HomeMy WebLinkAbout2000-09-19 WSB AGENDAWATER & SEWER BOARD
AGENDA
SEPTEMBER 19, 2000
CITY MANAGER'S CONF. ROOM
**** PLEASE ALLOW 1-112 HOURS FOR THIS MEETING ****
1. MINUTES OF JULY 11, 2000 MEETING. (ATT. 1)
2. GUEST : DAN BROTZMAN, CITY ATTORNEY
AMENDMENT #21 -TAX CUT 200 0 (ATT. 2)
3. LICENSE AGREEMENT-MULLEN H IGH SCHOOL. (ATT. 3)
4. NORTH RESERVIR DRAIN MODIFICATIONS AGREEMENT FOR
ENGINEERING SERVICES. (ATT. 4)
5. BUDGET REVIEW. (ATT. 5)
6 . OTHER.
WATER AND SEWER BOARD
MINUTES
JULY 11, 2000
The meeting was called to order at 5:03 p.m.
Members present:
Members absent:
Cassidy, Clark, Habenicht,
Otis, Wolosyn
Bradshaw, Higday, Kasson,
Burns
1. MINUTES OF THE JUNE 6, 2000 MEETING.
The Englewood Water and Sewer Board Minutes from the June 6,
2000 meeting were approved as written.
Mr. Cassidy moved;
Ms. Wolosyn seconded:
Ayes:
Nays:
Members absent:
Motion carried.
2. SOUTHGATE SUPPLEMENT #148.
To approve the June 6, 2000
Englewood Water and Sewer
Board Minutes.
Cassidy, Clark, Habenicht,
Otis, Wolosyn
None
Bradshaw, Higday, Kasson,
Burns
A request was made by the Southgate Sanitation District
representing the owners, Charles and Maria Savage, for
inclusion into the Southgate Sanitation District.
Supplement #148 is for 2.29 acres. The lot has a
Residential R2.5 Zoning and will remain the same for a
single-family residence. The legal is attached as Exhibit
A. The property is located north of e. Orchard Ave., south
of Belleview and west of Colorado Blvd. in Greenwood
Village. The address is 5611 S. Colorado Blvd.
Ms. Wolosyn moved;
Mr. Otis seconded:
Ayes:
Nays:
Members absent:
Motion carried.
3. SUPPLEMENT #149.
To approve the Southgate
Supplement #148 for a single-
family residence owned by
Charles and Maria Savage at
5611 S. Colorado Blvd.
Cassidy, Clark, Habenicht,
Otis, Wolosyn
None
Bradshaw, Higday, Kasson,
Burns
A request was made by the Southgate Sanitation District
representing the owners, Ta Uk and Rebecca Reed Cho for
inclusion into the Southgate Sanitation District.
Supplement #149 is for Lots 1 and 2 totaling 2.45 acres.
The lots have a Residential R2.5 Zoning. Lot 1 contains a
single-family residence. Lot 2 will be sold and a single-
family residence will eventually be built. The legal is
attached as Exhibit A. The property is located north of e.
Orchard Ave., south of Belleview and west of Quebec in
Greenwood village. The address is 6777 E. Orchard Rd.
Mr. Habenicht moved;
Mr. Cassidy seconded:
Ayes:
Nays:
Members absent:
Motion carried.
To approve the Southgate
Supplement #149 for a single
family residence and a
separate log owned by Ta Uk
and Rebecca Reed Cho. at 6777
E. Orchard Rd.
Cassidy, Clark, Habenicht,
Otis, Wolosyn
None
Bradshaw, Higday, Kasson,
Burns
Gary Kasson entered at 5:07 p .m.
Mayor Burns entered at 5:10 p .m.
4. REVISED ENGLEWOOD-CENTENNIAL AGREEMENT .
The Board received a copy of the draft of the revised
Englewood-Centennial Agreement for review. The agreement
will be discussed at a future meeting.
5. AGREEMENT FOR ENGINEERING SERVICES -BROWN & CALDWELL
CAPACITY ASSESSMENT -FACILITIES PLANNING.
Dennis Stowe, Manager of the Littleton/Englewood Wastewater
Treatment Plant, appeared before the Board to review the
proposed Agreement for Engineering Services with Brown and
Caldwell. The purpose of the agreement is to assess the
future requirements for the next Littleton/Englewood
Wastewater Treatment facilities expansion . Dennis noted the
projected rate of growth in the Littleton /Englewood service
area would require additional capacity and additional
treatment facilities to meet water quality standards.
Timing may become critical , depending on actual population
growth and regulatory requ i rements. The proposed
Engineering study is in the amount of $95,700. ~ \~\\
Mr. Habenicht moved; ~0 \1)..,, c_~\6
Mr. Cassidy seconded:
Ayes:
Nays:
Members absent:
Motion carried.
"f To approve the Southgate
Supplement #J:-tf9 for a single
family residence and a
separate log owned by Ta Uk
and Rebecca Reed Cho. at 6777
E. Orchard Rd.
Cassidy, Clark, Habenicht,
Ot i s, Wolosyn
None
Bradshaw, Higday, Kasson,
Burns
The meeting adjourned at 5:45 p.m.
The next meeting will be held July 11, 2000 at 5:00 p.m.
Respectfully submitted,
Cathy Burrage
Recording Secretary
A TT. 2
Ballot Title Setting Board
Proposed Initiative Number 1999-2000 #205 1
The title as designated and fixed by the Board is as follows:
AN AMENDMENT TO THE COLORADO CONSTITUTION EST AB LIS HING A $25 TAX CUT TO LOWER
EACH 2001 ST A TE AND LOCAL TAX IN EACH TAX BILL FOR EACH UTILITY CUSTOMER AND OCCUPATION
TAX AND FRANCHISE CHARGE, VEHICLE SALES, USE, AND OWNERSHIP TAX, INCOME TAX, PROPERTY
TAX, INCOME AND PROPERTY TAX EQUAL TO YEARLY REVENUE FROM SAL ES AND USE TAXES ON FOOD
AND DRINK OTHER THAN TOBACCO AND ALCOHOL, AND INCOME TAX EQUAL TO YEARLY REVENUE
FROM ESTATE TAXES, AND, IN CONNECTION THEREWITH, INCREASING THE TAX CUT $25 YEARLY;
SPECIFYING THAT THE TAX CUTS AND STATE REPLACEMENT OF LOCAL REVENUE SHALL NOT LOWER
ST ATE OR LOCAL EXCESS REVENUE; ALLOWING THE ST ATE TO LIMIT LOCAL ACTS INCREASING
REPLACEMENT COSTS; AND PROVIDING THAT ATTORNEY FEES AND COSTS SHALL ALWAYS BE PAID TO
SUCCESSFUL PLAINTIFFS ONLY .
The ballot title and submission clause as designated and fixed by the Board is as follows:
SHALL THERE BE AN AMENDMENT TO THE COLORADO CONSTITUTION ESTABLISHING A $25 TAX
CUT TO LOWER EACH 2001 ST ATE AND LOCAL TAX IN EACH TAX BILL FOR EACH UTILITY CUSTOMER
AND OCCUPATION TAX AND FRANCHISE CHARGE, VEHICLE SALES, USE, AND OWNERSHIP TAX, INCOME
TAX , PROPERTY TAX, INCOME AND PROPERTY TAX EQUAL TO YEARLY REVENUE FROM SALES AND USE
TAXES ON FOOD AND DRINK OTHER THAN TOBACCO AND ALCOHOL, AND INCOME TAX EQUAL TO
YEARLY REVENUE FROM EST A TE TAXES, AND, IN CONNECTION THEREWITH , INCREASING THE TAX CUT
$25 YEARLY; SPECIFYING THAT THE TAX CUTS AND STATE REPLACEMENT OF LOCAL REVENUE SHALL
NOT LOWER STATE OR LOCAL EXCESS REVENUE; ALLOWING THE STA TE TO LIMIT LOCAL ACTS
INCREASING REPLACEMENT COSTS; AND PROVIDING THAT ATTORNEY FEES AND COSTS SHALL ALWAYS
BE PAID TO SUCCESSFUL PLAINTIFFS ONLY?
The summary prepared by the Board is as follows:
This measure amends article X, section 20 of the Colorado constitution, by adding a new
paragraph ( d) to subsection (8). A $25 tax cut , increased $25 each year, would lower each state and
local tax bill for each utility customer and occupation tax and franchise charge; vehicle sales, use, and
ownership tax; yearly income tax; property tax ; income and property tax equal to yearly revenue from
sales and use taxes on food and drink other than tobacco and alcohol; and income tax equal to yearly
revenue from estate taxes. The initial tax cut of $25 is applied to tax bill s for tax year 2001. The
measure specifies that a joint income tax return equals two tax bills.
I . Amend TABOR -Tax Cuts
1
The measure specifies that the tax cuts established by this measure and state replacement of
local revenue shall not lower state or local excess revenue. The state may limit local acts increasing
replacement costs. Attorney fees and costs are always paid to successful plaintiffs only who seek to
enforce this measure.
