HomeMy WebLinkAbout2013-03-12 WSB AGENDAWATER & SEWER BOARD
AGENDA
TUESDAY, MARCH 12, 2013
COMMUNITY DEVELOPMENT CONFERENCE ROOM
1. MINUTES OF THE FEBRUARY 12, 2013 WATER BOARD MEETING.
(ATT. 1)
2. GUEST: Y ASS ER ABOUAISH -WATER CONSERVATION PLAN .
(ENCLOSED)
3. SOUTHGATE SUPPLEMENT #169. (ATT. 2)
4 . VALLEY SANITATION DISTRICT CONNECTOR'S AGREEMENT.
(ATT. 3)
5. ENGLEWOOD FIRE TRAINING CENTER -W. CHENANGO A VE. (A TT. 4)
6. OTHER.
Present:
Absent:
WATER & SEWER BOARD
MINUTES
TUESDAY, FEBRUARY 12, 2013
Oakley, Wiggin s , Lay, Waggoner, Moore, Woodward , Penn , Bums
Habenicht
Also present: Yasser Abouaish -City Engineer, Stu Fonda-Director of Utilities, Jonathan
Bridges -Englewood/Littleton Wastewater Treatment Plant, Randy Pierce -Utilities Systems
Support Specialist
The meeting was called to order at 5:03 p.m .
~ 1. MINUTES OF THE NOVEMBER 13, 2012 WATER BOARD MEETING
AND PHONE VOTE OF NOVEMBER 15, 2012 .
The Board received the Minutes of the November 13 , 2012 Water Board Meeting and the
resulting phone vote of November 15 , 2012.
~ 2. GUEST: DWAYNE TINSLEY -SOUTHGATE SANITATION DISTRICT
IBA INCREASE.
Dwayne Tinsley, Southgate Sanitation District's Manager, appeared to discuss the Big Dry
Creek Interceptor Agreement effective January, 2013. The updated Southgate BIA line charge
will be $0.220559 per 1,000 gallons of winter water consumption. This will affects only
Englewood customers in the Basin Interceptor sewer area. On an average Utilities bill the
increase be approximately $2.00 per year.
Motion: The Board moved to approve Southgate's BIA line charge increase to $0.220559.
Moved: Waggoner Seconded: Bums
Motion passed unanimously.
**Note: Nancy Reid, Assistant City Attorney, noted that Southgate has increased their fees for
consumers who are subject to the Big Dry Creek Interceptor. Such fees are billed by the City per
the interceptor agreement but do not require any action by City Council unless the City fees are
also affected . The charge is merely passed on through billing.
ttlJ 3 . GUEST : J ONATHAN BRID GES -MEADO W GOLD A D MINISTRATIVE
C O MPLIANCE ORD ER.
Jonathan Bridges appeared to discuss the Administrative Compliance Order to Gold Meadow
Dairies that will assess penalties of $12 ,000 for mismanagement of wastewater and
mismanagement of process waste. The violation was discovered during a site visit. The penalty
amount was reviewed by the EPA for accuracy. This is an informational item for the Board
before the letter is mailed .
llll 4. GUEST: YASSER ABOUAISH-WATER C ONSERVATION PLAN.
Yasser Abouaish , Utilities Engineer, appeared to discuss the progress of Englewood's Water
Conservation Plan. Yasser summarized the 75% progress report. Yasser will appear before the
Board in March with the 95% completed Conservation Plan and a cost benefit analysis. The
Conservation Plan will be published in the April Englewood Citizen , with the public review in
May and June.
llll 5. STO RMW ATER -MS4 C OMPLIANCE ASS IST ANCE.
Yasser Abouaish , Utilities Engineer, appeared to discuss the MS4 Stonnwater Assistance
Program. The proposal encompasses a stormwater specialist assisting Englewood with the MS4
Permit and establishing standard operating procedures.
M oti on:
Moved:
Recommend the City Manager approved the MS4 Stonnwater Assistance
Program.
Lay Seconded: Waggoner
Motion passed unanimously
l?lJ 6. FLUSH AND BURN PROGRAM.
Yasser Abouaish, Utilities Engineer, appeared to discuss the annual Water Distribution System
Annual Spring Maintenance Program that will begin in April. Englewood will temporarily
discontinue use of ammonia and convert its disinfectant to free chlorine. During this time,
increased flushing activities will also occur to remove any sedimentation in the water mains. A
notice will appear in the next Englewood Citizen. Customers that may be impacted during this
program, due to medical conditions, will be notified .
(ill 7. WATER METER PURCHASE.
Randy Pierce, Utilities Systems Support Specialist, appeared to discuss the Utilities Department
annual water meter purchase. The National Meter Company extended the same price for water
meters , registers and Itron modules as was given to the Denver Water Department. The Utilities
Department is requesting approval to purchase 618 meters in a variety of meter sizes from 5/8"
to 2" in the amount of $138,847.46.
Motion:
Moved:
Recommend Council approval of the bid from National Meter Company for a 618
water meters in the amount of$138 ,847.
Waggoner Seconded: Bums
Motion passed unanimously.
~ 8. METER YOKES & FITTINGS PURCHASE.
Three bids were received for the purchase of water yokes and fittings. The lowest, acceptable
bid that complied with the Public Law 111-38--Lead Free Compliance was Ferguson
Enterprises Inc. in the amount of $16, 168.00.
Motion:
Moved:
To recommend City Manager or Council approval of the bid for water meter
yokes and fittings from Ferguson Enterprises, Inc. in the amount of $16, 168.00.
Bums Seconded: Waggoner
Motion passed unanimously.
. .
1?11 9. BIKE TRAIL AT UNION A VE.
Tom Brennan , City Engineer, appeared to discussed the Bike Trail at Union Ave. Tom noted
that routing the bike path around the pump station is preferable.
rt] 10. NUTRIENTS AND LONG RANGE PLAN.
Dennis Stowe, Manager of the Littleton/Englewood Wastewater Treatment Plant appeared to
discuss the plant's long range planning efforts for ammonia and nutrients. Mr. Stowe noted that
expensive modifications to comply with State requirements may be necessary by 2030.
The meeting adjourned at 6: 15 p.m.
The next Englewood Water Board meeting will be Tuesday, March 12, 2013 at 5:00 in the
Community Development Conference Room.
Respectfully submitted ,
Cathy Burrage
Recording Secretary
Date
April 1, 2013
INITIATED BY
Utilities Department
COUNCIL COMMUNICATION
Agenda Item Subject
Southgate Supplement #169
STAFF SOURCE
Stewart H. Fonda, Director of Utilities
COUNCIL GOAL AND PREVIOUS COUNCIL ACTION
None.
RECOMMENDED ACTION
The Water and Sewer Board, at their March 12, 2013 meeting, recommended Council
approval of a Bill for an Ordinance approving Southgate Supplement #169.
BACKGROUND, ANALYSIS, AND ALTERNATIVES IDENTIFIED
The City of Englewood provides sewage treatment to approximately 32 ,000 accounts outside
the City through contracts with numerous connector districts. The area is defined by the
natural drainage and extends south and east from Broadway to the Valley Highway and from
Hampden to Lincoln Ave. excluding Highlands Ranch. By contract the City of Englewood must
approve any additions of land to be served by the districts. These are usually in-fill situations
that are within what the City considers to be the area it has committed to serve. Adequate
capacity has been provided in the treatment plant to accommodate all such future inclusions .
Annexation of this parcel of land will not increase the tap allocation of the Southgate
Sanitation District.
A request was made by the Southgate Sanitation District representing the owners, Howard
Bellowe and Jacquelline Stern, for inclusion of Supplement #169 consisting of a parcel totaling
1.2 acres into the Southgate Sanitation District for residential use . The property is currently
zoned Residential. The purpose of the inclusion is to install a sewer line and connect to the
existing sewer main in the street. The legal is attached as Exhibit "A". The property is located
on the north side of E. Garden Avenue , east of Colorado Blvd.
FINANCIAL IMPACT
None.
LIST OF ATTACHMENTS
Bill for Ordinance
Southgate Sanitation District Supplement #169
SGSUPP169
SUPPLEMENT NO. __ TO CONNECTOR'S AGREEMENT
THIS AGREEMENT, made and entered into by and between the CITY OF
ENGLEWOOD, acting by and through its duly authorized Mayor and C ity Clerk ,
here inafter called the "City," and SOUTHGATE SANITATION DISTRICT, Arapahoe
and Douglas Counties , Colorado , hereinafter called the "District,"
WITNESSETH:
WHEREAS, on the 20th day of June , 1961 , the City and the District
entered into an Agreement in which the City agreed to treat sewage originating from the
District's sanitary sewer system within the area served by the District , which Agreement
was renewed by Connector's Agreement dated November 16, 1988 and Amended April
20 ,2009;and
WHEREAS, said Connector's Agreement provides that the district may not
enlarge its service area without the wr itten consent of the City;
NOW , THEREFORE , in consideration of the mutual covenants and
undertakings herein set forth, the parties agree as follows :
1. The City hereby consents to the inclusion of certain additional area
located in Arapahoe County , Colorado , owned by Howard Bellowe and more fully
described on Exhibit A attached hereto and incorporated herein by reference , into
Southgate San itation District. The City agrees that said additional area may be served
with the sewer facilities of the District , and that the City will treat the sewage discharged
into the City's trunk line from sa id additional area , all in accordance with the
Connector's Agreement dated November 16 , 1988 and Amended April 20 , 2009 .
Accordingly , Exhibit A referred to in Paragraph 1 of the Connector's Agreement dated
November 16 , 1988 and Amended April 20 , 2009 , is hereby amended to include such
addi ti onal area .
