HomeMy WebLinkAbout1981 Ordinance No. 013• I
•
•
•
• •
ORDINANCE NO. 13
SERIES OF 198 1
BY AUTHORITY
COUNCIL BILL NO. 10
INTRODUCED BY COUNCIL
MEMBER FITZPATRICK
AN ORDINANCE APPROVING AN AGREEMENT BETWEEN THE CITY OF ENGLEWOOD,
COLORADO, AND THE REGIONAL TRANSPORTATION DISTRICT APPROVING A
GRANT UNDER THE REGIONAL AID URBAN SYSTEM APPLICATIONS FOR
I STALLATION OF CONCRETE BUS PAD ALO NG SOUTH SIDE OF 100 AND 200
BLOCK OF WEST FLOYD AVENUE.
WHEREAS, the City of Englewood made application to the
Re ional Transportation District for construction improvements
and repairs on Regional Transportation District bus routes; and
WHEREAS , Regional Transportation District approved an
application for improvements and repairs on Regional Transporta-
tion District bus routes.
NOW, THERE FORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE
CITY OF ENGLEWOOD , COLORADO:
Se ction 1. That an agreement between the City of Englewood
and the Region al Tran sportation District, titled "Regional
Transportation District Regional Aid Urban Systems", which
provides for the implementation of transit-related road improve-
ments and a to tal project cost of $20,600, of which the Regional
Transportation District shall pay $18,700, for replacing exist-
ing vertical curb and gutter on the south side of the 100 and
200 Blocks of West Floyd Avenue within the City of Englewood,
Colorado, with a 5-foot wide concrete curb and gutter with
added strength , whereby City shall provide right-of-way, design
construction and engineering services, obtain appraisals and
permits, complete the same and obtain Regional Transportation
District final inspection and written acceptance on or before
December 31, 1981. Thereafter, City shall maintain the improve-
ments and permit Regional Tran sportation District's use of the
aforedescribed improvements without additional cost for a period
of not less than five years, and , in the event the City interrupts,
eliminates or interferes with Regional Transportation District's
use of said improvement, the City shall refund to Regional
Transportation District grant funds received prorated over a
five-year period of time, and whereby the City shall hold harm-
less Regional Transportation Dis trict as a result of performance
of the agreement by the City of Englewood in that the City shall
perform the contract in compliance with all applicable laws . A
copy of said agreement is attached hereto as Exhibit A •
Section 2. That the City Council of the City of Englewood,
Co orado, he r eby a uthoriz es the Mayor of the City of Englewood
and the Director of Finance, ex officio City Clerk-Treasurer,
to set their hands and se al s to the foregoing-d e scribed
instrument for and on be half of the City Council of the City
of Englewood.
Introduced, read in full, and passed on first reading
o t he 5 t h day of January, 1981.
Published as a Bill for an Ordinance on the 7th day
o f. .T d uary , 1981 .
Read by title and passed on final reading on the
19th day of January, 1981.
Pub lished by title as Ordinance No.
1981, on the 21st day of January, 1981.
Attest:
ex
13 , Series of
I, Gary R. Higbee, ex officio City Clerk-Treasurer of
the City of Englewood, Colorado, hereby certify that the above
and foregoing is a true, accurate, and complete copy of the
Ordinance passed on final reading and published by title as
Ordinance No. 13 , Series of 1981.
-2-
.
I • .I
..
REGIONAL TRANSPORTATION DISTRICT
REGI ONA L AID URBAN SYSTEM
AGREEMENT
AGREEMENT made this day of , 1910, by and
between THf CITY OF ENGLEWOOD, hereinafter referred to u "Grantee," and
the Rl!GIONAL TRANSPORTATION DISTRICT, a political aubdivilion of the State
of Colorado, herelnafter referred to u "RTD."
