HomeMy WebLinkAbout1975 Ordinance No. 046•
•
•
INT RODUC ED AS A BILL BY COUNCILMAN BROWN
BY AUTHORITY
ORDINANCE NO. 46 , SERIES OF 1975
A ORDINANCE AMENDING SECTION 2 AND SECTION 44, CHAPTER 2,
TITLE XII OF THE 1969 E.M.C. PROVIDING FOR AND REQUIRING
PE RMITS AND FEES FOR SIDEWALK, CURB, GUTTER AND/OR DRIVEWAY
CON STRUCTION; REVISING EXCAVATION PERMIT FEES; PENALTY FOR
FAILI NG TO OBTAIN EXCAVATION PERMIT, AND PROVIDING A CHARGE
FOR SPECIAL STATEMENTS.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF
THE CITY OF ENGLEWOOD AS FOLLOWS:
Sec t i on 1.
That Section 2, Chapter 2, Title XII of the 1969 E.M.C.
hereby is amended to read as follows:
12-2-2 PERMIT REQUIRED AND PERMIT FEES
(a) It shall be unlawful for any person to construct any
sidewalk, curb, gutter, curb cut, or driveway within the
city limits without first obtaining a permit therefor from
the Director. Such permits will be issued only to regularly
lic ensed and bonded concrete contractors who post with the
city an annual performance bond in the amount of two thousand
dolla r s ($2,000), or to a homeowner for the property in which
he ow n s and resides. The permit shall expire ninety (90) days
after the day o f issuance.
(b) FEES CHARGED FOR A PERMIT TO CONSTRUCT ANY SIDEWALK, CURB,
GUTTE R, CURB CUT, OR DRIVEWAY AS DESCRIBED HEREIN WILL BE AS
FOLLOW S:
CURB AND GUTTER AND/OR SIDEWALK
CO ST RUCTION, INCLUDING STAKING
AND IN SPECTION -FIRST 7S LINEAL FEET
OR FRACTION THEREOF------------------------$30.00
EACH ADDITIONAL LINEAL FOOT----------------.36
CURB CUT AND/OR DRIVEWAY,
INCLU DI NG INSPECTION-----------------------12.00
NEW SIDEWALK ONLY, INCLUDING
INSP ECTION -FIRST SO LINEAL FEET----------6.00
ADDIT IONAL SO LINEAL FEET OR
FRACT ION THEREOF---------------------------4.00
•
•
CU RB AND GUTTER AND/OR SIDEWALK
RE MOVAL AND REPLACEMENT, INCLUDING
I SPECTION -FIRST SO LINEAL FEET-------------6.00
ADDI TIONAL SO LINEAL FEET OR
FRACTI ON THEREOF------------------------------4.00
Secti on 2.
That Section 44, Chapter 2, Title XII of the E.M.C.
hereby i s amended to read as follows:
1 2 -2-44 PERMIT FEES
Applicants for excavation permits may elect to use either
of t he two following alternative methods for paying permit fees:
(a ) If payment of the appropriate permit fee is made
according to the following table when the work is
completed and the excavation is properly backfilled,
the City shall be responsible for final resurfacing
of the opening:
Paved Public Ways:
2 ft. by 4 ft. excavation (8 sq. ft.)---$32.00
Each additional square foot-------------4.00
Partially Pav e d Public Way:
2 ft. by 4 ft. excavation (8 sq. ft.)---16.00
Each additional square foot-------------2.00
Unsurfaced Public Ways:
2 ft. by 4 ft. excavation (8 sq. ft.)---8.00
Each additional square foot-------------1.00
(b ) ALL FEES SHALL BE DOUBLED FOR STARTING WORK WITHOUT
A PERMIT.
(c ) Applicant may file with the Director written evidence
of a contract between each applicant and a reputable
paving firm showing that such firm will finally re-
surface all excavation according to City specifica-
tions after having been properly backfilled by the
permittee. A charge of $6.00 shall be made for each
such permit issued. A $2.00 BILLING FEE SHALL BE
CHARGED FOR ~ACH INDIVIDUAL STATEMENT REQUESTED.
(1962 Code,~ lS.19-3).
-2 -
Introduced, read in full and passed on First Reading
on the 3rd day of November, 1975.
Published as a Bill for an Ordinance on the 5th day
of November, 1975.
Read by title and passed on Final Reading on the 1st.
day of December, 1975.
Published by title as Ordinance No. 46 , Series of 1975,
on the 3rd day of December, 1975.
ATTE ST:
~~ .~, ~fficio ~erk-Treasurer
I, William D. James, do hereby certify that the above
a n d foregoing is a true, accurate and complete copy of the
Ord i nance, passed on Final Reading and published by title
as Ordinance No. 46 , Series of 1975.
-3 -