2. Each and every other provision of the sa id Connector's Agreement
dated November 16 , 1988 and Amended Ap ril 20 , 2009 , shall remain unchanged .
IN WITNESS WHEREOF, the parties have set their hands and seals th is
__ day of , 2013.
ATTEST :
CITY CLERK
(SEAL)
~~ S:UARY
(SEAL)
CITY OF ENGLEWOOD
By : ________ _
MAYOR
SOUTHGATE SANITATION DISTRICT,
ARAPAHOE AND DOUGLAS COUNTIES,
COLORADO -~
By ~~---
EXHIBIT A
(Legal Description)
Lot 3, Village Hill,
County of Arapahoe,
State of Colorado
215/13
------
24
.. -, •
I
!J
' 1
' \
\
. ArapaMAP Print Window
~300 .S
htto://gis.co .araoahoe.co.us/aranamanlite/PrintWindow.htm
!tfarJ'!li~PerrYi
Nature Preserve
Page 1of1
')/t;,/')()1 ".l
COUNCIL COMMUNICATION
Date Agenda Item
April 15, 2013
Subject
Valley Sanitation District
Connector's Agreement
INITIATED BY
Utilities Department
STAFF SOURCE
Stewart H. Fonda , Director of Utilities
COUNCIL GOAL AND PREVIOUS COUNCIL ACTION
City Council approved a standard Sanitary Sewer Connector's Agreement in January, 1988.
RECOMMENDED ACTION
At their March 12, 2013 meeting the Englewood Water and Sewer Board recommended
Council approval of the Valley Sanitation District Wastewater Connector's Agreement.
BACKGROUND, ANALYSIS, AND ALTERNATIVES IDENTIFIED
Sanitary sewer service is provided to districts outside of the Englewood corporate boundaries
through the standard connector's agreement. The Littleton/Englewood Wastewater Treatment
Plant is able to receive and trea t sewage transmitted by various districts . The attached
agreement addresses this service with the district that owns and maintains the sewer mains.
In the Valley Sanitation District there are 2293 taps. The Valley Sanitation District Sanitation
District will continue to own the lines and will be responsible for capital improvements in its
system. The attached map shows the Valley Sanitation District boundaries.
The City Attorney's office has reviewed and approved the standard Connector's Agreement.
FINANCIAL IMPACT
None .
LIST OF ATTACHMENTS
Resolution
Valley Sanitation District Wastewater Connector's Agreement
Map
Connectors Agr -Vallely San . Dis t.doc
WASTEWATER
CONNECTOR'S AGREEMENT
For Districts
4/19 /2012
Revision
Sewer Contract No. ___ _
THIS AGREEMENT, made and entered into this day of
_________ , 20 __ to be effective as of , 20_; by and
between the CITY OF ENGLEWOOD, COLORADO, a municipal corporation, hereinafter
referred to as "City," acting by and through its duly elected, qualified and authorized Mayor and
City Clerk, and the VALLEY SANITATION DISTRICT, a quasi-municipal corporation and
subdivision of the State of Colorado, hereinafter called "District," acting by and through its
authorized Representative.
WITNESS ETH
WHEREAS, the City owns and operates a sewage system, including a sewage treatment plant
which is jointly owned and operated with the City of Littleton, so situated physically as to be
able to receive and treat the sewage from a designated area served by the District and gathered by
the District's sanitary-sewage system; and
WHEREAS, it is the desire of the District to utilize the facilities owned by the City for the
treatment of sewage and the City is willing to serve the District for treatment of sewage under
certain conditions;
NOW, THEREFORE, IN CONSIDERATION of the promises and for other good and
valuable consideration hereinafter set forth, it is mutually agreed by the parties as follows:
1. The City hereby agrees under the conditions hereinafter set forth, to treat the sewage
originating from the District's sanitary sewer system within the area served by the
District as approved by the City and as indicated in the description attached hereto,
incorporated herein and marked as "Exhibit A."
The District specifically agrees to prevent sewage from any area other than that
described herein, from being discharged into the District's sanitary sewage system
connected to the City's trunk line and to prevent connections to the system from or in
any area other than those described herein.
2. In the operation of the District's sanitary sewer system, the District agrees that all
applicable Code provisions and rules and regulations of the City, including amendments
thereto during the term of the contract, shall be the minimum standards for the District's
system. The District further agrees to abide by all applicable state and federal laws,
rules, regulations, or permits, including those of the Environmental Protection Agency
(the EPA) as they become effective or implemented or upon notice from the City. The
District shall inform all users, contractors and subcontractors of such standards, rules and
regulations upon inquiry from such persons, and shall not furnish any information
inconsistent therewith. In this regard, it shall be the responsibility of the District to
obtain the applicable requirements from the appropriate governing body. The City shall
1
attempt to maintain and provide information on all requirements to the District ; however,
the City does not guarantee the accuracy or completeness of government regulations
other than the City 's own regulations.
3. Regarding the provision of sewer service, the City 's permitting requirements shall be
followed by the District and its users. All sewer plans, specifications and methods of
work within the District shall be submitted to the City in writing and approved by the
City prior to any construction or tap in the District's designated area . No permit shall be
final and no service shall be provided to property until construction is approved , in
writing by the City .
4 . The District shall be responsible for the proper maintenance of its sewer system and shall
rectify any problems or conditions which have been determined by the District or the
City to be detrimental to the City's treatment process or system. Should the City
determine that any discharge enters the sewer system contrary to applicable laws ,
ordinances , statutes , rules , regulations or permits, the District agrees to proceed at once
to take whatever lawful means may be necessary to recti fy any such problem or
condition.
5. The City shall have the right to allocate service under this Contract, and the City may
deny additional service for any utility-related reason, but in no event will the City
terminate or refuse any service without cause. The City shall have the right to disconnect
service to any area annexed to the District when such annexation takes place without
prior written City approval.
Within one year of this agreement , the District shall provide the City with an estimate of
the number of equivalent service taps needed for the next five (5) years under current
zoning and planned build out in the District's area as shown on Exhibit A. The District
shall continue to monitor zoning changes within its area to estimate its tap requirements
and provide the City with notice of tap requirement for the next five (5) year period
which time shall be given to the City on each anniversary date of this Agreement in a
form satisfactory to the Ci ty .
6. The City may impose and collect reasonable fees, tolls and charges, which shall be
uniform as to all outside-City users for the services provided by the City under this
Connector 's Agreement.
The City shall bill the District users directly for all applicable City charges for services
rendered under this Agreement. Should any user not pay the City, the City shall bill the
District and the District shall pay the amount due to City within forty-five (45) days of
such billing. These charges are subject to adjustment by the City from time to time .
When such adjustment to these charges are made , the City shall give the District forty-
five ( 45) days advance written notice.
The City may bill and collect "District Charges" imposed by the Districts as an
additional item to be billed and collected by the City along with the City 's Treatment
charge and other fees. The "District Charges" received by the City shall be remitted by
the City to the District annually; less an amount equal to the City and District charges
which remain delinquent. The District shall notify the City of any changes in the District
charges to be imposed and the remittance schedule before May 1st of each year.
2
7. Subject to the terms of the Taxpayer's Bill of Rights (TABOR), the term of this
Agreement is for a period of three (3) years from the date of execution and automatically
renewed for six (6) subsequent three (3) year periods unless either party gives a
minimum of six (6) months written notice, during which time the District agrees that all
effluent produced from taps within the District shall not be in violation of any federal,
state or City laws, rules or regulations, or any other applicable governmental regulations
or the permits under which the City operates its sewage treatment system. The City
agrees, during the term hereo f, to treat said effluent and to maintain adequate facilities
for treating the same.
8. The District agrees that it will maintain, at its own expense, all lines now owned and
operated by the District, it being specifically agreed that the City assumes no
responsibility should any of the District's lines become clogged, damaged, or require
maintenance. The District shall , if it deems necessary, notify its users of the District's
procedure to remedy service disruption.
9. The City is providing only sewage treatment service and , pursuant thereto; any permits
incidental to the use of the City's sewage lines shall be governed only by this individual
Contract with the District and the City does not, by this Contract, offer treatment service
except in strict accordance with the terms hereof. This Contract does not offer, and shall
not be construed as offering, sewage treatment service to the public generally or to any
area outside the limits of the District 's service area described in Exhibit A.
10 . This Contract may not be a ss igned, sold or transferred by the District without the City's
written consent.
11 . Should any federal law, rule, permit or regulation or should a decree or order of a court
render void or unenforceable any provision of this Contract , in whole or in part , the
remainder shall remain in full force and effect.
12. The District shall enforce this Agreement and each of its terms and conditions within the
area described in "Exhibit A." The District shall refuse to serve a user or potential user ;
disconnect the service of any user pursuant to appropriate law; or take other appropriate
action in the event of:
a . Nonpayment of such user of any charge made by the City for services ;
b. Any violation or noncompliance by such user with the terms of this Agreement;
c. Any violation or noncompliance by such user with the applicable laws, rules ,
permits or regulations of the City, the United States government , including the
EPA, the State of Colorado, the Department of Health, or other law , rule, permit or
applicable regulation .
13 . Continued breach of this Agreement by the District and/or its users shall be considered
cause for the City to terminate this Agreement. Should the District fail to promptly
rectify a breach of any provi sions identified herein, after notice thereof, the City may
take such steps and do such work as it deems necessary to enforce this Agreement ,
including litigation and specifically a right to injunction or specific performance against
the District or any o f its users as is necessary to protect the City's system and operations.
3
The prevailing party shall be entitled to expenses and costs of suit , including attorney
fees.
