Loading...
HomeMy WebLinkAbout2006 Ordinance No. 024• • • ORDINANCE NO . ;_/ SERIES OF 2006 -- BY AUTHORITY EY.h;b,+. t; :J-Joe/., 9 bi CONTRACT NO, '0 'l-J...~J, COUNCIL BILL NO. 25 INTRODUCED BY COUNCIL MEMBER WOODWARD AN ORDINANCE AUTHORIZING AN INTERGOVERNMENTAL AGREEMENT BETWEEN THE UNITED STATES ENVIRONMENTAL PROTECTION AGENCY (E PA ) AND THE CITY OF ENGLEWOOD, COLORADO, FOR THE ISSUANCE OF FISCAL YEARS 2006, 2007 AND 2008 STATE AND TRIBAL ASSISTANCE GRANTS (STAG) FOR THE LITTLETON/ENGLEWOOD WASTEWATER TREATMENT PLANT PHASE 2 EXPANSION PROJECT . WHEREAS, previ ous ly City Council approved the Brown and Ca ldwell Engineering Contract for th e de sign of the Phase 2 Expan sion Project improvement s at the Littleto n/Englewood Wastewa,er Treatment Plant an d also approved the Brown and Ca ldw ell co ntract amendment for construction management services during construction ; 11nd WHEREAS , City ,.:ouncil also apprcvcd by Ordinance two Intergov ernment al Agreements with the ( olorado Water Resou rces and Power De velopment Authority for the issuance of •;1,ier Revenue and Water Pollution Control Revolving Fund bonds for the Pha se :1 Ex pansion Project: and WHEREAS, City Council approv,d an JGA with the U.S . Environmental Prote ction Agency for the issuance of a 2004 Stale and Tribal Assistance Grant for the Phase 2 Expa nsion Project with the passag ., of Ordinance No . 40, Series of 2004; and WHEREAS, the treatment capacity of the UE WWTP needed expansion due to higher than anticipated population growth in the facility's service area and the regulatory req~irement to remove nitrate from the plant cmuent ; and WHEREAS , the Pre-de sign Project was completed along with the engineering design stage of the Pha se 2 project ; and the final draw ings and specifi ca tions we re made available to prcqualificd general contractors and subcontractors in order to obtain compet itive bids for the project; and WHEREAS. the U.S. EPA notified the City that the Littleton/Englewood Wastewater i reatmcnt Plant Ph ase 2 Project wa s qualified for a $1 ,000,000 grant in 2004 with net funds to the Cities for $964 ,300 grant in 2004 , saiJ grant funds being part of the EPA 's Fi sca l Year 2004 Appropriations Act. WHEREAS , the U.S. EPA notified the City in May 2006 that the Phase 2 Project ha s been awarded a $50 0,000 grant in 2006, with the proceeds to the City being $477 ,900; and -]- WHEREAS, the grant funds are part of the EPA's fiscal Year 2006 Appropriations Act and the City may be eligible for an additional ST AG special project grants in subsequent years , for which an application has been prepared for an IGA (Application for federal Assistance) for the issuance of said grant amount of $500,000 and other amounts that may be granted in subsequent years 2007 and 2008; and WHEREAS , the grant funds will be equally divided for Phase 2 capital expenses for Englewood and Li11le1on and matching funds will be equally divided between the cities of Li11le1on and Englewood . NOW, THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL Of THE CITY Of ENGLEWOOD, COLORADO, THAT : ~. The City Council of the City of Englewood, Colorado, hereby authorizes the City 10 apply for and accept the Intergovernmental Agreement, tilled "Application for Federal Assistance", between the U.S. Environmental Protection Agency and the City of Englewood for the issuance of fiscal years 2006, 2007 and 2008, State and Ti ibal Assistance Grants (STAG) for Li11le1on/Englewood Waslcwaler Treatment Plant Ph c,c 2 Expansion Project, auaehcd hereto as Exhibit A ~-The Mayor is authorized 10 execute and the City Clerk lo allcsl and seal the lnlergovcmmcntal Agreement for and on behalf of the City of Englewood . Colorado . ~3. The Director of the Li11lc1on/Englewood Wastewater Trcnlmcnl Plant is hereby authorized to further extend this lntcrgovemmcnlal Agreement between Lillleton/ Englewood Wastewater Treatment Plant and the U.S . Environmental Pro1ec1ion Agency for five additional one year periods . ~-Pursuant lo Anicle V, Section 40 , of the Englewood Home Rule Charter, the City Council has determined 1ha1 this Ordinance shall be published without exhibits because of ils si1c. A copy of tho se exhibits arc available in lhe Office of the Englewood City Clerk. Introduced. rend in full , and pass ed on first reading on th e 10th day of July , 2006 . Published as a Bill for an Ordinance on the 14th day of July , 2006 . Rend by lillc and passed on final reading on the 24th day of Jul y, 2006. Publi shed by title as Ordinance No.,gt/_. Series of 2006 . on the 28th day of Jul y. 2006 . -2- • • • • I, Loucrishia A. Ellis, City Clerk of the City of Englewood, Colorado, hereby certify that the above and foregoing is a ttue cop4, ?f the Ordio passed on final reading and published by title as Ordinance No . CL, Series of • • -3- • • Littleton/Englewood Wastewater Treatment Plant EPA APPLICATION KIT FOR FEDERAL ASSISTANCE ENGLEWOOD, CO IF S05oi5 CONTENTS Appllcadon for Fedenl Assistance Original Sl11111ture (Standard Fonn 424) Appllcadon for Federal Assistance Secdon B -Budget Categories (Federal & Non -Federal Share) Project Work Plan CWSRF Benents Assessment Object Class Categories Detail Breakdown Semi-Annual Performan ce Report Authorization lo Sign UNITED STATES ENVIRONMENTAL PROTECTION AGENCY REGIONS Ref: 8P-W-TF Mayor Olga Wolosyn City ofEnglewood IOOO Englewood Parkway Englewood, CO 80 I I 0 Dear Mayor Wolosyn: 999 18"' STREET-SUITE 300 DENVER, CO 80202-2466 Phone 800-227-8917 http ://www .epa.gov/reglon08 May 22, 2006 Re: Wastewater Treatment Plant Improvements Cities of Englewood and Littleton CO As you are aware, the U.S. Environmental Protection Agen cy 's (EPA) Fiscal Year 2006 (FY06) Appropriations Act provided $477,900 to the Cities ofEnglewood and Littleton for the above-referenced project. I am enclosing the following documents for your information and /or action: I. EPA Application Package . To he completed and submitted for funding. Additionally, the applicant MUST provide his/her State with a completed copy . 2. FY06 Special Projects Guidelines . 