Loading...
HomeMy WebLinkAbout2015-04-14 WSB AGENDAWATER & SEWER BOARD AGENDA TUESDAY, APRIL 14, 2015 -5:00 P.M. COMMUNITY DEVELOPMENT CONFERENCE ROOM 1. MJNUTES OF THE MARCH 10, 2015 MEETJNG. (ATT. 1) 2. BIG DRY CREEK DNERSION. (ATT. 2) 3. OTHER. Present: Absent: Also present: WATER & SEWER BOARD MINUTES MARCH 10, 2015 Wiggins, Penn, Oakley, Habenicht, Waggoner, Moore, Burns Gillit, Olson, Lay Stewart Fonda, Director of Utilities Tom Brennan , Utilities Engineer IV John Bock, Manager of Administration The meeting was called to order at 5:00 p.m. ~ 1. MINUTES OF THE FEBRUARY 10, 2015 MEETING & FEBRUARY 12 PHOt\TE VOTE. The Board received the Minutes of the February 10, 2015 Water & Sewer Board meeting and the Minutes of the February 12, 2015 phone vote. ~ 2. ERIC VAN METER& DOUGLAS McDONALD of McDONALD ENTERPRISES-REIMBURSEMENT. Eric Van Meter and Douglas McDonald appeared before the Board to request reimbursement of $31,879.67 from an overpayment due to buildings that were demolished: McDonald Enterprises had been continuously paying sewer cycle bills for 4 non-existing addresses since 2007. John Bock has noted that approximately $13,000 of this amount cannot be reimbursed because it is the maintenance fee that was collected by the City and remitted to South Englewood Sanitation District. McDonald Enterprises will have to contact South Englewood Sanitation District to request a refund for that portion. I -J Motion: Moved: To approve reimbursement to McDonald Enterprises in the amount of $31,879.67, less approximately $13,000 remitted to South Englewood Sanitation District. Burns Seconded: Habenicht The vote was unanimous. Motion carried. ~ 3. NOTICE OF SEWER SERVICE DISCONNECTION NOTICE FROM CITY OF SHERIDAN FOR 2000 & 1920 W. QUINCY AVE. AND 4345 & 4343 S. SANTA FE DR. The Board received a notice from Randy Mourning, City of Sheridan Supt., regarding a disconnection notice to the above properties because of a violation of the Englewood Municipal Code 12-2-4 which prohibits properties from sharing sewer service connections. The property owners have paid all past due fees, fines and tap fees, but have not constructed the required private service lines. Randy Mourning will keep Englewood apprised of any developments. )flJ 4. CHERRY Hli.LS Vli.LAGE RESIDENTIAL FIRE SPRINKLER SYSTEMS. The Board received a memo from Tom Brennan dated March 2, 2015 discussing Cherry Hills Village adopting the International Building Code 2012 for residential fire sprinkler systems. This code states any new residential construction over 2,500 sq. ft. in Cherry Hills Village will require a fire sprinkler system. Englewood serves water to approximately 100 residences in Cherry Hills Village that border Englewood. Staff recommend the City of Englewood adopt the three options shown in Denver Water's detail drawing for domestic residential sprinkler services. One of the options can only be used if the property has an existing service line that will not be upgraded. Utilities staff recommended approval as a policy. Motion: To adopt the three options shown in Denver Water's detail drawing for the provision of residential sprinkler systems in the City of Cherry Hills Village. J-2 Moved: Habenicht Seconded: Penn Motion passed unanimously. ~ 5. TWENTY YEAR CAPITAL IMPROVEMENT PROJECTION. Stu discussed the Utilities Department's twenty-year capital improvement projection. ~ 6. CITY OF ENGLEWOOD NEW BRMTD IDENTITY. The Board received a memo from the City Manager's office requesting board and commission input for developing a new brand identity for the City of Englewood. Updates will be available on the City website. The meeting adjourned at 5:20 p.m. The next meeting will be held Tuesday, April 14, 2015 at 5:00 p.m. in the Community Development Conference Room. Respectfully submitted, Cathy Burrage Recording Secretary I -3 COUNCIL COMMUNICATION Date Agenda Item Subject June 1, 2015 B ig Dry Creek Diversion INITIATED BY Utilities Department STAFF SOURCE Stewart Fonda , Director of Util ities COUNCIL GOAL AND PREVIOUS COUNCIL ACTION None RECOMMENDED ACTION The Englewood Water and Sewer Board , at their April 14 , 2015 meeting , recommended Council approval , by Ord inance , of the contract w ith Mclaughlin Whitewater Design Group. BACKGROUND, ANALYSIS, AND ALTERNATIVES