HomeMy WebLinkAbout1997 Ordinance No. 034J
··" '
ORDINANCE NO. :ti
SERIES OF 1997
BY AUTHORITY
COUNCIL BILL NO. 38
INTRODUCED BY COUNCIL
MEMBER WIGGINS
AN ORDINANCE CREATING PAVING DISTRICT NO. 38, IN THE CITY OF
ENGLEWOOD, COLORADO; ORDERING THE CONSTRUCTION AND
INSTALLATION OF STREET PAVING, CURB, GUTTER, SIDEWALK, AND
STORM DRAINAGE IMPROVEMENTS, TOGETHER WITH NECESSARY
INCIDENTALS; AND SETTING FORTH OTHER DETAILS IN CONNECTION
WITH THE DISTRICT .
WHEREAS, the City Council of Englewood, Colorado pursuant to the Charter,
Chapter 2 of Title 11 of the Municipal Code of the City, and laws of the State of
Colorado, hereby finds and determines that there exists a necessity for the creation of
Paving District No . 38, in the City (the "District"), and the construction and
installation of street paving, curb, gutter, sidewalk, and storm drainage
improvements, together with necessary incidentals, within the District; and
WHEREAS, the City Council has determined to proceed with the creation of the
District and the construction of the improvements within the District, as described in
Resolution No. 40, Series of 1997, passed and adopted by the City Council on March 17,
1997;
NOW, THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY
OF ENGLEWOOD, COLORADO, AS FOLLOWS:
Section 1. Creation of the District. That a special improvement district for the
removal and replacement or new construction of the improvements hereinafter
described, is hereby created and established in accordance with the City Charter,
Chapter 2 of Title 11 of the Municipal Code of the City, and the laws of the State of
Colorado, and shall be known and designated as "Paving District No. 38". All
proceedings, heretofore taken and adopted in connection with the District are hereby
ratified, approved, and confirmed.
Section 2. En~eerin" Plans and Specifications. That the engineer's reports,
together with the preliminary details, specifications, estimates of cost, maps , and
schedules attached or appended to said reports, are hereby approved and adopted.
Section 3. District Boundary. The District shall be located within the corporate
limits of the City and shall be comprised of all of the real property adjacent to which
the curb, gutter, sidewalk and paving do not meet City standards, which real property
may be assessed with the cost of the improvements. A list containing the addresses of
said real property is attached hereto as "Exhibit A.
-1-
10 b iii
Section 4. Description of Improvements.
(a) The proposed District shall include all of the real property fronting or
abutting on the street between the termini hereafter described,
including the real property within one-half (1/2) block of such streets
and avenues . Adjustments for the assessment of costs will be made
for irregular and odd-shaped lots and parcels of property.
(b ) The improvements to be constructed or installed are as follows :
(1) Necessary grading and excavation, with 8" compacted gravel
base course and 3" asphaltic concrete surface, concrete walks,
curb and gutter where not already installed or not meeting City
standards; together with appurtenances and incidentals on the
following streets and avenues:
On From T
W. Radcliff Ave .
W . Stanford Ave .
W. Thomas Ave .
S . Beverly Dr.
S . Garden St.
S . Windermere St.
W . Prentice Ave .
S. Windermere St.
S. Windermere St.
S . Windermere St.
W . Tufts Ave.
W. Thomas Ave.
W. Quincy Ave.
S. Windermere
Cul-de-sac± 600' E. of Navajo
Cul-de-sac ± 330' E . of Navajo
S . Garden St.
W . Thomas Ave.
Cul-de-s ac ± 220' S . of
Thomas Ave .
W. Tufts Ave.
S. Hickory Lane
(2 ) Necessary grading and excavation, with 6" compacted gravel
base course and 2" asphaltic concrete surface , concrete walks ,
curb and gutter where not already installed or not meeting City
standards; together with appurtenances and incidentals on the
following streets and avenues :
n From To
S . Emerson St. E . Girard Ave . E. Hampden Ave.
On
(3) Necessary grading and excavation, with concrete street paving;
together with appurtenances and incidentals on the following
streets and avenues :
From To
W. Jefferson Ave. S. Cherokee St. Alley E. of Cherokee
( c ) Prior to the removal and replacement or new construction of the
improvements within the proposed district, affected property owners
will be allowed a specified time period in which to have said
improvements removed and replaced or constructed on their own
initiative .
( d ) The probable total cost of the improvements to be constructed and
installed within the District is $1 ,380,000 .