3. National Environmental Policy Act (NEPA) Guidance . To aid in preparing an d providing required information to assess the environmental impacts of a project . Please see the enclo se d "NEPA Instructions for Special Appropriations Projects ," then contact Dana Allen at 303-312-6870, to discuss preparation of environmental info rmation and document review . 4. Semi-annual Performance Report (SPR) Template . The applicant must provide the State and EPA with the completed SPR as a minimum reporting requirement . Please note that EPA may stop payments if SPRs arc not promptly submitted lo both the State and EPA . The following are additional aids for, as well as responses to, recurring comments from past grant reci pients while completing the application package : • Box I, TYPE OF SUBMISSION : select Non-Construction • Box I 0, CATALOG OF FEDERAL DOMESTIC ASSISTANCE NUMBER : enter 66-606, and TITLE (Name of Program): enter Special Purpose • • • • • • • Box 16, IS APPLICANT SUBJECT TO REVIEW BY STATE EXECUTIVE ORDER 12372 PROCESS?, states' specifications arc as follows : Colorado, Montana and South Dakota . There arc no single points of conlact. The applicant must submit a completed copy of the application to his/her regional planni ng agency where the project is located . Please sec reference materials in the application kit; North Dakota and Utah. The applicant must submit a completed copy oftl1e application to his/her single point of contact for inter-governmental review; Wyoming. The applicant is required to contact the reviewing agency and inquire whether the review is necessary • Contract Specification Langu3ge (or "boiler plate "). Please contact yo ur State to obtain a copy of its state revolving fund boiler plate , which can also be used for STAG projects to avoid redundan cy of documentation . This boiler plate must be in~orporated into all project specifications • Minori ty Busine ss Enterprise/Women Business Enterprise (MBE/WBE) participation . The grantee and sub-grantee will take all neces sary affirmati ve steps to guarantee that minoriiy firms , women's business enterprises, and labor surplus area finns are used whenever possible . There wi ll be a specific i;rant condition in all grant award documents pertaining to this issue. Please ensure that these requirem ents are clearly stated in the specifications document s. Contact Marshell Pullman at 303-312-6499 with any que stions concerning MBE/WBE issues • Project Workplan. Your application must include the project workpl an, which shall co nt ain the following: a) a detailed description of the project b) the project location and latitude/longitude (Guidelines, page 9), .:1rong with a map c) the detailed project costs summaries d) the project timeline ·e) Outputs and Outcomes (Guidelines, page 14): please ensure that o•;'.r ,uts, to the maximum extent possible , and outcomes , are appropriately addre ss ed, and f) CWSRF Benefit s Assessment -Core Measure s for Project s: (Guidelines, Atchmt 6). The format can be used to measure project "outcomes ." This document must be submitted as an attachment. The Colorado Department of Public Health and Environment (CDPHE) will pl ay r. major role in managing your project on behalf of EPA. Please contact Carolyn Hermann at 303-692- 3551 to arrange the post-award project activities . Applications with insufficient workplans will not be processed resu;iing in substantial delays in awarding grants . To expedite the award process, please plan to submit your application u soon u possible. You can do this by one of two ways : hardcopy (enclosed) or elec1ronically . Should you choose .Jbe electronic method, you must first register at: hUP://www.mnts.gov (see the 'OET started' attachment for registration information). If you have any questions regarding administrative requirements, contact Joyce Brame at 303-312-6367 or~; regarding technical requirements, contact me at 303-312-600 I or ~mcl.bruce@epa gov . Congratulations and thank you in advance for your cooperation . cc : States' Contacts : Caro lyn Hermann, CDPHE 3 'i:'J'~ Bruce Suchomel Project Officer • • • APPLICATION FOR FEDERAL ASSISTANCE :Z. Dl,Tl! IUIMITTtD Applc:allt...-V-7103 1, TYl'R Of IUIIIIIIIOIU 3, DATI! IIICEVED BY STATE Sia•~- ~ l'IHpplcallon -~ Conatn1C11on 4. DATI! RECl!JYED BY FEDERAL AGENCY Fodo<111dordllr INFOflMATION Loga!Nomo: Orallllutlonal Unk: City of Englewood ~-,_ . ...,,.,,.,..,1 LI,~,, .... , .... ,._ .,. ___ ., ___ ., ~DUNS: 07-575-0133 -Plant Addreu: Nlffll and llllpllone nu_ of parson to bt con""'"4! on mallln s-. lnvotvlna this 1DDlcatlon falve .,.. code\ 1000 Englewood Parkway Prob: Mr. IFntNamo: Mark City.Englewood tAlddloNamo A • County, Arapahoe ........... Van Nostrand fi tall: Zip~ 80110 Suffix: P ,E, co Counlry: USA Email: mvannostrandt'aenolewoodoov. oro I. EMPLOYER IDENTlflCATION NUMBER (EIN): PhoM Nlfflberts;,. WNCOH) I Fax Nl#Tlber (gift.,. Clldt) nn., 1111111111111 303-762-2657 303-762-2620 I. TYPE OF APPUC,\TION: 7, TYPE OF APPLICANT: (SH badtofform for Apptk:ation Trs,N) iJ New )It Condnuatlon [] Revlalon •RM!on.----•)lnbo,(11) plho<(-) SN bed; of form for~ of letten.1 D D C Olher(apecify) ~"1-AGENCY: 1D. CATALOG OF fEDERAL DOMESTIC ASSISTANCE NUMBER: TfTLE Of APPLICANT'S PROJECT: • be IN..,. of Program): Special Purpose ~la-~~~ Littleton/Englewood WastewatP.r 12. AREAS AFFECTED IV PROJECT (CltJ.,, Count;.•, St1tH, 1tc.): Trea tment Plant Phase 2 Exp·ansiOn City of Engll!wood ~ Arapahoe County Project 1S, PROPOSED PROJECT 1•. CONGRESS.aNAL DISTRICTS OF: Sllrt 'l.12002 JEnc:lno Date : 9/2008 ··-l"·"iit'trict n.t --►-.t ,► 1 I 16. EITMAtED FUNDNO : ~!~!_~!.~~!'2!' .. ~'!~ECT TO REVIEW IY STATE EXECUTIVE a. Ftdlrll ~ 1 500 ooo ·-•· v •. .i ~!~ffJ~J~~~~'Ew~~372 ··-~ .-PROCESS FOR REVIEW ON c, Sia■ (Loan) ~ lfl'l n.n.n. nnn. DATE: May 12 , 2003 . •-~ ~ 1n snn nnn .-, .... No. rrJ PRO~ IS NOT COVERED BYE. 0 . 12372 o,Othor ~ 0 OR PROGRAM H.'5 NOT BEEN SELECTED BY STATE <nD D"'n<W f.Propmlncome ~ .