State impacts. The combined state fiscal impact of the tax cuts is a cumulative net negative
impact of at least $663.7 million. The state income tax cut would reduce general fund revenue by
$283.4 million cumulatively during the 30-month period from January 1, 2001, to June 30, 2003. For
this same 3 0-month period, the cumulative loss of revenue to the state of sales and use taxes paid on
vehicles is estimated to be $3 5 million, the impact of an income tax credit for the sales and use taxes
paid on the purchase of food and drink other than alc ohol and tobacco is estimated to be $183 .5
million cumulatively, and the impact of an income tax credit for estate taxes is estimated to be $160. 7
million cumulatively . In addition, the cut in the state utility customer tax would reduce the growth
in state general fund revenue by a significant but indeterminate amount during the 30-month period
beginning January 1, 2001.
The state would incur costs of at least $1, 100,000 to administer the tax cuts established by
this measure .
If the state replaces lost local revenues, the fiscal impact of the measure to the state would
increase by the amount of any such replacement.
Local impacts. The overall fiscal impact of the measure on local governments is
indeterminate. If the state replaces local revenue lost due to the tax cuts , it is possible that there will
be no direct fiscal impact on local governments. If there is no state replacement, the measure would
have a substantial negative fiscal impact on local governments.
The lost revenues from sales and use taxes paid on vehicles at the local level is estimated at
$38,929,052 for the 2001 local government fiscal year, while the cumulative impact of the proposed
tax cut on specific ownership revenues would result in $58, 190,300 in lost revenues for the same
fiscal year. Without state replacement, it is estimated that the measure would, at a minimum, reduce
local government utility customer tax revenues by $39,061,150 for the 2001 local government fiscal
year and reduce revenues from utility occupation taxes and utility franchise charges by $71,595,581
over the same fiscal year.
The lost local revenues from the property tax cut would be $114,352,350 for property tax bills
due in 2002. The property tax cut equal to yearly revenue from sales and use taxes on food and drink
other than tobacco and alcohol would cause local property tax revenue to decrease by a substantial
but indeterminate amount.
The requirement that attorney fees and costs are always be paid to successful plaintiffs could
have a considerable, though indeterminate, fiscal impact on local governments.
2
Title set; hearing adjourned October 6, 1999 at 6:37 p .m.
3
AMENDMENT 21 -TAX CUTS
1 Ballot Title: An amendment to the Colorado Constitution establishing a $25 tax cut to lower each
2 2001 state and local tax in each tax bill for each utility customer and occupation tax and franchise
3 charge, vehicle sales, use, and ownership tax , income tax, property tax, income and property tax equal
4 to yearly revenue from sales and use taxes on food and drink other than tobacco and alcohol, and
5 income tax equal to yearly revenue from estate taxes, and, in connection therewith, increasing the tax
6 cut $25 yearly ; specifying that the tax cuts and state replacement oflocal revenue shall not lower state
7 or local excess revenue; allowing the state t o limit local acts increasing replacement costs; and
8 providing that attorney fee s and costs shall alw ays be paid to successful plaintiffs only.
9 Text of Proposed Constitu tional Amendment:
10 Be it Enacted by the Peopl e of the State of Colorado :
11 Article X, section 20, The Taxpayer's Bill of Rights, is amended to add:
12 (S)(d) Tax cuts. A $25 tax cut , increased $25 yearly (to $50, $75 ... ), shall lower each tax
13 in each tax bill for each 2001 and later district: utility customer and occupation tax and franchise
14 charge; vehicle sales, use , and ownership tax; yearly income tax; property tax; income and property
15 tax equal to yearly revenue from sales and use taxes on food and drink other than tobacco and
16 alcohol; and income tax equal to yearly revenue from estate taxes. (8)( d) tax cuts and state
17 replacement of local revenue shall not lower state or local excess revenue , the state may limit local
18 acts increasing replacement costs, joint income tax returns equal two tax bills, and attorney fees and
19 costs to enforce (8)( d) shall alwavs be paid to successful plaintiffs only.
-1-
Final Draft
TAX CUTS
The proposed amendment to the Colorado Constitution:
2 ./ cuts each tax bill by $25 for property, income, utility, and vehicle taxes;
3 ./ increases the amount of each tax cut by $25 per year;
4 ,/ prohibits the provisions of the measure from reducing the amount of state
5 or local re venue that must be refunded to taxpayers under current law;
6 ,/ requires that a husband and wife each receive the tax cuts that affect state
7 income taxes.
8 Background
9 The proposal provides for an ini tial $25 tax cut for several state and local taxes.
10 When the state and local governments each impose a particular tax, the tax cut applies to
11 each government's tax. The amount of each tax cut increases by $25 per year, up to the
12 amount of the tax paid . For example, ifan annual tax bill is $70, the tax will be reduced $25
13 in the first year and $50 in the second year, and the tax will be eliminated in the third year.
14 Most of the taxes to which the cuts apply are for the general operations of government, such
15 as schools, prisons, constructing buildings , libraries, and fire protection. A portion of the
16 taxes are allocated for specific purposes , such as highways and the repayment of bonds.
17 Property tax. All counties and school districts and most cities and special districts
18 impose a property tax. Property taxes are reduced in two ways. First, each local
19 government's tax is directly reduced, and then it is reduced a second time to rebate any sales
20 tax revenue collected by the local government on food and nonalcoholic beverages sold at
21 grocery stores and restaurants . Homeowners and businesses pay property taxes to multiple
22 local governments and will receive the tax cut from each government. Owners of multiple
23 properties are entitled to tax cuts for each property . The property tax cuts begin with bills
24 received in 2002.
25 Income tax. Three of the tax cuts affect the state's income tax. First, individual and
26 corporate income taxes are directly cut. Next, income taxes are further cut to return the
27 amount of sales tax that the state collects on food and nonalcoholic beverages sold at
28 restaurants. Finally, income taxes are cut again to return the money the state receives from
29 the estate tax. The amount returned for food and nonalcoholic beverages is expected to
30 increase to $75 per taxp ayer in the third year, but to less than $100 in the fourth year. The
31 amount returned for estate taxes is expected to be $25 in the first year, but less than $50 in
32 the second year. The income tax cuts begin with income tax returns filed in 2002.
-1-
1 Utility taxes and charges. This proposal affects taxes and franchise charges paid
2 on utility services. H omeowners and renters do not pay state sales taxes on their gas and
3 electric bills, but in most cases pay local taxes on these bills. Telephone bills can include
4 sales taxes for service s for regular telephones, cellular telephones, FAX machines, pagers,
5 and other telecommun ications equipment. The tax cuts for utility taxes and charges begin
6 in 2001.
7 Vehicle taxes. The state, a few special districts such as RTD and the baseball
8 stadium district, and most cities and counties impose a sales tax when a vehicle is purchased.
9 The tax cut applies to the state sales tax and each local sales tax. In addition to sales tax,
10 a vehicle ownership tax is paid annually when a vehicle is registered. All local governments
11 that collect a property tax receive part of the vehicle ownership tax. The vehicle ownership
12 tax declines as a vehicle ages . The tax cut for each vehicle tax begins in 2001.
13 Impact of proposal on taxpayers and governments. Table 1 shows the estimated
14 impact of the tax cuts in the proposal on Colorado's taxpayers and governments.
15 Table 1
16 Estimated Taxpayer Savings/Government Revenue Reductions
17
18
19
20
Government Type
State
Local
Total
2001
$65 Million
$169 Million
$234 Million
2002 2003
$263 Million $410 Million
$580 Million $892 Million
$843 Mi llion $1,302 Million
21 The estimated tax savings for four different households are shown in Table 2. The
22 actual tax reductions for any househol d will depend on several factors. Some of these
23 factors are the number and age of vehicles owned , actual utility expenses, the local sales tax
24 rates, the number of property tax districts and their mill levies, and whether a taxpayer owns
25 property and pays inc ome taxes. The tax savings in Table 2 do not take into account
26 increases in federal income taxes for taxpayers who deduct their property, income , and
27 vehicle ownership taxe s .
-2-
1
2
3
4
5
6
7
8
9
10
11
12
Table 2
Examples of Tax Cuts
Estimated Tax Cuts for Households with the Following
Characteristics:
Household 1: Single ren ter, I I-year-old car, and average monthly utility
expenses of $100
Household 2: Single homeowner in four property tax districts, 3-year-old
car, and average monthly utility expenses of $158.
Household 3: Married renters, 9-year-old car and 3-year-old car, and
average monthly utility expenses of$ I 00.
Household 4: Married homeowners in six property tax districts, 3-year-old
car and I-year-old car, and average monthly ut ility expenses of S 158.
2001 2002 2003
$77 $154 $209
$126 $380 $578
$124 $279 $410
$151 $555 $862
13 State replacement of local revenue. The proposal provides that state replacement
14 of local revenue cannot reduce taxpayer refunds and that the state may limit local actions
15 that increase state replacement costs. However, the proposal does not specifically direct the
16 state to provide money to offset local government tax cuts.
17 Arguments For
18 1) State and local taxes are too high and should be reduced. Compared with other
19 states, Colorado's local sales taxes per person are the 3rd highest and total local taxes are
20 the 9th highest, while state income taxes are the 15th highest. State tax revenue is four
21 times greater than 20 years ago, compared to inflation and population growth that is only
22 2.8 times higher. Individual income tax revenue is seven times higher than 20 years ago.