( e ) The probable amount of the total cost of said improvements which the
City shall pay is approximately $520 ,000 .
-2-
.. '•'
·'
( f) The balance of the total cost which is not paid by the City will be
assessed against the real property specifically benefited by the
improvements. Probable costs per front or linear foot for said
improvements are as follows :
Paving:
Concrete:
40' width, 8" base, 3" asphalt
30' width, 8" base, 3" asphalt
24' width, 8" base, 3" asphalt
20' width, 8" base, 3" asphalt
32' width, 6" base, 2" asphalt
Monolithic curb, gutter & walk 6"
Monolithic curb, gutter & walk 4"
Vertical curb & gutter
8" Concrete "V" Pan 4 Ft. wide
8" Concrete Street Paving
4" Curbwalk I
6" Curbwalk I
$54 .25 F.F.
$40.75 F .F .
$32.50 F .F.
$27.00 F.F.
$32.50 F .F .
$33 .00 L.F.
$30.00 L.F .
$16 .25 L.F .
$23 .50 L.F.
$72 .00 F.F.
$31.00 L.F.
$33 .00 L .F.
No assessments will be made for curbs , gutters , and sidewalks in
place which conform with the plans and specifications for the proposed
improvements and which are acceptable to the City.
Property owners are specifically referred to the schedule of proposed
assessments which will be on file in the Office of the Director of Public
Works, from which the approximate amount to be assessed against
any particular lot or parcel of property may be determined.
Section 5. Improvements Authorized . The removal and replacement or new
construction of the improvements described above in and for the District, and as
shown by the plans , specifications , and maps approved and adopted by the City
Council, is hereby authorized and ordered. The material to be used in the removal
and replacement or new construction of said improvements is to be in accordance
with such plans, specifications, and maps .
Section 6. Assessment of Costs. The probable total cost of the improvements to be
removed, replaced, or constructed within the District is $1,380,000 ; it is proposed that
the City of Englewood will pay approximately $520 ,000 of said total cost. The balance
of the total cost which is not paid by the City of Englewood will be assessed against the
real property located within the District and specially benefited by removal and
replacement or new construction of the improvements . The approximate amounts to
be assessed against said properties on a front foot, linear foot , or square foot basis
shall be as more particularly set forth in Resolution No.40 , Series of 1997; said unit
costs are incorporated herein by specific reference.
Section 7. Payment of Assessments. The costs of the removal and replacement
or new construction and installation of the improv ements, less that portion which is
paid by the City, shall be assessed by ordinance upon all the real property within the
district based upon the benefit conferred by the improvements upon each parcel of
realty within the district. If the assessment is not paid in full within the period of
-3-
time set forth in the assessment ordinance, the amount and time of payment, and
the rate and time of payment of interest shall be determined by the City Council as
set forth in the assessment ordinance.
Section 8. Benefits. The City Council hereby finds and determines that the
improvements proposed to be removed and replaced or constructed will confer a
special benefit upon the real property within the District and a general benefit upon
the City as a whole .
Section 9. Severability. If any one or more sections or parts of this Ordinance
shall be adjudged unenforceable or invalid, such judgment shall not affect, impair
or invalidate the remaining provisions of this Ordinance, it being the intention that
the various provisions hereof are severable .
Section 10. Repealer . All ordinances , or parts thereof, inconsistent or in conflict
with this Ordinance are hereby repealed to the extent only of such inconsistency or
conflict.
Section 11 . Publication and Effective Date. This Ordinance, after its final
passage, shall be numbered and recorded, and the adoption and publication shall be
authenticated by the signature of the Mayor and the City Clerk, and by the Certificate
of Publication. At or about the time of publication of this Ordinance, a copy of this
Ordinance shall be provided to t he County Assessor and t he County Treasurer of
Arapahoe County and to the Division of Local Government in the Department of Local
Affairs of the State of Colorado . This Ordinance shall become effective thirty (30 )
days after publication following final passage.
Introduced, read in full , and passed on first reading on the 5th day of May , 1997 .
Published as a Bill for an Ordinance on the 8th day of May, 1997 .
Read by title and passed on final reading on the 19th day of May, 1997.
Published by title as Ordinance N oJ./:, Series of 1997 , on the 22nd day of May,
1997.
I , Loucrishia A. Ellis , City Clerk of the City of Englewood, Colorado , hereby
certify that the above and foregoing is a true copY:toJ'the Ordi ce passed on final
reading and published by title as Ordinance No.~ S ·e of 997 .