-17. IS THE APPLICANT DELINQUENT ON ,.,.y FED!RAL OEITI g, TOTAi. ~ 114,000 ,000 □ YII w 'Y•' llocl> an axplonallon, )II Mo 11. TO THE 8E&T OF MY KNOWLEDGE AND BELIE,, ALL DATA IN THIS APPLtCATlON/PREAPPUCATK>N ARE TltUE ,.,.0 CORft&CT. THE DOCUMENT HAI IEEN OULY AUTHORIZED BY THE GOVERNING BODY OF TH! APPLICANT AND THE APPUCANT WILL COMPLY WITH THE A.TI ACHED ASSURANCES IF ,THE ASIISTANCE IS AWARDED. ,._ Mr . Fim.Name Stewart ----Fonda """"' r, Tlllt Director of Utilities & L/E WWTP r,. ~fflir-mr.--1 _.-•-•ol,.._R_.....,. 1 ,Dl■Slgnad m'lloulE--S•ndllO Form 424 ("IY,11-2003) -byOMa ClrtulorM02 BUDGET INFORMATION -. ..Construction P.~rams OMB_,._ __ ...,_ .~,:(. • . ..::' ~•--:o/-. ::.~E~ ~~.!~~•:::~:~~.!~},;1ICllaiiA1~ ~_::;rtj?,"•"-:;~f~:i~~~~~-:t f:.:~~:.)§.;ir;:{~~rrf.::~¥iJ~~f?E~,.r<;;:g.-.... :: ,,._, Grant Program Func:tlon ... Actlvtty J"1. C::, ~ 1 Es1mated Unobllgaled Funds I New..-Revised Budgol I ~ F~ I ~~' F~ I ~;i-I T: 1. Special 66-606 $ s IS soo,ooo S30,ooo,ooo s 30,soo,000.00 2. 0.00 3 . 0.00 4 . 0 .00 5. Tolals $ o.oo,S . ·0.00'$ s -ls soo,oo o.oo I 30,000 ,000.00 30 ,500,00 o.oo >;~i.::.;.;_ __-.;: : ~;::: ::~::::;·.;·.o-:==~~.::-::;;~T-~BZfJIUQGEf~~~-¥~~iGti~~'lf:1t:f:.q"~f.~'fr:~~,~~~!~"';t:~~¥l~~;E.;.~-:fr1--~?-'~if~.f-=~" 6. Object Class Categones GRANT l'IIOORAM; FUNC110N OR ACTMTY 11 Speciaj. ~ ™ ~ a. Pononnel $ Purpose p -~ ~ b. Fringe Benefits c. Travel d. Equipnad e. SUpplies ,. Contradual 3,000,000 g. Conslrucllon 27,000,000 h.011.- I. Talal Dnc:t Char,l8'J (IIUtn of_,) 30 ,000 ,00 0.00 0.00 0 .00 .1-lnchctctwga _ k. TOTALS (_,, of 61 and 6/J s 30,000,00 o.oo IS 0 .00 .s o.oo IS $ 0.00 0.00 .s T-_ffi_ 0.00 0.00 0.00 0 .00 0 .00 0 .00 0 .00 0.00 0 .00 0 .00 0 .00 -· .. -==='."'.~~;~,;:!}.:;1:~¥':~::~r:=~"'~=•::::::.•;:~-==~'-:t=!:~-:~~~~.l:-~r-"J-!~:fi"'i.=':f?f..~tt;;.=~1!f.::i:::et:;r,:-=~ijivt:~~~~:~..:1=•~i!',li.'L\.-w:; :;h!.;:c"-":..'!l;'r~-ill~'f~:~~k.-i.fl'tl~-~~~~4.?~~~~r~J~H 7. Program Income $ $ $ Aua-tDd for Local Reproduction ---• • $ s 0.00 s.ldlnl~GM,.....f.tll) -IIJOMB,A-102 _ -• • ~~,i,s-~1:~~'.:·:tg~i.~W::~~~~~:J~~?-:;?;~,::.:-~.,)~'.:~;~lir1 ~£:~~~ (a) Grant Program I (b) Appli<a,I s;;;:..:··.~,-"i .• ~.:.f.,__:,~ ~ _-~.:z~+·-~---=-· (cl S1ale I !dl oo-Sources (e)TOTALS 8. Special Purpose S 30,000,000 S 0 s 0 $ 30,000,00 0.00 0 .00 9. 0 .00 10. 11 . 0.00 12. TOTA!. (_,,,,d,._ 6-11) s 30 ,ooo ,oo o.oo IS 0.00 ,s o.oo JS 30,000,00 o.oo 1~~~$~:~iit~Ji~~~~~I~~~;.~;;r~-Jj~~).-~~f.~i~~~:~~::~:·\~~~.:::~· -~·-.. : .. 7.~~s;:::~f~~~~:. :=?·.;~_ I T-fwtotYw I tot-I --I 3rd-I •- 13. Federal FY 2006 $ 411 ,90 0 .001s 4 77,900 s s $ 14.~ 30 , 000 , 00 0.00 7,500 ,000 7,500,000 7,500,000 7,500 ,000 15.TOTA!.(.,,,,dfnes13ax114J $ 30,477 ,900.00$ 7,977,900.00 $· 7,500,000.00$ 7,500,000.00 S 7 ,500,000.00 ~-/l!~p:~~':[~;1,:~~l*-~*~~~te ~-~ rulii>~il~~~•~i:!#(q~~~~,"t~:,:;;'•.~--., __ _ (a) Grant Program I FUTURE FUNDING PERIOOS (Years) (b) First I (c) Second f _ld) Ttmd l (a) Fol.di 16. Special Purpose IS 964,300 Is 477,900 Is 1,000 ;000 IS 1,000,000· 17. 18. 19. 20. TOTA!. ,.,,,,d/lnes 16-19) s 964 ,30 o.oo IS 477 ,90 o.oo IS 1 ,000,00 o.oo IS 1,000,000.00 [~~r4~t~f~~~~itt~}l~;'.~:.~~)ifg~~;~i~~t.~~:~i:~~~~1'~~:~~l ~~~~~~~~~:~~~~~1:i:~~~~~'.~~::~:;_~~~~~~;f~t;:~t:~:;~~~:~~~'. 21 . OndQwges: 122. lndinlctCharges: N None one 23.Renwb: Authorized for Local Reproduction _, __ C--.7-eJl ... 2 WORKPLAN for the Littleton/Englewood Wastewater Treatment Plant PHASE 2 EXPANSION PROJECT NEED FOR PROJECT June4,2004 Amended June 1, 2006 Regulatory Compliance --Water Quallty Issues Section 303(d) of the federal Clean Water Act requires states to identify water bodies or stream segments where existing effluent limitations are not stringent enough to implement applicable water quality standards. Water quality limited segments currently identified in Colorado are included on the States 1998 issued 303(d) list. The Littleton/Englewood Wastewater Treatment Plant (UE WWTP) discharges into Segment 14 of the South Platte River. Thi s segment of the river runs from Bowle s Avenue to the Burlington Ditch Hcadgate at the north end. Segment 14 of the South Platte River is al ready clas si fied for several beneficial uses , including : • Aquatic Life Warm Water I • Recreation I (formerly 2) • Water Supply (City of Thornton ) • Agricultural Uses The State has conducted several assessments and studies (including predicti ve modeling) to ascertain what levels of treatment may be required to protect the above listed beneficial uses and to meet w••er quality standards on water quality limited segments . As a result, the State has reduced the number of fecal colifonns allowed in the plants discharge to help achieve the Recreation I classification . The State has also conducted a Total Maximum Daily Load study It determine what nitrogen loadings from various sources will be allowed into this river segment. The primary inorganic nitrogen sources in Segment 14 have been identified as point discharges from wastewater treatment planL~ (Centennial, UE, and Glendale). Therefore the State will require a reduction in nitrate being discharged by the lJE WWTP and the other treatment plants into the river. These requirements will require installation of a new treatment process (denitrification) to allow the plant to meet the proposed new limits . • • Future water quality issues that are being tracked and monitored are for constituents discharged at the plant including but not limited to phosphorus, additiooal nitrogen redu ctions, metals (mercury, copper, silver, iron), sulfate, and lindanc. Also a wide BITBY of drugs (antibiotics, prescription drugs, steroids and honnones) arc now just being monitored and found in our waterways, most at very low concentrations . It is not yet known the fate of these drugs and what potential impacts on water quality or • quatic life there may be . Many of these constituents, if limits are included in the lJB WWTP discharge permit, will require additional levels of treatment. • Capadty Addldon The plants current ratin g i5 36 .3 million gallons per day (mgd) and 69,000 pounds per day (ppd) of organic loading (BODs), Average daily flows in 2003 were 22 .4 mgd , The organic loading is also a crucial part of the plants "capacity" rating . The average daily organic loading during 2003 was 48,800 ppd. Maximum month flow was 24 .6 mgd in April 2003 and maximum month loading was ~3,000 ppd in