23 This proposal saves the average family more than $450 in 2002, and higher amounts in
24 following years. As a result, Coloradans will have more money to spend or save as they
25 choose.
26 2) State and local revenue will exceed $25 billion in 2001 and will increase by more
2 7 than $1 .5 billion each year. The $25 annual increase in the tax cuts will never completely
28 eliminate all vehicle, income, or property tax revenue. Most income tax bills increase by
29 more than $25 each year. Taxes on utilities, which are basic needs that should not be taxed,
30 will end for most taxpayers . The tax cuts will cause government to eliminate unnecessary
31 spending. Voters can still approve a tax increase if they believe that government truly needs
32 more money.
33 3) This proposal provides the same dollar amount of tax relief to all families, thus
34 giving a larger percentage relief to low and middle-income families. The tax cuts are easy
35 for citizens to understand and should be simple to administer. The tax cuts benefit everyone
36 who pays a utility, vehicle, income, or property tax bill.
-3-
1 4) The tax cuts in this proposal could help the state 's business climate because
2 Colorado's taxes will be more competitive with taxes in other states. Much of the money
3 saved by taxpayers w ill be spent, leading to increased retail sales, jobs, and business
4 investment within the state .
5 Arguments Against
6 1) Less money will be available for the vital government services upon which
7 Colorado's citizens rely . Local government taxes will be cut by nearly $4 .0 billion during
8 the first five years, reducing or eliminating tax revenues for services such as fire protection,
9 law enforcement, and roads . State revenues will be cut by $2 .0 billion during the same
10 period, reducing money available for highway s, prisons , education, and other state
11 / programs. If the state replaces the local tax cuts , state services will be reduced below
12 current levels in four ye ars . In addition, all taxpayers statewide will pay for local services,
13 such as recreation and library districts , that benefit just a few . State replacement of local
14 taxes could also result in more state control over local issues .
15 2) Colorado 's constitution already limits the amount of taxes and fees that
16 governments can spend. In the past three years, governments have refunded more than a
17 billion dollars to Coloradans because of the constitutional limit. Additionally, the state
18 recently enacted permanent tax cuts sa ving taxpayers more than $475 million per year.
19 Coloradans alread y spend a smaller part o f their income for taxes than most others. In fact,
20 Colorado 's state and loc a l taxes are the 1 orh lowest in the country .
21 3) Although e ve ry one pays sale s ta xes, the tax cuts for sales taxes on food and
22 nonalcoholic bev erages appl y only to tho se who pay property or income taxes. This tax cut
23 excludes approximate ly 35 percent of th e state 's households that do not own property and
24 24 percent of individuals who do not pay income taxes.
25 4) This proposal could hurt Colorado's business climate and impair its long-term
26 economic growth . Res earch studies sho w that taxes are not the most important factor in
27 business location decisions . Other important factors such as a well-educated work force,
28 access to transportation , and solid infras tructure will be diminished by these tax cuts.
August 3, 2000 -4 -S:\LCS\PROJECTS \BALL01\2000\TABOR\linaldraft .wpd .wpd
-1 .;11,,-"'"-' -----· vvn '-/ '-vvv J UL.. v..., I""''-.I .I I L..UY.L.L.1'VV&I v' l l...L J I
I JJIJ JlV•
LICENSE AGREEMENT
THIS AGREEMENT, made and entared into as of the
::--__ __, __ day of , 19 _ __,,_-=---
by and between the Mc BROOM DITCR COMPANY, a municipal
corporation of Colorado, hereinafter referred to as "McBroom
Ditch Company 0 and
·· ·Mullen High School ------------------~-------------'
hereinafter ref~rred to as nLicensee,"
WITNESSETH : The McBroom Ditch Co. without any warranty
of its title or intQrest whatsoever, hereby authorizes
Licensee, its successor, assigns, to install
A 4" Biameter PVC Stormwater Force Main across
the McBz~om Ditches' 20' (twenty foot) righ~s-of-way,
described as a parcel of land situatad in the
NE 1 I 4 of Section :6 Township
5 South Range
68 We§t of the 6th P.M.,
County of Denver, Sta~e of Colorado and lying within the
following described lines:
See attached Exhibit A.
The above-described parcel contai n s 404.42 SF or 0.00928
acres, more or less.
1. Any construction contemplated or pertonned under this
License shall comply with and conform to standards
formulated by the McBrocrn Ditch Company and such
construction shall be performed and completed according to
the plans, consistinq of one sheet, a copy of which is
attached hereto and made a part hereof.
2. The Licensee shall noti!y the McBrocm Ditch Company at
least three (3) days prior to the time of commancement of
the construction of, or any repairs made to, Licensee's
4" Dia.meter PVC Storrnwater force Main
so that the Mc9room Ditch Company may, in
its discretion, inspect such operations. Existing pipeline
to be video taped and reviewed prior to construction and re-
video taped and r epaired after construction.
3. Within thirty (30) days from the date of the
commencement of construction of said
4" Force Main the Licensee
shall complete such construction, place and maintain
j. vc..
3
I
I
h
1 1
t: I
[: !
f !
""
===-----
permanent, visible markers, of a type and at such locations
as designated by the McSroom Ditch Company, referrin9 to the
centerline o! the installation and shall clear the crossing
area of all construction debris and restore the area to its
previous condition as near as may be reasonable. In the
event the placing of the centQrl ine markers. and the clearing
and restoration of the crossing area is not completed within
the time specified, the McBroom Ditch Company may complete
the work at the sole expense of t.~e Licensee .
4. The McBroom Ditch Company shall have the right to
maintain, install, repair, rQITlove or relocate the McSroom
Ditch or any other of its facilities or installations within
the rights-of-way, at any time and in such manner as deemed
necessary or convenient. The McBroom Citch Company reserves
the exclusive riqht to control all easements and
installations. In the event the
4" Force Main should interfere with any
future use of the McSroom D1tches' rights-of-way, the
Licensee shall, upon rQquest and at its sole expense,
relocate, rearrange, or remove its installations so as not
to interfere with any such use.
5. Any rQpair or replacement of any Mcaroom Ditch
installation made necessary, in t he opinion of the McEroom
Ditch company's officers because cf the construction of the
4" Force Ma i n
or other appurtenant 1ns~allation thereof, shall be made at
the sole expense of the Licensee .
6. The stipulation and conditions of this License shall be
incorporated into contract specifications if the
construction herein authorized is to be done a contract
.basis.
7. The rights and privileges granted in this License shall
be subject to prior agreements, licenses and/or qrants,
recorded or unrecorded, and it shall be the Licensee's sole
responsibility to determine the existence of said documents
or conflicting uses or installations.
a. The Licensee shall contact and fully cooperate with the
McBroom Ditches' personnel and the construction shall be
completed without interference with any lawful, usual or
ordinary flow of water through the McBroom Ditch. Licensee
shall assume all risks incident to the cossible presence of
such waters, or of storm waters, or of surface waters in the
McBroom Ditch.
9. All trenches or holes within the McSroom Ditches'
rights-of-way shall be backfilled and tamped to -t-fte--o-ri~al
~-+i-ne-Ht--ii:tyel:'~-~-~~eea~-t~-ifr'Che:!!--i-oo~e
m~~~-e--ee~-t:±~~f--n-:tft~-p~ent--r9-eT7--s~ari
Prodor-M~~~:-.an acceptable condit:ion in coinpli.ance
with plans provided per Pa~agraph 1. above and as approved by che McBroo~
Ditch Company.
I r
I
lO. Licensee, by acceptance of this license, expressly
assumes full and strict liability for any and all damages of
every nature to person or property caused by water trom the
ditch leaking through the aitch banks or pipeline at the
point or points where the Licensee performs any work in
connection with the crossing provided 'by this license. The
Licensee assumes all responsibility for maintenance of the
installation.
ll. Licensee shall indemnify and save har111less the McBroom
Ditch, its officers and employees, against any and all
claims, damages, actions or causes of action and expenses to
which it or they may be subjected by reason of said
4" Force Main
being within and across the premises of the McEroom Ditch or
by reason ot any work done or omission made by Licensee, its
agents or employees, in connection with the construction,
replacement, maintenance or repair of said installation.
12. It is expressly agreed that in case of Licensee's breach
of any of the within promises, the McSroom Ditch may, at its
option, have specific performance thereof, or sue tor
damages resulting from such breach .
13. Upon abandonment of any right or privilege herein
granted, the right of Licensee to that extent shall
terminate, but its obligation to indemnify and save harmless
the McBroom Ditch, its officers and employees, shall not
terminate in any event.
In granting the above authorization, the McBroom Ditch
reserves the right to make full use of the property involved
as may be necessary or convenient in the operation of the
water works plant and system under t.~e control of the
McBroom Ditch.
IN W!TNFSS WHEREOF, this instrument has been executed
as of the day and year first above written.
APPROVED:
Stewart Fonda
McBroon Ditch Company
APPROVED AS TO FORM:
McBroom Ditch company,
acting through and by its
Board
Presicrerli
!