IDENTIFIED Big Dry Creek discharges into the S. Platte River about 300 yards above the wate r intake at the Union Ave . Pump Station . The Big Dry Creek project would give the option of allowing water to bypass the intake structure. This bypass would alleviate hardness issues during low flow periods in the river. A structure for this purpose had existed but was destroyed during the 1965 flood. The proposed contract authorizes Mclaughlin Whitewater Design Group to perform Alternative Analysis, Preliminary Des ign and Spec ial Services. The Special Services include base mapping and support during the preliminary permitting process with the U .S . Army Corp of Engineers. FINANCIAL IMPACT The contract amount is $78 ,435 .00. The full contract amount will be funded from the $600 ,000 received from the Denver Water Boa rd Settlement. The settlement st ipulates that the funds be dedicated to alleviating water hardness at the Allen Water Treatment Plant. LIST OF ATTACHMENTS Ordinance Mclaughlin Whitewater Des ign Group Contract Big Dry Cree k Dive rsion 2015 z -I ·L~~~h,li~ ~h~t:'':"'~tper A DIV IS I O N OF M ERRIC K & CO M PAN Y March 30, 2015 Tom Brennan, P.E. City of Englewood Utilities Department 1000 Englewood Parkway Englewood, CO 80110 RE: Professional Services Proposal Big Dry Creek Diversion Replacement -Englewood Colorado Dear Mr. Brennan: Mclaughlin Whitewater Design Group (MWDG}, a Division of Merrick & Company, is submitting this scope of work and budget to complete professional services for the above referenced project . The work will include Alternatives Analysis, Preliminary Design and Special Services. MWDG is proposing to team with ERO (permitti ng} and Aztec Survey (mapping}. BACKGROUND A major flood in 1965 caused w ide-spread damage along the South Platte River. Englewood 's diversion structure at the confluence of Big Dry Creek and South Platte River was destroyed . MWDG met with you and Dave Coffman on site on February 10t h to discuss the replacement of the diversion. Project purpose and objectives discussed: • Purpose: Improve raw water quality at Englewood's primary drinking water intake on the South Platte River at Union Avenue. Water quality, particularly Hardness, in Big Dry Creek is poor creating treatment issues. • Objective: Divert flows from Big Dry Creek (approximately 5 cfs} year-round and discharge below primary drinking water intake at Union Avenue . Additional items discussed included: • The City has contact the USACE regarding CWA 404 permitting. The USACE indicated that a permit will likely be required and suggested the City work with a permitting specialist . • Flood Conveyance -FEMA Flood Hazard Zones have been mapped on Big Dry Creek. MWDG anticipates that the proposed project will need to meet "no-rise" criteria. MeLoughlin Whitewater Design Group. 2420 Alc ott St re e t. De nv er. CO 802 11 T 303 .964.3333 F 303 .964 .3355 R.l.'>!arketing\2015 FY Proposals\B igDryC reekDiversion\MWDG_BigDryCreekDi version_ProfServ_REVI doc 2 -z. • Urban Dr a inage and Flood Control District has completed a master p lan for Big Dry Creek includ i ng bank and channel stabilization. MWDG suggests that UDFCD be approached for possible partnering and integration of master plan improvements with diversion work. • Hardness not from an iden tified po i nt source -likely from soil exfiltration throughout basin and urbani zation. • There are no water users b etween the confluence and proposed d ischa rge locatio n besides Eng lewood . SCOPE Professional services scope of work has been divided into Special Services and Preliminary Design. Special Services Task 1: Permitting Support MWDG and design team {ERO) will provide the City support during the preliminary permitting process for the following permits during this phase of work: • CWA Section 404 -MWDG will support ERO's {subconsultant to MWDG) 404 permitting effort by providing project information, such as narratives of project purpose and improvements, sketches, and assistance with in itial consult with USACE. Initial meetings will be held with the USACE. A permitting strategy will be developed based on information gathered and consult with USACE. Final permitting including formal applications would be completed in a future phase {Final Design). Specific tasks that will be completed for CWA permitting are as follows: o Wetland Delineation o Endangered Species Act Compliance o Meetings with Regulators o Prepare Pre-construction Notification to the USACE o Prepare Hydrologic Depletions Analysis o Project Coordination • Floodplain -MWDG will coordinate with the City's Floodplain administrator Allen White to determine required permitting and analysis. Refer to Attachment C for the detai led permitting tasks and del iverables for the CWA 404 perm it {ERO 's scope). Deliverables : 1. Coordinate, prepare for, and attend one meeting with USA CE w/ meeting notes. 