January 2003. For referenr ~. a maximum month flow of31.7 mgd occurred in May 1999 and a maximum month loading 01 60 ,900 ppd was recorded in November 1999. The Phase 2 expan si on will in :rease the plants rated capadty to 50 mgd and 93 ,825 ppd of organic loading . This rating is projected to prov ide sufficient treatment capacity for the service area for the next 20 years . Infrastructure Modemlzadon In 1997 an annual infrastructure project replacement fund was created in the budget. This amount was determined to be from $1 ,000,000 to $2 ,000,000 per year and is to be used to replace and repair the existing infrastructure at the plant including buil dings , roofs, pur,,ps , pJ"'..ces!l equipment, roadway s, electrical and controls , and underground piping. Much of the im'rastrur;tur,, of the pbnt is over 30 years ol d. The Phase 2 project incorporates a majorit y of the infra •;tructure work that would have been required over the next 3 to 4 years , • Discharge Permit and Compliance Schedules The plants newly revi sed COPS discharge permit was issued in April 2001 . The permit will expire on April 30, 2006 , Thi s permit has been admini stratively extended by the Colorado Depanment of Public Health and Environment (CDPHE) until a new permit can be iss ued. Operation under the plants previous discharge permit has also been administratively extended by the Health Department in the pas t. Two important discharge limits were changed in the April 2001 issued permit: • fecal coliforms in the discharge must be reduced from 600 # per I 00 ml to 490 # per I 00 ml based on a 7-<lay geometric mean, and • stricter total inorganic nitrogen (TIN) limits would be imposed based on the nitrate TMDL study . The stricter TIN limits are to be imposed in the permit 57 months after EPAs approval of the TMDL. The TMDL has been finalized and the revised TIN limits will be imposed by April 2009 . This permit incorporates several compliance schedules. Each compliance schedule sets forth a task and a deadline for the task to be completed by the permittce. Two of the most significant compliance schedules are : • • construction of new disinfection fac ilities (chlorine con.tact tanks) by February I, 2004 (completed), and • construction of new nitrate-removal (denitrification) facilities •Jn or befon . 53 months after EPA acceptance of the nitrate TMDL for Segment 14 of the South Platte River (under construction) . 2 Planning and Pennltt1n11 The planning and pennitting process for this expansion and upgrade began when the State listed Segment 14 of the South Platte River as impaired in the late 1990s. Numerous meetings have been held with the Colorado Department of Public Health and Environment (CDPHE) as they started and c,:,nducted the Total Maximum Daily Load study for nitrogen on Segment 14. Plant staff as well as Brown & Caldwell environmental engineers and scientists have completed much of the work used by th,: CDPHE in their study . Compliance schedules were negoti ated with the CDPHE to ensure adequate and appropriate amounts of time were available to meet these import1111t requirements . A multi-stakeholder water quality group was formed to deal with the many complex issues that need to be resolved for the South Platte River . Th e South Platte River Coalition for Urban River Evaluation (S .P. CURE) has gained widespread support over the years with active participation by lJE WWTP . PROJ'.....:CT WORK SCOPl.: The Phase 2 Expansion Project includes the construction of the following major items : • Pretreatment improvements including new grit removal system , • Two new primary clarifiers and pump station expansion , • One new triclcling filter and pump station improvements, • One new solids contact tank and blower improvements , • Two new secondary clarifiers and pump station improvements, • Replacement of nilrifying triclcling filter media, • New denilrification filter system and pump station improvement s, • New non-potable water pumping station, • New sodium bisulfite storage building, • New anaerobic digester and digester building expan sion , • New dissolved air flotation tank, • New biosolids truck bay and storage hopper, • Odor control improvements , • Heating, ventilation and air conditioning improvements, • Electrical and controls, • Land scaping, • Yard piping and miscell aneous appurtenances. PROJECT SCHEDULE A project schedule is attached . It is anticipated that construction activities will take 48 months . 3 • • • • PERFORMANCE CAPABILITY The UE WWTP (acting through the City of Englewtod) bas managed and implemen!M two major expansion projects within the past 12 years . The 1992 Phase IA project was for $26,000,000 worth of expansion and infrastructure improvements . The 1998 Phase IB project was for $18,000,000 worth of expansion and upgrade improvements . Both projects were managed by UE WWTP and the firm of Brown & Caldwell and resulted in the projects being completed within the scheduled time and with change order pereentages of less than 5%. The 1992 Phase IA project received recognition from the American Consulting Engineer Council of Colorado in 199 i with the Engineering Excellence Honor Award. The plaot has also received maoy local aod national awards from EPA for excellence in various programs. A complete list of the awards received by the plant is available on the plant's website: www .englewoodgov .org/wwtp PROJECT FUNDING AND COSTS A combination of funding sources will be used to generate the estimated $114,000,000 project cost. The sources are City Sewer Fund Reserves, State Revolving Loan (SRLF), and Water Revenue Bonds from the Colorado Water Resources aod Power Development Authority (CWRPDA). Based on a loan application from each city the CWRPDA recently approved the issuance of a loan package to each city in the amount of $5 IM . A majority of the loao will be from the SRLF (20 year) and the remainder will • be shorter term (10 year) revenue bonds . The SRLF did not have the capacity to loan the entire requested amount to the cities . The bonds were issued by the CWRPDA in early May 2004 . STAG Grant A federal grant program exists for ao aonual earmark for identified water aod wastewater projects . These grants are typically in the raoge of several hundred thousaod to several million dollars . There is a 45% local match required along with other administrative requirements . The EPA Region 8 office will administer this graol For 2004 (FY2004) the grant amount was $1,000,000 for the UE WWTP Phase 2 Project aod was requested through the office of Senator Ben Nighthorse Campbell . A request bas been made for a Fiscal Year 2006 grant aod this has been approved in the amount of $500,000 . I 'rt~ec:t Costs The table below shows the estimated project costs broken down by major categories . ITEM PROJECT~T. (SM) June 1 2006 ~ 8.1 Construction 87 .1 Conslllll:lioo Manuement 12.3 ConlllllleDCv 6.5 • TOTAL 114.0 4 EXPECTED OUTPUTS FROM PROJECT As stated above the Phase 2 project will provide 13 . 