMBING
ELECTRICAL
MECHANICAL
FIRE PROTECTION
Page 2 of 2
Page 190 of 216
Exhibit A-5 Englewood Police - Specifications
Spec Title 100% DDs
DIVISION 00 CONDITIONS OF THE CONTRACT
00 01 07 Seals Page 9/15/2017
00 01 10 Table of Contents 9/15/2017
00 3132 Geotechnical Data (Soils Report)9/15/2017
Geotechnical Engineering Report 9/15/2017
DIVISION 01 GENERAL REQUIREMENTS
01 35 13.16 Special Project Procedures for Detention Facilities 9/15/2017
DIVISION 02 EXISTING CONDITIONS N/A
DIVISION 03 CONCRETE
03 30 00 Cast-In-Place Concrete 9/15/2017
03 30 53 Miscellaneous Cast-In-Place Concrete 9/15/2017
03 33 61 Ground Concrete Finish 9/15/2017
DIVISION 04 MASONRY
04 20 00 Unit Masonry 9/15/2017
04 42 00 Exterior Stone Cladding 9/15/2017
DIVISION 05 METALS
05 12 00 Structural Steel Framing 9/15/2017
05 21 00 Steel Joist Framing 9/15/2017
05 31 00 Steel Decking 9/15/2017
05 40 00 Cold-Formed Metal Framing 9/15/2017
05 50 00 Metal Fabrications Spec Not Provided
05 51 00 Metal Stairs Spec Not Provided
05 52 13 Pipe and Tube Railings Spec Not Provided
DIVISION 06 WOOD, PLASTICS AND COMPOSITES
06 10 00 Rough Carpentry 9/15/2017
06 16 00 Sheating Spec Not Provided
06 41 16 Plastic-Laminate Clad Architectural Cabinets Spec Not Provided
06 64 00 Plastic Paneling 9/15/2017
DIVISION 07 THERMAL AND MOISTURE PROTECTION
07 11 13 Bituminous Dampproofing 9/15/2017
07 19 00 Water Repellants 9/15/2017
07 21 00 Thermal Insulation 9/15/2017
07 26 00 Vapor Retarders 9/15/2017
07 27 26 Fluid Applied Membrane Air Barriers 9/15/2017
07 46 43 Composition Siding 9/15/2017
07 54 23 Thermoplastic-Polyolefin Roofing 9/15/2017
07 62 00 Sheet Metal Flashing and Trim 9/15/2017
07 72 00 Roof Accessories 9/15/2017
07 84 13 Penetration Firestopping 9/15/2017
07 84 43 Joint Firestopping 9/15/2017
07 92 00 Joint Sealants 9/15/2017
07 92 15 Security Caulk 9/15/2017
DIVISION 08 OPENINGS
08 11 13 Hollow Metal Doors and Frames 9/15/2017
08 14 16 Flush Wood Doors 9/15/2017
08 31 13 Access Doors and Frames 9/15/2017
08 31 13.53 Security Access Doors and Frames 9/15/2017
08 33 23 Overhead Coiling Doors 9/15/2017
08 34 63 Detention Doors and Frames 9/15/2017
08 41 13 Aluminum-Framed Entrances and Storefronts 9/15/2017
08 42 29.23 Sliding Automatic Entrances 9/15/2017
08 44 13 Glazed Aluminum Curtain Walls 9/15/2017
08 63 00 Metal Framed Skylights 9/15/2017
08 71 00 Door Hardware 9/15/2017
08 71 63 Detention Door Hardware 9/15/2017
Page 1 of 4
Page 191 of 216
Exhibit A-5 Englewood Police - Specifications
Spec Title 100% DDs
08 80 00 Glazing 9/15/2017
08 88 53 Security Glazing 9/15/2017
08 91 19 Fixed Louvers Spec Not Provided
DIVISION 09 FINISHES
09 22 16 Non-Structural Metal Framing 9/15/2017
09 22 16.23 Gypsum Board Shaft Wall Assemblies Spec Not Provided
09 29 00 Gypsum Board 9/15/2017
09 30 13 Ceramic Tiling Spec Not Provided
09 51 13 Acoustical Panel Ceilings Spec Not Provided
09 57 53 Security Ceilings Assemblies Spec Not Provided
09 65 13 Resilient Base and Accessories Spec Not Provided
09 65 19 Resilient Tile Flooring Spec Not Provided
09 68 13 Tile Carpeting Spec Not Provided
09 69 00 Access Flooring Spec Not Provided
09 91 00 Painting Spec Not Provided
09 96 00 High Performance Coatings Spec Not Provided
DIVISION 10 SPECIALTIES
10 11 00 Visual Display Units Spec Not Provided
10 12 00 Display Cases Spec Not Provided
10 14 16 Plaques Spec Not Provided
10 14 19 Dimensional Letter Signage Spec Not Provided
10 17 00 Telephone Specialties Spec Not Provided
10 21 13.13 Metal Toilet Compartments Spec Not Provided
10 21 16 Shower and Dressing Compartments Spec Not Provided
10 26 00 Wall and Door Protection Spec Not Provided
10 28 00 Toilet and Bath Accessories Spec Not Provided
10 44 13 Fire Extinguisher Cabinets Spec Not Provided
10 44 16 Fire Extinguishers Spec Not Provided
10 51 13 Metal Lockers 9/15/2017
10 51 14 Pass-Thru Metal Evidence Lockers 9/15/2017
10 56 26 Mobile Storage Shelving Spec Not Provided
10 75 16 Ground Set Flagpole Spec Not Provided
DIVISION 11 EQUIPMENT
11 12 00 Parking Control Equipment Spec Not Provided
11 66 23 Gymnasium Equipment Spec Not Provided
DIVISION 12 FURNISHINGS
12 36 16 Metal Countertops Spec Not Provided
12 36 61.16 Solid Surfacing Countertops Spec Not Provided
12 48 13 Entrance Floor Mats and Frames Spec Not Provided
12 93 00 Site Furnishings 9/15/2017
DIVISION 13 SPECIAL CONSTRUCTION - Not Used N/A
DIVISION 14 CONVEYING EQUIPMENT
14 24 00 Hydraulic Elevators 9/15/2017
DIVISION 21 FIRE SUPPRESSION
21 05 00 Common Work Results for Fire Suppression 9/15/2017
21 13 13 Wet Pipe Sprinkler Systems 9/15/2017
DIVISION 22 PLUMBING
22 05 00 Common Work Results for Plumbing 9/15/2017
22 05 13 Common Motor Requirements for Plumbing Equipment 9/15/2017
22 05 19 Meters and Gages for Plumbing Piping 9/15/2017
22 05 29 Hangers and Supports for Plumbing Piping and Equipment 9/15/2017
22 05 53 Identification for Plumbing Piping and Equipment 9/15/2017
22 07 00 Plumbing Insulation 9/15/2017
22 11 16 Domestic Water Piping 9/15/2017
22 11 19 Domestic Water Piping Specialties 9/15/2017
Page 2 of 4
Page 192 of 216
Exhibit A-5 Englewood Police - Specifications
Spec Title 100% DDs
22 11 20 Facility Natural Gas Piping 9/15/2017
22 11 23 Domestic Water Pumps 9/15/2017
22 13 16 Sanitary Waste and Vent Piping 9/15/2017
22 13 19 Sanitary Waste Piping Specialties 9/15/2017
22 13 23 Sanitary Waste Interceptors 9/15/2017
22 14 13 Facility Storm Drainage Piping 9/15/2017
22 14 23 Storm Drainage Piping Specialties 9/15/2017
22 15 13 General Service Compressed-Air Piping 9/15/2017
22 33 00 Electric Domestic Water Heaters 9/15/2017
22 34 00 Fuel-Fired Domestic Water Heaters 9/15/2017
22 40 00 Plumbing Fixtures 9/15/2017
DIVISION 23 HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
23 05 00 Common Work Results for HVAC 9/15/2017
23 05 13 Common Motor Requirements for HVAC Equipment 9/15/2017
23 05 16 Expansion Fittings and Loops for HVAC Piping 9/15/2017
23 05 19 Meters and Gages for HVAC Piping 9/15/2017
23 05 23 General-Duty Valves for HVAC Piping 9/15/2017
23 05 29 Hangers and Supports for HVAC Piping and Equipment 9/15/2017
23 05 53 Identification for HVAC Piping and Equipment 9/15/2017
23 05 93 Testing, Adjusting, and Balancing for HVAC 9/15/2017
23 07 13 Duct Insulation 9/15/2017
23 07 16 HVAC Equipment Insulation 9/15/2017
23 07 19 HVAC Piping Insulation 9/15/2017
23 08 00 Commissioning of HVAC Systems 9/15/2017
23 09 00 BAS Instrumentation and Control 9/15/2017
23 09 13 BAS Instrumentation and Control Devices 9/15/2017
23 09 13.13 BAS Actuators and Operators 9/15/2017
23 09 13.23 BAS Sensors and Operators 9/15/2017
23 09 13.33 BAS Control Valves 9/15/2017
23 09 13.43 BAS Control Dampers 9/15/2017
23 09 23 Direct Digital Control (DDC) System for HVAC 9/15/2017
23 09 23.43 Weather Stations 9/15/2017
23 09 33 Variable Frequency Drive 9/15/2017
23 21 13 Hydronic Piping 9/15/2017
23 21 23 Hydronic Pumps 9/15/2017
23 25 13 Water Treatment for Closed-Loop Hydronic Systems 9/15/2017
23 31 13 Metal Ducts 9/15/2017
23 33 00 Air Duct Accessories 9/15/2017
23 34 23 HVAC Power Ventilators 9/15/2017
23 36 00 Air Terminal Units 9/15/2017
23 37 13 Diffusers, Registers, and Grilles 9/15/2017
23 37 23 HVAC Gravity Ventilators 9/15/2017
