Loading...
HomeMy WebLinkAbout1974 Ordinance No. 026• • • INTRODUCED AS A BILL BY COUNCII.MAN BY AUTHORITY ORDINANCE NO. ;J. y , SERIES OF 1974 AN ORDINANCE AMENDING SECTION 5, CHAPTER 4, TITLE XV OF THE 1969 E .M.C., BY AMENDING A SCHEDULE OF SEWER HEAD TAP FEES TO BE CHARGED FOR CONNECTION TO SANITARY SEWER MAINS ON THE ENGLE WOOD SEWERAGE SYSTEM BOTH INSIDE AND OUTSIDE THE CITY'S CORPORA TE BOUNDARIES. WHEREAS, the Englewood Water and Sewer Advisory Board at its regular meeting of June 25, 1974, has made a recommendation to this Council relative to the amendment contained herein; and WHEREAS, the Council having reviewed said recom- mendation, concurring therein. NOW, THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF ENGLEt«>OD, COLORADO: That Section 5, Chapter 4, Article XV of the 1969 E .. C. is hereby amended as follows: 15-4-5 SEWER HEAD TAP FEES At the time of filing the application, said appli- cant sh all pay a sanitary sewer head tap fee as follows: (a) Inside the corporate limits of the City for ·· ndust rial, comnercial and residential service when sewer mains are owne d by the City, except when other fees are in effect y express agreement in existing sewer improvement district, f ollows: -1- • • • Schedule 1. Sanitary Sewer Head Tap Fees for Industrial and Connnercial Properties: 6" and under tap size 8" tap size 10" tap size 12" tap size $1,200 $2,400 $3,600 $5,400 In the case of new high-rise commercial or industrial con- struc t i on on property previously connected to the City san- i tary sewer system and upon which a previous head tap fee has b een paid, the previous head tap fee shall be credited against the charge for the current application. Sche dule 2. Reside ntial: Sanitary Sewer Head Tap Fee for Residential and Other Properties With Specific Use: A. Single Family Dwelling Unit Use: Cons truction Cost -----------(Actual Cost of Construction Per Front Foot) Plus En g inee r i ng Cost ------------(10% of Actual Cost of Construction Per Front Foot) Plus qe ad Ta p Fee ----------------$300 B. Mul t i p l e Family Dwelling Use: Each Dw e l ling Unit ----------$300 C If, as in the case of certain existing City sewer mains, the cos t of construction is unknown, thehead tap fee shall be $300 fo r each dwelling unit. D. In the case of new multiple family unit use construction o n prope rty previously connected to the City Sanitary Sewer System, the head tap f ee shall be $300 per unit, less the amou n t of head tap fee previously paid. (A dwelling unit is de f ined as one unit for occupancy by o ne fam ily for living 'and sleeping purposes) -2- • • School s --------------------$300 per tap based on each 12 pupils of school capacity equivalent to one tap. Hospit als -------------------$300 per tap based on each 4 beds of hospital capacity equivalent to one tap. Mobile Home Courts ----------$300 per tap based on 3 mobile home sites equivalent to one tap. Chu r c hes --------------------$300 per tap . Head tap fees for all other properties not listed in Schedule 2 shall be determined in accordance with Schedule 1. (All rates, as set forth herein, are subject to negotiation and revision for unusual cases) (b} At the time of filing the application, said applicant shall pay a sanitary sewer head tap fee for the connection to the sanitary sewer of any property located outside t h e corporate limits, for industrial, commercial and re sidential service, except when other fees are in effect by express agreement. Schedule 1. Sanitary Sewer Head Tap Fees for Industrial and Co11111ercial Properties, Except 'nlose Listed in Schedule 2. 6" and under tap size 8 " tap size 10" tap size 12" tap size $ 750 $1,500 $2,250 $3,250 Schedule 2. Sanitary Sewer Head Tap Fees for Residential and Other Properties With Specific Use: Residential: Reside ntial -Single Family Unit ---$300 per tap -3- • • • Residential -Multiple Family Unit ---$300 per tap Schools -~----------------------------$300 per tap based on each 12 pupils of school capacity equivalent to one tap. Hospitals ----------------------------$300 per tap based on each four beds of hospital capa- city equivalent to one tap. Mobile Home Courts -------------------$300 per tap based on each 3 mobile home sites equiv- alent to one tap. Churches -----------------------------$300 per tap Head tap fees for all other properties not listed in Schedule 2 shall be determined as described in Schedule 1 • Nothing in this document shall be construed so as to unilaterally alter any of the rates or terms contained in any connectors agreements existing between the City of Englewood and a san- itation district. Introduced, read in full and passed on first reading on the 1st day of July, 1974. Published as a Bill for an Ordinance on the 3rd day of July, 1974. Read by title and passed on final reading on the 15th day of July, 1974. Published by title as Ordinance No. 9.~ , Series of 1974, on the 18th day of July, 1974 • -4- ATI'EST: ijTN~ ex officio City Clerk-Treasurer I, Karl Nollenberger, do hereby certify that the above and foregoing is a true, accurate and complete copy of the Ordinance, passed on final reading and published by title as Ordinance No. gfe , Series of 1974. ex urer -s-