Loading...
HomeMy WebLinkAbout1962-06-12 EWSB MINUTES.. . ,, REGULAR MEETING ENGLEIDOD WATER AND SEWER BOARD "" JUNE l2p 1962 The meeting was called to order by Chairman Frantz at 5: 15 Po Mo Members Present: Hernbers A.bsentg Other City Braun, Brownewell .11 Frantz» Percefull McLellan, Ol:iner, Robohm Officials Present: Utilities Director BabcockJI City Attorney F.sch 9 Consultant Shivers (Seco Note: Due to anticipated absence of Board Members and City Administrat.ive Officials attending the Colorado Municipa1 League Conferences June 13th, 14th and. 15th~ the regular monthly meeting of the Englewod Water and Sewer Board was held Tuesday$ June 12th instead of the second Wednesday$ June 13th.,) Mr .. Wo WI> Wheeler and Mro Do Mo Forester of Wo Wo Wheeler and Associates , Consulting Eng:ineers were in attendance and presented the Contract Documentss Specifications and Drawings for Construction of Englewod Noo l Dam and Appurtenant Worksc Mr ... Wheeler explained to the Board that6 for expedience , it had been necessary to ask Mayor McLellan and Mayor Pro Tem Brownewell to 3ign the plans and specifications prior to clearance with the State Eng:lneer and. prior to having same reproduced, printed and bound for presentation and distribution» all of Which was done without actual Water and Sewr Board recommendations or City Council's official authorization., After short discusaion 9 Percefull moved, Brownewell 9 seconded.s That the Water and Sewer Board recommend to City Council that the signatures of No Lo McLellan , Hayor and L"' Lo Brownewellll H~r Pro Tem.s approving the plans and specifications for the construction or Englewood N''>o 1 Dam and Appurtenant Works » be ratified and confirmedo Ayes: Bra.mi, Browewell9 Frantz , Peroef'ull Nays: None Absent: HcLellan ~ Oliner 1 Robohm A discussion was next held relative to the time schedul.e involved in advertising for bids.» receiving same and contract awardingu It was brought out that., upon approval by City Council at its regular session on Monday 9 June l8th9 legal advertising could begin on June 21> 1962; bids could then be received on August 3, 1962; and, City Council consideration for awarding of the contract or oontrac·ts could be given a.t its regular session on August 6, 19620 Mr., Wheeler po:inted out that.u as requested by the Jiia.ter and Sewer Board previously, the plans and specifications have been se·t up :in two schedules; Schedule A, which ooveis th dam proper and outlet laC>rks and Schedule B 1 which covers the pump house and appurtenances a This provides for the possibility of awarding separate contracts for the work in Schedule A and Schedule B1 or awa.rdj.ng them together" A question was raised as to whether the invitation to bid on Schedule B should be advertised at this time inasmuch as a definite method of transmission of water from the dam to the Allen Filter Plant has not been determineda After discussion on the matter, it was the consensus of those present that advertising for bids on both schedules should proceed together since it is possible that a me ... hod t • transmission of the water ma;v" be deter.mined prior to receiving of bids; or~ in any even J> the Clty is not obligated to accept bids on Schedule B until readyo -2 - After considerable general discussion on the plans and specifications ;, Brownewell moved, Percefull, seconded_, That the Water and Sewer Board recommend to City Council that legal advertising of the invitation to bid on the Construction or Englewood No., l Dam and Appurtenant Works begin on June 21, 1962; that bids be received tor opening at 2:00 Po M. August 3 1 1962.J and., that City Council consideration for awarding the contract or contracts be given on August 6, 19620 Ayes: Braun, Browewell, Frantz, Percefull N1a3St None Absent: McLellan, Oliner,, Robohm --- A short discussion was held relative to the .financing of the Englewood No o 1 Dam project after which it was determined that no immediate recommending action by the Englewood Water and Sewer Board was necessary o There being no further buainesa to come before the Englewood Water and Sewer Board , the meeting was adjourned at 6:15 Po H. Approved _________ _ .. '(. Date: Subjects Recommendation: MI!MORANDtn·1 'ID THE ENGLE}.OOD CITY COUNCIL REGARDING ACT I ON OR RECOU-1ENDATION OF THE ENG!.EW)OD WATER AND SEWER :OOARD June 121 1962 Approval of Plans and Specification for the Construction ot Englewood No. 1 Dam and Appurtenant Workso That the signatures ot N. Lo McLellan, M~r and Lo Lo Brownewell, Mayor Pro Tem,, approving the plans and specif'ication:~ for the construction or Englewood No. l Dam and Appurtenant Works 1 be ratified and continuedo Respectfully submitted, ENGLEWOOD WATER AND SEWER BOARD Bn Robert F Frantz~ CfuiiiMi 427 MEM>RANDUM ro THE ENGL~D CITY COUNCIL REGARDnlG ACTION OR RECOMMENDATION OF THE ENGLEIDOD WATER AND SEWER BOARD Date: June 121 1962 Subject: Advertising for B1ds 6 Receiving of Same, and Contract Awarding in Cormect:ion With the Construction of &lgl.ewood Noo 1 Dam and Appurtenant Workao Recommendation: That legal advertising of the invitation to bid on the Construction of Englewood Noo l Dam and Appurtenant Works begin on June 21,, 1962; that bids be received for opening at 2:00 Po M., August 3, 1962; and,, that City Council consideration for awarding the contract or contracts be given on August 6$ 1962. Respectfully submitted, :mGLOOOD WATER AND S.E)JER BOARD Bys Robert F .. Frantz /\~ hhairman ~