23 51 16 Fabricated Breechings and Accessories 9/15/2017
23 51 23 Gas Vents 9/15/2017
23 52 16 Condensing Boilers 9/15/2017
23 74 16.13 Packaged, Large-Capacity, Rooftop Air-Conditioning Units 9/15/2017
23 81 23.13 Computer-Room Air-Conditioners, Ceiling-Mounted Units 9/15/2017
23 81 26 Split-System Air-Conditioners 9/15/2017
23 82 19 Fan Coil Units 9/15/2017
23 82 39.19 Wall and Ceiling Unit Heaters 9/15/2017
23 83 14 Gas-Fired Radiant Heaters 9/15/2017
DIVISION 26 ELECTRICAL
26 05 00 Common Work Results for Electrical 9/15/2017
26 05 19 Low-Voltage Electrical Power Conductors and Cables 9/15/2017
26 05 26 Grounding and Bonding for Electrical Systems 9/15/2017
Page 3 of 4
Page 193 of 216
Exhibit A-5 Englewood Police - Specifications
Spec Title 100% DDs
26 05 29 Hangers and Supports for Electrical Systems 9/15/2017
26 05 33 Raceways and Boxes for Electrical Systems 9/15/2017
26 05 53 Identification for Electrical Systems 9/15/2017
26 05 74 Power System Study 9/15/2017
26 09 23 Lighting Control Devices 9/15/2017
26 22 00 Low-Voltage Transformers 9/15/2017
26 24 16 Panelboards 9/15/2017
26 27 26 Wiring Devices 9/15/2017
26 28 13 Fuses 9/15/2017
26 28 16 Enclosed Switches and Circuit Breakers 9/15/2017
26 32 13 Engine Generators 9/15/2017
26 36 00 Transfer Switches 9/15/2017
26 41 13 Lightning Protection for Structures 9/15/2017
26 43 13 Surge Protective Devices 9/15/2017
26 51 00 Interior Lighting 9/15/2017
26 56 00 Exterior Lighting 9/15/2017
26 74 00 Electrical for Communications Systems 9/15/2017
DIVISION 27 COMMUNICATIONS – Not Used N/A
DIVISION 28 ELECTRONIC SAFETY AND SECURITY
28 31 11 Fire Alarm Systems 9/15/2017
DIVISION 31 EARTHWORK
31 10 00 Site Clearing 9/15/2017
31 20 00 Earthwork Spec Not Provided
31 23 33 Trenching and Backfilling 9/15/2017
31 25 00 Temporary Erosion and Sediment Control 9/15/2017
31 63 29 Drilled Concrete Piers and Shafts 9/15/2017
DIVISION 32 EXTERIOR IMPROVEMENTS
32 12 16 Asphalt Paving 9/15/2017
32 13 13 Concrete Paving 9/15/2017
32 13 73 Concrete Paving and Joint Sealants 9/15/2017
32 17 23 Pavement Markings 9/15/2017
32 31 13.53 High-Security Chain Link Fences and Gates 9/15/2017
32 91 13 Soil Preparation 9/15/2017
32 92 00 Turf and Grasses 9/15/2017
32 93 00 Planting 9/15/2017
DIVISION 33 UTILITIES
33 11 00 Water Distribution Piping 9/15/2017
33 31 00 Sanitary Utility Sewerage Piping 9/15/2017
33 41 00 Storm Utility Drainage Piping 9/15/2017
Page 4 of 4
Page 194 of 216
ID Task NameDuration Start Finish1Englewood Police Headquarters 513 daysThu 6/22/17Fri 6/28/192Pre-Construction & Procurement Phase327 daysThu 6/22/17Thu 10/4/183Schematic Design Process34 daysThu 6/22/17Tue 8/8/177Design Documents 94 daysWed 8/9/17Wed 12/20/178Design Document Development Phase 29 daysWed 8/9/17Mon 9/18/179100% Design Documents0 daysMon 9/18/17Mon 9/18/1710Civil/Foundation Package25 daysFri 11/3/17Mon 12/11/1711Civil/Foundation Package 0 daysFri 11/3/17Fri 11/3/1712Grading/Foundation Permit25 daysFri 11/3/17Mon 12/11/1713Sub Pricing Check10 daysFri 11/3/17Thu 11/16/1714Construction Documents 65 daysTue 9/19/17Wed 12/20/1715Construction Document Phase 65 daysTue 9/19/17Wed 12/20/1716100% CD Documents0 daysWed 12/20/17Wed 12/20/1717IGMP PROCESS35 daysMon 9/18/17Tue 11/7/1718 IGMP Kick-Off Meeting0 daysMon 9/18/17Mon 9/18/1719 Client DD Approval5 daysTue 9/19/17Mon 9/25/1720IGMP Pricing20 daysTue 9/19/17Mon 10/16/1721DD - RFIs10 daysTue 9/19/17Mon 10/2/1722 IGMP Review Meeting0 daysMon 10/16/17Mon 10/16/1723 Cost Reconciliation0 daysMon 10/16/17Mon 10/16/1724 IGMP Revisions0 daysMon 10/16/17Mon 10/16/1725Council Approval0 daysTue 11/7/17Tue 11/7/1726Early Subcontractor Sign On 53 daysTue 11/7/17Thu 1/25/1827Earthwork/Utility Subcontractor1 dayTue 11/7/17Tue 11/7/1728Caisson Sub1 dayTue 11/7/17Tue 11/7/1729Concrete Foundation/Rebar Subcontractor1 dayTue 11/7/17Tue 11/7/1730Steel Fabricator/Detailer1 dayMon 11/20/17Mon 11/20/1731Mechanical/Electrical/Plumbing1 dayMon 11/20/17Mon 11/20/1732Masonry Subcontractor1 dayMon 11/20/17Mon 11/20/1733Elevator Subcontractor1 dayMon 11/20/17Mon 11/20/1734Fire Sprinkler 1 dayMon 11/20/17Mon 11/20/1735Curtain Wall/HM Frame Subcontractor1 dayTue 1/23/18Tue 1/23/1836Framing/Drywall Subcontractor1 dayTue 1/23/18Tue 1/23/1837Roofer/Metal Panel Subcontractor3 daysTue 1/23/18Thu 1/25/1838Doors and Hardware 3 daysTue 1/23/18Thu 1/25/1839FGMP PROCESS 74 daysTue 11/7/17Mon 2/26/1840Subcontractor Pricing 20 daysThu 12/21/17Mon 1/22/1841Scope Review/Bid Analysis7 daysTue 1/23/18Wed 1/31/1842Submit GMP1 dayThu 2/1/18Thu 2/1/1843Approval of GMP6 daysFri 2/2/18Fri 2/9/1844Notice to Proceed1 dayTue 11/7/17Tue 11/7/1745Release of Critical Sub Contracts2 wksFri 1/26/18Thu 2/8/1846Release Remaining Contracts2 wksMon 2/12/18Mon 2/26/1847BIM Modeling 95 daysWed 12/20/17Tue 5/8/1854Utility Relocation Phase 1 - Owners Responsibility94 daysMon 8/7/17Mon 12/18/1755Sewer Line Relocation 10 daysMon 12/4/17Fri 12/15/1756Electrical Line Relocation - Xcel83 daysMon 8/7/17Fri 12/1/1757Street Lights Disconnected and Removed1 dayMon 12/18/17Mon 12/18/1758Fiber optics Relocation - Utility Provider (Comcast?)83 daysMon 8/7/17Fri 12/1/1759Memorial Tree and Plaque Relocation 83 daysMon 8/7/17Fri 12/1/1760Tornado Siren Relocation 83 daysMon 8/7/17Fri 12/1/1761Permits52 daysFri 11/3/17Mon 1/22/1862Grading/Foundation Permit0 daysMon 12/11/17Mon 12/11/1763Flood Plain Permit By Architect/Owner4 wksThu 12/21/17Mon 1/22/1864County Drainage Reports by Architect4 wksFri 11/3/17Mon 12/4/1765Building Permit by Architect15 daysThu 12/21/17Mon 1/15/1866Fire Department Review 2 wksThu 12/21/17Mon 1/8/1867State Storm Water Management Plan2 wksFri 11/3/17Thu 11/16/1768Fugitive Dust Permit2 wksFri 11/3/17Thu 11/16/1769State Storm Water Management Permit2 wksFri 11/17/17Mon 12/4/1770City of Englewood Storm Water Permit2 wksFri 11/17/17Mon 12/4/1771Ground Water Discharge Permit (If Needed)6 wksFri 11/17/17Thu 1/4/1872Electrical Permit1 wkTue 12/12/17Mon 12/18/17Englewood Police Headquarters Pre-Construction & Procurement PhaseSchematic Design ProcessDesign Documents Design Document Development Phase 8/9100% Design Documents 9/18Civil/Foundation PackageCivil/Foundation Package 11/3Grading/Foundation Permit 11/3Sub Pricing Check 11/3Construction Documents Construction Document Phase 9/19100% CD Documents 12/20IGMP PROCESS IGMP Kick-Off Meeting 9/18 Client DD Approval 9/19IGMP Pricing 9/19DD - RFIs 9/19 IGMP Review Meeting 10/16 Cost Reconciliation 10/16 IGMP Revisions 10/16Council Approval 11/7Early Subcontractor Sign On Earthwork/Utility Subcontractor 11/7Caisson Sub 11/7Concrete Foundation/Rebar Subcontractor 11/7Steel Fabricator/Detailer 11/20Mechanical/Electrical/Plumbing 11/20Masonry Subcontractor 11/20Elevator Subcontractor 11/20Fire Sprinkler 11/20Curtain Wall/HM Frame Subcontractor 1/23Framing/Drywall Subcontractor 1/23Roofer/Metal Panel Subcontractor 1/23Doors and Hardware 1/23FGMP PROCESS Subcontractor Pricing 12/21Scope Review/Bid Analysis 1/23Submit GMP 2/1Approval of GMP 2/2Notice to Proceed 11/7Release of Critical Sub Contracts 1/26Release Remaining Contracts 2/12BIM Modeling Utility Relocation Phase 1 - Owners ResponsibilitySewer Line Relocation 12/4Electrical Line Relocation - Xcel 8/7Street Lights Disconnected and Removed 12/18Fiber optics Relocation - Utility Provider (Comcast?)8/7Memorial Tree and Plaque Relocation 8/7Tornado Siren Relocation 8/7PermitsGrading/Foundation Permit 12/11Flood Plain Permit By Architect/Owner 12/21County Drainage Reports by Architect 11/3Building Permit by Architect 12/21Fire Department Review 12/21State Storm Water Management Plan 11/3Fugitive Dust Permit 11/3State Storm Water Management Permit 11/17City of Englewood Storm Water Permit 11/17Ground Water Discharge Permit (If Needed) 11/17Electrical Permit 12/12H1H2H1H2H1H2H12017201820192020City of Englewood - Police HQExhibit A - CMP 100% DD ScheduleProject: COEPHQ - Exhibit A - CMP 100% DD Schedule 10/31/2017Adolfson and Peterson ConstructionCity of Englewood - Police HQ Page 195 of 216