7 mgd of additional treatment capacity to serve additional population witiin the service area. The project will provide additional treatment capability to reduce total inorganic nitrogen and fecal colifonns being discharged to the South Platte River to help meet water quality criteria. Infrastructure improvements will ensure timely rehabilitation and or/ replacement of equipment and structures that has become obsol e e or worn out. Of the total estimated project cost of$ l 14M, approximately 51 % of this cost will go towards capacity expansion, 28% to regulatory compliance (additional treatment), and 21 % to infrastructure improvements. Outputs and Outcomes The EPA now requires additional detail related to Outputs and Outcomes In support of EPA 's 2003 Strategic Plan. This ls a result of EPA Order 5700.7, "Environmental Results Under Assistance Agreements." The most appllcable section of the 2003 Strategic Plan as II applies to this grant and project Is contained under Goal 2: Clean and Safe Waler. This project (Phase 2 Exp~nslon Project) supports Goal 2 (Clean and Safe Water), Objective 2.1 : Protect Human Health,, .,d Objective 2.2: Protect Water Quality. The overall goal of the project Is to Increase treatment capacity, reduce the amount of total Inorganic nitrogen and featl collforms In the discharge, and to maintain the wastewater Infrastructure to ensure sustainability and the longest useful life possible. Outputs have been determined as listed below: ❖ Provide additional treatment capacity of 13.7 mgd (additional population equivalents of 137,000 based on 100 gpcd/person) to service the growing south metropolitan Denver service area. ❖ Reduce the number of fecal collforms discharged to the South Platte River to Improve water quality and water recreation potential. ❖ Reduce the total Inorganic nitrogen discharged lo the South Platte River lo improve water quality based on a TMDL to protect downstream raw water supply for drinking water. ❖ Maintain and replace buildings, roofs, piping, and other plant equipment so that the maximum useful llfe of the facility ls achieved and that the Infrastructure Is reliable. Outcomes that are expected are listed below: ❖ The plant's new treatment capacity wlll service the designated urban growth area for the next 20 years. ❖ Overall water quality of Segment 14 of the South Platte River wlll continue to Improve and be monitored to gage this Improvement. ❖ Infrastructure Investment wlll result In a relloble and well maintained treatment facility with the ability lo keep user rates and charges al or below that charged by comparably sized facilities and systems. 5 • • • • BIDDING PROCESS Pn,quallftcadon or Contracton A process to prequalify contractors was completed in January and February 2004. General Contractors, Electrical Subcontractors, and Instrumentation/Control Subcontractors were invited to submit prequalification statements . Minimum criteria were set for each type of contractor. Based on a review of prequalification statements received and meeting the criteria requirements resulted in the following general contractors and major subcontractors being prequalified to bi,( the project: General Contractors: i. PCUGamey Construction, Louviers, Colorado ii. Archer-Western/ Stanek Constructors, Golden, Colorado m. Western-Summit Constructors, Denver, Colorado • Electrical Subcontractors: i. Eckstine Electric , Plattcv;!J~, Colorado ii . Ludvik Electrical, Lakewood, Colorado iii. McDadc-Woodcock Electric, Albuquerque, New Mexico iv . Sturgeon Electric, Henderson, Colorado Instrumentation/control system Subcontractors : i. Amwesl Controls Inc ., Brighton , Colorado ii. Wunderlich-Malec Environmental, , Minnetonka, Minnesota iii . JCS -Instrumentation Control Systems, Plymouth, Minnesota iv. CMC -Control Manufacturing Co., Napa, California v. UCEC -Utility Control & Equip . Corp., Arvada , Colorado &tddlng Status The Project Manual consisting of the contract documents, technical spec ifications, and drawings is now being reviewed by lhe contractors to prepare their bids . Bids were received on May 25, 2004 at 2:00 pm at the Administration Building of the lJE WWTP . The total base bid results are as follows : Conttactor Western-Summit Constructors Archer-Western/Stanek Construction PCUuamey Construction Contract Award Bid Amount $87,186,000 $89,985,000 $100,918,564 It is anticipated that a City Council Agenda item will be pru.:nted in mid -Ji:iy to request approval of a Notice of Award to the lowest resr ,onsive bidder. A Notice of Award was given to Western Summit Constructors and they began lile project on August 10, 2004 . • 6 TARGETS AND Mll,ESTONES The following targets and milestone dates are listed below : State Site Application Environmental Assessment FONS! Phase 2 Design Complete Construction Bid Period Notice of Award to Contractor Notice to Proceed Construction 50% Complete Start up and testing cf Denitrification Facility Project Subs!Antial Completic,n Project Final Completion End of Compliance Schedule For New Facilities REQUIRED REPORTING Target Pate CacruaJ datel January 2004 (May 2004) January 2004 (May 2004) March 2004 (June 2004) February 2004 (March 2004) March to May 2004 (May 25, 2004 bids opened) July 2004 (July 20, 2004) Augu st 2004 (August 10, 2004) June I, 2006 July 2007 