2-3 2. Support Documents 404 Permits (for ERO) -project descriptions, write-ups, sketches, assistance with initial consult with USACE 3. See Attachment Cfor additional CWA 404 deliverables . 4. Coordinate, prepare for, and attend one meeting with Englewood Floodplain Administrator w/ meeting notes. Task 2: Stakeholder/Owner Engagement It appears there are three primary Owners/Stakeholders in the project area -South Suburban Parks and Recreation District (trail/bridge at Big Dry Creek), Colorado Water Conservation Board (River Owner), and Urban Drainage and Flood Control District MWDG would coordinate and attend three meetings with these entities to present the proposed project. Meeting objectives would include identifying partnering opportunities, ownership/easements, and any project requirements. Deliverables: 1. Attendance at three {3} Stakeholder/Owner meetings. 2. Meeting materials (e.g. Power Point presentations, sketch/drawings) 3. Meeting notes Task 3: Base Mapping MWDG will complete topographic and bathymetric survey for the creek bottom, banks, and top of banks from the confluence with South Platte River to east side of Sante Fe Boulevard. Detailed ground survey will be conducted in diversion area. Cross sections at approximately 200 foot intervals will be surveyed along the creek upstream of the project area for flood and hydraulic analysis. MWDG completed survey work as part of the River Run Park project. Mapping from that project will be combined with new mapping for a complete base map for the project. Control points will be set . A private utility locate service will be h i red to "paint" existing utilities for survey. Englewood to provide MWDG any available utility information in the project area. Potholing of utilities will be completed by the City as needed based on preferred alternative. Property ownership and easement research will be conducted by a title search with limited field survey work to delineate approximate property lines and easements for design purposes . In areas where research indicates property lines are close to improvements or construction access will be needed additional field work may be added by the City to more accurately locate property lines. Easements and property lines will be added to base mapping. Deliverables: -Site Base Map w/ Property Lines & Easements (approximate) 2 -'-/ Preliminary Design Phase Two concept alternatives will be developed for the diversion and conveyance systems. Preliminary design will be completed for the City selected alternative . The following tasks will be completed for this phase Task 4: Coordination Meetings Conduct meetings with City of Englewood during preliminary design phase for coordination and review. Meetings will focus on project requirements, operations, proposed designs, utility conflicts, permitting and approval processes . Deliverables : 1. Conduct three {3} meetings 2. Meeting Agendas & Minutes Task 5: Flood Analysis The project requires a flood submittal and analyses. Proposed improvements that could affect flood conveyance including diversion and intake structure will be analyzed . One dimensional hydraulic modeling will be performed using HEC-RAS software. A Flood Insurance Study has been completed by FEMA along Big Dry Creek. It is assumed that the City has the Effective FEMA HEC-RAS model in electronic form and that no significant changes within the reach have been made since the effective date (i.e. Existing and Corrected Effective Models are the same). MWDG will perform the flood analysis using this model. Deliverables: 1. Flood Analysis including a no -rise certification per FEMA requirements . A CLOMR or LOMR is not included. Task 6: Diversion Hydraulic Analysis The