ID Task NameDuration Start Finish73Plumbing Permit1 wkTue 12/12/17Mon 12/18/1774Submittals/Lead Times228 daysWed 11/8/17Thu 10/4/1875Electrical110 daysTue 11/21/17Tue 5/1/1893Mechanical121 daysWed 11/8/17Thu 5/3/18103Fire Sprinkler/Alarm37 daysFri 2/9/18Tue 4/3/18106Early Submittals114 daysWed 11/8/17Tue 4/24/18124Misc. Submittals176 daysFri 1/26/18Thu 10/4/18154Overall Construction Project388 daysMon 12/18/17Fri 6/28/19155Mobilization10 daysMon 12/18/17Wed 1/3/18156Site Mobilization/Temp Phone and Power2 wksMon 12/18/17Wed 1/3/18157Erosion Control/Tracking Pad(s)2 wksMon 12/18/17Wed 1/3/18158Temp Fencing1 wkMon 12/18/17Fri 12/22/17159Construction Protection/Signage2 wksMon 12/18/17Wed 1/3/18160Earthwork12 daysWed 12/20/17Tue 1/9/18161Demo Parking Lot 2 daysWed 12/20/17Thu 12/21/17162Misc. Site Demo (Trees)5 daysWed 12/20/17Thu 12/28/17163Clear & Grub2 daysWed 12/27/17Thu 12/28/17164Overlot Survey / Staking1 dayFri 12/29/17Fri 12/29/17165Overlot Grading1 dayTue 1/2/18Tue 1/2/18166Excavate Pad to 4 +/- BFF4 daysWed 1/3/18Mon 1/8/18167Export Soil 4 daysThu 1/4/18Tue 1/9/18168Straight Shaft Pier Foundation System60 daysTue 1/2/18Wed 3/28/18169Rebar on-site0 daysTue 1/2/18Tue 1/2/18170Anchor Bolts on-site0 daysMon 1/8/18Mon 1/8/18171Tie Cages 20 daysWed 1/3/18Tue 1/30/18172Survey Piers10 daysTue 1/9/18Mon 1/22/18173Drill/Pour Piers30 daysWed 1/10/18Wed 2/21/18174Form/Pour Grade Beams/Pier Caps20 daysTue 1/30/18Tue 2/27/18175Form/Pour Elevator Floor and Walls?10 daysThu 2/22/18Wed 3/7/18176Insulation/Dampproofing4 daysWed 2/28/18Mon 3/5/18177Backfill/Compact Perimeter and interior slab3 daysThu 3/8/18Mon 3/12/18178Underground MEP 12 daysTue 3/13/18Wed 3/28/18179Utilities89 daysWed 1/3/18Tue 5/8/18180On Site Wet Utilities5 daysWed 1/3/18Tue 1/9/18181Potholing Existing Utilities2 daysWed 1/3/18Thu 1/4/18182Fire Line Water5 daysWed 1/3/18Tue 1/9/18183Domestic Water5 daysWed 1/3/18Tue 1/9/18184Sanitary Sewer (Not Needed)0 daysTue 1/9/18Tue 1/9/18185Storm Sewer (Surface Run-Off)0 daysTue 1/9/18Tue 1/9/18186Public Utilities54 daysThu 2/22/18Tue 5/8/18187Xcel Gas1 wkThu 2/22/18Wed 2/28/18188Xcel Electric Primary/ Set Transformer1 wkWed 5/2/18Tue 5/8/18189Building Shell144 daysTue 3/13/18Wed 10/3/18190Slab on Void17 daysMon 3/19/18Wed 4/11/18191Rebar on site0 daysMon 3/19/18Mon 3/19/18192Void Form on Site0 daysMon 3/19/18Mon 3/19/18193Fine grade Pad1 dayThu 3/22/18Thu 3/22/18194Install Slab Sure Void/Protection Board3 daysFri 3/23/18Tue 3/27/18195Install Vapor Barrier 2 daysWed 3/28/18Thu 3/29/18196Install Rebar 4 daysFri 3/30/18Wed 4/4/18197Set Floor Drains/CO/Floor sinks 2 daysThu 4/5/18Fri 4/6/18198Pour Slab on Void 3 daysMon 4/9/18Wed 4/11/18199Masonry Walls75 daysTue 3/13/18Tue 6/26/18200Masonry Rebar on site1 dayTue 3/13/18Tue 3/13/18201Embed plates on site1 dayTue 3/13/18Tue 3/13/18202Core/Elevator/Bearing Walls10 daysThu 4/12/18Wed 4/25/18203Sally Port/Adult Holding Cells/Booking/Etc25 daysTue 5/22/18Tue 6/26/18204Structural Steel37 daysThu 4/19/18Mon 6/11/18205Level 117 daysThu 4/19/18Fri 5/11/18206Erect Columns and Beams (Grid G - West)7 daysThu 4/19/18Fri 4/27/18207Joist and Deck 9 daysMon 4/30/18Thu 5/10/18208Misc. Detailing, Steel lintels, HHS Frame supports5 daysMon 5/7/18Fri 5/11/18209Level 220 daysMon 5/14/18Mon 6/11/18Plumbing Permit 12/12Submittals/Lead TimesElectricalMechanicalFire Sprinkler/AlarmEarly SubmittalsMisc. SubmittalsOverall Construction ProjectMobilizationSite Mobilization/Temp Phone and Power 12/18Erosion Control/Tracking Pad(s) 12/18Temp Fencing 12/18Construction Protection/Signage 12/18EarthworkDemo Parking Lot 12/20Misc. Site Demo (Trees) 12/20Clear & Grub 12/27Overlot Survey / Staking 12/29Overlot Grading 1/2Excavate Pad to 4 +/- BFF 1/3Export Soil 1/4Straight Shaft Pier Foundation SystemRebar on-site 1/2Anchor Bolts on-site 1/8Tie Cages 1/3Survey Piers 1/9Drill/Pour Piers 1/10Form/Pour Grade Beams/Pier Caps 1/30Form/Pour Elevator Floor and Walls? 2/22Insulation/Dampproofing 2/28Backfill/Compact Perimeter and interior slab 3/8Underground MEP 3/13UtilitiesOn Site Wet UtilitiesPotholing Existing Utilities 1/3Fire Line Water 1/3Domestic Water 1/3Sanitary Sewer (Not Needed) 1/9Storm Sewer (Surface Run-Off) 1/9Public UtilitiesXcel Gas 2/22Xcel Electric Primary/ Set Transformer 5/2Building ShellSlab on VoidRebar on site 3/19Void Form on Site 3/19Fine grade Pad 3/22Install Slab Sure Void/Protection Board 3/23Install Vapor Barrier 3/28Install Rebar 3/30Set Floor Drains/CO/Floor sinks 4/5Pour Slab on Void 4/9Masonry WallsMasonry Rebar on site 3/13Embed plates on site 3/13Core/Elevator/Bearing Walls 4/12Sally Port/Adult Holding Cells/Booking/Etc 5/22Structural SteelLevel 1Erect Columns and Beams (Grid G - West) 4/19Joist and Deck 4/30Misc. Detailing, Steel lintels, HHS Frame supports 5/7Level 2H1H2H1H2H1H2H12017201820192020City of Englewood - Police HQExhibit A - CMP 100% DD ScheduleProject: COEPHQ - Exhibit A - CMP 100% DD Schedule 10/31/2017Adolfson and Peterson ConstructionCity of Englewood - Police HQ Page 196 of 216
ID Task NameDuration Start Finish210Erect Columns and Beams (Grid G - West)6 daysMon 5/14/18Mon 5/21/18211Joist and Roof Deck 9 daysTue 5/22/18Mon 6/4/18212Pour Slab on Deck - Level 15 daysTue 6/5/18Mon 6/11/18213Exterior Envelope85 daysTue 6/5/18Wed 10/3/18214Exterior Wall and Roof Systems38 daysTue 6/5/18Fri 7/27/18215Exterior Wall Layout 3 daysTue 6/5/18Thu 6/7/18216Exterior Wall Framing20 daysFri 6/8/18Fri 7/6/18217Exterior Sheathing17 daysFri 6/22/18Tue 7/17/18218Frame/Sheath Canopies and misc. roof5 daysMon 7/9/18Fri 7/13/18219Spray Air Barrier/Multiple Mobs 10 daysMon 7/9/18Fri 7/20/18220Mineral Wool Insulation?5 daysMon 7/23/18Fri 7/27/18221Roofing/Thermal Protection30 daysMon 7/9/18Fri 8/17/18222Roof Carpentry/Curbs10 daysMon 7/9/18Fri 7/20/18223Spray foam Insulation at Parapet5 daysMon 7/23/18Fri 7/27/18224TPO at Main Roof 15 daysMon 7/23/18Fri 8/10/18225TPO at Canopies and Trellis's5 daysMon 8/13/18Fri 8/17/18226Set AHU's/EF's at Roof1 dayMon 8/13/18Mon 8/13/18227Aluminum Windows/ Storefront20 daysWed 8/15/18Wed 9/12/18229Masonry - Exterior Brick35 daysWed 7/18/18Wed 9/5/18230Install Brick/Stone at Entrance35 daysWed 7/18/18Wed 9/5/18231Wood Panels (WP)20 daysThu 9/6/18Wed 10/3/18233Interior168 daysThu 4/12/18Tue 12/11/182341st Floor 140 daysTue 5/22/18Tue 12/11/18235Interior Wall Layout (Grid G - East)3 daysTue 5/22/18Thu 5/24/18236Polish Concrete (Grind & First Coat)10 