I
L
r
i
L
I
;3:J3 i :J 31335
J.F. SATO AND ASSOCIATES
JOB . NO. SERV. t\PROPOSALS\MULLEN\WLEASE.DWC .1-_;
OESC. CROSSING EASEMENT OVER McBROOM DITCH F-
OATE : 7-12-00 BY--=ML..:..:.W ___ _
Consulting Engineers SCALE: 1 ·= 30' CHECKED _G~C'-----
Project Managers, Planners & Surveyors SHEET 1 OF-'1 __
NOTES : EXHIBIT .A .. 5898 So. Rapp SI. • Lirt!eton. CO 80120 • (303) 797-1200
EXHIBIT "A"
z -9--
SCALE: 1 n = .30'
THIS EXHIBIT DOES NOT REPRESENT
A MONUMENTED SURVEY. IT IS ONLY
IN TENDED TO DEPICT THE A TI ACHED
DESCRJPTJON.
S 7T42'16" E
20.22·
T.P.0.8.
N.E . COR. SEC. 6
TSS, R68W, 6th P.M.
1' AXLE w / ALUM. CAP
LS. 13155
ZONE R-5
(MULLEN HIGH SCHOOL)
EX ISTING McBROOM DITCH
20 ' WIDE EASEMENT
REC. # 9700080654
s .3"48'59" w
20.22'
N 7T42'16" W
20.22 '
N 3"48'59" E
10.11'
65.13' 62.76' 45.00' ----------1--~-------------
34 ~ 35 ' /_ ! 36 * -
4, 136 -I 6 I 4,817 -J;
sq. f t. • /;:::: / sq. ft. i
37
J, 150
sq . f t.
I I ---~-/--~-----------SJ.D~ J_ -----7-4 .~ --_45.,_QO'_
3'UE
f f WESTBRIDGE SUBDIVISION
FILING NO. 1
_,1 _ _,._I _ _BEC. # 970_Q158377
3
~
l
f
----------------------~~----------------~---------------------~-
; 3 ,:3 i:J31 395
Exhibit A
Beginning at a point in the centerline of the McBroom Ditch Company's 20 foot easement from
which the northeast corner of Section 6, T5S , R68W of 6 1h Principle Meridian bears
S80°57'33''W at a distance of 1196.44 ft.,
Thence N3 deg. 48 min. 59 sec. E, 10.11 ft. to the north easement line of the McBroom Ditch;
Thence, with the north easement line S 77 deg. 42 min. 16 sec. E, a distance of 20.22 ft.;
Thence, crossing the easement S 3 deg. 48 min. 59 sec. W, a distance of 20.22 ft. to the south
easement line to the McBroom Ditch:
Thence, with the south easement line N 77 deg . 42 min. 16 sec. W, a distance of20.22 ft.;
Thence, leaving the south easement line N 3 deg . 48 min. 59 sec. E, I 0.11 ft. to the point of
beginning.
=
'--
Date
October 2, 2000
INITIATED BY
Utilities Department
A TT... '-f
COUNCIL COMMUNICATION
Agenda Item Subject
North Reservoir Drain
Modifications Agreement for
Engineering Services
STAFF SOURCE
Stewart H. Fonda, Director of Utilities
COUNCIL GOAL AND PREVIOUS COUNCIL ACTION
None.
RECOMMENDED ACTION
At the September 19, 2000 meeting the Englwood Water and Sewer Board recommended
Council approval, by motion, of the Agreement for Engineering Services for the North
Reservoir Drain Modifications.
BACKGROUND, ANALYSIS, AND ALTERNATIVES IDENTIFIED
The North Reservoir is an 80 million-gallon raw water storage reservoir connected to the Allen
Filter Plant. When the North Reservoir is drained, some stored waste solid residuals may be
discharged to Big Dry Creek, which violates National Pollutants Discharge Elimination Permit
Standards (NPDES). It is proposed that lntegra Engineering be retained for a new hydraulic
structure to be constructed at the existing outlet pipe discharge headwall to capture waste
solid residuals released from the North Reservoir. The structure would be constructed
adjacent to Big Dry Creek and west of South Windermere Street.
A manual gate would allow water drained from the reservoir to either be diverted to Big Dry
Creek or to the existing pumping station at the Allen Plant. In turn, the existing pump station
would transfer the waste solid residuals to the existing 13 million-gallon wastewater storage
reservoir at the treatment plant site.
FINANCIAL IMPACT
The lntegra Engineering Agreement is for estimated engineering costs of $19,784.00 for
design services and $7,568.00 for construction phase services. Total engineering costs shall
not exceed $27,352.00 without prior written consent. In the 2000 Utilities Budget, funds are
available under #09-03-31411.
LIST OF ATTACHMENTS
North Reservoir Drain Modifications Agreement for Engineering Services
MEMORANDUM
TO:
FROM:
RE:
DATE:
Bill McCormick
Dugan S. Comer, Assistant City Attorney
North Reservoir Drain Modifications
Agreement for Engineering Services
September 7, 2000
I have reviewed the proposed Agreement and find no concerns regarding the
terms of the Agreement. You will need to present the Agreement to the Water Board,
and then the Board can refer the Agreement to Council, with a recommendation for
approval of the Agreement.
It will go in front of Council either as a Resolution or Motion, based upon a
decision from Dan regarding the best way to present it to Counci l
If you have any other questions please feel free to contact me.
.. . . . . . . . . . . . . . .
August, 31 2000
Mr. Bill McCormick
Utilities Operations Superintendent
City of Englewood
I 000 Englewood Parkway
Englewood, Colorado 80110
Dear Mr. McCormick:
integra engineering
450 Decatur Street, Denver. CO 80204
(303) 825-1802 Fax (303) 825-2322
North Reservoir Drain Modifications
Agreement for Engineering Services
In response to your request, we have prepared a scope of work and cost proposal to design
modifications for the North Reservoir at the Englewood Water Treatment Plant. This letter
presents a detailed description of the engineering services we propose , and an itemized cost
breakdown. For convenience, our proposal is formatted as a Letter Agreement that can be signed
to serve as a contract.
Project Description
The Allen Filter Plant operates the North Reservo ir, an 80 million gallon raw water storage
reservoir. The North Reservoir has an 18-inch diameter overflow and 27 to 30-inch diameter
gravity drain that discharge to Big Dry Creek. The North Reservoir has been used to store waste
solid residuals and recycle backwash water. When the North Reservoir is drained, some of the
stored waste solid residuals may be inadvertently discharged to Big Dry Creek.
The City of Englewood plans to modify the reservoir drain system to capture waste solid
residuals released from the North Reservoir. A new hydraulic structure will be constructed at the
existing outlet pipe discharge headwall adjacent to Big Dry Creek west of South Windemere
Street. A manual gate installed on the new hydraulic structure will allow water drained from the
reservoir to either discharge to Big Dry Creek or be diverted to the existing in-plant wastewater
pumping station . The existing wastewater pumping station will transfer the waste solid residuals
to the existing 13 million gallon wastewater storage reservoir at the treatment plant site.
Scope of Engineering Services
Integra Engineering shall plan and design modifications to
hydraulic structures on the existing North Reservoir drain.
comprise and are limited to those specifically set forth below.
~ .............. .
the existing outlet p1pmg and
Planned engineering services
PRACTICAL SOLUTIONS
Mr. B. McCormick August 31, 2000
Task 1 Project Management. Plan and coordinate engineering activities, assign and
supervise project staff, monitor budgets , administer subcontracts, and prepare monthly invoices.
Maintain project files of final design calculations, reports, memoranda, project correspondence,
and other project documents. Periodically discuss project development and key design issues
with City representatives. Submit engineering drawings and specifications to the City for review
and comment.
Task 2 Data Acquisition and Evaluation. Meet with City staff to obtain and discuss
ex1stmg project information and additional documents that may be needed. Review and
summarize existing data and information needed for the project, including :
• Site maps with topography, drainage, and flood plain information
• Drawings of existing structures , includin g building elevations
• Existing property lines, easements and ri ght-of-ways , location of utilities, and roads.
Task 3 Wetlands 404 Permit. Prepare an application for a Corps of Engineers 404
Permit required for construction in the wetland area surrounding the existing drain pipe discharge
structure. The application will be developed to obtain a national (g eneric) permit applicable to
small projects that disturb less than 0 .5 acres of wetland area.
Task 3 Hydraulic and Structural Design. Develop site p lans showing the location of
new facilities and modifications of existing facilities . Verify that the hydraulic components ,
piping, and drain system will conve y hydraulic loads at rated capacity . Design new piping ,
weirs , isolation gates, and associated hydraulic structures to allow gravity discharge from the
North Reservoir to Big Dry Creek or to manually di vert the discharge to the existing wastewater
pumping station . Verify that the existing was tewater pumps have su fficient capacity to pump the
quantity of water released from the North Reservoir.
Design structural components for the new di version structure including foundations, reinforced
concrete, stairs , grating, hoists , and other load bearing components . Structural design shall
conform to the Uniform Building Code (UBC) and other local building codes and regulations .
Task 4 Opinion of Probable Construction Cost. Develop an estimate of probable
construction cost for the project under average competitive bidding conditions. Cost data used to
develop the estimate may include published historical data, quotes from manufacturers and
vendors, and actual construction costs from similar projects. The opinion of probable
construction cost shall not be construed as a guarantee that actual construction contract bids will
be below the estimated amount.