I ~
-4-
'·
' .· ,
PPI Situs-ID
1971-35-3-23-032 HAMPDENA VEE851
1971-35-3-23-033 EMERSONSTS3475
1971-35-3-23-034 EMERSONSTS3435
1971-35-3-23-037 EMERSONSTS3401
1971-35-3-23-038 CLARKSONSTS3426
1971-35-3-24-00 l EMERSONSTS3444
1971-35-3-24-009 EMERSONSTS3446
1971-35-3-24-012 HAMPDENA VEE955
1971-35-3-24-013 EMERSONSTS3496
1971 -35-3-24-014 NO ADDRESS
2077-03-2-02-011 CHEROKEESTS3610
2077-03-2-02-012 CHEROKEESTS3612
2077-03-2-02-013 CHEROKEESTS3620
Name and Address
Columbia HealthOne LLC
4643 S. Ulster St. #1200
Denver, CO 80237-2853
Columbia HealthOne LLC
4643 S. Ulster St. #1200
Denver, CO 80237-2853
Columbia HealthOne LLC
4643 S. Ulster St. #1200
Denver, CO 80237-2853
Craig Hospital
3425 S. Clarkson St.
Englewood, CO 80110-2811
Craig Hospital
3425 S. Clarkson St.
Englewood, CO 80110-2811
Columbia HealthOne LLC
4643 S. Ulster St. #12 00
Denver, CO 80237-2853
Columbia HealthOne LLC
4643 S. Ulster St. #1200
Denver, CO 80237-2853
Columbia HealthOne LLC
4643 S. Ulster St. #1200
Denver, CO 80237-2853
Columbia HealthOne LLC
4643 S. Ulster St. #1200
Denver, CO 80237-2853
Columbia HealthOne LLC
4643 S. Ulster St. #1200
Denver, CO 80237-2853
James R. Sullivan
3610 S. Cherokee St.
Englewood, CO 80110-3526
Timothy G. Creedon
3612 S. Cherokee St.
Englewood, CO 80110-3526
Donald A. & Betty J. Joyce, JT TEN
3910 S. Galapago St.
Englewood, CO 80110-4523
Page 1
jmd413197
11 :04AM
E x
H
I
B
I
T
A
PPI Situs-ID
2077-03-2-02-014 CHEROKEESTS3630
2077-03-2-02-015 CHEROKEESTS3638
2077-03-2-02-016 CHEROKEESTS3642
2077-03-2-14-017 JEFFERSONA VEW262
2077-03-2-14-018 CHEROKEESTS3644
CITY DITCH
NO ADDRESS
2077-03-2-14-019 CHEROKEESTS3650
2077-09-1-00-001 WINDERMERESTS4300
2077-09-1-00-022 RADCLIFF A VEW1401
2077-09-1-00-035 WINDERMERESTS4460
2077-09-1-00-03 7 STANFORDAVEW1351
2077-09-1-00-03 8 STANFORDA VEW1301
2077-09-1-00-041 WINDERMERESTS4590
Name and Address
Michael B. Fehervary
3630 S. Cherokee St.
Englewood, CO 80110-3526
Glen D. Werner
3638 S. Cherokee St.
Englewood, CO 80110-3526
Maxine M. Molner & Linda L. Unger, JT Ten
3642 S. Cherokee St.
Englewood, CO 80110-3526
Mike Lee Cooper
252 W . Jefferson Ave .
Englewood, CO 80110-3535
John H. & Joyce Wise , JT TEN
3105 S. Gilpin St.
Englewood, CO 80110-3022
vlLY Ul .1.Ju5i-'WUUU
Utilities Department
3400 S. Elati
Englewood, CO 80110
Harold J. Corah
4021 S. Fox St.
Englewood, CO 80110-4562
Glenview LTD
4300 Windermere St.
Englewood, CO 80110-5539
J Ullil J..,. \...UJI.
% Van Schaak Property Management
7730 E. Belleview Ave. #210
Englewood, CO 80111-2605
Lone Star Plywood & Door Corporation
425 Airline Dr. #200
Coppell, TX 75019-4608
Windsor Industries, Inc.
1351 W. Stanford Ave.
Englewood, CO 80110-5533
Windsor Industries, Inc.
1351 W. Stanford Ave.
Englewood, CO 80110-5533
Noyes & Lamb Limited Liability Company
4590 Winderemere St.
Englewood, CO 80110-5541
Page 2
jmd4131'97
11:04AM
·.
/ .