daysTue 5/22/18Tue 6/5/18237Roof Drains7 daysTue 5/22/18Thu 5/31/18238Rough Ductwork15 daysTue 5/22/18Tue 6/12/18239Rough Hydronic10 daysTue 5/22/18Tue 6/5/18240Rough Electrical/Fire Alarm10 daysTue 5/22/18Tue 6/5/18241Rough Fire Sprinkler10 daysTue 5/22/18Tue 6/5/18242Set Door Frames3 daysWed 6/6/18Fri 6/8/18243Misc. Structural Steel Installed 3 daysWed 6/6/18Fri 6/8/18244Pour Slab on Deck - NO WORK BELOW0 daysMon 6/11/18Mon 6/11/18245Interior framing12 daysWed 6/6/18Thu 6/21/18246Wall Backing and Blocking15 daysTue 6/12/18Mon 7/2/18247Rough Plumbing (in Wall)15 daysWed 6/13/18Tue 7/3/18248Rough Electrical (In Wall)15 daysWed 6/20/18Wed 7/11/18249Insulation 3 daysTue 7/3/18Fri 7/6/18250Hard lid/soffit framing10 daysFri 6/22/18Fri 7/6/18251Rough Temp. Controls/Data/Telecom10 daysWed 6/20/18Tue 7/3/18252Drywall13 daysThu 7/12/18Mon 7/30/18253Tape and Finish20 daysMon 8/13/18Mon 9/10/18254Set Electrical Gear, Panels, switchboards5 daysTue 9/11/18Mon 9/17/18255Bathrooms/Locker Rooms17 daysTue 9/11/18Wed 10/3/18284Prime/ First Coat15 daysTue 9/11/18Mon 10/1/18285Grid Ceiling15 daysTue 9/18/18Mon 10/8/18286Finish Electrical/ Drop Light Fixtures15 daysTue 9/25/18Mon 10/15/18287Drop Sprinkler Heads 10 daysTue 9/25/18Mon 10/8/18288G/R/D's8 daysTue 9/25/18Thu 10/4/18289Casework Install15 daysTue 10/9/18Mon 10/29/18290Carpet10 daysTue 10/16/18Mon 10/29/18291Above Ceiling Inspections2 daysTue 10/9/18Wed 10/10/18292Drop Ceiling Tiles8 daysThu 10/11/18Mon 10/22/18293Set Doors and Hardware8 daysTue 10/23/18Thu 11/1/18294Final Paint10 daysFri 10/19/18Thu 11/1/18295Base8 daysFri 10/19/18Tue 10/30/18296Pre-Punch10 daysWed 10/31/18Wed 11/14/18297Final Clean3 daysThu 11/15/18Mon 11/19/18298Punch10 daysTue 11/20/18Wed 12/5/182992nd Floor 118 daysFri 6/22/18Tue 12/11/18300Interior Wall Layout3 daysFri 6/22/18Tue 6/26/18301Interior Framing Critical Walls 3 daysFri 6/22/18Tue 6/26/18302Roof Drain Leaders5 daysFri 6/22/18Thu 6/28/18Erect Columns and Beams (Grid G - West) 5/14Joist and Roof Deck 5/22Pour Slab on Deck - Level 1 6/5Exterior EnvelopeExterior Wall and Roof SystemsExterior Wall Layout 6/5Exterior Wall Framing 6/8Exterior Sheathing 6/22Frame/Sheath Canopies and misc. roof 7/9Spray Air Barrier/Multiple Mobs 7/9Mineral Wool Insulation? 7/23Roofing/Thermal ProtectionRoof Carpentry/Curbs 7/9Spray foam Insulation at Parapet 7/23TPO at Main Roof 7/23TPO at Canopies and Trellis's 8/13Set AHU's/EF's at Roof 8/13Aluminum Windows/ StorefrontMasonry - Exterior BrickInstall Brick/Stone at Entrance 7/18Wood Panels (WP)Interior1st Floor Interior Wall Layout (Grid G - East) 5/22Polish Concrete (Grind & First Coat) 5/22Roof Drains 5/22Rough Ductwork 5/22Rough Hydronic 5/22Rough Electrical/Fire Alarm 5/22Rough Fire Sprinkler 5/22Set Door Frames 6/6Misc. Structural Steel Installed 6/6Pour Slab on Deck - NO WORK BELOW 6/11Interior framing 6/6Wall Backing and Blocking 6/12Rough Plumbing (in Wall) 6/13Rough Electrical (In Wall) 6/20Insulation 7/3Hard lid/soffit framing 6/22Rough Temp. Controls/Data/Telecom 6/20Drywall 7/12Tape and Finish 8/13Set Electrical Gear, Panels, switchboards 9/11Bathrooms/Locker RoomsPrime/ First Coat 9/11Grid Ceiling 9/18Finish Electrical/ Drop Light Fixtures 9/25Drop Sprinkler Heads 9/25G/R/D's 9/25Casework Install 10/9Carpet 10/16Above Ceiling Inspections 10/9Drop Ceiling Tiles 10/11Set Doors and Hardware 10/23Final Paint 10/19Base 10/19Pre-Punch 10/31Final Clean 11/15Punch 11/202nd Floor Interior Wall Layout 6/22Interior Framing Critical Walls 6/22Roof Drain Leaders 6/22H1H2H1H2H1H2H12017201820192020City of Englewood - Police HQExhibit A - CMP 100% DD ScheduleProject: COEPHQ - Exhibit A - CMP 100% DD Schedule 10/31/2017Adolfson and Peterson ConstructionCity of Englewood - Police HQ Page 197 of 216
ID Task NameDuration Start Finish303Rough Ductwork12 daysWed 6/27/18Fri 7/13/18304Rough Hydronic12 daysWed 6/27/18Fri 7/13/18305Rough Electrical/Fire Alarm12 daysWed 6/27/18Fri 7/13/18306Rough Fire Sprinkler10 daysWed 6/27/18Wed 7/11/18307Set Door Frames2 daysThu 7/12/18Fri 7/13/18308Misc. Structural Steel Installed - (benches/countertops/breakfast bar)5 daysThu 7/12/18Wed 7/18/18309Interior framing15 daysThu 7/12/18Wed 8/1/18310Wall Backing and Blocking10 daysThu 7/19/18Wed 8/1/18311Rough Plumbing (in Wall)15 daysThu 7/19/18Wed 8/8/18312Rough Electrical (In Wall)15 daysThu 7/19/18Wed 8/8/18313In-wall Inspections2 daysThu 8/9/18Fri 8/10/18314Hard lid/soffit framing10 daysThu 7/19/18Wed 8/1/18315Rough Temp. Controls/Data/Telecom10 daysThu 7/26/18Wed 8/8/18316Insulation 7 daysMon 8/13/18Tue 8/21/18317Drywall15 daysWed 8/15/18Wed 9/5/18318Tape and Finish20 daysWed 8/29/18Wed 9/26/18319Bathrooms/Locker Rooms36 daysThu 8/30/18Fri 10/19/18348Prime/ First Coat10 daysThu 9/27/18Wed 10/10/18349Grid Ceiling15 daysThu 10/4/18Wed 10/24/18350Finish Electrical/ Drop Light Fixtures15 daysThu 10/11/18Wed 10/31/18351Drop Sprinkler Heads 10 daysThu 10/11/18Wed 10/24/18352G/R/D's6 daysThu 10/11/18Thu 10/18/18353Casework Install14 daysThu 10/25/18Wed 11/14/18354Carpet8 daysThu 11/8/18Tue 11/20/18355Rubber Flooring at Workout Room 3 daysWed 11/21/18Tue 11/27/18356Above Ceiling Inspections1 dayThu 10/25/18Thu 10/25/18357Drop Ceiling Tiles6 daysFri 10/26/18Fri 11/2/18358Set Doors and Hardware8 daysFri 11/16/18Thu 11/29/18359Final Paint10 daysWed 11/14/18Thu 11/29/18360Base5 daysWed 11/14/18Tue 11/20/18361Pre-Punch5 daysWed 11/21/18Thu 11/29/18362Final Clean3 daysFri 11/30/18Tue 12/4/18363Punch5 daysWed 12/5/18Tue 12/11/18364Core/Elevator 36 daysThu 4/12/18Fri 6/1/18365Rough Mechanical 10 daysThu 4/12/18Wed 4/25/18366Rough Electrical10 daysThu 4/12/18Wed 4/25/18367Paint Structure/Upper Walls7 daysThu 4/26/18Fri 5/4/18368Install Overhead Doors4 daysMon 5/7/18Thu 5/10/18369Finish Mechanical10 daysFri 5/11/18Thu 5/24/18370Finish Elec.10 daysFri 5/11/18Thu 5/24/18371Final Paint and Touch-up5 daysFri 5/25/18Fri 6/1/18372Sally Port/Holding Cells/CMU Block Area62 daysTue 5/22/18Fri 8/17/18373Mechanical Rough Above Ceiling5 daysTue 5/22/18Tue 5/29/18374Electrical Rough Above Ceiling5 daysTue 5/22/18Tue 5/29/18375Frame Ceiling5 daysWed 5/30/18Tue 6/5/18376Drywall/Tape and Finish15 daysWed 6/6/18Tue 6/26/18377Block Fill and First Coat4 daysWed 6/27/18Mon 7/2/18378Paint Ceiling4 daysWed 6/27/18Mon 7/2/18379Install Lights and trim7 daysTue 7/3/18Thu 7/12/18380Seal Concrete2 daysFri 7/13/18Mon 7/16/18381Set Plumbing Fixtures4 daysTue 7/17/18Fri 7/20/18382Bathroom Accessories4 daysMon 7/23/18Thu 7/26/18383Hang Doors Hardware4 daysFri 8/10/18Wed 8/15/18384Paint Touch-Up2 daysThu 8/16/18Fri 8/17/18385Site Work - Phase 148 daysWed 8/15/18Mon 10/22/18386Set Generator/ATS2 daysThu 9/6/18Fri 9/7/18387Grade For Curb and Gutter/Sidewalks8 daysWed 8/15/18Fri 8/24/18388Install Irrigation sleeves4 daysMon 8/27/18Thu 8/30/18389Curb and Gutter F/P/F9 daysFri 8/31/18Thu 9/13/18390Asphalt Patch Back4 daysFri 9/14/18Wed 9/19/18391Underground Electrical 10 daysFri 9/14/18Thu 9/27/18392Grade for Sidewalks/Drives/Pre-Grade for Rain gardens3 daysMon 8/27/18Wed 8/29/18393Sidewalks/Drives F/P/F10 daysThu 8/30/18Thu 9/13/18Rough Ductwork 6/27Rough Hydronic 6/27Rough Electrical/Fire Alarm 6/27Rough Fire Sprinkler 6/27Set Door Frames 7/12Misc. Structural Steel