WITNESSETH1
WHl!.R!AS, the RTD hu established a Regional Aid Urban System ("RAUS")
fund for the purpa.e of lmplementlng transit-related roadway lmprovemenu, and
WHER!AS, the Grantee hu filed an application attached hereto marked
!.xhlbit A and incorporated by reference u if fully set forth herel"I and
H!REAS, the Board of Directors of the RTD hu approved the use of RTD
local funds for the Project described ln !xhlbit AJ and
WHEREAS, the parties hereto desire to Implement capital lmprovementa
described herein.
NO , THEREFORE, in c:onalderatlon of the mutual promises contained
her n, and for other good and valuable consideration, the receipt and 1uffidency
of ch are hereby acknowledged, the parties agree as follows:
SECTION ONE
PURPOSE
The purpoM of this Agreement is to uliat the Grantee In implementing the
transit-related road improvement(s) descri bed below (hereinafter aometlmes
referred to u "the Project"). The Grantee, in tum, will carry out the Project ln
IC<:ordance wlth the terms of this Agreement.
:... .. . .
(
---'"'--: --~ .-,.··1 --.
SECTION TW O
THE PROJECT
The Project consbu of conatructlon of a concrete but pad on the south side
of Floyd Avenue, u more particularly described in Exhibit A attached hereto.
SECTION THREI!
THE GRANT
The RTD will provide the Grantee the tot&l cost of the project or EIGHTEEN
THOUSAND SEVEN HUNDRED AND N0/100 DOLLARS ($11,700.00) whichever is
Jess .
.. Where the Grantee performs the Project work through itl own
work force, the RTD wlll provi de the Grant funds on the buls of
lnvoic• received and approved by the RTD for time and materials
expended.
b. Where the Grantee performs the Project work throuah a contrac-
tor, the RTD wW provide the Grant funds on the buls of the contract
award price u may be mocified by~· orders approved by the RTD.
c. Where the Project work ls part of a larger capital lmprovement,
the RTD wW provide the Grant funds on the bull of the unlt prices bid
u part of such larger contract and RTD approval of COits for Items
which may not be identlfied in the larger contrect.
SECTION FOUR
ELIGIBLE COSTS
COits eligible for reimbursement by the RTD under this grant Agreement are
limi ted to the ectua1 cost of design and construction of the approved Project.
SECTION FIVE
GRANTEE REQUIREMENTS
L The Grantee will prepare any necessary right-of-way or other rHI
property acquisition Instruments for the Project.
/
I
,;
)
b.
. . . l
The Grantee will provide design document review, c onstruction inipec-
'neerlng aervices for the Project.
c. The Grantee will obtain any req uired appraisais, permits, and app ro va.ls
and Ube responsible for all ci t izen review nd public agency coordination.
d. T Grantee will maintain the completed Project.
e . The Grantee wilJ conatruct the Project through its own work force or
cause it to be constructed through formall y advertised, free, open, and competitive
bidding, and in .ccord.nce wi th such additional terms and conditions as the RID
may reqwre.
f. To the extent the work to be performed under this Agreement ia
performed by other than the employees of the Grantee or other Goverivnental
entity and the toi.I COit of IUCh work ii ln excess of FIV2 THOUSAND DOLLARS
($,,000.00) the Project Labor Agreement incorporated herein by reference lhall
app Y•
a. Reimbunement by R TD few eligible coa ts is expressly contingent upon
complet on of the work to be perfcwmed under this Agreement on or before
December ll, 1911. Grantee shall obtain the RT011 final inspection and written
concurrence in the acceptance of the completed project improvement on or before
December li, i911 .
S2CTJON SIX
D2SIGN APPROVAL
The Grantee shall obtain the RTD 's written approval of the final design, cost
estimates of rl&ht-of-way or other real property acquisition, and coat estimates of
the im provements to be constructed as part of this Project prior to the commence-
ment of acquisition or construction.