14. Should more than one district be connected to a sewer line, all districts on the sewer line
who are in breach ofthis Agreement shall be jointly and severally liable for any such
breach ofthis Agreement and each such district shall immediately, after notice, rectify
any problem or condition detrimental to the treatment process arising within its legal
boundaries. When more than one district is connected to a sewer line, and the City
discovers any violation of the t erms of this connector 's agreement; the City shall not be
required to prove which district is at fault but shall make available to all such affected
districts all information developed or accumulated by the City pertaining to such breach.
Nothing contained herein shall preclude a claim for indemnity or contribution by any
District against another District connected to a common sewer line. CRS-13 -21-111.5,
as amended shall govern the percentage of liability of any district on a common sewer
line in the event the City seeks to impose liability based upon negligence or fault .
15 . This Contract shall not be u sed as a legal defense or prohibition to the mandatory
consolidation of facilities by either party as may be required by the laws of the State of
Colorado of all existing sewer collection systems and facilities to a governmental entity
created to assume responsibility for sewer service in the area in which both the City and
State are a part under statutory or constitutional authority.
CITY OF ENGLEWOOD, COLORADO
, Mayor
ATTEST:
, City Clerk
4
VALLEY SANITATION DIS TRICT
Phyllis Gooden, President
STATE OF COLORADO )
\ lloMoA~ ) SS. COUNTYOF~ -· )
:;re--'_r.
owledged. before me this \ 0 day of ~.Q.&~1 '
---¥.--=-..!:.,q.JIL!!.....:~~~~~=-_.},,._-
Witness my hand and official seal.
My Commission expires: ( Q .-l ~ ~ t ~
®~d-.~~
NOTARY PUBLIC
5
EXHIBIT A
LITTLETON/ENGLEWOOD
WASTEWATER TREATMENT PLANT
INDUSTRIAL PRETREATMENT DIVISION
TO:
FROM:
DATE
SUBJECT:
COPIES :
MEMORANDUM
Mike Pattarozzi , Fire Chief
Jon Bridges, WWTP Industrial Pretreatment Administrator M
February 19, 2013
ENGLEWOOD FIRE TRAINING CENTER -WEST CHENANGO
AVENUE
Stu Fonda, Director of Utilities
Dennis Stowe, Manager LIE WWTP
The Littleton/Englewood Wastewater Treatment Plant (LIE WWTP) Industrial Pretreatment Division
(Division) regulates indirect discharge to the Publicly Owned Treatment Works in order to protect
the plant, the workers , and ensure compliance with the plant's Colorado Discharge Permit System
(CDPS) permit. In order to achieve these objectives the Division has implemented various programs
to regulate discharges from commercial and industrial sectors of the LIE WWTP service area. The
proposed discharge from the Englewood Fire Training Facility is one such discharge .
Facilities generating process wastewater in the LIE WWTP service area must manage that
wastewater in accordance with City of Englewood and City of Littleton Municipal Codes . Two
overall options exist for managing process wastewater. The first is managing the wastewater without
a discharge to the sanitary sewer. This is known as zero discharge and is accomplished in many
instances by treating and re-using the wastewater onsite. The West Metro Fire Training Center
utilizes this type of system. Other means of zero discharge operation include evaporating the
wastewater or hauling the wastewater off-site . In each of these instances there is no connection to the
sanitary sewer system .
The second option for managing process wastewater is through discharge to the sanitary sewer, in
accordance with municipal codes and other applicable regulations. This requires installing a
permanent connection to the sanitary sewer system along with appropriate pretreatment to comply
with Division requirements . Based on the Division's understanding of the proposed plan, this would
likely involve the installation of some type device to remove floatable and settleable materials from
the wastewater prior to discharging to the sanitary sewer connection. Measures would also need to be
put in place to minimize stormwater infiltration into the sanitary sewer through the process
wastewater collection system. This may be a possibility for the Englewood Fire Training Center.
However, the Division will require project plans and specifications in order to evaluate any potential
discharge to the LIE WWTP. A full evaluation of requirements can be completed by the Division
once plans are submitted ..
• Stu Fonda
From:
Sent:
To:
Subject:
Attachments:
Dear Stew:
Sherry Morrison [smorrison@waterrf.org] on behalf of Rob Renner [rrenner@waterrf.org]
Friday , March 08 , 2013 9 :09 AM
Stu Fonda
Support for Water Research
Letter to Congress_CO.docx
I am writing to ask for your help in ensuring that the Federal Government continues to
support our research on water and wastewater. As EPA continues to aggressively
regulate the water and wastewater industries , it is vitally important that those regulations
be based upon sound science and cost-effective technologies that protect public health
and the environment.
In response to Congress's significant cuts to the EPA budget, the Water Research
Foundation (WaterRF) and the Water Environment Research Foundation (WERF) joined
forces two years ago to defend EPA' s longstanding funding for the research we conduct.
For over 20 years , Congress has directed EPA to provide federal funding for WaterRF
and WERF research as a national priority .
Working with our supporters on Capitol Hill and armed with subscribers' letters of
support, we were able to husband a carefully defined $5 million competitive grant
program for nonprofit organizations who conduct water and wastewater research of
national significance through to passage in the fiscal year 2012 Omnibus Appropriations
Act. This competitive program will help ensure that critical water and wastewater-
related research will be conducted that matches local water and wastewater agency
priorities and will help ensure that federal mandates are based on sound science.
We hope to build on this success. We cannot do it without your support. Once again , we
respectfully request that you prepare the attached letter to your members of Congress ,
urging their continued support in FY2013 and FY2014 for water and wastewater
research by nonprofit foundations . Please prepare the letters on your company letterhead
and fax each of them separately to your Colorado Senators and Representatives. (To
identify the Representative in your district , visit www.congress.org .) In addition, we
1
requ~st that you fax a copy of the letters to Water RF at 303-730-0851.
Please let me know by return email if you are willing to support this effort. We thank
you for your attention to this important request. If you have any questions , please feel
free to contact me for additional guidance .
Sincerely ,
Robert C. Renner, PE , BCEE
Executive Director
p 303.347 .6150
rrenner@ waterrf.org
Attachment
This email has been scanned by the Symantec Email Security.cloud service.
For more information please visit http://www.symanteccloud .com
2
The Honorable Mark Udall
328 Hart Senate Office Building,
District of Columbia 20510-0605
Fax: (202) 224-64 71
Dear Senator Udall:
As Congress begins work on the FY2014 Budget, I want to urge you to support as a priority the continued
funding for drinking water and wastewater-related research at the Environmental Protection Agency (EPA) in
partnership with local wastewater and drinking water utilities. For over 20 years, Congress has supported this
extramural research at nonprofit water industry foundations that sponsor competitive research into source
water protection, water quality, and water infrastructure. Water and wastewater-related research should
remain a high priority as the nation looks at the staggering cost estimates for replacing aging water
infrastructure and contaminant-removal compliance costs.
My organization steadfastly supports and benefits from the respective research conducted through the Water
Research Foundation (WaterRF) and the Water Environment Research Foundation (WERF). This research
helps ensure that sound science governs compliance with Safe Drinking Water Act and Clean Water Act
mandates, regulations, and policies.
With the demise of earmarks, we worked with our supporters on Capitol Hill to develop a carefully defined
competitive program for nonprofit organizations who conduct water and wastewater research of national
significance. That support proved to be invaluable. The Congress passed the FY2012 Consolidated
Appropriations Act (Public Law 112-74), which included the following report language within EPA's budget:
Research: National Priorities. -The bill provides $5, 000, 000, which shall be used for
extramural research grants to fund high-priority water quality and availability research by
not-for-profit organizations who often partner with the Agency. Funds shall be awarded
competitively with priority given to partners proposing research of national scope and who
provide a 10 percent match, which may include in-kind contributions. The Agency is directed
to allocate funds to grantees within 180 days of enactment of this Act.
The program prioritizes funding for a cost-shared , competitive grant program within monies already being
provided to the U.S. EPA Office of Research & Development budget. This research program ensures that
critical water and wastewater-related research will continue to meet the needs identified by the local agencies
charged with meeting federal mandates.
As federal budgets continue to be cut, it is important that grant programs like this one be matched with real
dollars instead of in-kind contributions. It is also important that the non-federal cost-share of this grant
program be increased to 25 percent. Therefore , I respectfully request that the following modified report
language be included in the FY2014 Interior, Environment and Related Agencies Subcommittee bill:
"Research National Priorities: The bill provides $5,000,000, which shall be used for
extramural research grants, independent of the Star Grant program, to fund high-priority
water quality and availability research by not-for-profit organizations who often partner with
the Agency. Funds shall be awarded competitively with priority given to partners proposing
research of national scope and who provide a 25 percent match. The agency is directed to
allocate funds to grantees within 180 days of enactment of this Act. "
We thank you for your attention to this matter of important national, state, and local significance. If you have
any questions or comments, please contact me.
Sincerely,
From: Diane Ramey [mailto:rameyd60 @ yahoo.com]
Sent: Tuesday , February 26 , 2013 8:36 PM
To: Webmaster
Subject: Mineral content in Englewood's water
I'm curious to know whether lately Englewood's water has had a higher mineral &/or
lime content than usual. I've noticed that lime and mineral deposits are building up from
my water a lot quicker and thicker than it used to , just in the last month or two. I filter
my drinking water at the tap, but my filter doesn't remove the minerals , so I'm having the
same amount of buildup from the tap and from my water filtering system. Is this any
different than usual? I generally think Englewood has the best water around here, and
I'm not complaining -just curious. If you have the time to answer me , that would be
great. Thanks.