June 2008 August 2008 April 2009 Repons will be required of the general contractor, reviewed by the construction manager, and then forwarded to the UE WWTP project management staff. UE WWTP will then ensure that all document s are forwarded to the City of Englewood Finance Depanment for submittal with any pay applications . The repons include, but are not limited to, monthly pay application request s, quanerly status repons, and MBF/WBE participation repons. ACCOMPLISHMENT OF ACTIVITIES The project will be implemented through the Project Management Division of the UE WWTP . The Project Management Division is overseen by ti ,. Plant Manager and by the Director of Utilities . The Project Management Division utilizes the resources of staff, outside consultants and contractors to ensure the completion of the Phase 2 project. The Phase 2 project is identified in the City annual budget for 2004 and is shown in the '.' ear Capital Improvements Plan . The Project Management Division has to repon on a monthly basis on project status, budget, and sched ule to the Supervisory Committee . The Supervisory Committee is responsible for the ongoing operations and capital improvement required at the plant including necessary resources and personnel. The Supervisory Commictee is comprised of the City Manager of the City of Englewood and the Cit/ of Littleton and the Public Works Director from each city . Each City Menager repons directly to his or her respective City Council . 7 • • • JI • t I Ip ! HI • ! I I I 11 I ' ,, I /l ll' 111 i! I ' I 11 ·j ., '1 I~ i I I 1· • 7.~rr"'-10D£C i:;..."l(J,1 C\VSRF OeNEFJT:S ASSfSSMEf'IT -CORE MEASURES FOR PROJECTS Thls ~91! la'(i out the l'lf:aM:r'OS. An eledrcn.: 'fl!B!en of thi s .... ·o·k:tllut :.\1 :I be 1:s:i!j ~(l,f :'CJ:CIILng. JI \'l'tJI it!:.iu66 lith.S IC the' CiCTlhJTlOM~,)t)Of)&T,), soo.\CfS 11:.tin!iiS IOLnd on the folo,'tlr,g ~cs. T11ae oucrlbe tl\11 data ,e ,ud uut An ; EP 4·, ,:.af'IS to ~!,t itoi:'~ tN! 11"lormenan tor c;I• projects. O!Ml\Plete m'!asun:.• 0, 1, z. :,, and of ror c,•df ltHl/ridua/ project o: the llme or bolo exea,U::-n; a s ng lc loan m....,. finance ff\UWpk pr.,Jects. • l, 1, !nd lb are ~n,I lo< •~t :.OUl'n! i-ro;ccts. Please Include ~;-tt,!1n9 or:J c tJ tc" ctNT,n,cnts when, ap:,lotte. C'NSR E CQCC Beoet11; rl~ o. B,.a,•k prraJ.c:r l nform ■Uon (complet■ for aJJ pf'Oj~J d . a. er.Jca .,..n• f'Jrcu 2. Erp~,.r,,,.-L;-f(,tt., (:€!J;,.,..,J D:>e5 t t1b proJcct·5 saccil'k lol:Qlngs n..,._C'!Jo,it; aUc\'\I U::-system tc address: Projcd treddng • U· bC>e kkUtlonaJ trado't:,g tt __ (phasec pra}!d:1 □ S>haH • r or.gklal p,c)9a. ll ___ ) b . Po,h\lt!TyJ)e Cpes Num ,,.,C -00 2., wa.,,rb<>Or 100/12-~lglt liUC Soodlo H, t ·11,r othw locatlon JnhmNUon:· • O ~--ft>¥• 51. c. CWSRFloanamounttotheprojeC:$, "O,Oo01 000 -/_,, d. To ... CWSRl'lconomoontS. '->L!:1_ EllWJllondau..EL..!!z lntorut ,.,. (Onar, ~"!, Repaymen: p1t10d ~,rs •• NI~ Otagol1c!S frw the projeet. 2.2.. C.rckt all r<1lf'"".S C'a\eqc:utes l/'wlt 9&p;y tc :he protect. Fc-r a norpol11t ,oun:e pr."CJ«:i, ent• the sut~:catc~;. I ll mA 1118 JVA JV■ V YI X NPS=VO - J.• U••r pot)Ulatlan ••~ by th ■: ~j cd. /9'0 Q00 : trutmcnt fadnt,,tles~ ~D00 2 .• Vok,nN of waetewat:■r tre.aled/proa!.Ued P•OJett a.:z__rngo I .,,,._ lotiil ty(lff) ~d l . tmpnwem•nt or malnt.Aa~ ofw•t• quali ty. It. OOH thll pr.,ft:tt contrlt:ute l;D (Oletk one) watier ~•ny tmprcvvnent7)< neither □ water q ua!Uy rnalnt~rance7 □ •b. Do es thJ:1 proJe(t al'°'1 the sy:;u,n lo {dle,:.. one) achltve tlC/l'IP'.l'lall .l< nelU1c.·□ mNlt&An ccmpl!anct70 c. l s U-e lff'at.d wr(aa, tfl'IIU)/.. or 11f"'O'.l/lC1'1.'afer :::::!: fflGll!C? ICand •rdS, 0, ~ ~ 0 or~SK.ll.C.Q.01 ,J n O:sllng TMO L allocalhn7 X" a prnJectc:t TMOl ,nl ioatk:1111 C a vwatershcc!' rr .• usogc~ i:,: .a n? C N//\ 0 4 , conl 1ibullon t o &:,-otectlon 01 roston1tiun ol dL"$iyri•l cd use» and outcomes In lhe affected w,1terbc,d\•. Harte l!.11 appl icable box~ with~ ✓. for Ule c!est;inatcd U5CS, spedly ono pnmary u.e tta.r: m1vlS Ula water qtialty goats ol tN project, if appl:ic.!ble. P•p:imr., <>-other. Jf the pro:ea: docs rxit pril'\lklc any :-.?OU qualt,, ~ P,Jblle hedh t>cmen l s, btJt only in,pra-,u lnft astrud.ure stmp!-; chrJc: tnls bcit. n Destgnat9d u.a■ °"' willler,~ ShelliS., t'l arvesttna Cold w.nerfldUW"U W.wmw.e:rr~rv Frlrr.aN oflla:t reou!IOn Seoodary co11tatt re,,.rutton i ~rletJltlh i c t r:: -tilf;5~ sped(.., : Otl•'!.t -OIE:.ase ~Jt-: other UIN aDd autc.om•• OtJ1tr ~bllc he:alh w1~ .!'~l!.n /rec~dn~ Groo:,cfYlater protoctJO n Ci:f-,c 1 -pl~Jk ;.µ,_-elf•,• ~:no;, -p le,;,s,:. ~~ • .,fy -•~Ion Ramra!tcr. -. ·-0 • <> ;o on .... or •o on •:J or •n o"1f •□ or ..... on P ._: o r •□ o•, Pf'"• Q ,I •n on p n or: •D oo ;-L.: o ·- •□ O [l P f] o r "°'vl<>tJ ................ :i ~ :::i □ ~ ._, ---------------------·--------·----··-------ltepa,r\inf lntorm ■tlon, '"'•on nH!n:::J-' thb fOJT:I, .,.,.,./?144 t.., ,...,.sfro P1 :one ,3oJ;:"(',2.Z.t.57 .,.,= <,7,, ef G,.. .,h,,.,,✓ r ..., 001, comoletcJ F-J/-o, · • • • •• OBJECT CLASS CATEGORIES DETAil, BREAKDOWN (Note: Please Indicate any pre-award com with an 1tar (*)) (Fedenl 1b1re plu **Mitch 1b1re) a.PERSONNEL Posltln • Redp""I Staff Oaly Eatlaaled Salary A ■OIDI Total Peno■■el COIi b. Friaire Belienta .. ~ Rate X Total Frlna• BeaeOII COIC c. Tr■vel I■ .. State Purpose 0 ■1-Stale Purpose Destlaallon Desllullo■ Hour (Fl'lla) (Ho■rty Rate) ,·· Na. Day, Na. Staff Miles Rate Coll Na. Na. Per Lod&i■a Cost Staff Days Die ■ I Total Tnvel COIi • Page I of 3 d. Ca Ital COIIPorUalt Total ltcm•Lcuo Total Equipment Coat e. Sunnlleo UII supplies by croupi (Offlce, Laboratory; ·etc.) Cott • Total Supplies Cost r. Coatnctul ·yy 2006 Only List eac~ plaaatd coatn<t or lype or oervl<e to be procured. Cost Construction, Ma nag1.:l!.ent Services (Brown & Caldwell) 3,000,000 _· Construction Services (Western Summit Constructors) 21 ,ooo·,ooo Coa1ultanta Hourly Rate Dally Rate r. Tllal Coatnctul Cost $30,000,000 • Page 2 of 3 • •· Other 1O .... ratla• I· Otbtr • la-Klad Volantee11 Don1ttd S ce Item/Service Tot■I ln-Klad ltnu S.apl■ S12 bt. East-I' SS50/moa M ■rket Value S12/hr, @$120 BIA 12 moat !0/mon Owned b Tribe u .. C1lcul■tlont . Soarce • Tolll0t .. r b, Tolll Direct Cost(■ th'(!