Installed - (benches/countertops/breakfast bar) 7/12Interior framing 7/12Wall Backing and Blocking 7/19Rough Plumbing (in Wall) 7/19Rough Electrical (In Wall) 7/19In-wall Inspections 8/9Hard lid/soffit framing 7/19Rough Temp. Controls/Data/Telecom 7/26Insulation 8/13Drywall 8/15Tape and Finish 8/29Bathrooms/Locker RoomsPrime/ First Coat 9/27Grid Ceiling 10/4Finish Electrical/ Drop Light Fixtures 10/11Drop Sprinkler Heads 10/11G/R/D's 10/11Casework Install 10/25Carpet 11/8Rubber Flooring at Workout Room 11/21Above Ceiling Inspections 10/25Drop Ceiling Tiles 10/26Set Doors and Hardware 11/16Final Paint 11/14Base 11/14Pre-Punch 11/21Final Clean 11/30Punch 12/5Core/Elevator Rough Mechanical 4/12Rough Electrical 4/12Paint Structure/Upper Walls 4/26Install Overhead Doors 5/7Finish Mechanical 5/11Finish Elec. 5/11Final Paint and Touch-up 5/25Sally Port/Holding Cells/CMU Block AreaMechanical Rough Above Ceiling 5/22Electrical Rough Above Ceiling 5/22Frame Ceiling 5/30Drywall/Tape and Finish 6/6Block Fill and First Coat 6/27Paint Ceiling 6/27Install Lights and trim 7/3Seal Concrete 7/13Set Plumbing Fixtures 7/17Bathroom Accessories 7/23Hang Doors Hardware 8/10Paint Touch-Up 8/16Site Work - Phase 1Set Generator/ATS 9/6Grade For Curb and Gutter/Sidewalks 8/15Install Irrigation sleeves 8/27Curb and Gutter F/P/F 8/31Asphalt Patch Back 9/14Underground Electrical 9/14Grade for Sidewalks/Drives/Pre-Grade for Rain gardens 8/27Sidewalks/Drives F/P/F 8/30H1H2H1H2H1H2H12017201820192020City of Englewood - Police HQExhibit A - CMP 100% DD ScheduleProject: COEPHQ - Exhibit A - CMP 100% DD Schedule 10/31/2017Adolfson and Peterson ConstructionCity of Englewood - Police HQ Page 198 of 216
ID Task NameDuration Start Finish394Install Rain Garden - Memebrane, Filter Medium, Growing Medium10 daysFri 9/14/18Thu 9/27/18395Irrigation5 daysFri 9/28/18Thu 10/4/18396Misc. Site Furnishings5 daysFri 10/5/18Thu 10/11/18397Sod (weather dependent) 5 daysFri 10/12/18Thu 10/18/18398Site signage / Striping2 daysFri 10/19/18Mon 10/22/18399Pre-Occupancy15 daysWed 12/5/18Thu 12/27/18400Mechanical Start Up5 daysWed 12/5/18Tue 12/11/18401Test and Balance10 daysWed 12/12/18Thu 12/27/18402Final Inspections - Certificate of Occupancy11 daysWed 12/12/18Fri 12/28/18403Plumbing Final1 dayWed 12/12/18Wed 12/12/18404Electrical Final 1 dayWed 12/12/18Wed 12/12/18405Fire Dept. Final 1 dayWed 12/12/18Wed 12/12/18406Building Final CO1 dayFri 12/28/18Fri 12/28/18407Substantial Completion0 daysFri 12/28/18Fri 12/28/18408Owner Move-In15 daysMon 12/31/18Fri 1/18/19409Parking Lot Construction - Phase II115 daysFri 1/18/19Fri 6/28/19410Abatement (By Owner)0 daysFri 1/18/19Fri 1/18/19415Owner Moved Out of Existing Building0 daysFri 1/18/19Fri 1/18/19416Demo / Protection5 daysMon 1/21/19Fri 1/25/19417Pre-Demo Certifications (CFC, Ballasts, Refrigerants, etc) 5 daysMon 1/21/19Fri 1/25/19418Utilities Safe Off and Disconnect38 daysMon 1/21/19Wed 3/13/19419 Disconnect Qwest / Cable Service (Qwest / ???)5 daysMon 1/21/19Fri 1/25/19420 Disconnect of Building Water (Denver Water/Englewood)5 daysMon 1/21/19Fri 1/25/19421 Disconnect of Building Gas (XCEL)5 daysMon 1/21/19Fri 1/25/19422 Disconnect of Building Electric (XCEL)5 daysMon 1/21/19Fri 1/25/19423 Disconnect of Building Fiber Optics?5 daysMon 1/21/19Fri 1/25/19424 Disconnect of Sanitary Sewer System Cap and Plug5 daysMon 1/21/19Fri 1/25/19425Install Perimeter Fence2 daysMon 1/21/19Tue 1/22/19426Erosion Control/Tracking Pad(s)3 daysMon 1/21/19Wed 1/23/19427Tree / Structure Protection2 daysMon 1/21/19Tue 1/22/19428All Utilities Disconnected 0 daysFri 1/25/19Fri 1/25/19429Demo Permit (By Demo sub)0 daysFri 1/25/19Fri 1/25/19430Demo of Building/Foundations20 daysMon 1/28/19Fri 2/22/19431Backfill / Compact to subgrade at demoed Foundations3 daysMon 2/25/19Wed 2/27/19432Fire Station Patch Back Masonry 10 daysThu 2/28/19Wed 3/13/19433 Earthwork2 daysThu 2/28/19Fri 3/1/19434Earthwork - Overlot & Grade Site2 daysThu 2/28/19Fri 3/1/19435Drilled Piers20 daysMon 3/4/19Fri 3/29/19436Drilled Piers20 daysMon 3/4/19Fri 3/29/19437Utilities 22 daysThu 3/21/19Fri 4/19/19438Install Storm Water Detention System 10 daysThu 3/21/19Wed 4/3/19439Install Storm Water Lines 5 daysThu 4/4/19Wed 4/10/19440Underground Electrical 7 daysThu 4/11/19Fri 4/19/19441Car Port Structure27 daysMon 4/1/19Tue 5/7/19442Install Car Port Structure20 daysMon 4/1/19Fri 4/26/19443Install Car Port Lighting7 daysMon 4/29/19Tue 5/7/19444SiteWork 78 daysMon 3/4/19Wed 6/19/19445Street Work 15 daysMon 3/4/19Fri 3/22/19446Grade for C&G/Sidewalks7 daysMon 4/29/19Tue 5/7/19447C&G @ Parking Lot10 daysWed 5/8/19Tue 5/21/19448Fencing 15 daysMon 4/29/19Fri 5/17/19449Asphalt Paving 10 daysWed 5/22/19Tue 6/4/19450Striping/Signage3 daysWed 6/5/19Fri 6/7/19451Irrigation 5 daysWed 6/5/19Tue 6/11/19452Planting 6 daysWed 6/12/19Wed 6/19/19453Closeout 7 daysThu 6/20/19Fri 6/28/19454Exterior Punch 5 daysThu 6/20/19Wed 6/26/19455Final Inspections2 daysThu 6/27/19Fri 6/28/19456Substantial Completion 0 daysFri 6/28/19Fri 6/28/19Install Rain Garden - Memebrane, Filter Medium, Growing Medium 9/14Irrigation 9/28Misc. Site Furnishings 10/5Sod (weather dependent) 10/12Site signage / Striping 10/19Pre-OccupancyMechanical Start Up 12/5Test and Balance 12/12Final Inspections - Certificate of OccupancyPlumbing Final 12/12Electrical Final 12/12Fire Dept. Final 12/12Building Final CO 12/28Substantial Completion 12/28Owner Move-In 12/31Parking Lot Construction - Phase IIAbatement (By Owner) 1/18Owner Moved Out of Existing Building 1/18Demo / ProtectionPre-Demo Certifications (CFC, Ballasts, Refrigerants, etc) 1/21Utilities Safe Off and Disconnect Disconnect Qwest / Cable Service (Qwest / ???) 1/21 Disconnect of Building Water (Denver Water/Englewood) 1/21 Disconnect of Building Gas (XCEL) 1/21 Disconnect of Building Electric (XCEL) 1/21 Disconnect of Building Fiber Optics? 1/21 Disconnect of Sanitary Sewer System Cap and Plug 1/21Install Perimeter Fence 1/21Erosion Control/Tracking Pad(s) 1/21Tree / Structure Protection 1/21All Utilities Disconnected 1/25Demo Permit (By Demo sub) 1/25Demo of Building/Foundations 1/28Backfill / Compact to subgrade at demoed Foundations 2/25Fire Station Patch Back Masonry 2/28 EarthworkEarthwork - Overlot & Grade Site 2/28Drilled PiersDrilled Piers 3/4Utilities Install Storm Water Detention System 3/21Install Storm Water Lines 4/4Underground Electrical 4/11Car Port StructureInstall Car Port Structure 4/1Install Car Port Lighting 4/29SiteWork Street Work 3/4Grade for C&G/Sidewalks 4/29C&G @ Parking Lot 5/8Fencing 4/29Asphalt Paving 5/22Striping/Signage 6/5Irrigation 6/5Planting 6/12Closeout Exterior Punch 6/20Final Inspections 6/27Substantial Completion 6/28H1H2H1H2H1H2H12017201820192020City of Englewood - Police HQExhibit A - CMP 100% DD ScheduleProject: COEPHQ - Exhibit A - CMP 100% DD Schedule 10/31/2017Adolfson and Peterson ConstructionCity of Englewood - Police HQ Page 199 of 216
37-17244-00 09.15.17
ENGLEWOOD POLICE HEADQUARTERS
EMPLOYEE BREAK AREA
PUBLIC PLAZA
Page 200 of 216
37-17244-00 09.15.17
ENGLEWOOD POLICE HEADQUARTERS
EXTERIOR
Page 201 of 216
UPREF.ABCA B
C
UP
UP
EXISTING FIRE STATION:
TO REMAIN
PUBLIC ENTRY
PUBLIC PLAZA
SALLYPORT
ENTRY
SALLYPORT
