RESOLlll'ION FOR COOPERATION B~'TWEEN THE CITIES OF ENGLEWOOD AND LITTLETON FOR DEALING WITH
A COfM)N SEWAGE TREATMENT PROGRAM
WHEREAS, the Cities of Englewood and Littleton have experienced considerable growth and,
therefore, the need for expansion to their sewage treatment plants has arisen; and
WtlEllliAS, the two cities have long recognized this continuing problem and have attempted
to arrive at a solution through commissioning studies of their individual systems; and
Wtl l:!Ht:AS , the Uenver Regional Co uncil o f Goverrunents has also studied the problem of sewage
treatment in the South Denver metropolitan area and has encouraged cooperation among the various
cities and sewage districts; and
WllEREAS , on May 23 , 1 9 7 2 , the City Councils of Englewood and Littleton met in an informal
session to discuss their corranon concerns on the matter of sewage treatment; and
WHEREAS, it is c o mmonly bel ieved that the two cities could effect large economies through
a joint effort; and
WHEREAS, Englewood is in the process of acquiring the necessary land to provide for a large
treatment facility; and
WllEllliA!:i , it wd :; t h e i.;u11 :;e11::1u:-> ol all _p et::>on s p resen t at the May 23 meetiny that a joint
operation might be the most beneficial to the citizens of both cities as well as those living out-
side the boundaries of Littleton and Englewood who are within the drainage system currently served
by both plants ;
~. THEREFORE , BE IT RESOLVED, that both Englewood and Littleton will continue to operate
the ir own plants and t h at Littleton wil l inwncdiatcly begin to plan a trunk sewer connection to the
Englewood sewer system whi ch will all ow a bypass o f t he Littleton plant at such time as said facility
has reached its maximum capacity of approximately 5.5 million gallons per day, and
BE IT FURI'HER RESOLVED, that a j oint committee composed of representatives of both cities
be appointed to develop .the method and structure of operations, said committee to work toward
effecting a plan to implement this concept; and
387
BE IT FURTHER RESOLVED, that simultaneously with the planning of a trunk sewer extension the two cities
will begin to enginee r the necessary additional sewage plant capacity which both communities will
require in the near future with such additional plant to be built at the Englewood sewage treatment site.
ADOPTED AND APPROVED this 5th day of
A'rl'EST:
-..._,_
ex officio City Clerk
ATTEST:
ex officio City Clerk
June , 1972. --------