Task 5 Plans, Specifications, and Contract Documents. Engineered drawings,
specifications, and contract documents will be developed for competitive bidding and
construction. Drawing electronic files shall be in AutoCad format. Specifications shall follow
the Construction Specifications Institute (CS I) format. Coordinate work products such that
drawings and specifications are consistent and clearly define construc tion requirements.
North Reservoir Drain Modifications Page 2
Mr. B. McCormick August 31, 2000
Submit final contract documents the Colorado Department of Public Health and Environment for
review and approval prior to construction. Two sets of full size record drawings bearing the seal
and signature of a Colorado Registered Professional Engineer shall be provided for City records.
Task6 Bid Phase Assistance. Print 20 sets of Contract Documents for distribution to
City and qualified bidders. Schedule and conduct a pre-bid conference and tour of the existing
facility. Receive and respond to questions from bidders concerning clarifications and
interpretation of the plans and specifications. Prepare and issue up to 2 addenda prior to the bid
date to respond to bidder 's questions, and incorporate clarifications and interpretations into the
Contract documents. Evaluate bids and prepare a recommendation to award contract.
Task 7 Construction Management. Prepare and respond to project correspondence,
track and file documents, and review Contractor pay requests. Receive and respond to written
information requests regarding clarification of design and unknown or changed site conditions.
If needed, prepare supplementary written descriptions, sketches , or drawings to define
modifications needed to suit field conditions . Review test reports , manufacturer's product data
and similar information submitted by the Contractor for substantial conformance with the
Contract and design intent. If requested by the Contractor, review proposed substitutions of
equipment and material.
Review the contract schedule to ensure timely progress . Document construction progress and
verify Contractor's monthly estimates of percent completion. Assess the validity and cost of
change orders, time extensions , and claims. Recommend necessary actions by the City including
authorization of change orders , schedule modificatio ns, and payments to the Contractor.
Task 8 Site Meetings and Construction Observation. Provide intermittent observation
of construction work to verify compliance with contract specifications and design intent.
Frequency and duration of on-site construction observation will vary with construction progress.
Conduct periodic meetings with the contractor at the site to review construction progress and
resolve construction issues. Site meetings will be he ld on an as needed basis. A total of up to 6
meetings and site observation trips will be held in cl uding a project Pre-Construction meeting,
and final inspection.
Services Not Included. The Scope of Engineering Services and project fees do not include the
following services:
• Wetlands 404 Permit. If the area of proposed construction along Big Dry Creek impacts any
threatened or endangered species , an evaluation of environmental impacts at the site and a
mitigat ion plan may be required. The se ele ments are not included in the Scope of
Engineering Services.
• Surveying. The City will furnish existing site maps including topography and horizontal and
vertical control to be used as the basis for design.
North Reservoir Drain Modifications Page 3
Mr. B. McCormick August 31, 2000
• Geotechnical Investigation. The City will provide existing geotechnical reports developed
for the existing reservoirs, flood control embankments, and filtration plant.
• Permit fees. Fees for permits or other applications will be paid by the Owner.
• Electrical and Instrumentation.
Compensation
For the services described in the Scope of Engineering Services, lntegra Engineering shall be
compensated based on hourly billing rates plus expenses incurred directly for the project.
Expenses incurred for the project shall be billed at actual cost plus 10 percent. Estimated level of
effort and total costs for services provided under this Agreement are summarized in Table 1.
Hourly billing rates are itemized in Table 2. Estimated engineering costs are $19, 784.00 for
design services and $7,568.00 for construction phase services. Total engineering costs for all
services provided under this Agreement shall not exceed $27,352.00 without prior written
consent of the City.
Table 1 Estimated Level of Effort and Project Fees
Task Description Estimated Effort, Hours Expense Total
Engineer CADD Admin Total Fees
1 Project Management 16 4 8 28 200 2,392
2 Data Aquisition 8 24 32 2,072
3 Wetlands 404 Permit 24 8 32 2,504
4 Hydraulic & Structural Design 48 84 132 8,952
5 Construction Cost Estimate 8 8 680
6 Construction Documents 16 8 4 28 900 3,184
Design Subtotal 120 128 12 260 1,100 19,784
7 Bid Phase Assistance 16 4 20 1,500
8 Construction Management 24 8 8 40 100 3,124
9 Construction Observation 24 8 32 200 2,944
Construction Subtotal 64 16 12 92 300 7,568
Project Total 184 144 24 352 1,400 27,352
Table 2 Hourly Billing Rates
Category Hourly Billing Rate , Category Hourly Billing Rate ,
dollars dollars
Principal Engineer 105.00 Senior Designer 65 .00
Engineer IV 95.00 CAD Designer 58.00
Engineer III 86 .00 CAD Operator 48.00
Engineer II 75.00 Administrative 45.00
Engineer I 68.00
North Reservoir Drain Modifications Page 4
Mr. B. McCormick August 31, 2000
Authorization
When signed by a designated representative of the City of Englewood and Integra Engineering,
this letter constitutes an Agreement authorizing Integra Engineering to perform the work
outlined in the Scope of Engineering Services. This letter Agreement and the attached Terms
and Conditions become the agreement governing services for the project.
Sincerely,
lntegra Engineering City of Englewood
Signature : Mj ckaJ e. L:df=·
Printed Name: Michael P . Lutz. P . E. Printed Name : __________ _
Title : __________ -=-P=ri=n"""c=ip'-'=al Title :
--------------~
Date_: _________ A~u~g~u_st_3~1~·~2~0~00 Date : ______________ _
attachments
North Reservoir Drain Modifications Page 5
Int egra Engineering
Terms & Conditions
I. PROFESSIONAL RESPONSIBILITY Integra Engineering (Engineer) is employed to
render a professional service using that degree of care and skill ordinarily exercised by and consistent
with the standards of competent registered Professional Engineers under similar conditions.
In performing construction phase engineering services, Engineer shall act as agent of the Client.
Engineer's review or supervision of work prepared or performed by other individuals or firms
employed by the Client shall not relieve those individuals or firms of complete responsibility for the
adequacy of their work. Resident engineering or inspection provided by Engineer does not constitute
any form of guarantee or insurance with respect to the performance of a contractor. Engineer assumes
no responsibility for methods or appliances used by the contractor, for construction safety , or for
compliance by contractors with applicable laws and regulations .
II. BASIS OF AGREEMENT When executed by Client, the Agreement, with these Terms and
Conditions incorporated, shall constitute a binding agreement (hereinafter the "Agreement") on the part
of both Client and Engineer. This Agreement represents the entire understanding of Client and
Engineer as to those matters contained herein . No prior oral or written understanding shall be of any
force or effect with respect to those matters covered herein. This Agreement may not be modified or
altered except in wTiting signed by both parties .
The duties of Engineer shall not be construed to exceed those services specifically defined in the
Agreement. Additional services requested by Client may be added to this Agreement by written
amendment. The parties recognize that time or circumstances may preclude written amendment prior
to initiating or completing such additional services . If requested by Client to proceed with additional
services prior to executing a written amendment to the Agreement, Engineer shall be entitled to
additional compensation consistent with the terms of the Agreement. Engineer shall be promptly
notify Client when the charges for such additional work are determined by Engineer, and both parties
agree to execute a written amendment authorizing the additional compensation.
III. PAYMENT Payments to Engineer are due within 30 days after the date of billing. Interest
on an unpaid balance will accrue beginning on the 31st day at the rate of 1.5 percent per month or the
maximum interest rate permitted by law, whichever is less. Such interest is due and payable when the
overdue payment is made .
IV. INSTRUMENTS OF PROFESSIONAL SERVICE Calculations, drawings, technical
specifications, reports, computer files and other mater ials prepared by Engineer are instruments of
professional service. All instruments of professional service developed for the Project under this
agreement shall be the property of the Client when Engi neer has been compensated as set forth herein.
The Client may use the instruments of professional service developed for the Project for reference and
documentation. The Client may, at it's own risk, use information contained in the instruments of
professional service, including electronic files of engineered drawings, for other purposes. If the Client
reuses any information contained in the instruments of professional service for any purpose other than
lntegra En g ineering Terms and Conditions Page I
Beginning Funds Available
Sources of Funds
Operating Revenues
Charges for Services
Miscellaneous
Total Operating Revenues
Nonoperating revenues
Other Financ ing Sources
Total Sources of Funds
Uses of Funds
Operating Expenses
Operating Costs
Total Operating Expenses
Ca pital outlay
Debt Service -Principal
Debt Service -Interest
Other
Total Uses of Funds
Ending Funds Available
WATER FUND
Schedule of Changes in Funds Available
1996 1997 1998 1999 2000 2000
Actual Actual Actual Actual Budget Revised
Budget
$ 2,469 ,222 $ 2,142 ,936 $16,204 ,630 $12 ,037,683 $ 5,601 ,497 $ 5,601 ,497
3, 180 ,201 3,482 ,234 3,747,267 3,934 ,890 4,047 ,048 4,047 ,048
1,009,751 1,086,766 1,537 ,399 1,403,733 1,345 ,127 1,345,127
4,189,952 4,569 ,000 5,284 ,666 5,338 ,6 23 5,392, 175 5,392 , 175
323 ,993 279 ,910 333 ,421 315,856 162 ,629 162 ,629
15 ,292 ,636
4,513 ,945 20 ,141 ,546 5,618 ,087 5,654,479 5,554 ,804 5,554 ,804
3, 162,313 3,263,474 3,538 ,697 3,715 ,379 4,529 ,788 4,529 ,788
3, 162 ,313 3,263,474 3,538 ,697 3,715 ,379 4,529,788 4,529 ,7 88
1, 131 ,345 2,043 ,048 5,794,417 6,726,382 1,634 ,700 1,634 ,7 00
505 ,000 500 ,000 149 ,524 600 ,841 613 ,187 613, 187
41,573 80 ,694 302 ,396 423,3 97 513 ,172 513,172
192 ,636
4,840 ,231 6,079 ,852 9,7 85 ,034 11,465 ,999 7,290 ,847 7,290 ,847
$ 2,142,936 $16 ,204 ,630 $12,037 ,683 $ 6,226 ,163 $ 3,865,454 $ 3,865,454
A TT.