EXIT
W. ITHACA AVEW. JEFFERSON AVES. FOX ST.
S. ELATI ST.ONE WAY TRAFFIC
37-17244-00 09.15.17
ENGLEWOOD POLICE HEADQUARTERS
NORTH
SCALE: 1/16" = 1'-0"
SITE PLAN - LEVEL 01
Page 202 of 216
ABCA B
C
DN
UP
EXISTING FIRE STATION:
TO REMAIN
PUBLIC PLAZA W. ITHACA AVEW. JEFFERSON AVES. FOX ST.
S. ELATI ST.ONE WAY TRAFFIC
37-17244-00 09.15.17
ENGLEWOOD POLICE HEADQUARTERS
NORTH
SCALE: 1/16" = 1'-0"
SITE PLAN - LEVEL 02
Page 203 of 216
37-17244-00 09.15.17
ENGLEWOOD POLICE HEADQUARTERS
FRONT EXTERIOR BACK EXTERIOR
PUBLIC LOBBYEMPLOYEE BREAK AREA
Page 204 of 216
COUNCIL
COMMUNICATION
TO: Mayor and Council
FROM: Dorothy Hargrove
DEPARTMENT: Parks, Recreation & Library
DATE: November 6, 2017
SUBJECT: Motion to Issue an RFP for golf course management lease
DESCRIPTION:
Motion to Issue an RFP for golf course management lease
RECOMMENDATION:
Staff recommends that Council approve, by motion, the issuance of a Request for Proposals for
a long-term management lease for Broken Tee Golf Course.
PREVIOUS COUNCIL ACTION:
Council discussed the issuance of a Request for Proposals at their October 23, 2017 Study
Session and agreed, by consensus, to consider a motion to proceed at the next regular
meeting, November 6, 2017. Additional information was provided in response to questions
arising from that discussion.
SUMMARY:
Throughout this year’s continuing budget discussions Council expressed a desire to proactively
address the long term fiscal sustainability of city services and the need for continued investment
in infrastructure and facilities. In light of these concerns we request your consideration of
possible management changes at the Broken Tee Golf Course.
The current golf management team has done an outstanding job of providing a positive golfing
experience for the community. Broken Tee has been recognized as one of the best local
municipal golf courses and is a valuable asset for Englewood. Revenues and expenses have
been relatively stable for the last several years, allowing us to save roughly $690,000 in the Golf
Course Fund Balance.
This apparent stability, however, masks some underlying problems. Major capital projects
including course improvements, equipment purchases, facility upgrades, and an irrigation
system replacement, have been continually deferred to remain solvent. The estimated backlog
of capital needs in the next 3-5 years exceeds $1.5 million.
In addition, the City subsidizes the Golf Course Fund by providing administrative support worth
approximately $95,000 each year. The Fund has only returned money to General Fund
operations once in the last 5 years ($63,000 in 2014.)
Page 205 of 216
Our fees are already in line with the highly competitive local market and raising prices could
drive customers away. Revenues are also subject to the vagaries of the weather. Thus, revenue
increases alone would not make a significant difference.
Mandated increases in the minimum wage are putting added pressure on our personnel costs.
Commodity and contractual expenses continue to grow. Unfortunately, we have high fixed
costs, notably the annual debt service of roughly $210,000. The amount of expense reductions
wouldn’t be significant enough in the long-term to help with creating a more sustainable
operation.
In short, the Broken Tee operation as currently structured is not sustainable and the City risks
the need to further subsidize the course at some point in the future.
ANALYSIS:
After considering a variety of options, we are recommending that Council consider issuance of a
Request for Proposals for a long-term management lease for Broken Tee.
It is important to note that it is difficult to determine the feasibility and cost-effectiveness of any
potential partnership without considering more specific proposals. Prior to committing to a
concrete direction, staff recommends that the City issue a Request for Proposal in order to
gather necessary information from the marketplace. An open, transparent process is critical to
gathering this information and determining if a proposal meets all needs of the City and
community.
The attached Request for Proposal specifies that a successful management entity would
function as a partner with the City of Englewood in order to:
- Provide a high-quality, affordable and accessible golf experience for our community
- Sustain the value of our capital assets
- Allow the City to benefit from possible increased revenue
- Reduce expenses and financial risk to the City
Key provisions include requirements that any prospective operator meet high standards for
experience and professional qualifications, demonstrate financial stability, and provide a
detailed business plan outlining payments to the City and plans for capital improvements. At a
minimum, any lessee must pay the city $250,000 annually to cover debt service and associated
costs. All current memberships and passes will be honored and community partnerships
maintained or expanded. Ongoing oversight will ensure accountability.
Should Council concur that a long-term management lease is a reasonable solution to explore,
next steps in the process should ensure transparency and robust community involvement. We
suggest that a focus group of interested individuals meet with staff to discuss what they feel
would make a lease successful and what concerns they might have about the possible change.
Staff will send a brief online survey, with both selected and open-ended questions, to golf
course users to gather additional input. Feedback from these sources would be made available
to potential management firms to assist them in customizing their proposals to meet the needs
of the community. The RFP contains provisions necessary to ensure robust and continuing
oversight, both in terms of financial performance and customer satisfaction.
Page 206 of 216
Staff will forward all valid proposals to a Review Committee appointed by the City Manager and
composed of a Council member, community representatives, staff, and industry experts. This
committee will analyze proposals, coordinate public presentations by interested firms, and make
a recommendation to staff to proceed with contract deliberations if any proposal meets the
City's needs. Staff will forward to Council any proposed contract for consideration. In order to
provide sufficient time to gather community input and carefully analyze proposals we anticipate
that the earliest date that any possible contract would go to Council for deliberation would be
March, 2018.
Analysis of any proposals received in this process will provide the information necessary to
make decisions about the long-term success of Broken Tee. Thank you for your consideration.
FINANCIAL IMPLICATIONS:
At a minimum, any lessee must pay the city $250,000 annually to cover debt service and
associated costs. There is no direct cost associated with the issuance or review of the Request
for Proposals.
ALTERNATIVES:
CONCLUSION:
Staff recommends that Council approve the issuance of a Request for Proposals for a long-term
management lease for the golf course. The information gathered through this process will
provide realistic, market-based data to evaluate possible alternatives for the long-term
sustainability of Broken Tee.