•lb I) (laclude M1tcb Fund1) I, Indirect Cott: (Rate: %) J. Tofil Proposed Colll: Fedenl Percent■1e:--1...5.9.-% Reelplcat Percent11e:...2!:.!!L... % • Page 3 of 3 Call Total Special Appropriations Act Project . Semi-annual Performance Report Report No. ( l ), Date: (June I, 2006) (Reportina due data:~ 30* and September 30* (Federal Fiacal Year)) ~m gf. k~m=~ga ill&a:coiorado Gryt Nambtt: XP-98867701-o Anni Data: 5-22-06 GrytAmoyt: S477 ,900 IellllttltsCCafl: S 114 ,000,00,1 pate FONSIJCE Jppfd: 6-01-04 Dag Pulfd Appgpyfd: 7 -20-04 ComtnctlPa§tartPate: 8-10-04 wpldioNf)QateCil: N/A Amogpt bid To Date: S 62M Coaitrps#9t % Completed To Dag: 50% Bpdgt & Pmlest P,dod: 2004-2ooeNPDES Npmbg: co-0032999 SQWIS Number: Ladtp~•Cdtdm•lformat):. 39 .67° Lopptgdeldedmal{onmt): 105 .0• • PrplectDw,tpdop: (brief. .. ) Addition of 13 mgd of treatment capacity , new denitrification system using deep bed sand filters, infrastructure repairs and replacement to buildings, equipment and piping. Prelm Statps; A comparuop 0{ •ctg•I accompU,bmepts to the ohlectlve est,bU,be,1 {or \lie l!m95!: (Le., quantify the project "aatpall", (1ee Ml CFR §31 .MI, and Guldellaes oa "oatpats")) Bffseu ror fllvvace l(e,tahUfbed 0hlecUm wm pot met : PrwPN:,dby: Mark Van Nostrand 09.u: 303/762- 1:11111: mvannostrand@englewoodgov.org 2657 lg: 303/762-2620 • TbiJ report 1111B be submitted via e-mail, u III atllclunellt file, to : EPA'• Pnllfd Qflklr yd tu State • ffle:~.--•-R,port4oc COUNCIL COMMUNICATION • Dato Agonda ltom Subjact July 10, 2006 F&deral Granl for the UE WWTP Phase 2 Expansion Project INITIATED BY Littleton/Englewood Supervisory Committee I STAFF SOURCE Stewart H. Fonda, Utilities Director COUNCIL GOAL AND PREVIOUS COUNCIL ACTION Approval of the Planning and Capacity Assessment Study and the Phase 2 Pre-des ign Final Report . Approval of the Brown and Caldwell Engineering Contract for the design of the Phase 2 Expansion Project improvements at the Littleton/Englewood Wastewater Treatment Plant and approval of the Brown and Caldwell contract amendment for construction management services during construction . Approval by Ordinance of two (2) lntergovemmental Agreements with the Colorado Water Resources and Power Development Authority (CWRPDA) for the issuance of Water Revenue and Water Pollution Control Revolving Fund bonds for the Phase 2 Expansion Project . Approval by Ordinance No . 40 , Series of 2004 (Cot•ncff Bill No . 36), of an lntergovemmental Agreement with the U.S. Environmental Protection Agency (USEPA) 'or the Issuance of a 2004 State and Tribal Assistance Grant (STAG) for the Phase 2 Expansion Project . • RECOMMENDED ACTION • We recommend Council approve by Ordinance an lntergovemmentai Agreement with the U.S. Environmental Protection Agency for the Issuance of the Fiscal Year 2006 and subsequent years 2007 and 2006 the State and Tribal Assistance Grants for the Phase 2 Expansion Project. We also recommend that Mr . Stewart H. Fonda, Director of Utllltles be given the authorization to sign for the City with regard to this lntergovemmental Agreement. BACKGROUND, ANALYSIS, AND ALTERNATIVES IDENTIFIED The Littleton/Englewood WWTP has a current treatment capacity of 36.3 million gallons per day (mgd) and 63,000 pounds per day of organic matter. Two primary factors have been Identified that will require expansion of the present facility: 1) higher than anticipated population growth In the facility's service area and ; 2) the regulatory requirement to remove nitrate from the plant effluent. These two factors and the need for expansion were presented to both Littleton and Englewood City Councils at a study session In November 1999 . A planning and capacity assessment project was authorized as a result of the study session and Brown and Caldwell completed the project at the end of 2000 . The results of the project were presented to both councils at a study session in February 2001 . Brown and Caldwell recommended incraasing plant capacity to a nominal 50 mgd and discussed the need for nitrate removal that will rasutt from the ongoing nitrate Total Maximum Daily Load (TMDL) study. The TMDL was completed by the Water Quality Control Division earlier this year and was approved by the EPA as of June 4, 2004 . A pre-design project was completed to Identify specific plant components needed to expand the faclltty to the recommended capacity and Include de-nitrification (nitrate removal) systems . The pre-design project also Included the Identification of the ragulatOf)' work required to obtain approval from the Water Qualtty Control Division and the Denve; R"9ionai Council of Governments, the 208 planning agency In the Denver area. As part of the pne-deslgn proje<:•. a prel :minary estimate of project costs was developed . The llndlnga and nicommandatlons of the Pre-<lealgn Projact have been completed along with the engineering design stage of the Phase 2 project. The final drawtnga and lpecfflcatlont have been made avaUable to • praqualltled general contractm and aubcontractm In order to obtain competitive bid• for the project . Final bids -. ,-hied by the City on Mlly25, 2004 . Construction of the Phase 2 Expanalon Projactbegan on Auguat 10, 2004 . The EPA ftrlt notffled the City In a letter dated May 12, 2004 that the Llttletc ,1/Englewood Wastewater Treatment Plant Phaaa 2 Project was 8ffrdad a $1,000,000 grant In 2004 . The proceeds to the City were $964,300 . The grant funds wera part of the EPA'a Fl11cal Year 2004 Appropriatlona Act. R-,Uy, EPA haa notlflad the City In a letter dated May 22, 2006 that the Phaaa 2 Project haa been awarded a $500,000 grant In 2006 . The proceeds to Iha City wlll bl $477 ,900 . The grant funds ara part of the EPA'a Flacal Year 2006 Appropriations Act . The City may bl eligible for addltlonal STAG apectal project grants In aubsequent yeara . An application has been praparad for an Intergovernmental Agreement (Application for Federal Aaalatance) for the Issuance of said grant amount of $500,000 and other amounts that may bl granted In subsequent years 2007 and 2008 . The grant funds require