HomeMy WebLinkAbout2000-10-10 WSB AGENDAWATER & SEWER BOARD
AGENDA
October 10, 2000
CITY MANAGER'S CONF. ROOM
1. MINUTES OF SEPTEMBER 19, 2000 MEETING. (ATT. 1)
2. FIRE HYDRANT USAGE POLICY. (ATT. 2)
3. SOUTH SUBURBAN PARKING LOT AT McLELLAN RESERVOIR LAND.)
(ATT. 3)
4. THORNTON/FRICO LITIGATION UPDATE.
5. BI-CITY PERMIT APPROVAL.
6. OTHER.
WATER & SEWER BOARD
MINUTES
September 19, 2000
A-rr. I
The meeting was called to order at 5:05 p.m.
Mr. Fonda declared that a quorum was present.
Members present:
Members absent:
Also present:
Cassidy, Clark, Habenicht, Wolosyn, Higday
Burns
Kasson, Otis, Bradshaw
Stewart Fonda , Director of Uti l ities
Dan Brotzman , City Attorney
1. MINUTES OF THE JULY 11 , 2000 MEETING .
One correction and one addition were made on the July 11 , 2000 Minutes.
Ms . Wolosyn moved :
Mr. Burns seconded :
Ayes:
Nays :
Members Absent:
Motion carried .
To approve the July 11, 2000 Englewood Water and
Sewer Board Minutes as mended .
Cass idy, Clark, Habenicht, Wolosyn, Higday, Burns
None
Kasson , Otis , Bradshaw
2. GUEST: DAN BROTZMAN RE: ADMENDMENT #21 -TAX CUT 2000.
ADMENDMENT #24 -ZERO GROWTH.
The board received copy a copy of the Proposed Initiative Number 1999-2000
#205 regarding an amendment to the Colorado Constitution establishing a $25
tax cut to low each 2001 State and local tax in each tax bill for each utility
customer.
Dan Brotzman, Englewood City Attorney appeared before the Board and
discussed the ramifications and answered questions on Amendment #21 and
Amendment #24.
3. LICENSE AGREEMENT -MULLEN HIGH SCHOOL.
A request was made by the Mullen High School for a License Agreement for
installing a 4-inch diameter PVC stormwater main in Englewood's McBroom ditch
easement.
Mr. Higday moved:
Mr. Cassidy seconded : To approve the McBroom Ditch License Agreement
For Mullen High School.
Ayes: Cassidy , Clark, Habenicht, Wolosyn , Higday , Burns
Nays : None
Members Absent: Kasson, Otis, Bradshaw
Motion carried .
4 NORTH RESERVOIR DRAIN MODIFICATIONS AGREEMENT FOR
ENGINEERING SERVICES.
The North Reservoir is an 80 million-gallon raw water storage reservoir
connected to the Allen Filter Plant. When the North Reservoir is drained, some
stored waste solid residuals may be discharged to Big Dry Creek, which violates
National Pollutants Discharge Elimination Permit Standards (NPDES). It is
proposed that lntegra Eng ineering be retained for a new hydraulic structure to
be constructed at the existing outlet pipe discharge headwall to capture waste
solid residuals released from the North Reservoir. The structure would be
constructed adjacent to Big Dry Creek and west of South Windermere Street.
A manual gate would allow water drained from the reservoir to either be diverted
to Big Dry Creek or to the existing pumping station at the Allen Plant. In turn,
the existing pump station would transfer the waste solid residuals to the existing
13 million-gallon wastewater storage reservoir at the treatment plant site .
The lntegra Engineering Agreement is for estimated engineering costs of
$19,784.00 for design services and $7 ,568.00 for construction phase services.
Total engineering costs shall not exceed $27,352 .00 without prior written
consent. In the 2000 Utilities Budge funds are available .
Mr. Higday moved;
Mr. Clark seconded:
Ayes:
Nays :
Members absent:
Motion Carried.
5 . BUDGET REVIEW.
To approve the Agreement for Engineering
Services for the North Reservoir Drain
Modification to lntegra Engineering.
Cassidy, Clark, Habenicht, Wolosyn , Higday, Burns
None
Kasson , Otis, Bradshaw
The Board received a copy of the proposed Utilities' 2001 Budget. Mr. Fonda
reviewed the budge with the Board.
6 . OTHER
Mr. Higday noted that the new Civil Center is very nice but the conference rooms
could use more decorating.
Mr. Fonda updated the Board on the Thornton case and the progress on
investigating polymer line cleaning .
The meeting adjourned at 6:15 p.m.
The next Water and Sewer Board meeting will be October 10, 2000 at 5 :00 p.m.
Respectfully submitted,
Cathy Miller
Acting Recording Secretary
TO:
FROM:
DATE:
RE:
MEMORANDUM
Stewart Fonda, Director of Utilities
John Bock, Administrative Manage£i3
October 5, 2000
Fire Hydrant Usage Policy
A -r-r. 2
Englewood's existing fire hydrant usage policy requires contractors to first obtain a
permit and provide a $300 deposit that is reimbursed upon inspection after usage. A fire
hydrant usage policy is necessary to prevent damage to the hydrant and lost water
revenues.
Because of the Denver Water Board's new restrictive fire hydrant policy, some
contractors have started illegally drawing water from Englewood's fire hydrants. The
proposed bounty reward program would be more consistent with what Denver has
already implemented. The proposed changes are:
1. Applicants will be issued a large sign to which the permits will be attached. The
sign must be displayed on the fire hydrant while it is being used. If the sign is not
prominently displayed on the hydrant, the permit is null and void even if the sign
is on the premises but was not displayed. The purpose of the sign will be so an
Englewood City employee driving by will know at a glance if it is a permitted
use.