hydraulic analysis will entail closed conduit hydraulics of the diversion piping, analysis of the intake and bar rack. This will establish the required control section elevations. The low-flow hydraulics of the main channel structure including low flow notch and control section will then be conducted. Deliverables: 1 . None (analysis summary and results included in Task 8} Task 7: Alternative Concepts It is anticipated that the general layout and alignment of the drop structure and pipeline will present no significant alternates or options. These will be developed to a schematic z -S level in this Task to support the development/selection of the intake design. Two alternatives are anticipated for the intake -a side spill with fixed crest control and an intake with an inline gate or adjustable cres t control. Deliverables: Concept Drawings (Hardcopies {3}, Electronic files (PDFs)) -Total Estimated Sheets:~ -Diversion & Intake Plans: 2 -Plan & Profiles: 1 Task 8: Preliminary Design The alternative selected by the City will be further developed to a preliminary design level. The designs will integrate with improvements currently being planned along this reach by MWDG. The drawings will be created in AutoCAD using MWDG's standard format. A technical memorandum will be written and include the basis of design, recommendations for final design, and an opinion of probable cost . Deliverables: 1. Preliminary Drawings {Hardcopies (3), Electronic files (PDFs}) -Total Estimated Sheets:~ -Diversion & Intake Plan: 1 -Plan & Profile: 1 -Detail Sheets: 1 2 . Engineer's Opinion of Probable Costs 3. Technical Design Memorandum PROJECT TEAM MWDG (Prime) Key Staff • Rick Mclaughlin, PE -Senior Project Manager • Ben Nielsen, PE -Project Engineer/Project Manager Sub-Consultants • ERO -Permitting • Aztec Survey -Base Mapping Changes in key staff or sub-consultants will be approved by the City. ASSUMPTIONS 1 . Drawings 22" x 34" MWDG standards. 2 . No public or agency meetings (other than those outlined above) are required. 2 -(; 3. Preliminary Design will be accepted by the USACE Flood Readiness Branch without significant changes to proposed improvements. 4. Permit application and fees are not included . 5. FEMA CLOMR not required. 6. All deliverable drawings in AutoCAD format. 7. Legal boundary survey is not required. METHOD OF PAYMENT Services will be billed on an hourly rate plus expenses basis, not to exceed the maximum budget {unless authorized by City). Effort is estimated as shown on the attached Project Budget Worksheet. The budget for preliminary design services is $48,135. Special Services will be billed as hourly rate plus expenses . The amount of time required to provide these services is difficult to predict and is dependent on work requested by the City and other factors outside the control of the Design Team. A budget of $30,300 has been included and will not be exceeded without previous written authorization by City. The total budget of preliminary design and special services is $78,435. SCHEDULE MWDG will make reasonable efforts to perform the scope of work with expedience to meet the following schedule: • March 15, 2015 -Notice to Proceed • April 15, 2015 -Mapping Completed • June 15, 2015 -Concept Alternatives Completed • August 15, 2015 -Preliminary Design Completed Schedule shown is preliminary. City and MWDG will establish mutually agreed upon project schedule once contract is approved by the Water and Sewer Board and City Council. ATIACHMENTS The following attachments are made part of this proposal Attachment A Project Budget Worksheet Attachment B Schedule of Standard Hourly Billing Rates Attachment C Subconsultant Proposals 2.. -7 Please feel free to contact us at (303) 964-3333 if you have any questions or if you would like to discuss this proposal further. We look forward to working with the City toward a successful project. Very truly yours, Mclaughlin Whitewater Design Group, a Division of Merrick & Company Richard Mclaughlin, P.E. Senior Project Manager Benjamin Nielsen, P.E. Project Engineer z -8 Attachment A -PROJECT BUDGET WORKSHEET 2 -9 Attachment A .L';?