2000
Estimated
Actual
$ 6,226,163
3,934,890
1,476,582
5,41 1,472
274 ,866
-
5,686 ,337
5,039 ,395
5,039,3 95
1,980 ,818
613, 187
513,172
8,146 ,572
$ 3,765,929
5
2001
Budget
$ 3,765,929
3,934,890
1,488,840
5,423,730
275,418
-
5,699 ,148
4,641 ,128
4,641 , 128
1,246,700
628 ,277
500 ,525
7,016 ,630
$ 2,448,447
Page
I
I
I
I
11
• • •
• • n
• •
D
• 107.
~··
..
-lll I .-·
•
[d
• • '
Iii
~
~
~
Fund: Water Fund Department: Utilities
Mission Statement
The mission of the Utilities Department regarding the Water En terprise Fund is to provide the citizens of Englewood an
adequate supply of high quality water at the lowest possible price.
Utilities
Engineer I
Manager
of
Administration
Administration
1998
Classification Actual
Personal Services 1,496,211
Commodities 339,751
Contractual 2,226,810
Capital 5,722,262
TOTAL 9,785,035
Director
of
Utilities
I
Department
Specialist
Operations
Superintendent
I
Water
Production
1999 2000
Actual Revised
Budget
1,619,678 1,810,499
399,984 651,850
2,086,663 2,067,439
7,359,678 2,761,059
11,466,003 7,290,847
I
!
I
Collection
&
Distribution
2000
Estimated
Actual
1,755,341
675,580
2,608,474
3,107,177
8,146,572
2001
Budget
1,882,404
661 ,500
2,097,224
2,375,502
7,016 ,630
~ Page108
Fund: Water Fund
0901
Department: Utilities
Division : Source of Supply
Responsible for ma intaining raw water sources , reservo irs , equipment and the operations and accounting of the
Englewood Water Right Portfolio. Among the areas ma inta ined are City Ditch, McBroom Ditch, Boreas Pass Ditch,
Mclellan Reservoir, Mclellan Pump Station, Go lf Course Wells and the Union Ave . Pump Station and Reservoir.
Program Goal:
1. To provide an adequate and dependable source of water for the citizens of Englewood.
2000 Program Objectives:
1. Have McBroom Ditch pipe line des igned from Bear Creek Filter Plant to Un ion Ave. (Pump Station. Design is now
completed .)
2. Eli minate stormwater discharge areas into City Ditch. (Ongo ing)
3. Mainta in maximum flows in Boreas Ditch. (Ongo ing)
4 . Continue right-of-way recording on C ity Ditch easements. (Ongoing)
5. Install above ground 250 gallons diesel fuel tank .
6. Install new variab le frequency dr ive at the Cornell & Pennsylvania Pump Station. (On order)
7. Repair Mclellan Reservo ir Spillway . (Under des ign . Repairs in 2001 .)
8. Pipe Lee Gulch Flume . (Stil l wa iting on Littleton storm des ign . Maybe 2001 .)
9. Install 8 ' cha in lin k fence on west side of Mclellan Reservoir. (Designed . Goes to bid in August.)
10 . Complete McBroom Ditch piping from Clay St. to Union Ave . (Now under construct ion.)
11. Pipe City Ditch at 3600 S. Grant St. (Done)
12. Pipe McBroom Ditch across Oxford Br idge (Done)
2001 Program Objectives:
1. Repair Mclellan Reservoir Spillway
2. Pipe City Ditch in the 3000 block of S. Sherman St.
3. Finish C ity Ditch piping at the Oxford siphon .
4 . Install McBroom d ivers ion vault and piping at Bear Creek Filter Plant.
5. Clean the north reservoir of sludge.
6. Install two aerators on the north reservoir.
1998 1999 2000 2000 2001
Classification Actual Actual Revised Estimated Budget
Budget Actual
Personal Services 184,953 214,793 255, 150 257,436 265,843
Commodities 30,624 45, 114 87,700 89,049 87,100
Contractual 445,332 339,970 566,764 556 ,806 568,867
Capital 225,318 188 ,619 436,500 113,089 580,000
TOTAL 886,228 788,496 1,346, 114 1,016,380 1,501,810
Page
i
•
II
• •
II
• • • Iii ..
Fund: Water Fund
0902
Department: Utilities
Division: Power & Pumping
Power and Pumping Division is responsible for maintaining 32 pumps and motors throughout the City. These pumps and
motors deliver water to storage areas or are used as booster pumps to increase pressure as needed.
Program Goal:
1. To provide and maintain a reliable and economical pumping program that will deliver water to the storage tanks and
Englewood customers.
2000: Program Objectives:
1. Maintain existing pumps and motors . (Ongoing)
2. Install frequency drives and soft starters on various motors to lower power demand costs. (One installed at Union Ave .
so far .).
3. Install soft starters on 3 wash water pump motors . (Will be purchased before the end of the year).
2001: Program Objectives:
1. Maintain existing pumps and motors. (Ongoing)
2. Install variable frequency drive on backwash pump .
1998 1999 2000 2000 2001
Classification Actual Actual Revised Estimated Budget
Budget Actual
Personal Services 144,470 159,757 221,088 204,577 233,62C
Commodities 1,481 355 6,500 6,593 5,500
Contractual 485,750 396,006 476,000 476,000 476,000
Capital 33, 181 32,657 30,000 0 37,000
TOTAL 664 ,882 588 ,774 733,588 687,170 752, 120
Page 110
Fund: Water Fund
0903
Department:
Division:
Utilities
Purification
The Purification Division is responsible for maintaining a safe and pleasant tasting water supply for the citizens of
Englewood. It is respons ible for treating the raw water pumped from the South Platte River by coagulation,
sedimentation, filtration and disinfection. The division is responsible for the operation and maintenance of the equipment,
building and grounds .
Program Goal:
1. To provide an adequate, aesthetically pleasing and safe drinking water supply to the citizens of Englewood by efficient
operation of the Allen Filter Plant.
2000 Program Objectives:
1. Maintain State Water Standards throughout the year. (Ongoing)
2. Complete Allen Plant improvements (w ill be done in August)
3. Complete new control room for Allen Plant. (In design)
4. Rehabilitate the heat ing system at the Allen Plant. (Ongoing)
5. Install a particle counter in the Allen Plant laboratory . (Ongoing)
6. Sherman Tank rehabilitation . (comp leted)
7. 6 MG Overhead Storage roof slab rehab ilitation. (Goes to bid in Aug . Construction in Sept.)
8. Completion of Allen Filter Plant heat ing system upgrades . (In design)
9. Get polyphosphate Feed System going (Designed -Montgomery Watson hired)
10 . Sherman Tank rehab ilitation (completed)
2001 Program Objectives:
1. Rep lace Zuni Tank cathodic protection .
2. Install particle counters on four filters .
3. Install new polyphosphate feed system for corrosion control.
4 . Install floating boat dock on north reservoir.
5. Begin 80 MG reservoir draining and clean ing at the Allen Filter Plant.
6. Install 500 gallon polymer feed tank for dewatering building .
7. Repair clearwell roof.
8. Constuct storage area at Allen Plant.
9. Purchase 6" hydraulic pump .
10 . Maintain State water standards throughout the year.
1998 1999 2000
Classification Actual Actual Revised
Budget
Persona l Services 382 ,356 439 ,069 474,014
Commodities 197,799 251,452 408,500
Contractual 104 , 159 117,050 228 ,544
Capital 7,171 28 ,581 337,600
TOTAL 691,485 836 ,152 1,448,658
2000
Estimated
Actual
482 ,332
409,401
417,229
420,764
1,729,726
2001
Budget
508,325
415,500
256,753
399 ,500
1,580,078
Page 11
II
II
• •
ll
• •
•
I .
c
• • • • • • • !
~
~ --kl ..
•
Fund: Department: Utilities Water Fund
0904 Division: Transmission & Distribution
The Water Distribution Division is responsible for the integrity of the physical system and supplies potable water to the
City of Englewood. The Water Distribution System consists of approximately 160 miles of water mains, 2,000 valves, 630
fire hydrants and numerous appurtenances that transm it and distribute water to approximately 10,500 water user
accounts. The Division personnel plan, construct, operate and maintain the system to insure that a safe, reliable supply of
water is provided for industrial, commercial, domestic and fire-suppression needs of the City of Englewood .
