Loading...
HomeMy WebLinkAbout1990 Ordinance No. 031ORDINANCE NO. ,3 I SERIES OF 199~ BY AUTHORlTY 10 (d) COONCIL BILL NO, 34 lNl'ROOOCID BY caJNCn. MEMBER HATHAWAY AN CIUlINANCE APPROVING A SUPPLEMEN!'AL COOTRACT Bt'IWEEN '11lE CITY CF ENiLfRXlO AND '11lE STATE DEPAR'IMENl' OF HIGHWAYS, DMSICN OF HIGHWAYS, FOR WIDENING OF '11lE S0!1Ill BROADl\'l\Y BRIDGE OVER BIG DRY OEEK BE:lWF'ffi CENI'ENNIAL AVENUE AND RAFFERTY GARDENS , WHEREAS, a traffic hazard exists oo the bridge en South Broadway over Big Dry Creek between Centennial Avenue and Rafferty Gardens because of a narra.i."lg of traffic lanes and no pedestrian sidewalk; and WHEREAS, it is necessary to widen the bridge; and WHEREA3, it is recessary to arrend the Agreement approved by Council Bi ll 24, Series of 1988; and WHr.REAS, the City has already contributed $6,000 ta,,,ards the project, ha,,,ever additional funds are necessary; and NC/11, THEREFORE, BE IT ORDAINED BY '11lE CITY COONCn. CF 'll!E CITY CF ENGLFlmD, COLORADO, THAT : Section l. The City of En g l"""""1 agrees to enter into the Supplemental Contract with The State Departrrent of Highways, Division of Highways, for widening the bridge on the West side of Broaa.iay over Big Dry Creek between Cente.inial Avenue and Rafferty Gardens. The Contract generally provides: l. The City shall contribute an am:,unt of $19,000 te>,1ards cost of construction of the bridge widening. 2 . The tenns of the contract shall continue through the catpletion and final acceptance of the work by the State and payrrent by the City and shall inure to the benefit of and be binding upon the partie~, th!!ir successors and assigns. 3. The Special Provisions by the State concerning Controller's Approval, Fund Availability , Bond Requirement, Incle!mification, Discrimination and Affirmative Action, Colorado Labor Preference, and in gen eral are incorporated into said Contract. Sec.tion 2. The ~!ayor and City Clerk are hereby authorized to sign and att~SUpplemental Contract for and on behalf of the City of Englewood and City Council. -l - Introduced, re•d i ~ full, and pa s sed on first re•ding a, the 18th ot June, 1990. Publish<,d as a Bill for an Ordinance ,:in tre 21st day of June, 1990. Re•d bt titl e and passed on final reading a, the 2nd day of July, 1990. Published by title as ordinance No. iii , Series of 1990, on the 5th da\· of July , 1990 . - I, Patricia H. Cro.,, City Clerk of the City of Ehgle,,'O()(j, Colorado, hereby certify that the above and forego ng is a true copy of the ordinance passed on final reading and pablished by t itle as ordinance No. ,el_, Series of 1990. Q-1--. c// /l - ~ -2 - cc 10-0075-26 BROADWAY AT BIG DRY CREEK SUPPLEMENTAL CONTRACT THIS 1ST SUPPLEMENTAL CONTRACT, made th '.s ___ day of _______ , 19 __ , by and between the State of Colorado for the use and benefit of THE STATE DEPARTMENT OF HIGHWAYS, DIVISION OF HIGHWAYS, hereinafter referred to as the State, and THE CITY OF ENGLEWOOD, STATE OF COLORl\DO, hereinafter referred to as the contractor or city, WHEREAS, authority exists in the Law and Funds have been budget ed, appropriated and otherwise made available and a sufficient unencumbered balance thereof remains available for payment in Fund Number 2001, G/L Account Number 52046, Contract Encumbrance Nurnber 87701; and WHEREAS, required approval, clearance and coordination has been accomplished from and with appropriate agencies ; and WHEREAS, the State and the City have heretofore entered into a contract dated November 4, 1988 hereinafter referred to as the basic contract and made a part hereof by reference, which by its terms is still in effect as of the above date and which provided for preliminary engineering of improvements of Broadway, consisting of widening structure (No . :;-17-T) on Broadway 111: ~•ig Dry Creek within the city of Englewood in Arapahoe County, Colorado; and WHEREAS, the basic contract further provided that the City would contribute f.•inding to the State for the work ( ,scribe<' therein and that the City cost would be increased only by a written supplement to the basic contract; WIIEREJ\S, the parties wish to supplement the basic contract to expand the scc,pe of the work to be performed by the State under that contract, and to increase the amount of compensation to be reimbursed o the State by the City solely from City funds; and WIIEREJ\S, the additional work desired is to provide for conslruction to widen the structure at Broadway and Big Dry Creek to accommodate a cceleration/deceleration lanes and to provide erosion protection of the Big Dry Creek channel banks, upstream and downstream of the bridge widening; and WIIEREJ\S, additional city funds have become available to provide for the additio nal work; and WIIEI\EJ\.S, thi!J supplemental contract is executed by the State and the City under the auth o rity of Sections 43-2-144 and 29-1-203, C .R .S. as amended, and by the City under the authority of an appropriate ordinance or re,olution, which is attached hereto and made a part hereof . NOW, THEREFORE, it is hereby agreed that: A. The basic contract, unless specifically revised or amended herein, shall be and remain in full force and effect with respect to the contractual relationship between the parties hereto . B . Paragraph 3 of the basic contract shall be amended by deletinci the figure "$6,000" and sub,tituting therefor the figure "$25,000". 