--Diane Ramey
Englewood City Center resident
From: John Bock <jbock@englewoodgov.org>
To: "'rameyd60@yahoo .com"' <rameyd60@yahoo .com>
Cc: Webmaster <webmaster@englewoodgov .org>
Sent: Wednesday, February 27 , 2013 9 :30 AM
Subject: RE : Mineral content in Englewood's water
Hello Diane ,
Thanks for taking the time to send us your question.
As you have accurately observed, Englewood 's water hardness has been exceptionally
high for the last several months. The reason for this is because we take our water from
the South Platter River, and as the flow in the river drops the hardness goes up. So, in the
spring and early summer months when the runoff from the mountains is highest, we see
our lowest hardness. Then , in the fall and winter, as the river drops , our hardness goes
up. Because of the extreme drought conditions (this is as low as we have ever seen the
river) we are seeing the highest levels of water hardness any of us can remember. When
we get more precipitation both in the mountains and downstream , we will see lower
hardness levels.
To get the hardness down, the Water Department has been blending softer water from
other sources with the S. Platte River water. However, this has been only marginally
successful.
The white film on your dishes is most likely calcium chloride, the common mineral that
makes up water hardness. The most practical hardness controls are those that can be
practiced in the home:
Add vinegar to your dishwasher with each load. A cup will do it.
Stop the dishwasher when it gets to the dry cycle and towel dry the dishes.
A product called Lemi Shine can also be added to remove and control the calcium
buildup.
A water softener can be installed and run only during the high hardness months.
If you would like to discuss this with me further, feel free to contact me.
John Bock
Englewood Utilities Manager of Administration
303-762-2643
Fax 303-783-6894
jbock@englewoodgov.org
From: Diane Ramey [mailto:rameyd60@yahoo.com]
Sent: Wednesday, February 27, 2013 11:57 PM
To: John Bock
Subject: Re: Mineral content in Englewood's water
Wow, great answer. (And I was RIGHT! Cool!) Thank you for taking the time to fully
explain it. That's above and beyond the call of service, and I appreciate it. I have been
using vinegar to get rid of mineral buildups, but never thought of adding it to the
dishwasher. I will do that from now on, as my dishes have indeed been covered with a
white film. Vinegar is great stuff.
I really hope and pray for more precipitation this spring and summer. Not just for better
quality water, but to avoid more horrible fires. Thanks for the fantastic work you guys do
to bring Englewood residents some of the best water in the neighborhood. I'm only more
impressed with the City after this communication.
Gratefully,
--Diane Ramey
CITY OF ENGLEWOOD
cNGLEWOOD CIVIC CENTER* 1000 En lewood Pk
ACCOUNT NUMBER BILLING DATE
00030620 10/01/2012
GREG SCHALLER
6822 E HERITAGE PL S
CENTENNIAL CO 80111-4640
. *En lewood CO 8011 O
DUE DATE
11/15/2012
BILL NUMBER
MAKE CHECK OR MONEY ORDER PAYAg ~p4
CITY OF ENGLEWOOD. THERE WILL BE A $25 .00
CHARGE ON ALL RETURNED CHECKS.
$274.74
SERVICE LOCATION
6822 E HERITAGE PL S
l m~~~ll~l~l~W~lllll~~~~~l~l~I~~
0 0 0 3 0 6 2 0 3 6 6 3 7 0 6 8 2 2 7 0 0 0 0 2 7 4 7 4
WHEN PAYING BY MAIL INCLUDE TOP PORTION OF BILL WITH FULL PAYMENT.
ACCOUNT NUMBER
BILLING DATE DUE DATE
TYPE OF SERVICE
PREVIOUS BILLING
PAYMENT -THANK YOU
LATE FEES
WATER CHARGE
SEWER CYCLE BILLING
IBA CYCLE BILLING
SOUTHGATE SANITATION BILLING
SERVICE LOCATION
6822 E HERITAGE PL S
PRESENT READING PREVIOUS
FROM SERVICE DATES
10/01/2012
10/01/2012
10/01/2012
10/01/2012
TO
10/01/2013
09/30/2013
09/30/2013
09/30/2013
TOT AL AMOUNT DUE
CONSUMPTION
AMOUNTS
$223 .89
$-223 .89
$50 .65
0.00
$202.59
$16.00
$5 .50
$274.74
COMMENTS WATER CONSUMPTION HISTORY
DATE DAYS USAGE
PLEASE WRITE THE ACCOUNT NUMBER ON THE PAYMENT CHEC
PLEASE ENCLOSE THE TOP PORTION OF THE BILL WITH THE FU
PAYMENT.
DO NOT SEND CORRESPONDENCE WITH YOUR PAYMENT. SEND INQUIRIES TO:
ENGLEWOOD UTILITIES DEPT., 1000 Englewood Parkway, Englewood , CO 80110.
UTILITIES DEPARTMENT
CONCRETE QUESTIONS
BILL NUMBER
303-762-2635
303-762-2360
1138854
ENGLEWOOD PHONE NUMBERS
1. Englewood Utilities Customer Serv ice 303-762-2635
2 . Concrete Utility Customer Serv ice 303-762-2360
3 . Water & Sewer Emergency Numbers
8 :00 am -5 :00 pm, Monday -Friday 303-762-2635
After hours , Sat., Sun ., or holidays 303-762-2650
ENGLEWOOD UTILITIES DEPARTMENT OFFICE HOURS:
The offices of the Eng lewood Utilit ies Department are located at Englewood Civic Center, 1000 Englewood Pkwy .,
Englewood , CO 80110 . The office is open from 8:00 am -5 :00 pm , Monday -Friday. Meter inspections and
installat ions are scheduled from 9 :00 am -4 :00 pm , Monday -Thursday and 9:00 am -11 :00 am Fri day .
EXPLANATION OF CHARGES:
1. WATER CHARGE: This charge is for water purification . Water is billed quarterly and is based on either a water
meter reading or on the flat rate schedule.
2. SEWER CHARGE: This charge is for sanitary sewer processing . All sewer charges are billed in advance and are based
on a winter water meter reading , minimum tap size charge, number of units or on a flat rate schedule.
3. INTERCEPTOR BASIN AGREEMENT (IBA): This charge is for the operation and maintenance of the
Big Dry Creek Interceptor. This charge is paid by each customer whose sewage flows into this pipe .
4. STORM WATER CHARGE: This charge is for the operation and maintenance of the City of Eng lewood's storm water
collection system . It is based on the size of the lot and how much of it's surface will not absorb water .
5. SANITATION DISTRICT CHARGE (SAN): This is an annual district charge , in which the city acts as a collection
agency and remits the payment to the district. Contact the district directly.
6. SURCHARGE: A 25% late fee + 18 % per year interest is assessed for non-payment of a bill. This charge will apply to unpaid
outside sewer service accounts , unpaid storm water charges and to unpaid concrete district charges .
7. LATE CHARGE: A 5% per month late fee is assessed for non-payment of bill thirty (30) days from bill date.
8. OTHER CHARGES: May include : $5 .00 for Red Tag, $15 .00 for water turn off/on , $30.00 for curb stop box clean out and
miscellaneous charges for meter pit parts (replaced , repaired , installed, delivered}.
9. PREVIOUS CHARGES (PREV): Does not always represent delinquent amounts past due. Indicates that a bill has been
sent out and is unpaid prior to another bill being processed .
10. CERTIFICATION TO COUNTY:The total amount may be sent to the county for certification and collection for non-payment
of a sewer bill. A lien may be filed against the service address at this time also .
11. CONCRETE UTILITY FEE: This charge covers the cost of maintaining curbs and sidewalks in the public right-of-way.
The fee is based on the amount of public concrete adjacent to the property.
Questions should be directed to the Public Works Dept. at 303-762-2360.
PAYMENT POLICY:
ALL CHARGES are to be paid within thirty (30) days of bill date . Payments may be mailed, deposited in the payment d rop box
(located on the southwest entrance of Englewood Civic Center, 1st floor), or paid in person at the Central Cashiering counter
in Englewood Civic Center (hours 8:00 am -5 :00 pm). The charges may be paid in cash, by money order, by personal check,
or IN PERSON by Mastercard or Visa credit cards . Payment will be accepted from whomever tenders it.
Records are not kept as to whom tenders the payments ; only the date and the amount paid records are kept.
The charges shown on this bill are held against the property served rather than against any person.
If the charges shown on the bill are not paid by the due date, the property is subject to discontinuation of
service and all other legal remedies which the City may find necessary .
It is the responsibility of the property owner to provide the city with the co rrect ma iling address for the bills.
Fail ure to provide a correct mailing address for billing purposes may resul t in wate r t urn ed off or li ens filed .
The city is not held responsible for late charges accessed due to returned mail.
Failure to provide the city with thirty (30) day written notification to disconti nue au t o matic payment plan
may result in the payment due being applied to the accou nt, withou t refu nd.