~~h1 1i~ ~h!t~~<;;1t~r Project Budget Worksheet -ESTIMATED HOURS AZTEC McLaughlin Whitewater Design Group ERO SURVEY E><t•nd•d Subtotal Senior Project Design Sen ior Expenses com pony Task Cost P.M. Engineer Engineer CADD Tech Clerical total Tasks $175 $135 $90 $110 $75 14'Y. 39 .0 17-4.0 188 .0 92 .0 4 .0 $0 $57,655 $7,500 $13 ,280 $78,435 $78,435 1 Special Services -Permitting Support $12,115 1.01 404 & 401 I 8 $1 .255 $6,500 $7,755 1.02 Floodplain & UDFCD I 4 $715 $1,000 $1 ,715 1.03 Meetings -2 -USACE & Floodplain Admln 8 $1 .080 $1.080 2 Special Services -Stakeholder/Owner Engagement 2.01 Prepare and ottend three (3) meetings 2 9 $1 ,565 $1,565 3 Special Services -Base Mapping $13 ,280 $13,280 $18,185 3 .01 Complete Topographic ond Bothyemetrlc Survey 4 $540 $540 3 .02 Property ownership and easement research 2 2 $450 $450 N 3.03 Utility Locates 2 6 $810 $810 3.04 Develop Bose mops in AutoCAD 3 4 8 12 $3 .105 $3 ,105 ....... ~ 4 Prellmlnory Design Phase -Coordination Meetings $1,565 4 .01 Conduct three (3) meetings 2 9 $1 .565 $1,565 5 Flood Analysis $10,060 5 .01 Run Duplicative Effective Model 2 2 $450 $450 5 .02 Corrected Effective Model -Assume no changes 5 .03 Existing Conditions Model 2 8 $990 $990 5.04 Proposed Cond itions Model 2 8 32 $4,310 $4,310 5 .05 No-Rise Certificate & Report 2 24 8 $4,310 $4,310 6 Diversion Hydraulic Analysis $3,400 6 .01 Closed Conduit Hydraulics 1 2 4 $805 $805 6 .02 Intake & Grote Hydraulics 2 2 8 $1.340 $1,340 6 .03 Channel Control Hydraulics 1 4 6 $1 ,255 $1 ,255 7 Alternative Concepts $14,875 7 .01 Intake Options 4 8 16 $3,220 $3,220 7 .02 Pipe Ii ne Layout 1 6 12 $2 .065 $2 ,065 7 .03 Drop Structure Schematic layout 2 4 6 $1,430 $1,430 7 .04 Initial Costinq 2 4 8 $1 .610 $1,610 7 .05 Drawings -3 sheets 2 8 8 40 $6,550 $6,550 8 Prellmin ory Design of Selected Alternative $18,235 6.0 \ ~re\\mirory Des ign of the Drop Structure 2 B 16 $2,870 $2,870 project budget worksheet 1of2 3/412015 NJ PM Attachment A .L?\l~h1 1i~ ';'Vh!t~~'?t~r Project Budget Worksheet ESTIMATED HOURS AZTEC N Mclaughlin Whitewater Design Group ERO SURVEY E>chnded Subtotal Senior Project Design Senior Expenses company Task Cost -P.M. Engineer Engineer CADD Tech Clerical total -Tasks $175 $135 $90 $110 $75 7~'7 .. 39.0 174 .0 188.0 92 .0 4 .0 $0 $57,655 $7,500 $13,280 $78,435 $78,435 8 .02 Preliminary Design of Pipeline and Outlet 1 8 8 $1,975 $1,975 8 .03 Preliminary Design of Selected Intake 2 12 10 $2,870 $2 ,870 8 .04 Drawings -3 sheets 2 8 8 40 $6,550 $6,550 8.05 Statement of Probable Cost 2 6 8 $1 ,880 $1,880 8 .06 Technical Design Memorandum 2 8 4 4 $2.090 $2,090 project buctoet worksheet 2 of 2 3/ .. /2015 1 : .. 3 PM .· Attachment B -Schedule of Standard Hourly Billing Rates Personnel Work Cf ass PROJECT MANAGEMENT: Senior Project Manager Project Manager PROJECT ENGINEERING: Senior Project Engineer Project Engineer Senior Design Engineer Design Engineer FIELD ENGINEERING I CONSTRUCTION INSPECTION: Senior Field Engineer Field Engineer Cost Estimator Senior Inspector Inspector LANDSCAPE ARCHITECT: Senior Landscape Arch it ect Landscape Architect DRAFTING: Senior GADD Technician GADD Technician ADMINISTRATION: Clerical Per hr. $175.00 $150.00 $155.00 $135 .00 $110.00 $90.00 $145 .00 $125.00 $110 .00 $115.00 $90.00 $125 .00 $110.00 $110.00 $80 .00 $75 .00 Rates will be negotiated for personnel with qualifications not identified in the above schedule. Monthly rates can be furnished for full-time Inspectors. BILLABLE EXPENSES: Subconsultant Courier Travel Printing/Reproduction Communications Equipment GPS System Vehicle Mileage Other Materials or Equipment Cost plus 5% Cost Cost Cost Cost $100.00/unit/day Current Allowable IRS Rate Cost plus 5% This Schedule of Standard Hourly Billing Rates is considered to be "CONFIDENTIAL " information. Release of any information contained herein to third parties is prohibited without written consent from Merrick & Company. The above billing rates will be held firm through December 31, 2015. z -12 Attachment C-SUBCONSULTANT PROPOSALS 2 -13 ERO RESOURCES CORPOR.