Program Goal:
1. To provide a safe and dependable water transmission system to carry finished water from the Allen Filter Plant to
Englewood citizens.
2000 Program Objectives:
1. Replace water pipe in E. Yale Ave . from Broadway to S. Grant St. (In design)
2. Install appx. 5600 feet of McBroom Ditch pipe from S. Clay St. to W. Union Ave. (Ongoing)
3. Maintain, repair and operate valves, hydrants and piping throughout the distribution system. (Ongoing)
4. Provide correct locating service and records for distribution system. (Ongoing)
5. Pipe City Ditch as needed . (Ongoing)
6. Install meter pits when investigation determines they are needed . (Ongoing)
2001 Program Objectives:
1 .
2.
Maintain, repair and operate valves, hydrants and piping throughout the distribution system. (Ongoing)
Provide correct locating service and records for distribution system. (Ongoing)
3. Pipe City Ditch as needed. (Ongoing)
4 .
5.
Install meter pits when investigation determines they are needed. (Ongoing)
Replace 6" water main in S. High St.:-600 ft.
6. Replace 8" water main in W. Bates Ave. -1300 ft .
7. Finish McBroom piping to Union Ave.
8. Pipe City Ditch on Sherman St. and on W. Oxford.
1998 1999 2000
Classification Actual Actual Revised
Budget
Personal Services 482,470 461,832 494,987
Commodities 47,684 38,392 69,800
Contractual 110,275 104,457 131,772
Capital 27,765 70,270 319,800
TOTAL 668, 193 674,951 1,016,359
Page 112
2000
Estimated
Actual
441,854
71, 112
133,725
15,226
661,917
2001
Budget
466,567
72,750
131, 142
95,200
765,659
Fund: Water Fund
0905
Department: Utilities
Division: Mclellan Improvements
Responsible for the development of the land acquired in the construction of the Mclellan Reservoir. No personnel are
assigned to this division; expenses are for consultants.
1998 1999 2000 2000 2001
Classification Actual Actual Revised Estimated Budget
Budget Actual
Personal Services 0 0 0 0 a
!Commodities 0 0 0 0 0
'Contractual 9,833 0 20,000 20,000 20,000
Capital 0 100,000 0 0 0
TOTAL 9,833 100 ,000 20,000 20,000 20,000
• •
,. ,..
~ ..
• • • • •
t: ~
..
•
Fund: Water Fund
0906
Department:
Division:
Utilities
Allen Plant Improvements
This fund division was created to show the costs associated with the Allen Plant Expansion project. No personnel are
assigned to this division; expenses are for consultants and construction. Construction will be completed in 2000.
1998 1999 2000 2000 2001
Classification Actual Actual Revised Estimated Budget
Budget Actual
Personal Services 0 0 0 0
Commodities 0 11,278 0 19,226
Contractual 533,632 498 ,686 0 313,741
Capital 4,964,587 5,767,797 500,000 1,102,939
TOTAL 5 ,498,219 6,277,762 500,000 1,435,906
Page 114
0
0
0
0
0
Fund: Water Fund
0907
Classification
Personal Services
Commodities
Contractual
Capital
TOTAL
1998
Actual
Department:
Division:
1999 2000
Actual Revised
Budget
0 0
0 0
0 42,366
0 134 ,218
0 176,584
Utilities
Special Projects
2000
Estimated
Actual
0 0
0 201
0 26,843
0 325,000
0 352,044
2001
Budget
0
0
0
0
0
Page 115
" -IJ
• •
ll ..
• • • • I
I
Fund: Water Fund
0908
Department: Utilities
Divis ion: Administration & General
The Administrat ion Division is responsib le for coordinating the efforts of the Water Department and includes such
customer services as billing, delinquent account collections, water meter reading and maintenance, inspections, response
to customer requests and inquiries, issuing perm its, record-keeping and map maintenance.
Program Goals:
1. To provide a wide variety of customer services to Englewood residents and to provide support functions for the other
Water Department programs.
2000 Program Objectives:
1. Read water meters and have water and sewer bills ready to mail by the first of each month. ( Done & ongoing)
Provide profess ional and courteous service to our customers. (Done & ongoing)
Ma intain the delinquency rate at or below 3%. (Done & ongoing)
•
4.
5.
Install new meters through the flat-rate to meter transfer program (246 Installed)
Replace water meters that have stopped functioning or stopped operating at acceptable performance levels as they are
discovered. (Done & ongoing)
•
6. Continue comprehensive meter testing and remote checking. (Done & ongoing)
· 7. Continue expansion of the Backflow Prevention Program. Set up new backflow accounts and retest existing devices. (ongoing)
8. Publish a community newsletter relating to water quality and conservation by June 1, 2000. (Done) • •
9. Provide inspection services for the City Center redevelopment. (Done & ongoing)
2001 Program Objectives:
1. Read water meters and have water and sewer bills ready to mail by the first of each month.
2 .
5.
Provide profess ional and courteous service to our customers .
Provide technical support to the other divisions of the Water Department.
Maintain the de linquency rate at or below 3%.
Install new meters through the flat-rate to meter transfer program.
Replace water meters that have stopped functioning or stopped operating at acceptable performance levels as they are
discovered .
7. Continue comprehensive meter testing and remote checking . ll 8. Continue expansion of the Backflow Prevention Program. Set up new backflow accounts and retest existing devices.
9. Publish a community newsletter relating to water quality and conservation by June 1, 2000.
• •
II
• •
10 . Provide inspection services for the City Center redevelopment.
11 . Begin installation of radio frequency, automated water meter reading .
1998 1999
Classification Actual Actual
Personal Services 301,961 344 ,227
Commodities 62 ,164 53 ,394
Contractual 537,830 588, 127
Capital 464,240 1,037,536
TOTAL 1,366,195 2 ,023 ,284
Page 116
2000 2000 2001
Revised Estimated Budget
Budget Actual
365,260 369, 142 408,049
79,350 79,997 80,650
644,359 664,130 644 ,462
1,137,159 1,130,159 1,263,802
2 ,226,128 2,243,428 2,396,963
Beginning Funds Available
Sources of Funds
Operating Revenues
Charges for Services
Miscellaneous
Total Operating Revenues
Nonoperating Revenues
Total Sources of Funds
Uses of Funds
Operating Expenses
Operating Costs
Total Operating Expenses
Capital outlay
Debt Service -Principal
Debt Service -Interest
Total Uses of Funds
Ending Funds Available
SEWER FUND
Schedule of Changes in Funds Available
1996 1997 1998 1999 2000 2000
Actual Actual Actual Actual Budget Revised
Budget
$24,786 ,806 $25 ,3 54 ,3 12 $22 ,2 93 ,443 $18,511,676 $17 ,317,138 $17 ,317 ,13 8
4,562,853 4,677 ,639 4,710 ,589 4,842,106 4,77 2,900 4,772 ,900
1,532 ,7 58 936 ,707 1,116,879 1,655,471 635 ,500 635 ,500
6,095 ,611 5,614 ,346 5,827,468 6,497 ,577 5,408,400 5,408,400
1,658,194 1,715 ,225 1,421,283 1,446 ,77 5 1,335 ,000 1,335 ,00 0
7,753 ,805 7,329,571 7,248,751 7,944,352 6,743,400 6,743,400
4,203 ,651 4,465 ,981 4,423,477 4,969 ,520 6,556 ,010 6,556 ,010
4,203,651 4,465,981 4,423,477 4,969,520 6,556,010 6,556 ,01 0
2,0 21,149 4,991,780 5,673 ,956 1,083,627 672,500 672,500
383,828 411 ,1 66 440,451 471 ,822 505,428 505,428
577,671 521 ,513 492 ,634 459 ,90 3 42E .093 426 ,093
7,1 86 ,299 10 ,39 0,440 11,030 ,518 6,984 ,872 8,1 60 ,031 8,16 0,031
$25 ,354,312 $22 ,2 93 ,443 $18,511,676 $19,471 ,156 $15 ,900 ,507 $15 ,9 00,507
2000
Estimated
Actual
$19,471 , 156
4,726 ,000
1,250,200
5,976 ,20 0
1,030,957
7,007 ,156
6,6 63,497
6,663,497
686 ,990
505,428
426 ,09 3
8,282 ,0 08
$18 ,196,304
2001
Budget
$18,196 ,3 04
4,772 ,900
1,250 ,200
6,023 ,100
1,035,000
7,058 ,100
6,600,835
6,600 ,835
1,361 ,8 50
541,427
390 ,087
8,894 ,199
$16,360,205
• •
II
•
II
• • • • • • II ~
Fund: Sewer Department: Utilities
Mission Statement
The mission of the Utilities Department regarding the Sewer Fund is to provide citizens within the Englewood service area
with an operating wastewater collection system at the lowest possible cost.
I Utilities i
I Engineer I
Administration
I
1998
Classification Actual
!Personal Services 495,404
Commodities 55,067
Contractual 3,864,349
Capital 6,615,698
TOTAL 11,030,518
Page 118
Director
of
Utilities
'
1999
Actual
578,781
50,816
4,319,619
2,035,657
6,984,873
Department
Specialist !