Created Date/Time : 03/11/2013 09:34:09 AM
Customer Number : 00030620
Account Number: 36637068227
Service Address: 6822 E HERITAGE PL S
Mailing Address:
GREG SCHALLER
6822 E HERITAGE PL S
CENTENNIAL CO 80111-4640
Customer/ Account Transaction History
Trans Date Transaction
3/1/2013 0 :00 Sewer Balance Late Fee
2/27 /2013 0 :00 Payment -TeleWorks
Description
Outstanding Sewer Balance Late Fee
Payment -Thank You
12/12/2012 0 :00 Sewer Charge Recover 13 rates Sewer Retro Rate Increase One Time Charg
10/1/2012 0 :00 Cycle Bill i ng Due : 11/15/2012 Cycle Billing Due : 11/15/2012
5/31/2012 0 :00 Payment-TeleWorks Payment -Thank You
3/1/2012 0 :00 Sewer Balance Late Fee
10/1/2011 0 :00 Cycle Bil li ng Due : 11/15/2011
4/12/2011 0 :00 Payment -TeleWorks
10/1/2010 0:00 Cycle Billing Due : 11/15/2010
12/30/2009 0:00 Reconcile Balance To Sewer
12/30/2009 0 :00 Transfer Balance
12/30/2009 0 :00 Reconcile Balance To Sewer
12/30/2009 0 :00 Transfer Balance
12/28/2009 0:00 Sewer Balance Late Fee
11/10/2009 0:00 Payment
10/1/2009 0:00 Cycle Billing Due : 11/14/2009
5/12/2009 0:00 Sewer Charge Recover 09 rates
5/12/2009 0 :00 Payment
5/1/2009 0 :00 Sewer Balance Late Fee
10/10/2008 0 :00 Cycle Billing Due: 11/15/2008
8/8/2008 0 :00 Reconcile Balance To Sewer
8/8/2008 0 :00 Transfer Balance
8/8/2008 0 :00 Reconcile Balance To Sewer
8/8/2008 0:00 Transfer Balance
8/1/2008 0 :00 Sewer Balance Late Fee
5/13/2008 0 :00 Payment
5/1/2008 0 :00 Sewer Balance Late Fee
10/1/2007 0 :00 Cycle Billing Due : 11/15/2007
11/3/2006 0:00 Payment
9/30/2006 0 :00 Cycle Billing Due : 11/15/2006
12/14/2005 0:00 Payment
10/1/2005 0:00 Cycle Billing Due : 11/01/2005
2/24/2005 0:00 Payment
10/2/2004 0:00 Regular Billing -Sewer
10/2/2004 0:00 Regular Billing -San i Dist
10/2/2004 0 :00 Regular Billing -IBA
12/4/2003 0 :00 Payment -Sanitation District
12/4/2003 0:00 Payment -Sewer
10/2/2003 0 :00 Regular Billing -Sewer
10/2/2003 0 :00 Regular Billing -Sani Dist
12/4/2002 0 :00 Payment -Sanitation District
12/4/2002 0 :00 Payment -Sewer
10/2/2002 0 :00 Regular Billing -Sewer
10/2/2002 0 :00 Regular Billing -Sani Dist
Outstanding Sewer Balance Late Fee
Cycle Billing Due : 11/15/2011
Payment -Thank You
Cycle Billing Due : 11/15/2010
Reconcile Balance To Sewer
A/R Reconciliation
Reconcile Balance To Sewer
A/R Reconciliation
Outstanding Sewer Balance Late Fee
Payment -Thank You
Cycle Billing Due : 11/14/2009
Sewer Cycle Billing for 2009 rates recov
Payment -Thank You
Outstanding Sewer Balance Late Fee
Cycle Billing Due : 11/15/2008
Reconcile Balance To Sewer
A/R Reconciliation
Reconcile Balance To Sewer
A/R Reconciliation
Outstanding Sewer Balance Late Fee
Payment -Thank You
Outstanding Sewer Balance Late Fee
Cycle Billing Due : 11/15/2007
Payment -Thank You
Cycle Billing Due: 11/15/2006
Payment -Thank You
Cycle Billing Due : 11/01/2005
Payment -Thank You
Regular Billing -Sewer
Regular Billing -Sani Dist
Regular Billing -IBA
Payment -Sanitation District
Payment -Sewer
Regular Billing -Sewer
Regular Billing -Sani Dist
Payment -San itation District
Payment -Sewer
Regular Billing -Sewer
Regular Billing -Sani Dist
Amount Balance
$40.49 $251.28
($70.00) $210.79
$6 .05 $280.79
$224.09 $274.74
($223 .89) $50 .65
$50.65 $274.54
$223 .89 $223.89
($217 .23) $0 .00
$217 .23 $217.23
$32.45 $0.00
($32.45) ($32 .45)
$32.45 $0 .00
($32.45) ($32.45)
($40 .20) $0 .00
($212 .12) $40 .20
$202.50 $252 .32
$9 .62 $49 .82
($174 .84) $40 .20
$40 .20 $215 .04
$174 .84 $174 .84
$4 .74 $0.00
($4.74) ($4 .74)
$4 .74 $0 .00
($4.74) ($4.74)
($48.44) $0.00
($169 .99) $48.44
$48.44 $218.43
$169 .99 $169.99
($141.95) $0.00
$141.95 $141 .95
($123.40) $0.00
$123.40 $123.40
($108 .08) $0 .00
$103 .16 $108 .08
$4.58 $4 .92
$0 .34 $0 .34
($4 .45) $0 .00
($89. 72) $4.45
$89 .72 $94 .17
$4.45 $4.45
($4.33) $0.00
($67.20) $4.33
$67.20 $71.53
$4 .33 $4.33
Customer: 00030620
Account: 36637068227
GREG SCHALLER
6822 E HERITAGE PL S
CENTENNIAL, CO 80111-4640
Balance: $251.28
Deposit: $0. 00
Last Bill: $274. 74 Due 11/15/2012
Plan: None
Ne x t:
Active
Owner
Credit is Ex cellent (0)
3663706822-DN
Cycle C2/Book 0001
..::..l.QJ~
[2}<;,.ontact
00030620 36637068227 GREG SCHALLER 6E ~
Residential Annual
Move In 10/02/2002
No Tasks to be completed on file
Final Notice
Customer I Service Address I Customer/Account I Services I Addresses I Reading History I Transaction History I Bills I Comments I Move In/Out I PAP I Deposits
Meter Reading Contact I Equipment I Loans/POS I Collections I >>>
All I Notes I Tasks I Letters I Service Orders I Contacts I Inquiries I eMail I Attachments
(it
Date/Time I Type I Description I Amount I User ID I Departments 1 •
01/16/2013 06:52:56 AM Letter Final Notice -Sewer $0.00 JERICKSON CUSTOMER SE
10/08/2012 04:28:29 PM Note Certification $0. 00 JERICKSON ADMINISTRAT
01/17/2012 08:56:43 AM Letter Final Notice -Sewer $0. 00 JERICKSON CUSTOMER SE
01/1412011 07: 16: 11 AM Letter Final Notice -Sewer $0. 00 JERICKSON CUSTOMER SE
10/05/2009 02: 46: 45 PM !Note !Late Fees $0.00 JBOCK CUSTOMERS
O 1/14 /2009 07: 29: 46 AM Letter Certification Sewer Letter $0.00 ASUNDINE CUSTOMER SE
01/16/2008 09:35:23 AM Letter Certification Sewer Letter $0.00 RPIERCE CUSTOMER SE
~
H I ._
This customer callled to protest the late fees. Stu said that if he pays the bill by 11/1/2009 (or sets upand keeps a payment plan if he is a hardship case) we can waive •
the fees . There will be no more waived late fees in any case .
..:.J
Customer: 00030620
Ac count: 36637068227
GREG SCHALLER
6822 E HERITAGE PL S
CENTENNIAL, CO 80111-4640
Balance: $251.28
Deposit: $0.00
Last Bill: $274. 74 Due 11/15/2012
Plan: None
Next:
Active
Owner
Credit is Excellent (0)
3663706822-DN
Cycle C2/Book0001
:BJ~ontact
000 30620 366370 6822 7 GREG SC HALLER 6E ~
Residential Annual
Move In 10/02/2002
No Tasks to be completed on file
Final Notice
l
Customer I Ser v ice Addres s I Cu stomer/Account I Services I Addresses I Reading History I Transaction History I Bills I Comments I Move In/Out I PAP I Deposits
Meter Reading Contact
All I Notes I Tasks
01/16/2013 06:52:56 AM Jennifer Walker-Erickson
01/17/2012 08:56:43 AM Jennifer Walker-Erickson
01/14/2011 07 : 16 : 11 AM Jennifer Walk.er-Erickson
01/14/2009 07 :29:46 AM **Amy Sundine
01/16/2008 09: 35: 23 AM Randy Pierce
..
I Equ ipment
Letters I Ser v ice Orders
inal Notice -Sewer
~Final Notice -Sewer
EJFinal Notice -Sewer
EJcertification Sewer Letter
EJcertification Sewer Letter
I Loans/POS
I Contacts
EtJ
EtJ
EtJ
AdHoc (?)
I
I Inquiries
Colle ct ions I >>>
I eMail I Attachments
Ad Hoc Description
~
~
Billing Information
Payment Options
Online -Credit or debit card (Visa,
MasterCard or Discover) and e-check
payments are accepted at
www.englewoodutilities .org .
ACH -Automated checking and savings
withdrawal is now available. For more
information please visit
www.englewoodgov.org. or call 303-762-
2635.
Payment by Phone -Credit or debit card
(Visa, MasterCard or Discover) and e-check
payments are accepted by calling 303-783-
6930.
Bill Pay -Bill payment service offered by your
personal bank.
In Person -Cash , check, money order and
credit or debit card (Visa , MasterCard or
Discover) at Englewood Civic Center (Cashier
Dept.), 1000 Englewood Pkwy.
By Mail -Check or money order to: City of
Englewood, 1000 Englewood Pkwy,
Englewood, CO 80110 .
Partial Payments
The City will accept partial payments and
payment arrangements. However, this does
not exempt the customer from late fees if the
total amount is not paid within four months of
the bill date. Payments credited to the
· account DO NOT STOP further notices if the
account has an unpaid balance.