ATTACHMENTS:
Request for Proposals (RFP) City of Englewood, Colorado, Broken Tee Golf Course,
Management Lease
Page 207 of 216
City of Englewood, Colorado
Broken Tee Golf Course
Management Lease
Request for Proposals (RFP)
RFP Issue Date: xxx xx, 2017
Page 208 of 216
City of Englewood, Colorado- Request for Proposal – Management Lease - October, 2017 Page 2 of 9
REQUEST FOR PROPOSAL (RFP)
Purpose of RFP: The City of Englewood is seeking proposals from qualified individuals, corporations,
partnerships and other business entities authorized to do business in the State of Colorado for the purpose
of granting a management lease to operate the Broken Tee Golf Course.
RFP Description: Management services to include operations of the golf course, driving range, practice
facilities, club house, pro shop, concessions, and restaurant. Proposed lease term and conditions. The
maximum length of any proposed lease cannot exceed 20 years and the City prefers a minimum 5 year
term. The proposal shall include an annual payment to the City of Englewood that must at minimum
cover the City’s established debt service for the facility and related expenses
Project Manager and Contact: Dorothy Hargrove
Director – Parks, Recreation and Library Services
City of Englewood
1155 West Oxford Avenue
Englewood, CO 80110
303-762-2553
Site Visit and Pre-Proposal Conference:The City will hold a mandatory Site Visit and Pre-
proposal Conference at 9:00 a.m. on xxx xx, 2017 at Broken Tee Golf Course to provide all prospective
applicants sufficient information and understanding of the City’s facility, scope of operations and
expectations for successful management. ALL QUESTIONS REGARDING CLARIFICATION OF
THIS REQUEST TO BE ADDRESSED AT THE PRE-PROPOSAL CONFERENCE MUST BE
SUBMITTED IN WRITING BY EITHER E-MAIL OR FAX), TO THE CITY PRIOR TO 5:00
P.M. ON XXX XX, 2017. Impromptu questions will be permitted and spontaneous unofficial answers
provided, however bidders should clearly understand that the only official answer or position of the City
will be in writing, and posted to bid net for all prospective applicants identical information.
Submission of Proposals, and Due Date & Time: To be considered, submissions must be received as
follows:
One original and five (5) hard copies of the proposal must be submitted by mail or by hand
submission in a sealed envelope and received by the Finance and Administrative Services (FAS)
office by 4:00 pm on xxx xx, 2017. The address is:
Finance and Administrative Services, 3rd Floor
City of Englewood
1000 Englewood Parkway
Englewood, CO 80110.
One digital copy must be submitted via email or a cloud-based system, such as Dropbox or
Google drive, no later than 5:00 pm on xxx xx, 2017. Questions concerning submission of
digital copy may be made to eboyd@englewoodco.gov.
Pre-proposal Questions and Addenda: Submit all inquiries, suggestions, or requests concerning
interpretation, clarification or additional information pertaining to this RFP in writing or email through
the FAS office no later than Wednesday, xxx xx, 2017. The issuance of a written addendum by the FAS
office is the only official method whereby interpretation, clarification or additional information can be
Page 209 of 216
City of Englewood, Colorado- Request for Proposal – Management Lease - October, 2017 Page 3 of 9
given. The City shall not be responsible for oral interpretations given by any City employee,
representative or agent.
Any and all addenda to this RFP will be provided on bid net as an addenda, no later than xxx xx, 2017.
Communication is prohibited between the bidders, their employees, representatives, or agents, and any
City employee, representative, or agent, other than as stated above, regarding this Request except with
designated participants in attendance ONLY DURING:
The Pre-Proposal Conference
Negotiations
Contract Signing
As otherwise specified in this Request.
Violations of this provision by a bidder or City personnel may result in the rejection of the
proposal.
Project Background and Anticipated Goals
Broken Tee Golf Course is located at 2101 West Oxford Avenue in Sheridan, Colorado. The course is just
west of the intersection of Santa Fe Drive and Oxford Avenue, within the city limits of Sheridan but
owned and operated by the City of Englewood, and it serves customers throughout the Denver metro area
The course includes a championship 18-hole course with Dye design front 9, a Par 3 course, driving
range, and excellent practice areas. Originally built in 1977, renovated in 1995 and again in 2008, the
combined courses include approximately 100 acres. The Broken Tee was included in the 2017 Colorado
Avid Golfer CAGGY awards as staff pick for Best Practice Facility, Best Course for Families, and Best
Course for Seniors. Broken Tee has averaged 40,000 total rounds on the championship course and
20,000 rounds on the Par 3 course per year. There are 4 operational wells which provide adequate water
for course maintenance and 2 additional wells could be added if necessary. The original 1977 irrigation
system on the back 9 is still in use while other irrigation areas have been upgraded in renovations. The
facility to be operated includes:
3,914 square foot club house built in 1982 and last renovated in 1995
Restaurant with seating for 85 people
Bar,
Pro shop,
Meeting room,
Banquet room,
Learning Center of 1,625 square feet
Staff offices
Maintenance facility includes a 9,415 square foot office and meeting space, maintenance and
storage sheds
Possible capital challenges include aging irrigation infrastructure, bunker improvements,
clubhouse and restaurant upgrades, and updates to the driving range conveyor and lighting.
I. RESPONSES TO THIS REQUEST
A. Definitions
City: The City of Englewood, Colorado
Project Team: Designated staff from the City of Englewood, including the City Manager and
Director of Parks, Recreation and Library Services
Page 210 of 216
City of Englewood, Colorado- Request for Proposal – Management Lease - October, 2017 Page 4 of 9
Applicant: Firm submitting proposal
B. Scope of Services The successful applicant will provide a Response to this Request that illustrates an
understanding that successful management shall include serving in partnership with the City of
Englewood in its desire to provide a high-quality, affordable, family-oriented golf experience for the
benefit of the entire Englewood community and ensure the long term sustainability of the course and
facilities.
C. Operational Elements to be Addressed The Applicant shall at a minimum provide the following
scope of services:
1. Manage operations of the golf course, driving range, practice facilities, club house, pro shop,
concessions, restaurant and bar in accordance with industry best practices
2. Keep the Golf Course and practice area open for play during a published schedule approved by
the Director – Parks, Recreation and Library Services
3. Maintain excellent course conditions
4. Maintain all buildings, property/equipment and facilities
5. Prepare and implement an annual budget and an annual financial report to the City
6. Provide quarterly review of operations with the designated oversight agent of the City
7. As the successful applicant will not be operating as part of the City’s operational format, but as an
independent contractor, the applicant shall provide information regarding the necessary business
systems to be developed and implemented for use in management of the golf course, including
but not limited to: efficient purchasing processes, scheduling tee times, tournament management,
asset inventories, and collection and accounting of fees, merchandising and supply management.
This plan should also indicate intent to operate or outsource to a sub-lessee any component parts
of the golf course or its facilities, including but not limited to: restaurant, bar, pro shop, banquet
room learning center, maintenance, and golf lessons.
8. Recruit, hire, train and evaluate employees in accordance with all applicable local, state and
federal regulations
9. Operate and maintain a fleet of golf carts adequate to accommodate the demand for public rental
10. Maintain all required licenses, permits, and certifications for operation
11. Actively market the golf course throughout the region. Branding should include reference to the
City of Englewood, Colorado
12. Maintain adequate insurance
13. Pay all utilities and applicable taxes
14. Assume existing agreements for leagues, memberships, community tournaments, and honor
existing passes and coupons.
D. Position Statements Applicants should provide position statements that will address the following
areas of interest:
1. Describe goals and overall approach to successful operation of public golf facilities
2. Provide detailed a description of past experience in public golf facility management
3. Describe business practices, budget development methodology and financial accounting
processes
4. Explain philosophy and methods for evaluating services and measuring success
5. Describe preferred marketing strategies
6. Describe capital improvements deemed necessary to the long-term success of the golf course,
including plans to address irrigation and well improvements
7. Describe changes, if any, you plan to make at the golf course to maintain or increase usage and
Page 211 of 216
City of Englewood, Colorado- Request for Proposal – Management Lease - October, 2017 Page 5 of 9
advance the image of the course throughout the community
8. Describe plans to maintain and develop community partnerships and to support a robust youth
golf program
9. Explain proposed development of fee structure, including resident discounts, play and
membership incentives
10. Describe best practices for course marshalling, managing pace of play and tournament
management
11. Describe key elements in successful restaurant and bar management
12. Describe key elements in successful pro shop and concessions management
E. Subcontractors A list of those areas of the facility for which Applicant anticipates utilizing a
subcontractor, and a list of all subcontractors under consideration by Applicant for providing services
under this Proposal.
F. Business Plan The applicant shall submit a 5-year business plan that shall at a minimum include:
1. Proposed lease term and conditions. The maximum length of any proposed lease cannot exceed
20 years and the City prefers a minimum 5 year term.
2. Proposed pro-forma operating budget showing income from all sources and anticipated expenses
3. A detailed plan to cover expected capital expenses
4. A minimum of $250,000 annual payment to the City of Englewood to cover debt service and
related expenses.
5. Fee structure development, of Green Fees and Annual Memberships including an overview of
any planned changes to golf rates and when they will take effect.
6. Establishment of discount programs, play and membership incentives.
7. Plans to maintain equipment and systems owned by the City, including irrigation, to the
manufacturer’s standards over the term of the contract.
G. Experience The successful applicant will provide the following information:
1. Detailed evidence of qualifications and financial ability to enter into a long term management
lease for Broken Tee Golf course, including at least 5 years’ experience in golf course
management of facilities of at least similar size
2. Resumes of key individuals within applicant’s organization, including CEO.
3. Contact information of at least 3 recent professional references.
H. Parking Lot and Adjacent Facilities Access The applicant shall provide access from dawn to dusk
throughout the year to the adjacent River Run Trailhead and recreational access to the South Platte
River. The City of Englewood will maintain the parking lot to current standards but will require the
Golf Course applicant to provide snow removal as needed.