I
I
I
i
' I
Operations !
I
Superintendent I
!
2000
Revised
Budget
651,669
91,400
5,812,942
1,604,021
8,160,032
Wastewater
Collections
2000
Estimated
Actual
678,214
92,130
5,893, 153
1,618,511
8,282,008
i
2001
Budget
712,680
92,900
5,795,255
2,293,364
8,894,199
Fund: Department: Utilities Sewer Fund
1007 Division: Wastewater Collections
The Wastewater Collection Division is responsible for the installation, operation and maintenance of the wastewater
collection system .
Program Goal:
1. To provide a reliable collection system to transport wastewater from Englewood residents and businesses to the Bi-
City Wastewater Treatment Plant.
2000 Program Objectives:
1. Maintain and flush all of Cherry Hills Rancho collection mains. (Ongoing)
2. Continue maintaining and repairing the South Englewood Sanitary Collection System . (Ongoing)
3. Flush all mains within system at least once per year. (Ongoing)
4. Continue root cutting program. (Ongoing)
5. Continue manhole inspection and repair , as needed . (Ongoing)
6. Identify and bring to proper grade manholes that are too high or too low. (Ongoing)
7. Maintain Cherryridge Sanitation District. (Ongoing)
8. Continue televising problem lines. (Ongoing)
9. Monitor demolition and construct ion activities at City Center. Insure protection of City's sewers .
10. Rehab ili tate 530' of 8" sewer with lnstituform lining at 600 W. Princeton Ave . {In Design)
11. Reroute sewer main at 750 W . Hampden Ave . {In design)
2001 Program Objectives:
1. Maintain and clean all of the collection mains that the division is responsible for at least once a year .
2. Continue root cutting program .
3. Continue to inspect and maintain all manholes.
4. Identify and bring to proper grade manholes that are two high or too low.
5. Continue televising problem mains .
6. Help other divis ions w ith Distribution and Stormwater projects .
7. Upgrade Case backhoe to a John Deere backhoe .
1998 1999 2000 2000 2001
Classification Actual Actual Revised Estimated Budget
Budget Actual
Personal Services 171, 109 173,996 222,556 223,693 229,461
Commodities 19,913 16,680 34,000 34,000 34,050
Contractual 93,467 95,366 106,187 106 ,676 105, 187
Capital 3,911 20,110 165,000 169,355 32,200
TOTAL 288,401 306 , 152 527,743 533,724 400,898
l
I
[
I
I
'
'
•
• •
D
•
Page 119.
-
• • •
, ..
Fund: Sewer Fund
1008
Department: Utilities
Division: Administration & General
The Administration Division is responsible for coordinating the efforts of the Sewer Department and includes such
customer services as billing, delinquent account collections, inspections, response to customer requests and inquiries,
issuing permits, record-keeping and map-system maintenance.
Program Goals:
1. To provide a wide variety of customer services to Englewood residents and to provide support functions for the
Wastewater Department programs.
2000 Program Objectives:
1 .
2.
3.
4.
5.
6.
Generate and mail annual utility bills during the first week of June, July, September and December. (Ongoing)
Maintain the delinquency rate at or below 4%. (Ongoing)
Survey all active construction areas in the sanitation districts in January, March, May, July, September and November
in order to set up new accounts in a timely manner. (Ongoing)
Monitor those hotels under the Hotel Sewer Tap Agreement to verify compliance. (Ongoing)
Provide project support to the Utilities Department for a wide variety of water and sewer related projects. Respond to
requests for information and assistance in a timely and professional manner. (Done, Ongoing)
Provide inspection services for the City Center redevelopment. (Done)
• 2001 Program Objectives:
• •
• •
1 .
2.
Generate and send annual utility bills during the first week of June, July, September and December.
Maintain the delinquency rate at or below 4%.
3 . Survey all active construction areas in the sanitation districts in January, March, May, July, September and November
in order to set up new accounts in a timely manner.
7. Monitor those hotels under the Hotel Sewer Tap Agreement to verify compliance. (Ongoing)
8. Provide project support to the Utilities Department for a wide variety of water and sewer related projects. Respond to
requests for information and assistance in a timely and professional manner.
9. Provide inspection services for the City Center redevelopment.
10. Continue development of the GIS system. Coordinate with needs of other Departments.
1998 1999 2000 2000 2001
Classification Actual Actual Revised Estimated Budget
Budget Actual
Personal Services 324,295 404,785 429,113 454,522 483,219
Commodities 35, 154 34, 136 57,400 58, 130 58,850
Contractual 3,770,882 4,224,253 5,706,755 5,786,477 5,690,068
Capital 6,611,787 2,015,547 1,439,021 1,449, 156 2,261, 164
TOTAL 10,742,117 6 ,678,721 7,632,289 7,748,284 8,493,301
Page 120
Beg inn ing Funds Available
Sources of Funds
Operating Revenues
Charges fo r Serv ices
Inte rest and ot her
Total Operating Revenues
Total Sources of Funds
Uses of Funds
Operating Expenses
Operati ng Costs
Total Operating Expenses
Capit al ou tla y
Total Uses of Funds
Ending Funds Available
STORM DRAINAGE FUND
Schedule of Changes in Funds Available
1996 1997 1998 1999 2000 2000
Actual Actual Ac tual Actual Budget Revised
Budget
$ 201,723 $ 99,095 $ 146 ,391 $ 223,452 $ 294 ,362 $ 294,362
127,3 88 127,340 127,267 127 ,026 127,0 00 127,000
13, 147 7,701 10 ,577 9,392 10,000 10 ,000
140,535 135,041 137,844 136,418 137,000 137,000
140 ,53 5 135,0 41 137 ,844 136,418 137,00 0 137,000
127,09 1 76 ,835 60,783 56 ,36 8 75 ,568 75,568
127 ,0 91 76,8 35 60,783 56,368 75 ,568 75 ,568
116,072 10,910 ----
243, 163 87,745 60,783 56,368 75 ,568 75,568
$ 99,095 $ 146 ,391 $ 223,452 $ 303 ,502 $ 355,794 $ 355,794
2000
Estimated
Actual
$ 30 3,502 $
127,000
10 ,035
137 ,035
137 ,035
78 ,3 52
78,352
-
78 ,352
$ 36 2,1 85 $
2001
Budget
362,185
127,000
10,000
137 ,000
137 ,000
85,631
85,631
-
85 ,631
413,553
I
~ • • • •
II
II
•
•
•
IJ
•
Page 12 1,
• • • • • • • •
• • • • • • • •
I
•
Fund: Storm Drainage Department: Utilities
Mission Statement
Responsible for maintaining the stormwater catch basins and mains in the City. Functions include :main flushing and
cleaning.catch basin cleaning.point repair and installation.emergency response and locating responsibilities
Utilitie
Engine
s
er
I
I
I
Id Fie
Mainte nance
Classification
Personal Services
Commodities
Contractual
Capital
TOTAL
Page 122
I I
!
I
I
I I
1998
Actual
35,864
2,424
22,496
0
60 ,784
Director
of
Utilities
I
Administration
1999
Actual
39,071
5,268
12 ,029
0
56 ,368
2000
Revised
Budget
47,568
7,400
20,600
0
75,568
Department
Specialist
NP DES
Permitting
2000 2001
Estimated Budget
Actual
50, 181 54,292
8,480 8,500
19 ,691 22,839
0 0
78 ,352 85,631
~i(•ir•·•;r•m•mt•'M';•n'•P1tz1·1~1·liilil ..................... .. _.. .............. .
Fund: Storm Drainage
15XX
Department:
Division:
Utilities
All
The Storm Water Department is responsible for the operat ion and maintenance of the C ity's storm sewer system :
Services include billing, system maintenance , enforcement of code requirements, plan review and field locates, capital
construction, rehabilitation and program implementation to comply with all State and Federal regulations:
Program Goal:
• • • •
1. To provide a reliable stormwater system to capture stormwater and tran s port it to receiving waters. •
2. To maintain the City's Storm Water Collection System in good working order and to insure the City's compliance with
the State and Federal EPA's rules and regulations . •
2000 and 2001 Program Objectives:
1. Clean and inventory all catch basins and piping within th e system at least once per year. (Ongoing)
2. Identify and repair stormwater mains that are in need of point repair. (Ongo ing)
3. Clean stormwater mains when identified as needing the Vactor vacuum process. (Ongoing)
4 . Monitor the cond ition of the City's Storm Water Collection System. (Ongoing)
5. Monitor developments in the creation of Federal NPDES regulations which may affect the City . (Ongoing)
6. Be prepared to submit Part I NPDES Permit requ irements as the State and EPA require them. (Ongoing)
1998 1999 2000 2000
Classification Actual Actual Revised Estimated
Budget Actual
Persona l Services 35 ,864 39 ,071 47,568 50 , 181
Commodities 2,424 5,268 7,400 8,480
Contractual 22,496 12,029 20 ,600 19,691
Capital 0 0 0 0
TOTAL 60 ,784 56 ,368 75,568 78,352
2001
Budget
54,292
8,500
22 ,839
0
85 ,631
• I