\TW:X'S PROPOSED SCOPE OF WORK BIG DRY CREEKDIHRSIO:'\ SECTIO:'\ 40.t PER\IITIEG FEBRUARY 23, 2015 i\icLaughlin \\1J.itewater Design Group (Client), on behalf of the City of Englewood (City) requested that ERO Resources Corporation (ERO) prepare a scope of services to perfonn ecological services for a proposed diversion of Big Dry Creek at the confluence \vith the South Platte River in Englewood, Colorado. The proposed project will require impacts to wetlands and other waters of the U.S along Big Dry Creek. Based on preliminary project information, it is likely Section 404 of the Clean Water Act authorization from the U.S. Army Corps of Engineers (Corps) is required. ERO will perfom1 the following tasks to assist the Client with Section 404 pem1itting. Task 1: Wetland Delineation ERO Resources will evaluate the overlook project area for wetlands or other potential waters of the U.S. Areas \\·ith wetland indicator species will be investigated for soil and hydrologic indicators . Wetlands will be delineated following the methods in the revised online version of Corps· Wetland Delineation Manual (1987) and appropriate regional supplement. Open water and channels will be dctemiined based on the presence of an ordinary high water mark as defined in 33 CFR Part 328. The boundaries of wetlands, open water, and channels will be mapped to sub-meter accuracy by ERO using a Global Positioning System (GPS). or, when appropriate, boundaries will be mapped onto an appropriately-scaled aerial photograph . ERO will incorporate the wetland boundaries into project base mapping provided by the Client and will send the Client a revised base mapping file that includes a layer with the boundaries of wetlands, open water, and channels. Prod11cts Digital file showing wetland boundaries 2 -I'-/ ERO REsOL"RCES CORPORATIO:s·s PROPOSED ScOPE OF \\'ORK BIG DRY CREEK DIYERSIOX SECTIO'-: 4~ PER.\!!ITIXG \\'etland ddineation map Completed routine wetland determination fom1s Asmmpions Performing the del ineation is weather depend ent. The ground must be free of snow, and in most instances , the soil s must be unfrozen to collect the needed soi l data Thi s Scope of\York includes d elineating wetlands within the project area originally given . A new scope of work will be provided if the project area is modified. The Client will arrange access t o th e property Task 2. Endangered Species Act Compliance A qualified ERO ecologist will conduct a habitat assessment for species listed as tlm:atened or endangered under the Endangered Species Act. Based on current knowled ge of the area, ERO assumes th at n o threatened or endangered species habitat will be present. If no habitat for threatened or endangered species is found , ERO will submit a habitat assessment ktter to the U.S Fi sh and \Yildlife Service (Service) for it s review and apprornl. ProduCIS Draft and final habitat assessment letter delivered to the project team vi a ernai !; one bard copy m aile d to the Service Assr1mpio11s l\o threatened or endan gere d species habitat is pre sent and fomial consultation with the Service is not required . If fonnal consultation is necess ary, ERO will prepare a new scope of work. Th e Client will arrange access t o the property Task 3. Meetings '\Tith Regulators ERO will arrange a preapplication meeting with the Corp s, Environmental Protecti on Agency (EPA), Sen-ice, other intereste d regulatory agencies, and the project team t o re.,iew project goals, sik constraints, prdiminary design, and potential unavoidable in1pacts on waters of the U.S. Proditds • Memo summarizing items di scusse d during the agency meeting . . - z -JS' A.m unpti.o11s ERO REsorncrs CORPORATIO:-;'s PROPOSED ScOPE OF WORK Bra DR y CREEK DIVERSION S ECTION 40-l PE!L\!JTID:G • One meeting will be conducted with the agencies and project team. Task 4. Prepare Pre-construction Notification If jurisdictio nal wetlands or other waters of the U.S. are found in the project area , and it is dekmuned they \>ill be impacted by the propose d project ERO will prepare a pre- constmction notification (PC1\) as part oftbe r.:quest for authorization under one or m ore nationwide pennits. The PC!