SECTION SEVEN
CONTINUING TRANSPORTATION use
In consideration for this Grant, the Grantee shall permit the RTD free UH of
the improvements funded hereunder for transportation purposes for a period of not
lea than five U) years from the date said im provements are completed and made
availabie for pubHc use. In the event the Grantee interrupts, eliminates, or
Interferes with the RTD's use of u id improvements, the Grantee lhaU immediately
refund to the RTD the fu ll amount of the Grant funds receiv ed hereunder, pro-
r a ted over the f ive-yeu period.
-)-
I ...
~ . .:
SECTION EIGHT
FINAL INSPECTION
The Grantee lh&.l l obtain the RTD's final inspection and written concu rrence
m the ccptance of completed Project improvements.
SECTION NINE
HOLD HARMLESS -RTD NOT LIA&LE
Grantee, •rea to save and hold the RTD h&rmleu frolt) and against ail auitl,
c1alm1, and demands bued upon any aUeged damage to property or any alleged
Injury to perlON (including death) which may occur or be aUeged to have occurred
by or on account of any negligent act or omission on the part of the said Grantee,
1 ts 9Ubcontr.ctor1, or any of their servants, employees, or agents. The Grantee, at
Its own expense, will aettJe or defend any claJma or litigation arill• out of the
performance of this Agreement.
The R TD IMU not be Uable for any damage to the Project lmprovement1
throucf\ the routine use thereof unless caused by the negUgence and/or omwlon of
RTDemploy..._
SECTION TEN
TERMINATION
Either pwty may terminate this Agreement at any time by giving writtSI
notJce specif~ the date of termination, such notice to be given not leu than
ninety (90) days prior to the date therein specified. In the event the Grantee
desires to cancel this Agreement after R TD has expended funds for design, but
before construction has begun, Grantee shall relmbune the RTD for aJ1 design
fundl expended by RTD. ln the event the Grantee desires to cancel thi1 Agreement
after Project construction clarlng the Initial five U) year period, it may do so upon
giving written notice to the RTD, specif ying the date of termination, 1Uch notice
to be given not leu than ninety (90) days prior to the date therein specified. As a
concltion precedent to termination after Project construction, the Grantee shaU
reimbune the RTD for all Grant funds received under this Agreement, pro-rated
over said five-year period.
SECTION f.LEVEN
PROHIBITED INTER~TS
No officer, member, or employee of the RTO, and no members of its
aovemi,. body, and no other public official or employee of the governing body ol
-·-... . . .
. .,
•
•
'
•
'I ,,, ' .. ' ..... ,~·' .-•· ... -.... ! ;:.,,.:, . ..;_.
t i ty or local ities induded wlthin the District, durl g hi !> o:-her tenure or for
o ye r ther&fter, shall have any i nterest, ·rect or indi re , in ~h.i s Agreement, o r
t he proceeds thereof.
SE CTION TWELVE
MJSCELLAN EOUS
1. Notices. Any notice to be given hereunder atWJ be deemed given when
tent by registered or certified mail t o the addresses herein contained of the party
to be notified.
2 . Equ&J Employment Opeortunlty. In connection wi th the performance of .
this A&reement, the Grantee lhaU not discriminate against any employee or
appllc:Mt for e mploym ent becal.De of race, color, religion, sex, national orlgln, age,
marital atatua, being handicapped, a disadvantaged person, or a c:habled or Viet
Nam •a veteran. The Grantee ahall take affirmative action to lnlure that
applicants are employed, and that employees are treated durln& employment
without regerd to their race, color, religion, sex, national orlgln, age, marital
si.tus, belna handicapped, a disadvantaged person, or a claabled or Viet Nam era .
veteran. Such Ktion ahall lndude, but not be limited to, the followlng1 em-
ployment, upsrading, demotion, or transfer; recruitment or recruitment ·
adverUaln&I layoU or termination; ratea of pay or other forma of compenaationa
on for training, lndudln& apprenticeship • .,
, I
J, Agreement Binding. This Agreement shall inure to the benefit of and
be bin upon the successors and assigns of the parties hereto.