LATE FEES SCHEDULE
Bill Date Late Fees Assessed
6/1/2012 11/1/2012
7/1/2012 12/1/2012
8/1/2012 1/1/2013
9/1/2012 2/1/2013
10/1/2012 3/1/2013
11/1/2012 4/1/2013
12/1/2012 5/1/2013
Delinquency
A 25 percent surcharge will be imposed for
collection services on any unpaid balance
based on the schedule above .
A final notification will be mailed prior to the
surcharge assessment.
The city takes steps to ensure bills are
mailed to the proper address, but it is the
property owner's responsibility to notify the
city of any address changes.
Collection of Unpaid Charges
Unpaid accounts will be sent to the county
for collection . The county treasurer will
enforce any delinquent amount by placing a
lien on the property which is added to the
property tax bill. The county will add an
additional amount as its collection fee.
Explanation of Charges
• Sewer Charge: This charge is for sanitary
sewer processing. All sewer charges are
billed in advance and are based on the
lowest winter water meter reading or
minimum tap size charge, whichever is
greater.
• IBA (Interceptor Basin Agreement):
This charge is for the operation and
maintenance of the Big Dry Creek
Interceptor. It is billed to each customer
whose sewage flows into this pipe .
• Sanitation: This is not a City of
Englewood charge. This is an independent
sanitation charge in which the City acts as
a collection agency and remits the payment
to the district. Please contact the district
directly with any questions.
1000 Englewood Pkwy
Englewood, CO 80110
p 303-762-2635
F 303-783-6894
www.englewoodgov.org
2012 SEWER SYSTEM INFORMATION
FOG and the Arteries of the
Englewood Sewer System
F.O.G. is short for Fats, Oils, and Grease ;
pollutants commonly found in kitchen
wastewater. When FOG gets into our sanitary
sewer system, much like the arteries in our
bodies, it can harden in the lines and cause stop-
ups or sanitary sewer overflows, which may
result in raw sewage running onto the ground .
FOG can also cause enormous problems during
the wastewater treatment process which costs
our customers a lot of money. Preventing FOG
from entering your drain system will also help
you to avoid plumbing backups and costly sewer
repair bills. Minimizing FOG is the right thing
to do for you and our environment!
What can YOU do to help?
DO Place cooled cooking oil and poultry or meat
fat into a sealed container.
DO Use paper towels to wipe residual grease or
oil off of dishes, pots , and pans prior to washing
them .
DO NOT Dump cooking oil, poultry or meat fat,
and grease into the kitchen sink or toilet bowl.
DO NOT Use hot water and soap to wash
grease down the drain because it will cool and
harden in your pipes or the sewer line .
MINIMIZE the use the garbage disposal to get
rid of food scraps -scrape them into the trash .
Did You Know?
"Biosolids" are the nutrient-rich organic
materials produced during the biological
and physical treatment of wastewater at the
Littleton/Englewood Wastewater Treatment
Plant (LEWWTP). These materials are
recycled as a fertilizer in farm programs to
provide a source of crop nutrients and
contribute to improve soil structure. In
2011 , over 3,000 tons of biosolids were
spread on 2 , 100 acres of farmland,
producing wheat with an increased protein
content that can earn the farmer a higher
price .
You can learn more about the use of
Biosolids at the LEWWTP on the web at:
http ://englewoodgov.org/lndex.aspx?page=
191 L/tr~
City of Englewood Utiliti~ {t ?/(JI;
1000 Englewood Pkwy
Englewood, CO 80110
p 303-762-2635
F 303-783-6894
www.englewoodgov.org
WHAT TO DO WITH UNWANTED MEDICATIONS
Pharmaceuticals (both prescription and over-the-counter
medications) that are flushed down the toilet are not
removed during ordinary wastewater treatment which
allows them to pass through to the environment where
they cause harm to aquatic life and may contaminate our
drinking water sources . By not flushing pharmaceuticals
down the toilet , you can protect both the environment
and public health.
The Colorado Department of Public Health and
Environment (CDPHE), with support from various groups ,
operates The Medication Take-Back Pilot Project which
offers the public a secure and environmentally
respons ible way to dispose of unwanted household
medications . This project offers a way to clear your home
of the medications you no longer need .
Secure collection boxes are located at each of the
following metro area locations :
• King Soopers at 9551 S University Blvd .
• King Soopers at 100 Founders Pkwy, Castle
Rock
• Denver Health at Wellington E. Webb Center for
~Care , 301 VV 61
h Ave . DeR\IQC,
Tri-County Health Department at 4~1 S
~adway , Englewood Jfb /j5 ---For more information on .-i:th~e~p""'r""o""g::'!ra""'~"isit -
www.coloradomedtakeback.info or contact the CDPHE at
303-692-2903.
Bringing your unwanted medications to a collection site is
the preferred method of disposal. If this is not possible,
mix unwanted medications with kitty litter or coffee
grounds to make the medicine unusable, place it in a
water-tight container, and dispose of it in your household
trash on the day of collection . Remember to blot out or
remove your personal information from containers prior
to disposal for security reasons.
To learn more, please visit the Educational Center link at
the Littleton/Englewood Wastewater Treatment Plant
website (www.lewwtp.org).
CITY OF ENGLEWOOD
ENGLEWOOD CIVIC CENTER* 1000 En lewood P
ACCOUNT NUMBER BILLING DATE
00030620 10/01/2012
GREG SCHALLER
6822 E HERITAGE PL S
CENTENNIAL CO 80111-4640
DUE DATE
11/15/2012
BILL NUMBER
MAKE CHECK OR MONEY ORDER PAYAS~=54
CITY OF ENGLEWOOD. THERE WILL BE A $25.00
CHARGE ON ALL RETURNED CHECKS.
$274.74
SERVICE LOCATION
6822 E HERITAGE PL S
ll~~~IUll~IRlllllllll~lllll~l~I
0 0 0 3 0 6 2 0 3 6 6 3 7 0 6 8 2 2 7 0 0 0 0 2 7 4 7 4
WHEN PAYING BY MAIL INCLUDE TOP PORTION OF BILL WITH FULL PAYMENT.
ACCOUNT NUMBER
BILLING DATE DUE DATE
TYPE OF SERVICE
PREVIOUS BILLING
PAYMENT-THANKYOU
LATE FEES
WATER CHARGE
SEWER CYCLE BILLING
IBA CYCLE BILLING
SOUTHGATE SANITATION BILLING
SERVICE LOCATION
6822 E HERITAGE PL S
PRESENT READING PREVIOUS
FROM SERVICE DATES
10/01/2012
10/01/2012
10/01/2012
10/01/2012
TO
10/01/2013
09/30/2013
09/30/2013
09/30/2013
TOT AL AMOUNT DUE
CONSUMPTION
AMOUNTS
$223.89
$-223 .89
$50 .65
0.00
$202 .59
$16 .00
$5.50
$274.74
COMMENTS WATER CONSUMPTION HISTORY
DATE DAYS USAGE
PLEASE WRITE THE ACCOUNT NUMBER ON THE PAYMENT CHEC
PLEASE ENCLOSE THE TOP PORTION OF THE BILL WITH THE FU
PAYMENT.
DO NOT SEND CORRESPONDENCE WITH YOUR PAYMENT. SEND INQUIRIES TO:
ENGLEWOOD UTILITIES DEPT., 1000 Englewood Parkway, Englewood, CO 80110.