\" will include a summary of the wetland delineation, threatened and endangered species inform:ition, and inform:ition on grading and stmctures provided by the Client ERO will coordinate with the Clie11t on wh:it other infom1ation ERO require s for the submittal to the Corps. Typical information includes plan and profile views, cross sections, figures showing and quantifying impacts to jurisdictional are as, quantities of fill material below the ordinary high water mark, details, backgrolllld information on other approval requirements (e .g., those of the Federal Emergency Management Agency). and a d is cuss ion of the purpose of, and m~ed for, the project. T)pically, if we tland impacts are le ss than 0 .1 acre , compensatory ntitigation would not be required fo r the Corps. Produds: Draft PCK submitt ed to Clie nt forre>iew Final PCK submittal to the Corp s Assumptions • The proposed project will be authorized under a 1\"ationwide Perm it . • If the Corps detennines that an Individual 404 Permit Application is necessary, ERO will prepare a new scope of services . • If it is ddermined the project can be authorized under the Urban Drainage and Flood Control District Regional General Permit, the cost will increase by Sl,000 .00. • Compen satory \vetland mitigation will not be required If wetland mitigation is required, a new scope of work "·ill be prepared for a5si stance with a wetland mitigati on plan. z -/(p ERO REsoCRCES CORPORATIO~·s PROPOSED ScOPE OF \VoRK Bro DRY CR.EEK DrvER.5rox SECITOX 4 0.J J'ER.\llTf!XG Task 5. Prepare Hydro logic Depletions Analysis Tue prop osed project w ould like ly re sult in depletions t o the South Platte Rin~r between the intake and outfall stmcture, and therefore the Corps may require a hydrologic analysis of the portion of the South Platte River that would be affected by the diwrsiou . Thi s include s providing information on existing aquatic re sources pokntially affected by the project and the potential effects on the se resources . Resources that \Yould need evaluation include flows , \Yater quality, aquatic life , and \Vetland and riparian habitat. Products • Hydro logic analysis to be in cluded with the Section 404 of the CW A permit application . Assumptions • TI1e analysi s would be based on information available from the City, Client, or other resources and that additional infom1ation would not be required. If additional research is n:qulred, ERO will prepare a new scope of work. Task 6. P r oje ct Coordination ERO will ensure all document<; and figures are reviewed for technical and editorial accuracy. Thi s task also includes items associated \Vith project coordination such as team communication, project manage meut, and quality a<;surance . ERO will attend up to two meetings \Yith the project team to di scuss the project status. Esti mated Costs Tasks 1 through 6 will be compktcd on a time-and-material s basis for a cost estimated to be $6,500.00, including expenses billed at cost plu s 3% (see below for breakout). Task 1. Task2 . Task 3. Task4. Task 5. Task3 . Wetland Delineation Eodang.m:d Species Act Compliance Meetings with Regulators Prepare Pre-Construction Kotification Prepare Hydrologic Analysis Project Coordination Total including expenses 2 -1 7 $1 ,000 .00 $500.00 $500.00 $2,500 .00 Sl,500.00 $500.00 S6,500.00 A AZTEC ~CONSULTANTS, ]NC. Benjamin A Nielsen , P.E Merri9k/Mclaughlin Whitewater Design Group 2420 Aicatt Street Denver, CO 80211 Re : Proposal to Provide Surveying Services for Big Dry Cre.ek Diversion -Design Survey Engfe'NOOd , Colorado Ben : Feb ruary 18, 2015 Aztec Consultants, inc. is pleased to submit this proposal to provide surveying serJices for the ~!9 r?..rr Cre~k Diverslo~n Project located in ~n,gl~mod, Colorado . The foOowing outlines our Scope of Services, Fee and Schedule. Scope of Services 1. Control Survey • EStcfufiSh liofizontal and vertical survey control for the site based on AutoCAD fifes pfop~i:e~ b,Y ~-cri.ent to ,provi.9,e: ~h.e ~~6CAD '.fl!is.~9:,taj~Lng point tabulation f?r !Yin9 ~QJ9 ~~1~ng t:~~_tr_~ p9.im_~· V~rti~a1 __ D~t~m Wijf ~~ t~N£D~~'- • Set '4 control points on srte ·rn locations not hkefy to be disturbea aunng any cO-nsuUCOO'n . • Pi:eP.a_f.e "!3 Survey C~ntrol Pla_n illustr~ting primary and site eqr:itrol points alor:ig ~th coorainate and elevation tabulation, basis of bearings and veftictll benchmark with datum. 2. Design Survey • Fieid survey to ·locate improvements, ground features, trees and litilitie.s within the ~JITY.~Y l_irllits; Th~. ~u.r'/~Y limit? are 6U:tJ_ineEf in reE oh t2e ~t:taqi~9 ~~)'.(Hl.E~.ri: A". • °1htf~9t. Wl!b a ut!ll1Y !<2~tiJJ9 ~Ofi1P.?DY Jo h~ye ~h~ ut!_~~g"t,s>~.@ .... li![JJP}§ ~m_?_rked within the i:nappif!g limits. ;A.JI ~9"Yl1 utirrties that are caP~~I~ of ~Electronic QE?