II. SUBMITTAL REQUIREMENTS
Proposals shall be relevant and concise and include reference to examples of previous experience in
management of similar facilities. Proposals shall address the following sections in order. The following
information is anticipated to be concise and complete.
a)Cover Letter
b)Position Statements
c)Subcontractors, if any
Page 212 of 216
City of Englewood, Colorado- Request for Proposal – Management Lease - October, 2017 Page 6 of 9
d)Business Plan and Approach (including anticipated range of user fees, lease terms
including a capital improvement plan)
e)Insurance Coverage in amount of $1 million, with $2 million aggregate and
naming City as additional insured
f)Legal Actions or Lawsuits (last five years)
g)Firm’s qualifications/experience and Client References
h)Signatures
Proprietary data or trade secrets should be clearly identified as such in your proposal in
conformance with Colorado Open Records Act, C.R.S. 24-72-200.1 et seq., and specifically C.R.S.
24-72-204(3)(a)(IV) (xxx xx, 2017).
III. TERMS AND CONDITIONS OF RFP
A.Proposal Terms: Each proposal shall give the complete mailing address of the Applicant and
be signed by an authorized representative by original signature with his or her name and legal
title typed below the signature line. The cost of developing and submitting the proposal is
entirely the responsibility of the Applicant. This includes costs to determine the Applicant’s
method of meeting the terms of this Request, preparation of the proposal, submitting the proposal,
negotiating for the contract and other costs associated with this Request.
B.Proposal Errors: The City has the right to rely on any financial data provided by Applicant.
The Applicant shall be responsible for any mathematical error in financial data. The City
reserves the right to reject proposals, which contain errors.
C.Late Proposals: Bids that are received after the bid deadline time and date shall be disqualified
from consideration. Accordingly, Applicants who are mailing their proposals should allow for
normal mail delivery time to ensure timely receipt by the City. Late technical and/or cost
proposals will be marked as such, retained unopened in the file and not receive consideration.
D.Altering Proposals: A Applicant may modify a proposal by letter or by personal delivery to
City Clerk at any time prior to the closing date and time for receipt of proposals.
E.Withdrawal of Proposal: A proposal may be withdrawn on written request from the Applicant
to the City’s contact person prior to the closing date.
F.Conditional Proposals: Conditional proposals shall be rejected as non-responsive.
G.Proposal Ownership & Additional Information: All proposals and accompanying
documentation shall become the property of the City. Submission of a proposal constitutes
Applicant’s acceptance of the procedures, evaluation criteria and RFP instructions. The City
reserves the right to solicit additional information or proposal clarification from anyone
submitting a proposal, should the City deem such information necessary. All drawings submitted
to City become the property of the City.
H.Sales/Use Tax: Applicant should anticipate payment of all applicable local, State and Federal tax
associated with the services provided by the Broken Tee Golf Course.
Page 213 of 216
City of Englewood, Colorado- Request for Proposal – Management Lease - October, 2017 Page 7 of 9
I.Conflict Of Interest: No City official or employee shall have a fiduciary or other interest in the
contract.
J.Ethics: The Applicant shall not offer or accept gifts of value nor enter into any business
arrangement with any employee, official or agent of the City. A proposal shall not be considered
for award if the price in the proposal was not arrived at independently and without collusion,
consultation, communication or agreement as to any matter related to price with any other
Applicant, competitor, or City employee.
K.Addenda: Any interpretations, corrections, or changes to the RFP will be made by addenda, and
posted to bid net. The City reserves the right to amend this Request prior to the due date of
Responses. If it becomes necessary to revise any part of this Request, an Addendum shall be
provided to all potential Applicants who have requested a copy of this Request. Applicants shall
acknowledge receipt of all addenda. Failure to acknowledge Addenda may be grounds for
disqualification of the proposal. Sole issuing authority of addenda shall be the City’s Project
Manager. Addenda will be emailed to all who are known to have received a copy of this RFP.
L.Law Compliance: Proposals must comply with all federal, state, county and local laws
concerning this type of service.
M.Required Documentation: The Applicant shall provide all documentation required by this RFP.
Failure to provide this information may result in rejection of the Applicant’s proposal.
N.Indemnification: Applicant should incorporate into its proposal that it will, to the fullest extent
permitted by law, hold harmless, defend at its own expense, and indemnify the City of
Englewood, their officers, officials, employees, and volunteers, against any and all liability,
claims, losses, damages, or expenses, including reasonable attorney’s fees, arising from all acts or
omissions to act of Applicant, its contractors, subcontractors, or its officers, agents, or employees
in rendering services arising out of this RFP and its subsequent contract.
O.Insurance: Applicant shall procure and maintain for the duration of the contract, insurance
against claims for injuries to persons or damages to property which may arise from or in
connection with the performance of the work hereunder by the Applicant, its agents,
representatives, or employees.
P.Proposal Submission: Proposals shall be submitted in paper format including an original and
five copies, and one digital copy. The original and each copy shall include a tabbed index and
page numbers. The original must be clearly marked and contain an original signature. Failure to
clearly mark the original and provide an original signature may result in a proposal being found
non-responsive, and given no consideration.
Q.State Law Governance: Any Agreement issued as a result of this RFP shall be governed by and
construed in accordance with the laws of the State of Colorado.
IV.SELECTION PROCESS & EVALUATION CRITERIA
A.Staff Review – A committee composed of the Director of Parks, Recreation and Library, a
member of Finance and Administrative Services Department, a member of the City Attorney’s
office, and additional staff members appointed by the City Manager shall initially review each
Page 214 of 216
City of Englewood, Colorado- Request for Proposal – Management Lease - October, 2017 Page 8 of 9
proposal. Only those complete proposals which meet all the terms and conditions of the RFP will
be forwarded to a community Review Committee.
B.Review Committee: A Review Committee that will include community representatives, staff,
and other designated officials, will evaluate all valid proposals and make recommendations to the
City Council. The City Council will make the final determination and reserves the right to award
this proposal to the entity considered most qualified based upon a combination of factors
including, but not limited to the following:
1. Price offered for the annual lease agreement
2. Compliance with required qualifications
3. Completeness of the proposal
4. Financial strength and capacity of the applicant
5. Demonstrated understanding of local conditions and markets
6. Alignment with the overall goals of the City to provide affordable, high quality recreational
experiences for its citizens and the surrounding community
7. Any additional factors deemed reasonable and in the City’s best interest
C.Mandatory Interviews: In-person interviews and/or presentations to the Review Committee
and interested members of the public will be required on xxx xx, 2017. Exact times and venue
shall be determined solely by the City.
D.Elements of Decision The City reserves the right to accept or reject any or all proposals or part
of a proposal; to waive any informalities or technicalities; clarify any ambiguities in proposals;
modify any criteria in this Request; and unless otherwise specified, to accept any item in a
proposal. The City reserves the right to award the proposal to the firm deemed to be in the best
interest of the City. The City will accept the proposal that, in its best judgment, will provide the
best partnership with the City, best meet the City’s recreational goals for the facility, and provide
the greatest financial benefit to the City.
V.AWARD NOTIFICATION
A.Award Notification: The City will notify all Applicants in writing within five business days
after selection of the proposal.
B.Negotiation: Contract Award is subject to the successful negotiation of an agreement covering
both services and revenue to the City, and the vote of the City Council to approve and authorize
execution of an agreement document. Although negotiable, the City is interested in a 5 to 20 year
lease agreement, subject to annual approval conditions.
C.Open Records Act (C.R.S. 24-72-200.1 et seq.): All proposals become the property of the City.
All information contained in proposals will become open for public review once a contract is
signed or all proposals are rejected.
VI.CONTRACT AWARD
The successful Applicant will be required to enter into a formal contract that is acceptable to the City
within thirty (30) days of City accepting the proposal. Special Provisions within the agreement allow for
Page 215 of 216
City of Englewood, Colorado- Request for Proposal – Management Lease - October, 2017 Page 9 of 9
the addition of attachments, amendments, and special conditions that may be negotiated by the successful
Applicant and the City. This RFP and the Applicant’s Response to this RFP shall be included as a legal
part of the agreement. In the absence of any language to the contrary, this Request will be the
determining document in questions of compliance with the specifications for this project.
A. Contract Formation: No contract shall be considered to have been entered into by the City until
all legally required signatures, bonds, proof of insurance, and certifications have been rendered,
and the successful Applicant (Licensee) and the City have signed a written contract.
B.The City will require the following concepts to be part of the negotiated agreement:
1.Termination for Public Convenience: In addition to other termination clauses, specific
text shall be included in conformance with TABOR to allow the City to terminate the
agreement for public convenience. The composition of the text shall take into
consideration and establish compensation for repayment of any infrastructure costs,
including any fixed equipment or facility enhancements as Capital Investment made by
the Licensee as of the date of the termination.
2.Disclosure of Ownership and any change to ownership in excess of 10% of the rights of
the Licensee during the term of the contract.
3.Written and fully Executed Amendments required. No change to the terms of the
agreement shall be enforceable or effected unless the change has been presented in
writing, considered by the City, and a written addendum to the agreement executed by
both parties has been completed.
4.Prohibition of any assignment, pledging, transferring or encumbrance of any
interest that is the responsibility of, or income due to the Licensee in performance of
this agreement. Termination of this contract by the City shall be automatic and
irrevocable upon such action by the Licensee.
5.Performance bond. A performance bond to cover the operational expenses of the course
for a one year period. This bond shall be renewed on annual basis during the term of the
contract.
Page 216 of 216