UTILITIES DEPARTMENT
CONCRETE QUESTIONS
BILL NUMBER
303· 762-2635
303-762-2360
1138854
Created Date/Time : 03/11/2013 09:34 :09 AM
Customer Number: 00030620
Account Number: 36637068227
Service Address : 6822 E HERITAGE PL S
Mailing Address :
GREG SCHALLER
6822 E HERITAGE PL S
CENTENNIAL CO 80111-4640
Customer/ Account Transaction History
Trans Date Transaction
3/1/2013 0:00 Sewer Balance Late Fee
2/27 /2013 0 :00 Payment-TeleWorks
12/12/2012 0:00 Sewer Charge Recover 13 rates
10/1/2012 0 :00 Cycle Billing Due : 11/15/2012
5/31/2012 0 :00 Payment-TeleWorks
3/1/2012 0 :00 Sewer Balance Late Fee
10/1/2011 0 :00 Cycle Bill i ng Due : 11/15/2011
4/12/2011 0 :00 Payment-TeleWorks
10/1/2010 0 :00 Cycle Billing Due : 11/15/2010
12/30/2009 0 :00 Reconcile Balance To Sewer
12/30/2009 0 :00 Transfer Balance
12/30/2009 0 :00 Reconcile Balance To Sewer
12/30/2009 0:00 Transfer Balance
12/28/2009 0:00 Sewer Balance Late Fee
11/10/2009 0:00 Payment
10/1/2009 0:00 Cycle Billing Due : 11/14/2009
5/12/2009 0 :00 Sewer Charge Recover 09 rates
5/12/2009 0 :00 Payment
5/1/2009 0 :00 Sewer Balance Late Fee
10/10/2008 0:00 Cycle Billing Due : 11/15/2008
8/8/2008 0 :00 Reconc il e Balance To Sewer
8/8/2008 0 :00 Transfer Balance
8/8/2008 0 :00 Reconcile Balance To Sewer
8/8/2008 0:00 Transfer Balance
8/1/2008 0 :00 Sewer Balance Late Fee
5/13/2008 0:00 Payment
5/1/2008 0 :00 Sewer Balance Late Fee
10/1/2007 0 :00 Cycle Billing Due : 11/15/2007
11/3/2006 0 :00 Payment
9/30/2006 0 :00 Cycle Bill ing Due : 11/15/2006
12/14/2005 0:00 Payment
10/1/2005 0:00 Cycle Billing Due : 11/01/2005
2/24/2005 0 :00 Payment
10/2/2004 0:00 Regular Billing -Sewer
10/2/2004 0 :00 Regular Billing -Sani Dist
10/2/2004 0:00 Regular Billing -IBA
12/4/2003 0 :00 Payment -Sanitation District
12/4/2003 0 :00 Payment -Sewer
10/2/2003 0 :00 Regular Billing -Sewer
10/2/2003 0:00 Regular Billing -Sani Dist
12/4/2002 0 :00 Payment -Sanitation District
12/4/2002 0 :00 Payment -Sewer
10/2/2002 0:00 Regular Billing -Sewer
10/2/2002 0 :00 Regular Billing -Sani Dist
Description
Outsta nding Sewer Ba lance Late Fee
Payment -Thank You
Sewer Retro Rate Increase One Time Charg
Cycle Billing Due : 11/15/2012
Payment -Thank You
Outstand ing Sewer Ba lance Late Fee
Cycle Billing Due : 11/15/2011
Payment -Thank You
Cycle Billing Due: 11/15/2010
Reconcile Balance To Sewer
A/R Reconciliation
Reconcile Balance To Sewer
A/R Reconciliation
Outstanding Sewer Balance Late Fee
Payment -Thank You
Cycle Billing Due : 11/14/2009
Sewer Cycle Billing for 2009 rates recov
Payment -Thank You
Outstanding Sewer Ba lance Late Fee
Cycle Billing Due : 11/15/2008
Reconcile Balance To Sewer
A/R Reconciliation
Reconc ile Balance To Sewer
A/R Reconciliation
Outstanding Sewer Balance Late Fee
Payment -Thank You
Outstanding Sewer Ba lance Late Fee
Cycle Billing Due : 11/15/2007
Payment -Thank You
Cycle Billing Due: 11/15/2006
Payment -Thank You
Cycle Billing Due : 11/01/2005
Payment -Thank You
Regular Billing -Sewer
Regular Billing -Sani Dist
Regular Billing -IBA
Payment -Sanitation District
Payment -Sewer
Regular Billing -Sewer
Regular Billing -Sani Dist
Payment -San itation District
Payment -Sewer
Regular Billing -Sewer
Regular Billing -Sani Dist
Amount Balance
$40 .49 $251.28
($70 .00) $210.79
$6 .05 $280.79
$224.09 $274 .74
($223 .89) $50 .65
$50 .65 $274 .54
$223.89 $223 .89
($217 .23) $0.00
$217 .23 $217 .23
$32.45 $0.00
($32 .45) ($32.45)
$32.45 $0 .00
($32 .45) ($32.45)
($40 .20) $0.00
($212 .12) $40 .20
$202.50 $252.32
$9.62 $49.82
($174 .84) $40 .20
$40.20 $215 .04
$174.84 $174 .84
$4.74 $0.00
($4 .74) ($4 .74)
$4.74 $0.00
($4 .74) ($4 .74)
($48.44) $0.00
($169 .99) $48.44
$48 .44 $218.43
$169 .99 $169.99
($141.95) $0.00
$141.95 $141.95
($123.40) $0 .00
$123.40 $123.40
($108 .08) $0.00
$103 .16 $108 .08
$4.58 $4.92
$0.34 $0.34
($4.45 ) $0 .00
($89 .72) $4.45
$89.72 $94.17
$4.45 $4.45
($4 .33) $0.00
($67 .20) $4.33
$67 .20 $71.53
$4 .33 $4.33
Customer: 00030620 Balance: $251.28 Active
Account: 36637068227 Deposit : $0.00 Owner
GREG SCHALLER Last Bill: $274. 74 Due 11/15/2012 Credit is Exceftent (0)
6822 E HERITAGE PL S Plan: None 3663706822-DN I CENTENNIAL, CO 80111-4640 Next: Cycle C2/Book 0001
Customer I Service Address I Customer/Account I Services I Addresses I Reading History I Transaction History
Meter Reading Contact I Equipment I Loans/POS
AD I Notes I Tasks I Letters I Service Orders I Contacts
Date/Time I Type I Description I
01/16/2013 06:52:56 AM Letter Final Notice -Sewer
10/08/2012 04:28:29 PM Note Certification
01/17/2012 08:56:43 AM Letter Final Notice -Sewer
01/14/2011 07: 16: 11 AM Letter Final Notice -Sewer
10/05/2009 02:46:45 PM !Note !Late Fees
01/14/2009 07:29:46 AM Letter Certification Sewer Letter
01/16/2008 09:35:23 AM Letter Certification Sewer Letter
Residential Annual
Move In 10/02/2002
No Tasks to be completed on file
Final Notice
I Bills I Comments I Move In/Out I PAP I Deposits
I CoUections I > > >
Inquiries I eMail I Attachments
Amount I User ID I Departments 1 .....
$0.00 JERICKSON CUSTOMER SE
$0.00 JERICKSON ADMINISTRAT
$0.00 JERICKSON CUSTOMER SE
$0. 00 JERICKSON CUSTOMER SE
$0.00 JBOCK CUSTOMERS
$0.00 ASUNDINE CUSTOMER SE
$0.00 RPIERCE CUSTOMER SE
....
H I ~
This customer callled to protest the late fees. Stu said that if he pays the bill by 11/1/2009 (or sets upand keeps a payment plan if he is a hardship case) we can waive ....
the fees. There will be no more waived late fees in any case.
.::J
Customer: 00030620
Account: 36637068227
GREG SCHALLER
6822 E HERITAGE PL S
CENTENNIAL , CO 80111-4640
Balanc e : $251.28
Deposit: $0.00
Last Bil: $274.74 Due 11/15/2012
Plan: None
Next:
Active
Owner
Credit is ExceHent (0)
3663706822-0N
Cycle C2/Book0001
Residential Annual
Move In 10/02/2002
No Tasks to be completed on file
Final Notice
Customer I Service Address I Customer/Account I Services I Addresses I Reading History I Transaction History I B~ls I Comments I Move In/Out I PAP I Deposits
Meter Reading Contact I Equipment I Loans/POS I CoHections I > > >
All I Notes I Tasks Letters I Ser vice Orders I Contacts I Inquiries I eMail I Attachments
Date/Time •
1/16/2013 06:52:56 AM Jennifer Walker-Erickson
01/17/2012 08 :56 :43 AM Jennifer Walker-Erickson
01/14/2011 07: 16: 11 AM Jemifer Walker -Erickson
01/14 /2009 07 : 29: 46 AM **Amy Sundine
01/16/2008 09:35 :23 AM Randy Pierce
~
inal Notice -Sewer
E)Final Notice -Sewer
EJcertification Sewer Letter
EJcertification Sewer Letter
ElJ
ElJ
ElJ
AdHoc (?) Ad Hoc Description
.. ....
Billing Information
Payment Options
Online -Credit or debit card (Visa,
MasterCard or Discover) and e-check
payments are accepted at
www.englewoodutilities.org.
ACH -Automated checking and savings
withdrawal is now available. For more
information please visit
www.englewoodgov.org. or call 303-762-
2635.
Payment by Phone -Credit or debit card
(Visa, MasterCard or Discover) and e-check
payments are accepted by calling 303-783-
6930.
Bill Pay -Bill payment service offered by your
personal bank.
In Person -Cash, check, money order and
credit or debit card (Visa, MasterCard or
Discover) at Englewood Civic Center (Cashier
Dept.), 1000 Englewood Pkwy.
By Mail -Check or money order to : City of
Englewood, 1000 Englewood Pkwy,
Englewood, CO 80110.
Partial Payments
The City will accept partial payments and
payment arrangements. However, this does
not exempt the customer from late fees if the
total amount is not paid within four months of
the bill date. Payments credited to the
account DO NOT STOP further notices if the
account has an unpaid balance.
LATE FEES SCHEDULE
Bill Date Late Fees Assessed
6/1/2012 11/1/2012
7/1/2012 12/1/2012
8/1/2012 1/1/2013
9/1/2012 2/1/2013
10/1/2012 3/1/2013
11/1/2012 4/1/2013
12/1/2012 5/1/2013
Delinquency
A 25 percent surcharge will be imposed for
collection services on any unpaid balance
based on the schedule above.
A final notification will be mailed prior to the
surcharge assessment.
The city takes steps to ensure bills are
mailed to the proper address, but it is the
property owner's responsibility to notify the
city of any address changes.
Collection of Unpaid Charges
Unpaid accounts will be sent to the county
for collection . The county treasurer will
enforce any delinquent amount by placing a
lien on the property which is added to the
property tax bill. The county will add an
additional amount as its collection fee.
Explanation of Charges
• Sewer Charge: This charge is for sanitary
sewer processing. All sewer charges are
billed in advance and are based on the
lowest winter water meter reading or
minimum tap size charge, whichever is
greater.
• IBA (Interceptor Basin Agreement):
This charge is for the operation and
maintenance of the Big Dry Creek
Interceptor. It is billed to each customer
whose sewage flows into this pipe.
• Sanitation: This is not a City of
Englewood charge. This is an independent
sanitation charge in which the City acts as
a collection agency and remits the payment
to the district. Please contact the district
directly with any questions.
City of Englewood Utilities
~' 1000 Englewood Pkwy
Englewood, CO 8011 O
p 303-762-2635
F 303-783-6894
www.englewoodgov.org
MEMORANDUM
To: Stu Fonda, Utilities Director P
From : John Bock, Utilities Manager of Administratio ~~
Date: March 11 , 2013
Subject: 4546 S Pennsylvania St.
Mr Eric Lehman 's home was transferred from the flat rate water to metered on February
20 , 2013. Because flat rate water is billed in advance he received a credit on his account
of $79.00.