•· Lawa to Apely . The Project lh&ll be CArried out in accordance with the
laws of the State of Colorado and all applicable Federal laws 4t regulations.
Amendment. This Agreement may not be amended except in writina by
mu agrttment of the parties, nor may rights be waived except by an lnstrurnent
n s igne d by the party charged with such waiver.
IN ITNESS HE EOF, the part ies have ck.dy executed thls Agreement,
eUecti e the day and date first above written.
APP O VEO AS TO LEGAL FORM
FO THE RTO
ATTEST r
REGION AL TRANSPORTATION DISTRICT
Sy
E=-x-ecu--t ,...iv-e""'o"'"a,.., r_ec_t_o_r_an_d,...G=-en-er-al-:-rM..-anag--er-
GRANTEEr THE CITY OF ENGLEWOOD
' ~
•
•
•
E IONAL AID URBAN SYS EM A PLICA N
(Pf e com plete and return b y. Ma y 5 , 1 9 8
1 . Submitting city, county, agency C j t y of Eng l ewoq d
2. Address 3400 s . Ela t i , Englewood, CO Phone o. 761-1 1 40, Ext. 503
8 011 0
3. of person RTD should contact regarding this projec'I.. Director of N
Gary • Di d Ti d Se rvices
Engi .a ring
Phone No/61 -114 0 t E XT .
503
4. Locafon of project and description of existing conditions.
(Use o ne fonn for tach project submitted. Drawings may be a.ttac:hed.)
P roject L atioo: _ _.S"'"'o~u.:::t..:.:h:.::s;.::i::.;;d::.oe~.:o-=f~l::..:0::;..0=---=&--=2:..;:..,:0::.-.:b=l-=o;.:c:.:.k:.:s=--W~ • ....:.F..:l::.;;o::;..y~d=--~A:..::v..;:e;;.:.n.:..:u::.;e;:;;_ __ _
Descriptton: Exi ting vertical c urb and gutter on the sou thside
f these two b locks and ad jacent asphaltic concrete paving
s howing signs of extreme distress and failure due to
i ncreased usage of RTD bus es in this area.
5. Project Justification : Rem ova l of the existing curb and gutter ( 2 ft. pan)
and rep lacement with new curb and gutter (5 ft wide pan) will
give necessary added strength t o areas present l y experiencing
displacemen t. Project wil l al so i nclude removal and replace-
ment of one catch b~sin and the c rosspan at South Acoma Street.
Priority 1 ing of!!:!!§ project among all proposals being submitted by your agency :
7. Locat Particip tio (check appropriate spaces)
A. Construction by agen~ forces kJ
to include:
1. Survey and Design £:1
2. Construction Staking kl
3. Construction Inspection kl
B. Constru ction by outside contractor{ 1 ) 0
t o include:
1. Survey and Design 0
2. Construction Documents 0
3. Staking 0
4. Construction Inspection 0
C. Request RTD Partic ipation kl
to inclu de : (Please specify)
Actual construction costs by contract
Englewood will p rovide ne c essary engineering services.
( 1) If project cost is $5,000 o r ove r the "Project labor Agreement" applies •
(OV ER ) Rev . ATD 1)294.11 /79
••
•
•
•
8 . Estima ted Project Cost
A.O. • (2) Existing
D ;gn (3 ) All engineering by Englewood
Construction
Total
Local Funding
ATD Fundi ng
(2) Appl icant prepares required ... men or R.O.W. Acquisition.
(3) Ac al design costs only.
hen Completed Return to:
RTD
TSM Division
1325 South Colorado Boulevard
Denver, Colorado 80222
-o -
$ 1.900.00
$ 18,700.00
$ 20,600.00
$ 1,900.00
$ 18,700.00
Director of Enginee ing
Services 5/9/80
(Title) (Date)