PPI Situs-ID
2077-09-1-00-047 RADCLIFF A VEW1300
2077-09-1-00-048 RADCLIFF A VEW1252
2077-09-1 -00-069 WINDER11ERESTS4550
2077-09-1-00-070 STANFORDA VEW1582
2077-09-1-00-073 NO ADDRESS
2077-09-1-00-07 4 STANFORDAVEW1401
2077-09-1-00-07 5 WINDER11ERESTS4390
2077-09-1-00-076 NO ADDRESS
2077-09-1-16-006 TUFTSAVEW1510
CDOTLOTS
ALONG CURVE
2077-09-1-16-010 THOMASA VEW1515
2077-09-1-17-004 GARDENSTS4640
2077-09-1-17-005 GARDENSTS4650
Name and Address
Windsor Industries, Inc.
1351 W. Stanford Ave.
Englewood, CO 80110-5533
Windsor Industries, Inc.
1351 W. Stanford Ave.
Englewood, CO 80110-5533
Lone Star Plywood & Door Corporation
425 Airline Dr. #200
Coppell, TX 75019-46 08
Windsor Industries, Inc.
1351 W. Stanford Ave.
Englewood, CO 80110-5533
Windsor Industries, Inc.
1351 W. Stanford Ave .
Englewood, CO 80110-5533
DMH Properties LLC
1401 W. Stanford Ave.
Englewood, CO 80110
Renaud Inc.
4390 Windermere St.
Englewood, CO 80110-5539
Renaud Inc.
4390 Windermere St.
Englewood, CO 80110-5539
Joe R. & Barbara A. Zylstra, JT TEN
1510 W. Tufts Ave.
Englewood, CO 80110-5538
11..,,u1urauu ut:pa.iuuo;;;1n u1 iransponauon
2000 S. Holly Street
Denver, CO 80222
Attn: Paul Forster
IJ M ~ J ... '"", llil;,
% Daniel F. Haney
1495 W . Th omas Ave .
Englewood, CO 80110-5577
.csuue or .c.1111:::;L r. nu11::r
510 Powderhom Dr.
Monument, CO 80 132-8422
Charles C. Haney
3322 W . Aksarben Ave.
Littleton , CO 80 123-7924
Page 3 jmd4/3/97
!1:04AM
PPI Situs-ID
2077-09-1-17-006 GARDENSTS4654
2077-09-1-17-015 GARDENSTS4660
2077-09-1-17-022 TUFTSA VEW1470
2077-09-1-17-023 THOMASA VEW1493
2077-09-1-23-013 THOMASA VEW1500
2077-09-1-23-005 THOMASA VEW1480
2077-09-1-23-006 THOMASA VEW1470
2077-09-1-23-011 NO ADDRESS
2077-09-1-23-012 WINDERMERESTS46 l 0
2077-09-1-24-001 NA VAJOSTS4501
2077-09-1-24-002 NO ADDRESS
2077-09-1-24-003 NA V AJOSTS454 l
2077-09-1-25-002 STANFORDA VEW1312
Name and Address
Garden Lane Warehouses
4654 S. Garden Ln.
Englewood, CO 80110-5548
Harold Ausfahl, et al.
600 Watson Ln .
Littleton , CO 80123-2902
Antonio & Assunta Bovenzi, IT TEN
2111 S. Harlan St.
Lakewood, CO 80227-3617
1\.-lli:lfu;;;, \.-. naw;;y
% Good Decal Co.
1495 W. Thomas Ave.
Englewood, CO 80110-5577
J M & J Investments , Inc.
1495 W. Thomas Ave .
Englewood, CO 80110-5577
Mildred G. & Mary S. Harr, JT TEN
6818 S. Elizabeth St.
Littleton , CO 80122
L T R Partnership
1470 W. Thomas Ave.
Englewood, CO 80110-5544
Jack & Virginia Nelligan, IT TEN
4675 S. Windermere St.
Englewood, CO 80110-5542
Verne S. & Mary Porter, JT TEN
1460 W. Tufts Ave .
Englewood, CO 80110-5536
H & B Enterprises
4501 S. Navajo St.
Englewood, CO 80110-5529
H & B Enterprises
4501 S. Navajo St.
Englewood, CO 80110-5529
United Maching Inc .
454 l S. Navajo St.
Englewood, CO 80110-5529
Windsor Industries , Inc.