Previously, Mr. Lehman 's home was in billing group 1. When he was transferred to
meter his account was moved to bill ing group 3 because his house is located in that meter
reading part of town. This is to facilitate efficient meter reading .
Billing group 1 pays for Januay, February and March. Billing group 3 pays for March ,
April and May . This means as for sewer, storm water and concrete charges Mr. Lehman
owes the City for April and May charges . Part of his cred it was used to pay these charges
leaving a credit balance of $32.94 which is being refunded to him . This is our standard
practice for all accounts to which this happens .
Mr. Lehman called and demanded refund of the full $79.00 .
4546 S Pennsylvania St.
Date
1/1/2013
Item
Ql Flat Rate Water Billing
Ql Flat Rate Sewer Billing
Ql Storm Water Billing
January
$ 56.42
$ 20.87
$ 4 .16
$ 1.84
February March April May Total
$ 56.42 $ 56.42 $
$ 20.87 $ 20 .87 $
$ 4 .16 $ 4 .16 $
$ 1.84 $ 1.84 Ql Concrete Charges
Meter Installed 2/20/2013 Account is moved from Cycle 1 to Cycle 3 for meter reading purposes
28 days Flat Rate Water Credit
Meter Sewer Credit
-73 .34 $
-5 .66 $
Q3 Water Billing
Q3 Sewer Billing
Q3 Storm Water Billing
Q3 Concrete Billing
$
$
$
$ 18.88
$ 1.39
$ 2 .71
$ 18.88 $
$ 1.39 $
$ 2 .82 $
If the credit of $79 .00 is refunded these charges remain unpaid .
Q3 Water Billing
Q3 Sewer Billing
Q3 Storm Water Billing
Q3 Concrete Billing
Ql Bills for January, February & March
Q3 Bills for March, April & May
$
$
$
$ 18.88 $ 18.88 $
$ 1.39 $ 1.39 $
$ 2 .71 $ 2 .82 $
Meter Installed 2/20/2013 and account moved from Ql to Q3 all charges paid through 5/31/2013
1/1/2013 0:00 Cycle Billing Due : 02/01/2013 $244.17 $244.17
2/1/2013 0 :00 Payment-TeleWorks ($244 .17) $0.00
2/27 /2013 0:00 Water Billing Adjustment 2/20/13 to 3/31/2013 Credit ($73.34) ($73.34)
2/27 /2013 0 :00 Sewer Billing Adjustment Flat to meter credit ($5.66) ($79.00)
2/27/2013 0 :00 Sewer Billing Ql to Q3 $37.76 ($41.24)
2/27 /2013 0 :00 Concrete Billing Ql to Q3 $5 .53 ($35. 71)
(73 .34) $
(5 .66) $
37 .76 $
2 .77 $
5.53 $
37 .76 $
2.77 $
5.53 $
Amount Due
(73 .34)
(79.00)
(41.24)
(38.47)
(32 .94) Refunded
37 .76
40.53
46 .06
2/27 /2013 0 :00 Stormwater Billing Ql to Q3 $2 .77 ($32 .94) Total amount of credit used to pay for April & May = $46.06
3/4/2013 0 :00 Water Refund Adjustment $32 .94 $0.00
Meter Installed 2/20/2013 and account moved from Ql to Q3 $79.00 Refunded no April or May Charges Paid
1/1/2013 0 :00 Cycle Billing Due: 02/01/2013 $244.17 $244.17
2/1/2013 0:00 Payment-TeleWorks ($244.17) $0.00
2/27 /2013 0:00 Water Billing Adjustment 2/20/13 to 3/31/2013 Credit ($73 .34) ($73.34)
2/27 /2013 0 :00 Sewer Billing Adjustment Flat to meter credit ($5 .66) ($79 .00)
Water Refund Adjustment $79 .00 $0.00
2/27/2013 0:00 Sewer Billing Ql to Q3 $37.76 $37.76
2/27 /2013 0 :00 Concrete Billing Ql to Q3 $5.53 $43 .29
2/27/2013 0 :00 Stormwater Billing Ql to Q3 $2 .77 $46.06
Created Date/Time : 03/04/2013 11:33 :54 AM
Customer Number: 00067495
Account Number: 01005045467
Service Address: 4546 S PENNSYLVANIA ST
Mailing Address:
ERIC LEHMAN
LISA GIDDAY
4546 S PENNSYLVANIA ST
ENGLEWOOD CO 80113-5841
Customer/ Account Transaction History
Trans Date Transaction
2/28/2013 0:00 Reconcile Balance To Wa t er
2/28/2013 0:00 Transfer Balance
2/27 /2013 0:00 Concrete Billing Adjustment
2/27 /2013 0 :00 Stormwater Billing Adjustment
2/27 /2013 0:00 Sewer Billing Adjustment
2/27 /2013 0:00 Sewer Billing Adjustment
2/27 /2013 0:00 Water Billing Adjustment
2/1/2013 0 :00 Payment-TeleWorks
1/1/2013 0:00 Cycle Billing Due : 02/01/2013
10/31/2012 0 :00 Payment-TeleWorks
10/1/2012 0 :00 Cycle Billing Due: 11/01/2012
303-875 -6094
Description
Reconcile Balance To Water
A/R Reconciliation
Concrete Billing Adjustment
Stormwater Billing Adjustment
Sewer Billing Adjustment
Sewer Billing Adjustment
Water Billing Adjustment
Payment -Thank You
Cycle Billing Due : 02/01/2013
Payment -Thank You
Cycle Billing Due: 11/01/2012
~1 i;:f8?_ I KJ mu .. 60 d.-/)-0 l1 3
Q l -Ai Q3
-ow1rse,.q tf .r,1 q /~
-s~W? tf ~IG
6Mc ~L /<!)
Amount Balance
$40.40 ($32 .94)
($40.40) ($ 73.34)
$5.53 ($32.94)
$2. 77 ($38.4 7)
$37 .. 76 ($41.24)
($5.66) ($79.00)
($73.34) ($73.34)
($244.17) $0.00
$244.17 $244.17
($240.11) $0.00
$240.11 $240.11
00067495
01005045467
ERIC LEHMAN
LISA GIDDAY
01/01/2013
4546 S PENNSYLVANIA ST
ENGLEWOOD CO 80113-5841
00067495-01005045467
01/01/2013 02/01/2013
PREVIOUS BILLING
PAYMENT -THANK YOU
WATER CYCLE BILLING
SEWER CYCLE BILLING
CONCRETE CYCLE BILLING
STORM WATER CYCLE BILLING
02/01/2013
0
01/01/2013
01/01/2013
01/01/2013
01/01/2013
PLEASE WRITE THE ACCOUNT NUMBER ON THE PAYMENT CHECK .
PLEASE ENCLOSE THE TOP PORTION OF THE BILL WITH THE FULL
PAYMENT .
1164185
$244.17
4546 S PENNSYLVANIA ST
1 1~~001~1~111~11~1111~~~~001~11~~
0 0 0 6 7 4 9 5 0 1 0 0 5 0 4 5 4 6 7 0 0 0 0 2 4 4 1 7
4546 S PENNSYLVANIA ST
0
03/31/2013
03/31/2013
03/31/2013
03/31/2013
04/01/2013 90
0
$240 .11
$-240.11
$169 .26
$62 .60
$8 .15
$4 .16
$244.17
0
Consumption is in 1 OOOs of Gallons
1164185
WATER CONSERVATION PLAN UPDATE
The Utilities Department staff and Clear Water Solutions (CWS) have completed approximately
75% of the City of Englewood's Water Conservation Plan in accordance with the Guidance
Document produced by the Colorado Water Conservation Board (CWCB). The Guidance
Document outlines nine steps in the water conservation planning process. To date, CWS and
the City have completed the majority of five of the nine steps per the scope of work. Initial goals
were set after characterizing the City's water distribution system, customer categories and past
and future water use in each of those categories.
The City established an initial water savings goal of 10% over a ten-year planning period.
The water savings will be from the City's final list of customer categories: Residential, Multi-
Family, Commercial, Industr ial, and Municipal. Water conservation measures were then
selected by the City staff through two screening processes -one with staff and one with the
Water and Sewer Board. The screening included the following criteria and narrowed the
universal list down to 19 measures and programs.
1. Staff and other resources
2. Financial implications
3. Political ramifications
A final list of water saving measures and programs were developed to be evaluated further,
shown below in Table 1.
Table 1 -Final List of Measures/Programs
Rank Conservation Measures and Programs
1 Billing Software Upgrades
2 Water Waste Ordinance
3 Leak Detection & Repair
4 Water Rate Study
5 Evaluation of Policies to Encourage Water Savings
6 Water Restrictions
7 Turf & Landscape Standards for New Development
8 Irrigation System Standards for New Development
9 Soil Amendment Standard for New Landscapes
1 O Website Upgrades /Public Education
11 Requiring Wind/Ra in Sensors for Commercial
12 Outdoor Residential Water Audit Kits
13 School Education Program
14 Advanced Metering Infrastructure (AMI)
15 Distribute ET Scheduling in Water Bill
16 Irrigation System Efficiency Device Rebates
17 Metering of Non-Potable Irrigation
18 Xeriscape Classes Uointly with others)
19 Indoor Residential Water Audit Kits
* Shaded cells represent existing measures.
Estimated savings from this final list were taken through a cost-benefit analysis, which is
approximately 90% completed. Once this analysis is completed, the water savings will be
compared to the initial water savings goal, and staff will determine if those goals should be
adjusted . CWS had a meeting with City staff on January 14, 2013 to discuss some assumptions
related to the cost-benefit analysis so that effort can be finalized.