§ign¥,on· ~rJ _be J~!ed : Qti_!iti.e~.fnu}fh~ve a "if~~~~Je" lfne :!1 q~a~fto .pe C!eemeo ~Lbcatabfe", 'Any utilitie5 Without a "Traceable"Jine canhbt be located. • Field survey of fhe utility markings ancf add the data to the fopqgraphic 'base map. • As-built survey of any sanitary and storm structures, manholes 'and inverts servicing tJ:i~§ite ana .aa9 tjie d1~ta!o-~¢1p}5Q9r<!phic ba:S? ·map . • su·ryey Yfci!er surf~~-level_ ~t cre_e~ !Jew ~urir;g su'Y.~. • Survey pedeStrian bncjge deck and low chord elevations. • Provide a 'fina·I topog raphic base map in AutoCAD ~ormat containing planimetrics, points, utilities, 1' &fritoi.frs ana DTM . J.t :\BO..""OSAL \PR_.U 001-11400\:?r_u129.doc Sooo S . Llncoln Stree t • Sr.ite 201 • Llttleton, CO Sou2 • Main (303) 713-1898 • Fax (303) 713-1897 2. -I 8 B~njamin A 1\idsen 21J7f20 15 3. Cross Section Survey • Field survey to collect cross sect ions of t he 8 sections in red o n the att ached "EXHIBIT A ". • Survey 2 FEMA flood cross sections . Locat ions to be determined later . • Grade breaks, tops, toes of slopes , banks of creek, flow line of creek , improvements will be captured along each cross section. • Add the cross section data to the topographic base map . 4. ROW /Ownership Map • Research Arapahoe Count y records to obtain subdivision plats , Land Survey Plats and deeds relevant to the area . • Perform a field survey to locate sectio n comers and property corners controlling the ROW lines and parcel boundaries of the areas inside and adjacent to the port ion outlined In red on the attached "EXHIBIT A ". There are 7 parcels affected . • Resolve any discrepancies between field measured data and record data . • Provide a final map with parcel boundaries and ROW lines and ownership information. • Obtain 7 t itle commitments (at $450 each) to provide the vesting deeds of the 7 subject parcels and to identify and plot existing easements and encumbrances of record . • Add all ownership and easement data to the AutoCAD base map . Fee The Client agrees to pay AzTec Consultants compensation for services performed on a fixed fee basis , except as noted . The fees quoted herein will be used as a guide in determining the percentage of work completed by AzTec, where applicable . Progress billings will be made towards the end of each month for services performed during that period . All bills are due and payable upon receipt of invoice . 1. Control Survey ..................................................................... Lump Sum Fee: $1 ,080 2. Design S_uryey ..................................................................... Lump Sum Fee: $3,200 3. cr·oss Section Survey ......................................................... Lump Surri Fee: $2, 100 4. ROW/Ownership Map .......................................................... Lump sum Fee: $6,900 Total Lump Sum Fee: $13.280 Schedule The Scope of Services for Tasks 1-3 will be completed within Three (3) weeks from the date that Written Notice to Proceed is received . Schedule for Task 4 will be dependent upon the title company 's timeliness in provid ing the title commitments . 1\1: \PROPOSAL \PR_11001-11400\Pr_11129 .doc 2 -/ 9 BenjaminA. Nielsen 2/I 7i2015 General Terms It is understood and ag reed between the parties tha t t he total fee as described he rein is for the scope of services as set forth herein . If unforeseen field conditions exist, aS:Surnptions o.f th is proposal a re not met or addition al services are requested by Merrick/McLaughlin Whitewater Design Group, (Cl ient), the scope of the add itional ser\rices and a lump sum fee will be determined and a change order will be prepared and sent to Cl ient describing the scope and fees cl the addltionaf servites requested . Work on the additional services will not commence until written authorization to proceed is received via standard mail, facsimi le or e -ma il. We look forward to being a part of your team for this project. Please call if you have any questions. S incerely, AzTec Consultants, Inc. Dale C . Rush PLS Vice President Approved and accepted this ____ day of ________ , 2015, by (Signature) ~-----------~for _____________ _ (Title) (Client name) M:\P3.0?0SAL \:?:l._UOOl-l.l.tOO\Pr_11u9 .dcc z-zo Benjamin A. Nielsen 21171io'i5 EXHIBIT "A" SURVEY LIMITS & CROSS SECTION LOCATIONS M:\P:lOPOSAL\P:t_11001-11400\Pr_11129.doc 2. -:Z./