2 I c ! C. Paragraph 2 of the 1,asic contract shall be amended by the addition of the following: "The State shall obtain any neceosary easements so that the channel can be maintained upon completion of construction." 0. Paragraph 4 of the basic contract shall b~ amended by deleting the entire paragraph and replacing it as follows: "4 . The City shall reimburse the State in an amount not to exceed $ 25,000 for a portion of the costs incurred by the State in the performance and completion of the work. The total above shall be designated f o r payment as follows: Preliminary Engineering Construction TOTAL $ 6,000 19,000 $25,000 It is recognized that the cost amounts in thia p,ragraph 4 are estimated amounts. The City has contributed $6,000 for the prel ·~inary engineering work. The City shall contribute a lump sum of $19,000 for its portion of c o nstruction services to the project . Reimbursement to the State by the County shall be a lump sum of $19,000, payable within 60 days after completion and final acceptance of the work. Payment will be continge~t upon final inspec1:ion and acceptance by the City. Such 3 acceptance shall not be unreasonabl y withheld. The State shall ·provide to the City two(2) sets of mylar reproducible "as constructed" drawings within 180 days of final payment." 0 Ill WITIIE SS WHERE ~F , the parties hereto have executed thi• contract t he day year fir~t ab o v e written . ATTE ST : CLIFFORD W, HALL State Contro ller By------------ ATTEST : By------------ Title __________ _ STATE OF COLORADO ROY ROMER, GOVERNOR By =E_x_e_c_u~t~iv_e_D~i~'r_e_c~t~o-r _____ _ DEPART MENT OF HIGHWAYS kPPROVED : DUANE WOODAPD Attorney General By BARRY B. RYAN Assistant Att orney General Natural Resources Section CITY OF ENGLEWOOD, COLORADO By Title _____________ _ DATE Juno 18, 1990 INITIATED BY STAFF SOURCE ISSUE/ACTION PROPOSED COUNCIL COKIIUNICATION AGENDA ITEi! 12 (b) Public 1/orks SUBJECT Bill for Ord . for Suppl. Controc t with Colo. Dept. of Hwy. Broadway 6o Big Dry Creek Kells 1/aggoner, Director of Public 1/orka Adopt a bill for an ordinance approving supplemental contract with Colorado Department of Highways for construction of the Broadway and Big Dry Creek Bridge llidening . PREVIOUS COUNCIL ACTION Original contract with the Colorado Department of Highways was approved by Ordinance No. 23, Series of 1988, passed and adopted by City Council on August l, 1988. STAFF ANALYSIS The purpose of thi1 Supplemental Contract is to provide funds for widening the west side of the Broadway bridge over Big Dry Creek by 13 feet 4 inches to allow room for a third southbound driving lane and a 6 foot 9 inch wide sidewalk for pedestrian traffic . Conatruction of this o ject will take 75 days and is anticipated to start in the Fall, 1990 . CDOH will provide the eugineering inspection and testing on the conatruction of this project . BACKGROUND Duign by CDOH otaff bridge engineera commenced in Decembar , 1988. Originally , t h• City end Urba,, Drainage and Flood Control Distdct partici_pated in review of tho propo11d improvements. Aa design was completed, it waa de\·ermined by COOH '■ hydraulics engineer, baaed upon the "Report on South Broadway &ridge Hydraulic Study" by Blatchley Anoe . (Jun•, 1982), that additiona l channel ia,prov1111nta up and dovnatrou of the bridge were not coat effective at this time . llithout these channel ia,provementa, UD&FCD declined to participate further in the contract . Construction includes complete concrota slope paving under the bridge to ia,prove the hydraulic capacity of the bridge. It will handle a 20 to 25 year storm with flow valociti•• in the 17 to 18 feet per 11cond rang•. Further extenaive improv1m1nt1 1 including relocation of a 30 inch diameter Denver llatar Board waterline hanging underneath tho bridge, would be required to provide the c apacity for a 100 year storm flow of 12,600 cubic feet per ucond . Final con eatimate for this project 1a $415,000 . Th• City'• 1haro of tho coat 1a $25,000 . By th• original Ordinance, the City ha ■ already paid $6 ,000 . Thia s upplemental contract providea that the City will now pay t he remaining $19,000 for construction of the project . The balance of the moniu will be paid by CDOH. The $19,000 h u been previously allocated to this project in the Road and Bridge monies in the PIF . (1 C