1351 W. Stanford Ave.
Englewood, CO 80110-5533
Page 4 jmdolf.l/97
11 :04 AM
-I '
"
PPI Situs-ID
2077-09-1-25-003 NA V AJOSTS4520
2077-09-1-25-006 NA V AJOSTS4500
2077-09-1-25-007 NA V AJOSTS4500
2077-09-1-26-002 "WINDERMERESTS4450
2077-09-1-27-003 NO ADDRESS
2077-09-1-27-004 NO ADDRESS
2077-16-1 -00-010 NO ADDRESS
2077-16-1 -00-016 BELLEVIEW A VEW1200
Nam e and Address
James L. Popish & Jeannie M. Holtz
6670 Crestbrook Dr.
Morrison, CO 80465-2232
Navajo Enterprises
4500 S. Navajo St.
Englewood, CO 80110-5530
Navajo Enterprises
4500 S. Navajo St.
Englewood, CO 80110-5530
Charles K. & Rosetta M. Angle
80 l E. Dogwood Ave .
Littleton, CO 80121-2423
Windsor Industries , Inc .
1351 W . Stanford Ave .
Englewood, CO 80110-5533
Windsor Industries, Inc .
1351 W. Stanford Ave.
Englewood, CO 80110-5533
South Suburban Parks & Recreation District
6631 S. University Blvd.
Littleton, CO 80121-2973
South Suburban Parks & Recreation District
6631 S . University Blvd.
Littleton, CO 80121-2973
Page 5 jmd413/97
11 :04 AM
. ...
...
Date
May 5, 1997
INITIATED BY
Department of Public Works
COUNCIL COMMUNICATION
Agenda Item
10 a ii
STAFF SOURCE
Subject
Ordinance to Create Paving District
No . 38
Charles Esterly, Director of Public Works
COUNCIL GOAL AND PREVIOUS COUNCIL ACTION
Council in cluded these streets in various phases of the proposed 10 year Paving Plan, and approved Resolution
No. 40 on March 17, 1997 , declaring the City 's intent to form Paving District No. 38 .
RECOMMENDED ACTION
Staff seeks Council consideration of an ordinance creating Paving District No. 38.
e BACKGROUND, ANALYSIS, AND ALTERNATIVES IDENTIFIED
Since 1956, the City has been improving its streets to meet minimum City Standards through paving improvement
districts. During this period, some 30 districts have been completed , improving approximately 99 miles of streets
and 43 alleys.
The costs of these improvements are borne by both the adjacent property owners , through special assessment s
levied for work done adjacent to their propert ies , and the City , through monies budgeted in the PIF for street and
alley intersection work, incidental storm sewer construction , right-of-way acquisition , fence relocations, etc.
At the 1983 Budget Retreat, Council approved a ten-year paving district program to bring all streets , not included
in previous districts , up to C ity Standards. Proposed paving district stree ts were presented to Council as an
accumulation of recommendations from several areas : requests from citizens , petitions , requests from business
or industrial property owners , requests from Council , review of past dist ricts, review of maintenance problems and
costs , and physical inspections. Prior to inclusion in the list, streets showing signs of distress were tested for
thickness of asphaltic concrete and basecourse to determine the appropriate action required . Streets not meeti ng
min imum City Standards were proposed for reconstruction and assessment. Street s that were found to meet City
Standards were not proposed for paving district inclusion , but rather, will be included in a City overlay-sealcoat
program where no assessments are levied.
The streets proposed for inclusion in Paving District No . 38 are streets that have not previously been constructed
to minimum City Standards , and , from testing results, require total reconstruction .
Due to delays , the 10 Year Plan was revised in 1996 ; the streets proposed for Pav ing District No . 38 are now in
Year 7 of th e rev ised plan , scheduled for constru ction in 1998. The 5 Year Capital Construction Plan for 1997
included funding for Paving District No . 38 in years 1997 and 1998, with actual construction in 1998. This
schedu le allows time for the Colorado Department of Transportation (COOT) to comp lete the construction of the
Navajo truck route prior to the construction of Paving District No . 38 , as many of th e proposed district streets are
contiguous with that construction .
'
' 4 .....
FINANCIAL IMPACT
Paving District No. 38 is scheduled for construction during the summer and fall of 1998. Funding for the City's
portion of the project, in the amount of approximately $520,000, is budgeted in the 1997 and 1998 PIF.
Construction funding for the assessable portion, in the approximate amount of $690 ,000 , will need to be provided
by the City from the General Fund balance, reimbursable through assessments to the affected properties and will
be due with property taxes in the year 2000, or from a bond sale . The assessment total will be approximately
$860,000, which includes legal fees, contingencies, etc ., bringing the project total to $1 ,380 ,000 .
LIST OF ATTACHMENTS
Ordinance
. , .
• '\