a 45% local match In axpendlturaa for the project. The grant funds will bl equally divided for Phase 2 cepltal expenses for the City of Englewood and the City of Llttleton . FINANCIAL IMPACT The coat of the Phan 2 Project ts esUmated to bl S 113,750,000 , la a capllaJ coat and wilt bl spilt 50/50 with the City of Llttleton. Funds to conUnue the project are Included In the 2008 budget. Grant funds will bl uaed to pay for a portion of the total capita! expenditures . The required matching funda ara available from the Sewer Reserve Account project expenditures and/or portions of the loan proceada. LIST OF ATTACHMENTS lntergovemmental Agreement for the Issuance or grant funds by the U.S. EPA for Iha LIE WWTP Phase 2 Expansion Project . • • • • COUNCIL COMMUNICATION Date : Agenda Item: Subject: )ult 10, 2006 11 a I Federal Grant for the L/E wwr P Phase 2 Expansion Project Initiated Br, Littleton/Englewood Supervisory Committee I Staff Source: Stewart H. Fonda, Utilities Director COUNCIL GOAL AND PREVIOUS COUNCIL ACTION • Approval of the Planning and Capacity Assessment Study and the Pha se 2 Pre-design Final Report. • Approval of the Brown and Cald we ll En gi neering Contract for the design of the Phase 2 Expansion Project improvements at the Littleton/Englewood Wastewater Treatment Plant and approval of the Brown and Caldwell contract amendm ent for construction management services during construction . • Approval by Ordinance of two (2) Intergove rnmental Agreements wi th the Colorado Water Resources and Power Development Authority (CWRPDA) for the issuance of Water Revenue and Water Pollution Cont rol Revolving Fund uonds for the Phase 2 Expansion Project. • Appro val by Ordinance No. 40, Series of 2004 (Council Bill No . 38), of an Intergovernmental Agreem ent wi th the U.S . Environmental Protection Agency (USEPA) for the issuan :e of a 2004 State and Tribal Assistance Grant (STAG) for the Phase 2 Expansion Project. RECOMMENDED ACTION Staff recommends that Council approve a Bill for an Ordinance authorizing an Intergovernmental Agreement with the U.S. En viron mental Protection Agency for the issuance of the Fiscal Year 2006 and subsequent ;ears 2007 and 2008 State and Tribal Assistance Grants for the Phase 2 Expansion Project. We also recommend that Stewart H. Fonda, Director of Utilities be given the authorization to sign for the City with regard to this Intergovernmental Agreement. BACKGROUND, ANALYSIS, AND ALTERNATIVES IDENTIFIED The Littleton/Englewood WWTP has a current treatment capacity of 36 .3 million gallons per day (mgd) and 63,000 pounds per day of organic matter. Two primary factors have been Identified that will require expansion of the present facility: 1) higher than anticipated population growth in the facility's service area and ; 2) the regulatory requirement to remove nitrate from the plant effluent. These two factors and the need for expansion were presented to both Littleton and Englewood City • Councils at a Study Session in November 1999. A planning and capacity assessment project was authorized as a result of the Study Session and Brown and Caldwell completed the project at the end of 2000. The results of the project were presented to both Councils at a Study Session In February 2001. Brown and Caldwell recommended increasing plant capacity to a nominal 50 mgd and discussed the need for nitrate removal that will result from the ongoing nitrate Total Maximum Daily Load (TMDL) study. The TMDL was completed by the Water Qualify Control Division and was approved by the EPA as of June 4, 2004. A pre• iesign project was completed to identify specific plant components needed to expand the facilily to the recommended capacity and include de-nitrification (nitrate removal) systems . The pre-design project also included the identification of the regulatory w ork required to obtain approval from the Water Quality Control Division and the Denver Regional Council of Governments, the 208 planning agency in the Den ver area . As part of the pre-design project, a preliminary estim.:te of project costs was developed. The findings and recommendations of the Pre-design Project have been completed along with the engineering design stage of the Phase 2 project. The final drawings and specifications were made available to prequalified general contractors and subcontractors in order to obtain competitive bids for the project. Final bids were received by the City on May 25, 2004. Construction of the Phase 2 Expansion Proje ct began on August 10, 2004 . The EPA first notified the City in a letter dated May 12, 2004 that the Littleton/Englewood Wastewat er Treatment Plant Phase 2 Project was awarded a $1,000,000 grant in 2004. The proceeds to the City were $964,300. The grant funds were part of the EPA 's Fiscal Year 2004 Appropriations Act. Recently, EPA has notified the City in a letter dated May 22 , 2006 that the Phase 2 Project has b een awarded a $500,000 grant in 2006. The proceeds to the City will be $477,900. The grant funds are part of the EPA's Fiscal Year 2006 Appropriations Act. The City may be eligible for additional ST AG special project grants in subsequent years. An appli cation has been prepared for an Intergovernmental Agreement (Application for Federal Assistance) for the issuance of said grant amount of $500,000 and other amounts that may be granted in subsequent years 2007 and 2008. The grant funds require a 45 % local match in expenditures for the project. The grant funds will be equally divided for Phase 2 capital expenses for the City of Englewood and the City of Littleton. FINANCIAL IMPACT The cost of the Phase 2 Project is estimated to be $113,750,000, and is a capital cost that will be split 50/50 with the City of Littleton. Funds to continue the project are included in the 2006 budget. Grant funds will be used to pay for a portio11 of the total capital expenditures. The required m,tching funds are ave'lable from the Sewer Reserve Account project expenditures and /or portio, ,s c ;c loan proceeJs. LIST OF ATTACHMENTS • Bill for an Ordinance • IGA for the issuance of grant funds by the U .S. EPA for the L/E WWTP Phase 2 Expansion Project.