2. If the sign is not returned at the end of the permit period, $50 will be deducted
from the collected damage deposit.
3. It is proposed that a bounty reward program be implemented where if any City
employee observes a hydrant being used illegally, Code Enforcement is called and
a ticket is issued with a resulting conviction in Municipal Court, the City
employee will receive a $100 bounty.
4 . The damage deposit collected by the Utilities Department will be increased from
$300 to $600 due to more accurately reflect material and repair costs .
Preliminary Cost Estimate
Parking Lot@ Countyline & Highline No. Date: 6/6/00
DESCRIPTION QUANTITY UNIT UNIT PRICE
.. MOBILIZATION 1 LS $ 2,850 .00
EARTHWORK
fine grad ing 2450 CY $ 4 .00
Import Fill 2450 CY $ 12 .00
CRUSHER FINE TRAIL (8' width} 100 LF $ 5 .00
RECYCLED ASPHALT PARKING LOT 13,000 SF $ 0 .50
Sign age 1 LS $ 1,500 .00
FENCING
3 -Ra il Post & Peg 480 LF $ . 12 .00
CONCRETE WHEELSTOPS 40 EA $ 40 .00
Project Total
10% Contingency
Total
A//. 3
A1~south Suburban ~y Park and Recreation District
By :J .Hand Sheet: 1 of 1
SUBTOTAL TOTAL
$ 2,850 .00 $ 2,850.00
$ -$ -
$ -$ -
$ 9 ,800 .00 $ 9,800.00
$ 29,400.00 $ 29,400.00
$ -$ -
$ -$ -
$ 500 .00 $ 500.00
$ -$ -
$ 6,500 .00 $ 6,500.00
$ -$ -
$ 1,500 .00 $ 1,500.00
$ -$ -
$ -$ -
$ 5,760 .00 $ 5,760.00
$ -$ -
$ 1,600 .00 $ 1,600.00
$ 57,910.00 $ 57,910.00
$ 5,791.00 $ 5,791.00
$ 63,701.00 $ 63,701.00
Preliminary Cost Estimate
Parking Lot@ Countyline & Highline #2 No . Date : 6/6/00 By:J .Hand Sheet: 1 of 1
DESCRIPTION QUANTITY UNIT UNIT PRICE SUBTOTAL TOTAL
MOBILIZATION 1 LS $ 1,250 .00 $ 1,250.00 $ 1,250.00
$ -$ -
EARTHWORK $ -$ -
fine grading 300 CY $ 4 .00 $ 1,200.00 $ 1,200.00
Import Fill 0 CY $ 12 .00 $ -$ -
$ -$ -
$ -$ -
CRUSHER FINE TRAIL (8' width ) 200 LF $ 5 .00 $ 1,000.00 $ 1,000.00
$ -$ -
RECYCLED ASP HALT PARKING LOT 20 ,900 SF $ 0 .50 $ 10,450 .00 $ 10 ,450.00
$ -$ -
Signage 1 LS $ 1,500 .00 $ 1,500 .00 $ 1,500.00
$ -$ -
Cul vert 75 LF $ 50 .00 $ 3 ,750 .00 $ 3,750.00
Flared end sect ion 2 EA $ 500 .00 $ 1,000 .00 $ 1,000 .00
$ -$ -
FENCING $ -$ -
3 -Ra il Post & Peg 600 LF $ 12 .00 $ 7 ,200 .00 $ 7,200 .00
$ -$ -
CONCRETE WHEELSTOPS 48 EA $ 40 .00 $ 1,920 .00 $ 1,920.00
Project Total $ 29,270.00 $ 29,270 .00
10% Contingency $ 2,927.00 $ 2,927.00
Total $ 32,197.00 $ 32,197.00
Preliminary Cost Estimate
~11\South Suburban ~y Park and Recreation District
Parking Lot@ Countyline & Highline #3 No. Date: 9/6/00 By: J . Hand Sheet: 1 of 1
DESCRIPTION QUANTITY UNIT UNIT PRICE SUBTOTAL TOTAL
MOBILIZATION 1 LS $ 8,000 .00 $ 8,000 .00 $ 8,000.00
$ -$ -
EARTHWORK $ -$ -
fine grading 5000 CY $ 4 .00 $ 20,000 .00 $ 20,000.00
Rough Grading 5000 CY $ 2 .00 $ 10 ,000 .00 $ . 10,000.00
$ -$ -
18" RCP culvert 55 LF $ 50 .00 $ 2,750.00 $ 2,750.00
Flared end section 2 EA $ 500 .00 $ 1,000.00 $ 1,000.00
$ -$ -
CRUSHER FINE TRAIL (8' w idth) 200 LF $ 5 .00 $ 1,000.00 $ 1 ,000.00
$ -$ -
RECYCLED ASPHALT PARKING LOT 20 ,900 SF $ 0 .50 $ 10,450.00 $ 10,450.00
$ -$ -
Bridge 90 LF $ 1,000.00 $ 90,000 .00 $ 90,000.00
$ -$ -
Sign age 1 LS $ 1,500.00 $ 1,500.00 $ 1,500.00
$ -$ -
FENCING $ -$ -
3 -Rail Post & Peg 600 LF $ 12 .00 $ 7 ,200 .00 $ 7,200.00
$ -$ -
CONCRETE WHEELSTOPS 48 EA $ 40.00 $ 1 ,920 .00 $ 1,920.00
Project Total $ 153,820.00 $ 153,820.00
10% Contingency $ 15,382.00 $ 15,382.00
Total $ 169,202.00 $ 169,202.00
' \
\
I
\-------
\ -